0 KONSTRUKSI FABRIKASI DAN PENGUJIAN

METERING REGULATING STATION


Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : Revisi: 1

Lampiran 1 / Attachment 1

Document No. Legend :

User V Vei
r i
f cation W : Witness

Project H Hold Point SW : Spot Witness


Contract No R Review A : Document Approval

Project No. P Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTMTIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

1 DESIGN AND APPROVAL DOCUMENT

1 1 QA'QC Manual
.
ISO 9001 Approval OA/QC Manual OA/QC MANUAL P P R,A

Approval Drawing Isometic


12 . Approval of All Drawing, Isometi
r c, and P&ID Panduan Basis Desain As built Drawing P P R, A
and P&ID

1 3 Approval Sizing and Calculation


.
Panduan Basis Detain Approval Sizng Calcutai
t cn Sizing Calculai
t on P P R A ,

14 . Approval Datasheet STM / Panduan Basis Desain Approval Data Sheet Data Sheet P P R A ,

15 . Qualification / Approval ofWeldng Procedure ASME Sect IX&AWS D.1.1 Approval WPS/POR WPS / POR P R R A ,
A

16 . Qualification) Approval of Wei dor and Welding Operator MIGAS re La ben Approval Welder Certii
f cate Welder Certificate P R R , A A

NDE Procedure & NDE


17 . Approval ofNDE Procedure and Personnel Certificate ASME Se« V & SNT-TC-1A Approval NDE Procedure P R R A ,
Personnel Certificate

1 8 Fabrication Po
.
r cedure ASME B31.8 Approval Fabrication Procedure Fabrication Procedure P P R A ,
R

Approval NDE Persomel


19 . Hydrostatic Testing Procedure ASMEB31.0 NDE Personnel Certificate P R R. A
Certificate

1 10
- Painting Procedure STM Approval Painting Procedure Painting Procedure P P R A ,

1 11 FAT Procedure
.
Panduan Basis Detain Approval FAT Procedure FAT Procedure P P R A ,

Approval SAT & Commissioning SAT & Commissioning


1 12
. SAT and Commissioning Po
r cedure Panduan Basis Desain P P R A .
Procedure Procedure

? APPROVAL PRESENTATION BY MCAB

21 . Approval Presena
t tion fc* Metering System MIGAS Repletion Slide Presentation Berta Acorn P P R
,
R R H
,

22 . MIGAS Approval Letter for Mstaring System MIGAS Regulation Approval Permit Letter Sunt Peraef u/i/an A

3 RECEIVING MATERIALS?
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : PKS-CTE-MD-CS-002 Revisi: 1 Hal. : 53 dari 69

Document No. Legend :


User V : Verification W : Witness

Project H : Hold Point SW : Spot Witness


Contract No R : Review A : Document Apprwal

Project No. P : Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Draw rig

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

3 1 INSULATING JOINT
.

STM
Factory Certificate and
Compliance with specification Approval Data Sheet Manufacture Document
P R R

Factory Certificate and


b Certificates (COO, COC, etc.) STM Certificates P R V .
R V ,
Manufacture Document

c Visual Inspecit on, Danensicn and Qunity checks STM PO , Supporting Certificate Material Receive Report P W R

3 2 METER
.

Approval Dala Sheet, Sizing Instruction Manual,


B Compliance with specification STM f Panduan Basis Desain P R R
Calculation Certificate Metrology

Instruction Manual,
b Certificates (COO,COC,Calibration, etc.) STM ! Panduan Basis Desain Certificates P R V R V
Certificate Metrology , ,

c Hazardous area certificate: Cerelec/Baseefa/FM/UL STM / Panduan Basis Desain Certificates Factory Certificate P R, V R V ,

d Visual Inspecit on, Drnensian and Ouaity checks STM i pBnduan Basis Desain PO, Supporting Ceri
t ficate Material Receiving Report P W R

33 ACTIVE REGULATOR

Approval Dala Sheet, Sizing Instruction Manual,


a Compliance with specification STM / Panduan Basis Desain P R R
Calculation Certificate Metrology

Instruction Manual,
b Certificates (COO,COC.Calibration, etc.) STM / Panduan Basis Desain Certificates P R V R V
Certificate Metrology , ,

c Hazardous area certificate: Cenelec / Baseefa / FM / UL STM / Panduan Basis Desain Certificates Factory Certificate P R, V R, V

d Visual Inspection. Dimension and Quaity checks STM / Panduan Basis Desain PO, Supporting Ceri
t ficate Material Receiving Report P W R

3 4 GAS FILTERS
.

STM / Panduan Basis Desain


Approval Data Sheet, Sizing Factory Certificate and
a Compliance with specification P R R
Calculation Manufacture Document
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : PKS-CTE-MD-CS-002 Revisi: 1 Hal. : 54 dari 69

Document No. Legend :

User V : Verification W : Witness

Project H : Hold Point SW : Spot Witness


Contract No. R : Review A : Document Approval

Project No. P : Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

Factory Certificate and


b Certificates (COO, COC, etc.) STM / Panduan Basis Desain Certificates P R V ,
R, V
Manufacture Document

c Visual Inspection, Dimension and Ouality checks STM / Panduan Basis Desain PO , Supporting Certificate Material Receiving Report P W R

3 5 BALL VALVE
.

STM / Panduan Basis Desain


Factory Certificate and
a Compliance with specification Approval Data Sheet P R R
Manufacture Document

Factory Certificate and


b Material Identification and Certificates STM / Panduan Basis Desain Certificate Material P R V R, V
Manufacture Document ,

c Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO , Supporting Certificate Material Receiving Report P W R

3 6 REGULATING VALVE
.

Factory Certificate and


a Compliance with specification STM / Panduan Basis Desain Approval Data Sheet P R R
Manufacture Document

Factory Certificate and


b Material Identification and Certificates STM / Panduan Basis Desain Certificate Material P R , V R , V
Manufacture Document

c Hazardous area certificate: Cenelec / Baseefa / others STM / Panduan Basis Desain Certificates Factory Certificate P R V ,
R V
,

d Visual Ispection, Demension & Quality checks STM / Panduan Basis Desain PQ, Supporting Certificate Material Receiving Report P W R

3 7 SLAM SHUT VALVE


.

Factory Certificate and


a Compliance with specification STM / Panduan Basis Desain Approval Data Sheet P R R
Manufacture Document

Factory Certificate and


b Material Identification and Certificates STM / Panduan Basis Desain Certificate Material P R , V R , V
Manufacture Document

c Hazardous area certificate: Cenelec / Baseefa / others STM / Panduan Basis Desain Certificates Factory Certificate P R , V R V
,

d Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO , Supporting Certificate Material Receiving Report P W R
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : PKS-CTE-MD-CS-002 Revisi: 1 Hal. : 55 dari 69

Document No. Legend :

User V Verii
f cation W : Witness

Project H Hold Point SW : Spot Witness

Contract No. R Review A : Document Approval

Project No. P Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

3 8 RELIEF VALVE
.

