Presentation of The NSA: New Supplier Assessment
Presentation of The NSA: New Supplier Assessment
1 INTRODUCTION
2 EVALUATION Process
3 EVALUATION Form
& SCORING Matrix
4 REQUIREMENTS
OVERVIEW
2
1 INTRODUCTION
3
39 / 61 Requirements
Purpose:
Evaluate the manufacturing maturity of a new supplier:
Basics are in place
At the beginning of a project, evaluate the effectiveness of
operational launch organization on supplier site
Operational Requirements
Maximum duration of the evaluation on site: 1,5 2 days
Self-assessment by supplier before evaluation: Optional
4
Case of use
New supplier or new supplier plants
Former supplier which has not shipped in last 12 months,
Current supplier quoted to a new commodity.
Result
Result is a risk assessment
• Recommended
• Recommended with action plan
• Not Recommended
Even with Red items, but strong action plan potential supplier could be
sourceable
Evaluation
Basic Criteria of requirement are mainly used to support assessment
Checking the readiness of potential supplier for automotive industry
requirements
5
2 EVALUATION
Process
6
NSA – Main Steps
Audit form sent: - 3 weeks
QIP Presentation (90min)
Submission of the audit form
a Meeting to answer to
supplier questions
+ 6 weeks
a NSA is valid for 18
Optional months
Mandatory if Supplier is selected
7
NSA – Main steps
Supplier Self-Assessment – Good practices
Example
8
3 EVALUATION Form
& SCORING Matrix
9
NSA - New Supplier Assessment
Evaluation Form – Creation of the empty form
10
NSA - New Supplier Assessment
Evaluation Worksheets
Header
Input of basic information (Supplier Identification, date,….).
Summary
Result of audit/self assessment calculated automatically.
Audit
Questionnaire list.
Action plan
Supplier action plan to close gaps identified during customer audit.
Instruction and Training
Description of usage of QIP questionnaire.
Link to material training in PSA B2B portal.
Action plan Instruction
Description of usage of action plan sheet.
NSA instruction
Special instructions for NSA evaluation.
Glossary
Complete list of abbreviations used in audit list.
11
NSA - New Supplier Assessment
Audit Fields (1/3)
Item
Abbreviation of topic for identification (e.g.: FR - Fast Response).
Requirement
General definition/summary of the intent of requirement.
Extra scoring
Identification of the requirement overweighed. The quotation of these requirements
will impact another one key element called “EXTRA” on the summary sheet.
Criteria
Abbreviation of topic for identification (e.g.: FR21 for the first criteria of requirement
FR2).
Criteria Requirement
Detailed deployment of 'Requirement' in bullet points.
Used for collecting evidences and setting up scoring.
Two types of Criteria of the Requirement are identified:
• basic criteria (identified with Bold type) = basic requirements (must have),
• additional criteria (identified with unbold type) = additional requirements
(recommended best practice). Only quoted in PCPA and QSB+ evaluation.
12
NSA - New Supplier Assessment
Audit Fields (2/3)
Look For
Auditor hints and techniques how and what need to be checked besides
'Criteria Requirement’.
Supplier
Criteria Quotation (OK / NOK):
Self quotation done by the supplier regarding the status available in the list
and defined in « instruction and training » sheet.
Quotation :
Automatic quotation regarding the rules of quotation defined in
« instruction and training » sheet.
13
NSA - New Supplier Assessment
Audit Fields (3/3)
Comment
Notes for evidences and non-conformances.
For the self-assessment, supplier has to write comments.
Deviations need to be described in the way that action plan can be defined.
Customer Re-quotation need to be justified in order to explain the real status of
the situation.
14
NSA – New Supplier Assessment
An example of requirement
- Requirement - Extra scoring status (for tier n requirements). Auditor hints and techniques how and
identification. - Criteria’s identification. what need to be checked besides 'Criteria
- General Definition, - Detailed deployment of 'Requirement' in bullet of Requirement’.
summary of the intent points. Supplier has to operate a system to
of requirement. meet listed expectations.
