WI-FA-03 ESP Hopper Aeration Air Blower&heater
WI-FA-03 ESP Hopper Aeration Air Blower&heater
WI-FA-03 ESP Hopper Aeration Air Blower&heater
Revision
KPJB-0954-03-WI-FA-03
0.0
Work Instruction
ESP HOPPER AERATION AIR Division Operation (Galih Atcup H)
BLOWER&HEATER Date December 2013
1. PURPOSE
a. To prepare ESP aeration blower and heater before start-up
b. To preserve ESP aeration blower and heater after shutdown
.
2. SAFETY AND ENVIRONMENTAL ISSUES
General PPE (Personal Protective Equipment) follows the “List of PPE” as previously described in this
book.
3. PROCEDURE
ESP Hopper Aeration
Procedure
Air Blower&Heater
Start Permissives The ESP hopper aeration air blower A (0FAD-F801A) start permissives shall
include the following:
1. ESP hopper aeration air blower A plug-in is not Take Out (TO)
2. ESP hopper aeration air blower A start command;
3. ESP hopper aeration air blower A start outlet valve open or ESP hopper
aeration air blower B outlet valve no.1 and ESP hopper aeration air
blower B outlet valve no.2 open;
The ESP hopper aeration air blower B (0FAD-F801 B) start permissives shall
include the following:
1. ESP hopper aeration air blower B plug-in not available is not Take Out
(TO)
2. ESP hopper aeration air blower B start command;
3. ESP hopper aeration air blower B outlet valve no.1 or ESP hopper
aeration air blower B outlet valve no.2 open;
The ESP hopper aeration air blower C (0FAD-F801 C) start permissives shall
include the following:
1. ESP hopper aeration air blower C plug-in not available is not touch off;
2. ESP hopper aeration air blower C start command;
3. ESP hopper aeration air blower C start outlet valve open or ESP hopper
aeration air blower B outlet valve no.1 and ESP hopper aeration air
TJB 3&4 Work Instruction.
KPJB-0954-03-WI-FA-03_ ESP Hopper Aeration Blower and Heater Start Up Shutdown 1/4
TJB #3&4 Number
Revision
KPJB-0954-03-WI-FA-03
0.0
Work Instruction
ESP HOPPER AERATION AIR Division Operation (Galih Atcup H)
BLOWER&HEATER Date December 2013
Revision
KPJB-0954-03-WI-FA-03
0.0
Work Instruction
ESP HOPPER AERATION AIR Division Operation (Galih Atcup H)
BLOWER&HEATER Date December 2013
1. ESP hopper aeration air blower B outlet valve no.2 open, air blower B
outlet valve no.1 and air blower C outlet valve close;
2. ESP hopper aeration air blower B start running;
3. Hopper electric heater B start.
Revision
KPJB-0954-03-WI-FA-03
0.0
Work Instruction
ESP HOPPER AERATION AIR Division Operation (Galih Atcup H)
BLOWER&HEATER Date December 2013
1. Ensure that the equipment was fully assembled as per first design.
2. Ensure that work area is clean after work completed. If there there is any hazardous waste
material, such material shall be removed to the hazardus waste storage.
3. If there there is any hazardous waste and material, such as used oil and scrap shall be removed to
the designated place ( hazardous waste storage and temporary scrap storage).
5. REFERENCE
a. 145-236-62-0202 Operation & Maintenance Manual Operation Instruction FGD Plant
b. P&ID
6. ATTACHMENTS
None