Factory Certificate and


a Compliance with specification STM / Panduan Basis Desain Approval Data Sheet P R R
Manufacture Document

Factory Certificate and


b Material Identii
f cation and Certificates STM / Panduan Basis Desain Certificate Material P R , V R , V
Manufacture Document

c Hazardous area certificate: Cenelec / Baseefa / others STM / Panduan Basis Desain Certificates Factory Certificate P R V ,
R , V

d Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO , Supporting Certificate Material Receiving Report P W R

3 9 CHECK VALVE
. .

STM / Panduan Basis Desain


Factory Certificate and
a Compliance with specification Approval Data Sheet P R R
Manufacture Document

Factory Certificate and


b Material Identii
f cation and Certificates STM / Panduan Basis Desain Certificate Material P R V R V
Manufacture Document , ,

c Hazardous area certificate: Cenelec / Baseefa / others STM / Panduan Basis Desain Certificates Factory Certificate P R V ,
R , V

d Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO , Supporting Certificate Material Receiving Report P W R

3 10 PRESSURE, TEMPERATURE GAUGE/INDICATOR and THERMOWELL


.

STM / Panduan Basis Desain


Approval Data Sheet, Sizing Factory Certificate and
a Compliance with specification P R R
Calculation Manufacture Document

Factory Certificate and


b Material Identii
f cation and Certificates STM / Panduan Basis Desain Certificate Material P R V R V
Manufacture Document , ,

c Hazardous area certificate: Cenelec / Baseefa / others STM / Panduan Basis Desain Certificates Factory Certificate P R , V R , V

d Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO , Supporting Certificate Material Receiving Report P R V ,
R

Factory Certificate and


e Tagging Name Plate STM / Panduan Basis Desain Certificate Material P R, V R
Manufacture Document
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : PKS-CTE-MD-CS-002 Revisi: 1 Hal. : 56 dari 69

Document No. Legend :

User V Verii
f cation W : Witness

Project H Hold Point SW : Spot Witness


Contract No. R Review A : Document Approval

Project No. P Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

3 11 ELECTRONIC VOLUME CONVERTER


.

Approval Data Sheet, Sizing Factory Certificate and


a Compliance with specification STM / Panduan Basis Desain P R R
Calculation Manufacture Document

Factory Certificate and


b Material Identification and Certificates STM / Panduan Basis Desain Certificate Material P R , V R , V
Manufacture Document

c Hazardous area certificate: Cenelec / Baseefa / others STM / Panduan Basis Desain Certificates Factory Certificate P R V ,
R V ,

d Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO, Supporting Certificate Material Receiving Report P W R

3 12 PIPE AND FITTING


.

STM / Panduan Basis Desain


Approval Data Sheet, Sizing Factory Certificate and Test
a Review Mill/Test Certificates and Conformance to Code/Specification P R R
Calculation Report

Factory Certificate and Test


b Material Identification STM / Panduan Basis Desain Certificate Material P R , V R , V
Report

c Visual Ispection, Demension & Ouality checks STM / Panduan Basis Desain PO, Supporting Certificate Material Receiving Report P R, W R

4 FABRICATION PROCESS OF PIPING SYSTEM AND SKID

4 1 LAYOUT AND CUTTING


.

Panduan Fabrikasi dan


a Cutting Pipes, Channels/Beams and Other Material Cutting Plan & Layout Inspection Reports P R R
Pengujian MRS

Panduan Fabrikasi dan


b Check Transfering of Heat Numbers Mill Certii
f cate Material Traceability Report P R R
Pengujian MRS

Panduan Fabrikasi dan


c Check Layout GA Drawing & Cutting Layout Inspection Reports P R R
Pengujian MRS

4 2 PREPARATION AND FIT UP PIPING


.

a Pipe cleaning, angle fit up check ASME B31.8 /SNI 3474 Approval Drawing Inspection Reports P SW SW
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : PKS-CTE-MD-CS-002 Revisi: 1 Hal. : 57 dari 69

Document No. Legend :

User V Verification W : Witness

Project H Hold Point SW : Spot Witness

Contract No. R Review A : Document Approval

Project No. P Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

b Dimensional check and pipe alignment ASME B31.8/SNI 3474 Approval Drawing Inspection Reports P SW SW

4 3 WELDING PIPE SPOOL


.

Approval WPS/POR & Welding


a Check Conformance to WPS/POT ASME Section IX WPS/POR & Welding Map P SW SW
Map

Welder/Welding Operator
b Check Welder and Welder Operator ASME Section IX Valid Certificates P SW SW
Certificate

Approval WPS/POR & Material


c Check Welding Electrode Used ASME Section IX Material Certificate P SW SW
Certificate

d Check Parameter of Welding ASME Seci


t on IX Approval WPS/POR Welding Report P SW SW

4 4 PREPARATION AND FIT UP STRUCTURE/ SKID


.

a Angle preparation and fit up check AWS D.1.1 Approval Drawing Inspection Reports P SW SW

b Dimensional check and structure alignment AWS D.1.1 Approval Drawing Inspection Reports P SW SW

4 5 WELDING STRUCTURE/ SKID


.

Approval WPS/POR & Welding


a Check Conformance to WPS/POR AWS D.1.1 WPS/POR & Welding Map P SW SW
Map

Welder/Welding Operator
b Check Welder and Welder Operator AWS D 1 1. .

Certificate
Valid Certificates P SW SW

Approval WPS/POR & Material


c Check Welding Electrode Used AWS D.1.1 Certificate
Material Certificate P SW SW

d Check Parameter of Welding AWS D.1.1 Approval WPS/POR Welding Report P SW SW

4 6 INSPECTION AND TESTING


.

a Visual and Dimensional Check AP11104 & AWS D.1.1 Approval Procedure Dimensi and Visual Reports P R, SW R SW
,
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : Revisi: 1

Document No. Legend :

User V : Verification W : Witness

Project H : Hold Point SW : Spot Witness


Contract No. R : Review A : Document Approval

Project No. P : Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

b Non Destructive Examination (NDE) ASME Section V & AP11104 Approval NDE Procedure NDE Map P R, SW R SW,

100% RT/PAUT for all butt weld joint ASME Section V & AP11104 NDE Report, Film RT NDE Reports P R R

100% MPI/PT for all i


f llet weld joint ASME Section V& AP11104 NDE Report NDE Reports P R, SW R , SW

100% UT o
f r penetration weld joint of Lifting Lug ASME Section V & AWS D.1.1 NDE Report NDE Reports P R, SW R, SW

4 7 HYDROSTATIC/ PRESSURE TEST


.

