QUALITY MANAGEMENT SYSTEM

Document Title:

STRUCTURAL STEEL WORKS


Ref#.: GAS-ALF-C-IT-011 Date: 26/01/2020
(ITP)

INSPECTION AND TEST PLAN(ITP) PRINT NAME SIGNATURE Ref. GAS-ALF-C-IT-011-RO


STRUCTURAL STEEL WORKS Prepared by Furqan Khattak No:
Approved by Mr. Rafique
Approved by Client
Discipline CIVIL PROJECT GASCO PM-211 Date 26-01-2020
Location PM-211 CLIENT GASCO

Item Project Phase & Activity Reference Acceptance Refer Criteria INSPECTION POINTS REMARKS
No: Activity Code Documents
ALF TPI MM GAS

1.0 DOCUMENT REVIEW


1.1 Review Of Procedures, GAS-ALF-C-SA-005- IFC Drawings RH/ NA RH/ S Contractor “RH” For
MOS and Procedure of Sec 7 BS4190 H H Documents Review, “H” For
Welding works IFC Drawings ASTM A325, A490 Material Sampling &
GAS-ALF-C-MS-010 AISC Testing.
GAS-ALF-C-SA-007
2.0 MATERIAL RECEIVING
2.1 Material Receiving GAS-ALF-C-SA-005, IFC Drawings H NA H S Hold Point “H” for “MM” for
Inspection of Structural Sec 7 BS4190 Delivery of the First Batch,
Steel, Shapes & Plates, Alfanar Quality ASTM A325, A490 “W” for the delivery of the
Anchor Bolts, Washers, Procedure AISC rest of batches. “ H” hold
Nuts QP 9.1.0 point for Contractor.
3.0 INSTALLATION
3.1 Installation of the GAS-ALF-C-SA- IFC Drawings, GAS-ALF-C- H H H S Hold Point Inspection for
Anchor Bolts prior 005,Sec 7.1 SA-006 “MM”.
Concrete/ Grouting GAS-ALF-C-SA-007 GAS-ALF-C-CL-003
QUALITY MANAGEMENT SYSTEM
Document Title:

STRUCTURAL STEEL WORKS


Ref#.: GAS-ALF-C-IT-011 Date: 26/01/2020
(ITP)
3.2 Inspection of Erection GAS-ALF-C-MS- ASTM A325 W NA H S Hold “H” point Inspection
of the Steel/ Alignment 010, Sec 6.2 ASTM A490 for “MM” and Witness for
GAS-ALF-C-SA-005, GAS-ALF-C-CL-009 “ALF”.
Sec 07

3.3 Inspection of GAS-ALF-C-MS- ASTM A325 H NA H S Hold “H” point Inspection


Tightening of Bolts 010, Sec 6.2 ASTM A490 for “MM” and “H” for
GAS-ALF-C-SA-005, GAS-ALF-C-CL-009 “ALF”.
Sec 07

4.0 PRE-COMMISIONING
NA
LEGENDS:

R-Review of the documents

S-Surveillance- With or without notification Inspection Will be carried out at Site.

W-Witness Inspection/Tests-Subsequent activities/Inspections may proceed if the Inspection will not be performed on Scheduled Time.

H-Hold point for QC Inspection or Test- Approval/Confirmation may be required prior proceeding further process.

N/A- Not applicable- May not be required for Inspection

ALF- Alfanar Main Contractor, TPI-Third Party Inspection

MM-Mott MacDonald, GAS- Gasco