16
NSA – New Supplier Assessment
Application
17
NSA – Implementation Scoring
For Each Criteria
ROAD Only for NSA in case of critical situation identified (no resource
BLOCK or no decision to implement the action plan)
18
NSA – Implementation Scoring
For Each Requirement
No impact of additional criteria in NSA scoring. But they can be evaluated in order
to prepare next PCPA & QSB+ audits.
19
NSA – Implementation Scoring
Thresholds for result calculation
On Overall evaluation:
• score < 59% => Overall result goes Red
• 60% ≤ score < 80% => Overall result goes Yellow
• score ≥ 80% => Overall result goes Green
20
4 REQUIREMENTS
OVERVIEW
21
NSA – Requirements Overview
12 Key Elements (and 1 “EXTRA”)
22
QSB plus – Requirements Overview
#1: Corporate Management and Strategy (CSM)
Level of certification :
Status of ISO TS 16949 certification & MMOGLE self evaluation.
Project Management :
Site Involvement during project.
Project milestones.
Identification of new skills.
Escalation process :
Internal & external communication in case of issue.
Communication between shifts (Shift book management).
24
QSB plus – Requirements Overview
#3: Control of Non-conforming Product (CNC)
Containment process
Rework process
25
QSB plus – Requirements Overview
#4: Verification Station & Error Proof Verification (VSEP)
Final Checking :
Organization
Standards
26
QSB plus – Requirements Overview
#5: Standardized Work (SW)
27
QSB plus – Requirements Overview
#6: Layered Process Audit & Skills Management (LPASK)
28
QSB plus – Requirements Overview
#7: Risk Reduction (RR)
PFMEA management :
Periodical reviews & Cross-functional approach.
Management of the highest risk items :
Identification & analysis.
Action plans follow-up.
Reactive and Proactive review :
Periodical reviews :
• Update after internal or external issues.
• PFMEA review based on KPI.
Reverse PFMEA :
• Real and effective risks verification at the workstation.
• Findings taken into account to improve process.
General Risks management to guarantee manufacturing activity :
Natural risks (floods, fire,…) & “Supply chain” risks (loss of energy …).
By-pass processes and back-up solution.
29
QSB plus – Requirements Overview
#8: Managing Changes (MC)
30
QSB plus – Requirements Overview
#9: Maintenance (MAI)
Maintenance organization & activities (planning & tracking) :
Available resources & facilities.
Communication with manufacturing dep.
Preventive maintenance master planning / Corrective maintenance
activities.
Working standards, technical documentation.
Maintenance records (equipment diary).
L1 Maintenance management :
Definition of L1 maintenance operations.
Planning & follow-up (records).
Operators suggestions & lessons learned management.
Spare parts management :
Critical spare parts list & standardization Policy.
Stock management & storage conditions.
31
QSB plus – Requirements Overview
#10: Manufacturing & Material Flow Management (MMFM)
Manufacturing scheduling :
Business Planning (=> fix the capacity).
Master production schedule (MPS => manage the resources).
Daily manufacturing program.
32
QSB plus – Requirements Overview
#11: External Logistic (ELG)
Supply process :
Master schedule of deliveries.
Reception control plan in incoming.
Shipping process :
Flow of full / empty packaging.
Shipping planning & Preparation process (Bogus truck).
33
PCPA – Requirements Overview
#12: Part & Process Control (PPC)
Management of the documents :
Customer approved drawing (last update available).
Process flow diagram linked with PFMEA and Process control plan.
Identification of the KPC (CSE)
Implementation of the KPC at tier suppliers.
Identification of key and pass through characteristics (included tier n).
Product & process validation at tier suppliers.
SPC & Records management
Documentation of control records included product audits.
Review of control results and associated reaction plans.
Control limits calculation.
Spare parts production
Specific process.
“End of life” management.
Storage.
34