ASME B31.8 / Panduan


a Check for NDE clearances Pipe Book, NDE Reports Pipe Book, NDE report P V R R
Fabrikasi dan Pengujian MRS

b Compatibility of Test Equipment & Temp Material MIGAS regulation Valid Calibration Certificate Calibration Certificate P R, A R R

ASME B31.8 / Panduan


c Test Equipment Calibration Valid Calibration Certificate Calibration Certificate P H H H
Fabrikasi dan Pengujian MRS

ASME B31.8 / Panduan


d Hydrotest Operation Hydrotest Procedure Hydrotest Report P H H H
Fabrikasi dan Pengujian MRS

4 8 PAINTING
.

STM / Panduan Fabrikasi dan


a Check Painting Material ( Batch No.) Certificate Material Painting Reports P R R
Pengujian MRS

STM / Panduan Fabrikasi dan


b Humidity Check Approval Painting Procedure Painting Reports P SW R
Pengujian MRS

STM / Panduan Fabrikasi dan


c Check Surface Preparation Approval Painting Procedure Painting Reports P SW R
Pengujian MRS

STM / Panduan Fabrikasi dan


d Roughness Check Approval Painting Procedure Painting Reports P SW R
Pengujian MRS

STM / Panduan Fabrikasi dan


e Check DFT of Primier Coat Approval Painting Procedure Painting Reports P SW R
Pengujian MRS

STM / Panduan Fabrikasi dan


Check DFT of Second Coat Approval Painting Procedure Painting Reports P SW R
Pengujian MRS
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : Revisi: 1

Document No. Legend :

User V : Verification W : Witness

Project H : Hold Point SW : Spot Witness


Contract No. R : Review A : Document Approval

Project No. P : Prepare


PERAKIT
REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

STM / Panduan Fabrikasi dan


9 Check DFT of Top Coat Approval Painting Procedure Painting Reports P SW SW
Pengujian MRS

STM / Panduan Fabrikasi dan


h Final Visual Check Approval Painting Procedure Painting Reports P SW SW
Pengujian MRS

5 TESTING EQUIPMENT AND INSTALLATION/ ASSEMBLY

51 . Factory Integrated Acceptance Test (FAT)

Berita Acara (BA) & FAT


a Visual and Dimensional Check FAT Procedure Approval FAT Procedure P H R , W* R SW*
,

Reports

Berita Acara (BA) & FAT


b Leak Test FAT Procedure Approval FAT Procedure P H R , W* H
Reports

Function Test FAT Procedure


Berita Acara (BA) & FAT
c Approval FAT Procedure P H R W*,
H
Reports

Panduan Fabrikasi dan


52 . Verification of correct installation of all Equipment and Instrument Approval Drawing, Procedure Inspection Report P R, SW R SW,
Pengujian MRS

Panduan Fabrikasi dan


5 3 Visual and Dimensional Verification
. Approval Drawing Inspection Report P R, SW R, SW
Pengujian MRS

Panduan Fabrikasi dan


54 .
Check Layout for Accessibility Operation & Maintenance Approval Drawing, Procedure Inspection Report P R, SW R , SW
Pengujian MRS

Panduan Fabrikasi dan


55 . Check all Equipment Installation Approval Drawing Procedure
, Inspection Report P R, SW R, SW
Pengujian MRS

Panduan Fabrikasi dan


56 .
Check all Instrument System Approval Drawing, Procedure Inspection Report P R SW
,
R SW,
Pengujian MRS

Panduan Fabrikasi dan


57 . Check all Pipings. Fittings and Tubings Work Approval Drawing, Procedure Inspection Report P R, SW R SW,
Pengujian MRS

Panduan Fabrikasi dan


58 . Megger Test for Wiring Approval Drawing, Procedure Inspection Report P R, SW R, SW
Pengujian MRS

Panduan Fabrikasi dan


59 .
Grounding dan Bonding Test Approval Drawing, Procedure Inspection Report P R, SW R , SW
Pengujian MRS

Panduan Fabrikasi dan


5 10.
. Continuity Test for Electrical Circuits Approval Drawing, Procedure Inspection Report P R SW
,
R SW,
Pengujian MRS
0 KONSTRUKSI FABRIKASI DAN PENGUJIAN
METERING REGULATING STATION
Pgn
energy for life
A member of Pertamina PT PERUSAHAAN GAS NEGARA Tbk.

No. Dok : Revisi: 1

Document No. Legend :

User V : Verification W : Witness

Project H : Hold Point SW : Spot Witness


Contract No. R : Review A : Document Approval

Project No. P : Prepare PERAKIT


REV DATE DESCRIPTION CONTRACTOR PGN DITMET MIGAS
PEREKAYASA
AFC : Approval For Construction Drawing

INSPECTION AND TEST PLAN

INSPECTION
CERTIFYING VERIFYING DOCUMENT TO BE
NO PROCESS DESCRIPTION INSPECTION ACTIVITIES ACCEPTANCE CRITERIA
DOCUMENT INCLUDE IN OA DOSSIER PERAKIT
CONTRACTOR PGN MIGAS DITMET
PEREKAYASA

Panduan Fabrikasi dan


5 11. Function Test and Instrument Test of Field Instruments
. Approval Drawing, Procedure Inspection Report P R, SW R, SW
Pengujian MRS

5 12.
. Site Integrated Acceptance Test (SIAT)

Berita Acara (BA) & SIAT


a Visual and Dimensional Check SIAT Procedure Approval SIAT Procedure P H H
Reports

SIAT Procedure
Berita Acara (BA) & SIAT
b Leak Test Approval SIAT Procedure P H H W W
Reports

Berita Acara (BA) & SIAT


c Megger test SIAT Procedure Approval SIAT Procedure P H H W W
Reports

Berita Acara (BA) & SIAT


d Function Test SIAT Procedure Approval SIAT Procedure P H H W W
Reports

Syarat Teknis Kemetrologian Berita Acara (BA) &


5 13 Calibration (TERA) Approval Calibration Procedure P W SW W H
(STK)
.

Calibration Report

6 MANUFACTURE DATA RECORD (MDR)

61 . All Specified Certification of Metering Contract Specification Certificate MDR P RA


,
R R

62 .
All Shop Test/ Data/ Mill Test/ Vendor Inspection Report Contract Specification Inspection/Test Reports MDR P RA
,
R R

63 .
All NDT and Personnal Qualification Reports Contract Specification Test Repot
r s and Certificate MDR P RA
,
R R

Approval Drawing, Isometric MDR


64 .
As Built Drawing Contract Specification P RA R R
and P&ID
,

*
Mengacu PO FAT
pgn
energy for hfe
A n yifi ii
.
of fVifTui',nr'U

TYPICAL DRAWING

PANDUAN KONSTRUKSI

FABRIKASI DAN PENGUJIAN

METERING REGULATING STATION

PKS-CTE-MD-DG-002

PT. PERUSAHAAN GAS NEGARA Tbk


Jakarta, 2019
INDEX SHEET
NO. DRAWING NO. SHEET NO. TITLE
i PKS-CTE-MD-DG-002 SHEET 01 OF 33 INDEX SHEET
2 PKS-CTE-MD-DG-002 SHEET 02 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 C2 GUO
3 PKS-CTE-MD-DG-002 SHEET 03 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 C2 QUO

U PKS-CTE-MD-DG-002 SHEET 04 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 C2 C-65

5 PKS-CTE-MD-DG-002 SHEET 05 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 C2 G65

6 PKS-CTE-MD-DG-002 SHEET 06 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 C2 GI60


7 PKS-CTE-MD-DG-002 SHEET 07 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 C2 GI60

8 PKS-CTE-MD-DG-002 SHEET 08 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 C2 G250


9 PKS-CTE-MD-DG-002 SHEET 09 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 C2 G250

10 PKS-CTE-MD-DG-002 SHEET 10 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 D GI6

II PKS-CTE-MD-DG-002 5HEET 11 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 D GI6


12 PKS-CTE-MD-DG-002 SHEET 12 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 D G25

15 PKS-CTE-MD-DG-002 SHEET 13 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 D G25

14 PKS-CTE-MD-DG-002 SHEET 14 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 D GM)

15 PKS-CTE-MD-DG-002 SHEET 15 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 D G40

16 PKS-CTE-MD-DG-002 SHEET 16 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 D G65

17 PKS-CTE-MD-DG-002 SHEET 17 OF 33 TYPICAL ISOMETRIC MRS TYPE P2 D G65

18 PKS-CTE-MD-DG-002 SHEET 18 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P2 D GI60

19 PKS-CTE-MD-DG-002 SHEET 19 OF 33 TYPICAL ISOMETRIC MRS TYFE P2 D GI60


REFERENCES
20 PKS-CTE-MD-DG-002 SHEET 20 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 D G65

21 PKS-CTE-MD-DG-002 SHEET 21 OF 33 TYPICAL ISOMETRIC MRS TYPE P3 D G65

22 PKS-CTE-MD-DG-002 SHEET 22 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El GU

23 PKS-CTE-MD-DG-002 SHEET 23 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El GL

ZU PKS-CTE-MD-DG-002 SHEET 24 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El G6

25 PKS-CTE-MD-DG-002 SHEET 25 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El G6 (°<fw


- 11-N BSUCD rM MnfMMTADCN M/tMH W
26 PKS-CTE-MD-DG-002 SHEET 26 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El GIO a-B-17 b&o rx hmmxiaiw m/MI MW

Mil OISCRIPTH
27 PKS-CTE-MD-DG-002 SHEET 27 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El GIO

28 PKS-CTE-MD-DG-002 SHEET 28 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El GI6


Pgtl PT. PERUSAHAAN GAS NEGARA Thk.
29 PKS-CTE-MD-DG-002 SHEET 29 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El GI6
WORK EXECUTOR / CONSULTANT LOGO AND NAME
30 PKS-CTE-MD-DG-002 SHEET 30 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El G25

31 PKS-CTE-MD-DG-002 SHEET 31 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El G25


[ PROJECT NAME ]
32 PKS-CTE-MD-DG-002 SHEET 32 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El G40

33 PKS-CTE-MD-DG-002 SHEET 33 OF 33 TYPICAL GENERAL ARRANGEMENT MRS TYPE P3 El G40


NOTES

1 ALL D'MENStON ARE IN MIlilMETERS UNLESS NOTED


142 78 £0M.1 10 J 10 110 MIM 50(300) .134 . (184) . 200 .

OTHERWISE
2 THE
.
DRAWNG IS FOR REFERENCE ONLY. GENERAL
ARRANGEMENT DRAWING SHALL 8E MADE & PERUSAHAAN
PERAKfT PEREKAYASA SISTEM METER MINYAK DAN GAS
BUMI.
i . THIS DRAWING IS USED FOR CUSTOMER P2 C2 150#.
ANY CHANGES ON MAIN COMPONENT SHALL REFER TO
PANOUAN BASIS DESAIN MRS ElANGGAN.
4 0PI COMPLETE WTO 5 WAY MANIFOLD.
.

5 SIZING REGULATOR 0" VENDOR.


6 PRESSURE GAUGE WTTH GPERATNG PRESSURE > 4 BAKG,
.

SHALL 0E INSTALLED 2 WAY MANIFOLD.

g IE

REFERENCES

IP?
ISSUED rCR UPLOCNUnCN M/t&t
/g\ l»-lt-1T inxs ran unnofunoN

«V. OA IP atn

Pgn pr. PERUSAHAAN GAS NEGARA Tbk.

WORE EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

oT\ SECTION A-A


,

© SCALE NTS
TYPICAL GENERAL ARANGEMENT
MRS TYPE P2 C2 G60
2905
1
. ALi DIMENSION ARE IN MIIDWFERS UNLESS NOTED
OTHERWISE
2 . THIS DRAW1NC IS FOR REFERENCE ONLY. GENERAL
ARRANGEMENT ORAWING SHALL BE MADE BY PERUSAHAAN
PERAKH PEREKAYASA SISTEW METER MINYAK DAN GAS
BUMI.
3 . THIS DRAWING IS USED FOR CUSTOMER P2 C2 150#.
ANY CHANGES ON MAIN COMPONENT SHALL REFER TO
PANDUAN BASIS DESAJN MRS PELANGGAN.
.
DPI COMPLETE WITH 5 WAY MANIFOLD.
5 . SIZING REGULATOR BY VENDOR.
6 . PRESSURE GAUGE WITH OPERATING PRESSURE > 4- BARG,
SHALL HE INSTALLED 2 WAY MANIFOLD.

REFERENCES

ISSUED OH NnXMHTAlXM DW/ASE M/HH HEF


IWO F0» UdDrtXTATXK

DESCRIPTION

Pgn PT. PERUSAHAAN GAS NEGARA Tbk.

WORK EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


"

02 \ SECTION B - B oT\ SECTION A-A ,


MRS TTPE P2 C2 C160

SCALE NTS SCALE NTS


NOTES

ALL DIMENSION ARE IN MLLIMETERS UNLESS NOTED


OTHERWISE
2 THIS DRAWING IS FOR REFERENCE ONLY, GENERAL
.

ARRANGEMENT DRAWING SHALL BE MADE ffY PERUSAHAAN


PERAKIT PEREKAYASA S1STEM METER MINYAK DAN GAS
BUMI.
3 . THIS DRAWING IS USED FOR CUSTOMER P2 D 150#.
ANY CHANGES ON MAIN COMPONENT SHALL REFER TO
PANDUAN BASIS DESAIN MRS PELANGGAN.
4 DPI COMPLETE WTTH 5 WAY MANIFOLD.
.

5 SIZING REGULATOR BY VENDOR.


.

6 . PRESSURE GAUGE WTOi OPERATING PRESSURE > * BRAG,


SHALL BE INSTALLED 2 WAY MANIFOLD.

315

HQ MIN 5D (300) 137 (184) 137 150 64 _


420
_
64 .
150 76

REFERENCES

3 re* upuuounw

0 . a-12-17 tssua rat maanAncN

ICY. MIT DESCRIPTION cum im

2093 $
Pgn PT. PBBUSAHAAN GAS NECARA Tbk.

oT\ FRONT VIEW SIDE VIEW


ALi NTS 0 NTS
WORK EXECUTOR / CONSULTANT LOCO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS TYPE P2 D CI 6
1
. ALL WMENSIDN ARE IN MILUMETERS UNLESS NOTED
OTHERWISE
2 . VENDOR SHALL DESIGN, SLUMSHUT SHALL NTEGRATED
WITH REGULATOR.
3. SENSING TAPPING LENGTH SHALL BE UN 5D OR 3ASED
ON MANUFACTURE RECOMMENDATION.

MATERIAL DESCRIPTION MATERIAL DESCRIPTION

agams-sr*

FT. PBRUSAHAAN GAS NEGARA Tbk.

WORK EXECUTOR / CONSULTANT LOGO AND NAME

"
w we *nre sk«q <o<>™__
PC wuj, pcoo mewm, »stm ww/Ajs;
» .

«> g _

[ PROJECT NAME ]

TYPICAL ISOMETRIK
MRS TYPE P2 0 G16

29-11-19 PKS-CTE-MD-W-002
(MET 11 Of 38)
NOTES

1
.
ALL DIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE
2 .
TUS DRAWING IS FOR REFERENCE ONLY. GENERAL
ARRANGEMENT DRAWING SHALL BE MADE BY PERUSAHAAN
PERAKIT PEREKAYASA S'STEM METER MINYAK DAN GAS

3 . TUS DRAWING IS USEO FOR CUSTOMER P2 D 150#.


ANY CHANGES ON MAIN COMPONENT SHALL REFER TO
PANDUAN BASIS DESAIN MRS PELANCGAN.
4 .
DPI COMPLETE WTTH 5 WAY MANIFOJ)
5 .
SIZING REGULATOR BY VENDOR.
6 . PRESSURE GAUGE WITH OPERATING PRESSURE > 4 BARG,
SHALL BE INSTALLED 2 WAY MANIFOLD.

REFERENCES

/\1

1 Jt-H-I

-
rao n> anwoir*r<M mi/ut tc*/9in wa

«EV. OAK . (SCRIP "ON mn otre

340 3
Pgn PT. PERUSAHAAN GAS NEGARA Tbk.

FRONT VIEW
0 FORI EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS TYPE P2 D G25
1
. ML DIMENSION ARE IN MILUMETERS UNLESS NOTED
OTHERWISE
2 VENDOR SHALL OESIGN, SLUMSHUT SHALL
. INTEGRATED
WITH REGULATOR.
3 .
SENSING TAPING LENGTH SHALL BE UIN 50 OR BASED
ON MANUFACTURE RECOMMENDATION

MATERIAL DESCRIPTION MATERIAL DESCRIPTION


.Mom Sfto unripe
.
CAflBQN HBC APt SL OS- B PSL 1/ *ST\J A100 OR B, S04.40. SR B3«.'0, BE
JRSt- -
frWfr imL t t U? NECK RAISED fACt. ASHE BI6.5. ASTU Alii. *M.-Sgir
Usctt »N»AL WOUND CASKET. NOH ASBESTOS. nDOBLE GRAPHITE. 318--

CARBON STEEL. IWHOJ1IC WW BOLT. ASHE jS gj 0:». 1, BE.


API BL at B PSL 1 / ASTV A1Q6 Ota SCH.4C. #150 PT. PERUSAHAAN GAS NEGARA Tbk.
*,?a*- aaasc gg.H& sir,",*
Plus sg s» p«mu«t mMiM. P«ssjg mm »-» urn
_

WORK EXECUTOR / CONSULTANT LOCO AND NAME

[ PROJECT NAME ]

TYPICAL ISOMETRIK
MRS TYPE P2 0 G25
S1U0B0LT MM Or£J C/W 3EA HEAVY HEX HUTS TO AIM » »

PKS-CTE-MD-DC-002
(SCET 13 OF 36)
. All DIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTXERWSE
2 THIS CRAWING IS FOR REFERENCE ONLY. GENERAL
.

ARRANGEMENT DRAWING SHALL BE MADE BY PERUSAHAAN


PERAKIT PEREKAYASA StSTEM WtTER UIMfAK DAN GAS
BUML
3. THIS DRAWING IS USED FOR CUSTOMER P2 D 150#.
ANY CHANGES ON MNN COMPONENT SHALL REFER TO
PANCUAN BASIS 0ESAJN MRS PELANGGAN.
4. DPI COMPLETE WITH 5 WAY MANIFOU).
5. SIZING REGULATOR BY VENDOR.
fi. PRESSURE GAUGE WTTH OPERATING PRESSURE > 4 BARG,
SHALL BE INSTALLED 2 WAY MANIFOLD.

315

no
.
MIN5D(300) 137 _ |184) _ 137 150 64 420 .64 150 76

REFERENCES

OUCS rat NUKMTAKM MO/I* Ikjmt


B-12-1T ISSUBl rm UftfiCTAWM «M/AJf tCK/Ttl

PgTI PT. PERUSAHAAN GAS NEGARA Tbk.

FRONT VIEW
© NTS
WORK EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS TYPE P2 D G40
NOTES

1
. ail dimension are in milljmeters unless noted
OTHERWISE
2 . THIS DRAWING IS FOR REFERENCE ONLY. GENERAL
ARRANGEMENT DRAWING SHALL BE MADE BY PERUSWAAN
PERAKIT PEREKAYASA SETEM METER MINYAK DAN GAS
011 Ml.
i . THIS DRAWING IS USED FOR CUSTOMER P2 0 150#.
ANY CHANGES ON MAJN COMPONENT SHALL REFER TO
PANDUAN BASIS DESAJN MRS PELANCGAN.
4 . DPI COMPLETE WITH 3 WAY MANIFOLD.
5 SIZING REGULATOR BY VENDOR.
.

6 PRESSURE GAUGE WITH OPERATING PRESSURE > 4 8ARG


.
.

SHALL BE INSTALLEO 2 WAY MANIFOLD

t
315

T
110 HQ MIN 5D (300) 137 (184) 137 150 4 64 150 76

REFERENCES

If# lb
A SUO) FOR MK£*£>IT«T*W MO/kS MT

M1N 2D
A H-1X-1T JSUOI rw MPLD<OIT<TO< «OV«TU WA

_ _

*v DESCRIPTION om *ro

145 152 [120) 150 5D [903) 178 145 300


2093 0
PgTI PT. PERUSAHAAN CAS NEGARA Tbk.

FRONT VIEW
0 02\ SIDE VIEW
WORK EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS TYPE P2 0 G65
NOTES

ALL DIMENSION V*E IN MILLIMETERS UNLESS NOTED

REF NCS
.

OTHERWISE-
2 . THE SIZE Of DOWNSTREAM METER COMPONENTS SH«il
BE MATCH WITH THE INSTALLATION PIPEWORK.
3 .
PIPE NIPPLE MAY BE SUBSTTTUTED WITH GALVANIZED PIPE.

G4

@
207
227

MAIN COMPONENT DEVICES OF METER OR REGULATING STATION


WW El
SMV-M *MB m UPUMHUKM

0 22-12-17 ««D fan MFlEMDfTATION


DESCRIPTION DESCRIPTION
OA* DCSCHirTIOH
Flexible Riser consists ot flexible stainless pipe, ball valve. Meter Diafragma Please See Meter Dia'racua
steel pipe covered by 3LPE. transition fr Brass / Galvanized Maleable Cast Iron . hem ale Threaced SM 0139 ar Equal
Spring Loaded c.'w OPSO ' UPSO, Please see STM Regulator & Slum3hut Brass / Galvanized Maleable Cast Iron , Male Threaded SNI 0139 or Eqjal
Brass ' Galvanized Malleable Cast Iron Male Threaded. SNI 0139 ar Fqunl (Note 3) Brass i Galvanized Malleable Cast Iron . Female Threaded SNI 0139 or Equal Pgll PT. PBRUSAHAAN GAS NEGARA Tbk.
Brass 'Galvanized Malleable Cast Iron Female Threaded, SNI 0139or Equal Temperature Gauge Please See STM Temperature Instrumentation, Range 0-S0 deg C, dial size 2.5". NPT
Hex Reducing Nipple Brass ' Galvanized Malleable Cast Iron Male Threaded, SNI 0139 or Equal Hex Reducing Nipple Brass / Galvanized Malleable Cast Iron , Male Threaded SNI 0139 or Equal
Isolating Ball Valve Brass 'Galvanized Malleable Cast Iron Female Threaded, SNI 05-0170/SNI 05-0169 Isolating Ball Valve Brass i Galvanized Malleable Cast Iron . Female Threaded SNI 05-0170/SNI 05-0169 WOG Valve YORK EXECUTOR / CONSULTANT LOGO AND NAME
/ WOG Valve or Equal Brass i Galvanized Malleable Cast Iron . Male Threaded SNI 0139 or Equal
Please See STM Pressure Instrumentation Pressure Range 0-1,6 Barg. dial 2.5, (mm) 315 SS, Thread Please See STM Temperature Instrumentation
[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS TYPE PJ El G4
NOTES

. All OtOSKW ATC IN MUMrcRS UNLESS NOTED


OTHERWISE.
2 THE SIZE OF DOWNSTREAM
.
METER COMPONENTS SHALL
BE MATCH #fIH THE INSTALLATION PIPEWORK.
3 PIPE NIPPLE MAY BE SUBSTITUTED WITH GALVANIZED PIPE.
.

4 . PIPE STEEL SUPPORT SHALL BE ANCHORED TO THE


CONCRETE PEDESTAL

BASE PLATE
BRACKET METER ANGLE BAR L50x50x5
120x120x5

\
A . .

o () u i.O,
.
m
.
7

REFERENCES

iouts rw hfuwkaum

DESCRIPTION

PgTl PT. PERUSAHAAN GAS NEGARA Tbk.

WORK EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

METER INSTALLATION ON CONCRETE


TYPICAL GENERAL ARANGEMENT
MRS TYPE P3 El G4
NOTES

1 .
KL DIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE.
2 THE SIZE OF DOWNSTREAM METER COMPONENTS SHALL
.

BE MATCH WITH THE INSTALLATION PIPEWORK.


y PIPE NPPLE MAY BE SUBSTITUTED WITH GALVANIZED PIPE-

(Note 2)
15)

REFERENCES

JO FW MPLQifXMTO,

JO NM fUKOffATlOH
MAIN COMPONENT DEVICES OF METER & REGULATING STATION
DESCRIPTION

NO ITEM DESCRIPTION NPS QTY NO ITEM DESCRIPTION NPS QTY


0
"
riexible Riser riexible Riser consists or Flexible stainless pipe ball valve 32 mm* V 1 EA 08 Meter G.6 Meter Diafragrra Please See Meter Diafragma 1 "
1 EA
,

PgTl PT. PERUSAHAAN GAS NEGARA Tbk.


steel pipe covered by 3LPE, transition from steel to PE pipe 09 Reducer Brass / Galvanized Malleable Cast Iron . Female Threaded, SNI 0139 or Equal 1" x 3/4
"
1 EA
"

02 Regulator Spring Loaded cAv OPSO / UPSO, Please see STM Regulator 8. Slumshut V 1 EA 10 Double Nipple Brass 1 Galvanized Malleable Cast Iron , Male Threaded, SNI 0139 or Equal 3'4 1 EA
03 Pipe Nipple Brass Galvanized Malleable Cast Iron , Male 1 hreadea, SNI 0139 or Equal (Note 3) 1" 2 EA 11 Tee Brass / Galvanized Malleable Cast Iron . Female Threaded. SNI 0139 or Equal 3/4" 1 EA
WORK EXECUTOR / CONSULTANT LOCO AND NAME
04 Tee Brass Galvanized Malleable Cast Iron . Female Threaded, SNI 0139 or Equal 1
"
1 EA 12 Temperalur Gauge Please See STM Temperature Instrumentation Range 0-60 deg C dial size 2.5" , NPT 1/2" 1 EA
05 He* Reducing Nipple Brass / Galvanized Malleable Casl Iron , Male Threaded, SNI 0139 or Equal "
1 x 1/2
"
1 EA 13 Hex Reducing Nipple BrassGalvanized Malleable Cast Iron . Male Threaded. SNI 0139 or Equal 1 x3/4.
"
1 EA
06 Isolating Ball Valve Brass / Galvanized Malleable Casl Iron , Female Threaded, SNI 05-0170/SNI 05-0169 1/2" 1 EA 14 Isolating Ball Valve Brass 1 Galvanized Malleable Cast Iron .
Female Threaded SNI 05-0170/SNI05-0169 WOG Valve 1
"
1 EA

f WOG Valve or Equal 1 EA 15 Head Plug Brass Galvanized Malleable Cast Iron . Male I hreaded, SNI 0139 or Equal 1 "
1 EA [ PROJECT NAME ]
07 P-
essure Gauge Please See STM Pressure Instrumentation Pressuie Range 0-1.6 Barg dial 2.5"
, 1/2" 1 EA 16 Then nu well 315 SS. Thread Please See STM Temperature Instrumentation 3/4" x 1/2" 1 EA

TYPICAL GENERAL ARANGEMENT


MRS TYPE P3 El G6
NOTES

1
.
ALL DIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE.
2 THE SIZE OF DOWNSTREAM METER COMPONENTS SHALL
.

BE MATCH WITH THE INSTALLATION PIPEWORK.


3 PIPE HIPPIE MAY BE SUBSTITUTED WITH CALVANIZED PIPE
.

4 .
PIPE STEEL SUPPORT SHALL BE ANCHORED TO THE
CONCRETE PEDESTAL

BASE PLATE
BRACKET METER- ANGLE BAR L50x50x5
120x120x5
,
- o
rO
/v - T SX CM

/
.
!!

277
TOP VIEW
TOP VIEW
SCALE NTS
SCALE NTS

630 630

REFERENCES

MS

DESCRIPTION

PgTl PT. PERUSAHAAN GAS NECARA Tbk.

WORK EXECUTOR / CONSULTANT LOCO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


SCALE MRS TYPE P3 E1 G6
NOTES

1 .
Ail DIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE.
2 . THE SIZE OF DOWNSTREAM METER COMPONENTS SHALL
BE MATCH WfTH THE INSTALLATION PIPEWORK.
PIPE NIPPLE MAY BE SUBSTTTUTED WITH GALVANIZED PIPE-

REFERENCES

A +
.

A nan r<* mumhutw tm/ksr j v«u WF

a-11-17 tss*B ra» «PU**TATCN MH/A9C «U

«v OA* chCp <P»T>

MAIN COMPONENT DEVICES OF METER & REGULATING STATION


PgTl PT. PERUSAHAAN GAS NEGARA Tbk.
NO ITEM DESCRIPTION NPS QTY NO ITEM DESCRIPTION NPS QTY
01 Flexible Riser Flex b e Riser consists of flexible stainless pipe ball valve,
, 32 mm x 1" 1 EA 08 Double Niple Brass i Galvanized Malleable Cast Iron , Male Threaded. SNI 0139 or Equal 1
*
1 EA

steel pipe covered by 3LPE, transition from steel to PE pipe 09 Reducer Brass / Galvanized Malleable Cast Iron , Female Threaded, SNI 0139 or Equal 1 x 2"
"
2 EA WORK EXECUTOR / CONSULTANT LOGO AND NAME
02 Regulator Spring Loaded c/w OPSO / UPSO. Please see STM Regu ator & Slumshut 1" 1 EA 10 Meter G 10 Meter Diafragma Please See Meier Oiafragma 2
"
1 EA
03 Pipe Nipple Brass 1 Galvanized Malleable Cast Iron . Male Threaded SNI 0139 o, Equal (Note 3)
. 1* 2 EA 11 Hex Reducing Nipple Brass / Galvanized Malleable Cast Iron . Male Threaded, SNI 0139 or Equal 1
"
x 3/4" 2 EA
04 Tee Brass / Galvanized Malleable Cast Iron , Female Threaded SNI 0139 or Equal
, 1
*
1 EA 12 Tee Brass / Galvanized Malleable Cast Iron . Female Threaded, SNI 0139 or Equal 3/4" 1 EA
[ PROJECT NAME ]
05 Hex Reducing Nipple Brass / Galvanized Malleable Cast Iron . Male Threaded SNI 0139 or Equal
. rxi/2- 1 EA 13 Temperature Gauge Please See STM Temperature Instrumentation Range 0-60 deg C, dial size 2.5", NPT 1/2" 1 EA
06 Isolating 3all Valve Brass / Galvanized Malleable Cast Iron , Female Threaded, SNI 05-0170/SNI 05-0169 1/2* 1 EA 14 Isolating Ball Valve Brass / Galvanized Malleable Cast Iron . Female Threaded. SNI 05-0170/SNI 05-0180 WOG Valvn r 1 EA
/ VVOG Valve or Equal 1 EA 15 Head Plug Brass / Galvanized Malleable Cast Iron , Male Threaded. SNI 0139 or Equal 1
*
1 EA
TYPICAL GENERAL ARANGEMENT
07 Pressure Gauge Please See STM Pressure Instrumentation. Pressure Range 0-1,6 Barg, dial 2.5" 1/2" 1 EA 16 Thermoweil 316 SS, Thread Please See STM Temperature Instrumentation 3/4" x 1/2" 1 EA
MRS TYPE P3 El 610
NOTES

I . All DIMENSION ABE IN UWJMETTRS JNLESS NOTED


OTHERWISE.
2 THE SIZE Of DOWNSTREAM METES COMPONENTS SHALL
.

BE HATCH WTTH THE INSTALLATION PIPEWORK.


3 PIPE NIPPLE MAY BE SUBSTITUTED WTO GALVANIZED PIPE.
.

PIPE STEEL SUPPORT SHAU. BE ANCHORED TO THE


CONCRETE PEDESTAL

BASE PLATE
BRACKET METER ANGLE BAR L50x50x5
120x120x5

* .

ctr: a
~

o< (L_
K (I®. r ii o

X \o\ . .

TOP VIEW
TOP VIEW
SCALE
SCALE

799 799

REFERENCES

ISSMS *W IKlBIEMUnCN
: s(*/*<4nE
OW/AK 4A/ARH

j a-g-17 ISSUCD WUMOIMHCW MH/UL «R/BTU


BY. WH DESCRIPTION PWTl C

0
Pgn PT. PERCSAIIAAN GAS NEGARA Tbk.

WORK EXECUTOR / CONSULTANT LOCO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS TYPE P3 E1 G10
1
. ALL DIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE-
1*E SIZE CF DOWNSTREAM UETER COMPONENTS SHALL
BE MATCH WTO THE INSTALLATION PIPEWORK.
3 PIPE NIPPLE MAT BE SUBSTITUTED WITH GALVANIZED PIPE
.

REFERENCES

mm
/fJjMi-ti nsja n* imwtato" wc/am ja/mh _
>v

la-n-wl WUMWTATO mi/ASL , NKA

«r> | wir d es tw o«"b j m

MAIN COMPONENT DEVICES OF METER & REGULATING STATION 0


PgTl PT. PERUSAHAAN CAS NEGARA Tbk.
NO ITEM DESCRIPTION NPS QTY NO ITEM DESCRIPTION NPS QTY
"

01 Flexible Riser Flexib e Riser consists of flexible stainless pipe, ball valve. 32 mmxl" 1 EA 08 Oouble Nipple Brass / Galvanized Malleable Cast Iron . Male Tnreadec SN 0139 or Equal 1 1 EA

steel pipe covered by 3LPE, transition from steel to PE pipe rx2- 2 EA WORK EXECUTOR / CONSULTANT LOGO AND NAME
09 Reducer Brass / Galvanized Malleable Cast Irun . Ferna e Threaded SNI 0*39 or Equal
02 Spring Loaded c/w OPSO / UPSO. Please see STM Regulator & Slumshut 1"
1 EA 10 Meter G.16 Meter Diafragma Please See Meier Oiafragma 2
"
1 EA
Regulator
Brass 1 Galvanized Malleable Cast lion . Male Threaded. SNI 0130 or Equal (Note 3) Hex Reducing Nipple Brass 1 Galvanized Malleable Cast iron . Male Threaded SNI 0136 or Equa) 2 EA
"
03 Pipe Nipple 1"
2 EA 11 1" x 3/4

04 Tee Brass / Galvanized Malleable Cast Iron , Female Threaded, SNI 0139 or Equa 1
"
1 EA 12 Tee Brass / Galvan zed Malleable Cast Iron , Female Threaded, SNI 0139 or Equal 3/4" 1 EA
[ PROJECT NAME ]
05 Hex Reducing Nipple Brass / Galvanized Malleable Cast Iron . Male Threaded, SNI 0139 or Equal 1"x1/2" 1 EA 13 Temperatur Gauge Please See STM Temperature Instrumentation, Range 0-80 deg C, dial size 2.5". NPT 1/2" 1 EA

06 Isolating Sail Valve Hrass / Galvanized Malleable Cast Iron . Female Threaded. SNI 05-0170/SNI 05-0169 1/2- 1 EA 14 Isolating Ball Valve Brass / Galvanized Malleable Cast Iron Female Threaded SNI 05-0170/SNI 05-0169 WOG Valve 1 "
1 EA

/WOG Valve or Equal 1 EA 15 Head Plug Brass / Galvan zed Malleable Cast Iron Male Ihreaded. SNI 0139 or Equal 1" 1 EA
TYPICAL GENERAL ARANGEMENT
07 Pressure Gauge Please See STM Pressure Instrumentation Pressure Range 0-1 6 Barg d al 2,5"
, 1/2" 1 EA 16 Therm owe It 316 SS. Thread Please See STM Temperature Instrumentation 3/4* x 1/2" 1 EA
MRS TYPE P3 E1 GI6
1
. ALL OIMENSION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE
2 . THE SIZE OF DOWNSTREAM METER COMPONENTS SHALL
BE MATCH WTTH THE INSTALLATION PIPEWORK.
3 PIPE NIPPLE MAY BE SUBSTITUTED WTTH GALVANIZED PIPE.
.

A . PIPE STEEL SUPPORT SHALL BE ANCHORED TO THE


CONCRETE PEDESTAL

BASE PLATE
ANGLE BAR L70x70x6 140x140x6

<C=R(® t n

TOP VIEW TOP VIEW


NTS
NTS

897 897

REFERENCES

aim/ks.

Nfr/AX

BuemmoH

pgn PT. PERUSAHAAN GAS NEGABA Tbk.

WORK EXECUTOR / CONSULTANT LOCO AND NAME

[ PROJECT NAME 3

TYPICAL GENERAL ARANGEMENT


MRS ffPE PJ El G16
All DIMENSION ARE IN UUJMCTERS UNLESS NOTED
OTHERWISE.
2 THE SIZE OF DOWNSTREAM METER COMPONENTS SHAH
.

BE MATCH WITH THE INSTALLATION PIPEWORK.


1 PIPE NPPLE MAY BE SUBSTITUTED WITH GALVANIZED PIPE.
.

REFERENCES

%W<#k *H >«

0 B-IJ-W ISSUO) n* MFUMWTATW AIW/A* m/mi | nka


rv DAT! OESCRIPIION I o«o ipro

Pgn PT. PERUSAHAAN GAS NEGARA Tbk.

MAIN COMPONENT DEVICES OF METER & REGULATING STATION


WORK EXECUTOR / CONSULTANT LOCO AND NAME
NO ITEM DESCRIPTION NPS QTY NO ITEM DESCRIPTION NPS QTY
01 Flexible Riser Flexible Riser consists of flexible stainless oipe ball valve.
,
32 mm x 1" 1 EA UfcJ Double Nipple Brass / Galvanized Malleable Cast Iron Male Threaded SNi 0139 or Equal
.
1" 1 EA
steel pipe covered by 3LPfc. transition from steel lo PE pipe 09 Reducer Brass! Galvanized Malleable Cast Iron Female Threadeo SNI 0139 or Equal 1" x 2" 2 EA
.

[ PROJECT NAME ]
02 Regulator Spring Loaded c/w OPSO1 UPSO. Please see STM Regulator & Slumshut 1 "
1 EA 10 Meter G 25 Meter Uiafragma Please See Meter Diafragma r 1 EA
03 Pise Nipple Brass / Galvanized Malloablc Cast Iron . Male Threaded SNI 0139 or Equal (Note 3*
, 1" 2 EA 11 Hex Redlining Nipnle Brass / Galvanized Malleable Cast Iron , Male Threaded. SNI 0139 or Equal 1" x 3/4
"
2 EA
04 Tee Brass t Galvanized Malleable Cast iron , Female I hreaded, SNI 1)139 or Equal 1
"
1 EA 12 Tee Brass I Galvanized Malleable Cast Iron . Female Threadeo SNI 0139 or Equal 3/4" 1 EA
TYPICAL GENERAL ARANGCMENT
OS He* Reducing Nipple Brass ' Galvanized Malleable Cast iron . Mate Threaded SNI 0139 im Equal "
13 1/2"
.
1 x 1/2* 1 EA 1 emperature Gauge Please See STM Temperature Instrumentation Range 0 60 deg C, dial size 2.5"
, NPT 1 EA MRS TYPE P3 El 025
06 isolating Ball Valve Brass .' Galvanized Malleable Cast iron Female Threaded SNI 05-0170/SN 05-016S 1 EA 14 Brass / Gavamzed Malleable Cast Iron Female Threaded SNI 05-0170/SNI 05-0169 WOG Valve
,
1/2"' Isolating Ba 1 Valve 1
"
1 EA
/ WOG Valve or Equal 1 EA 15 Heec Plug Brass / Galvanized Malleable Cast Iron Male Threaded SNI 0139 or Equal
. 1
,
1 EA
07 Pressure Gauge Please See STM Pressure Instrumentation Pressure Range 0-1.6 Barg. dial 2.5"
. 11T 1 EA 16 Thermowell 316 SS. Thread Please See STM Temperature Instnimentation 3 '4 X 1/2'
,
"
1 EA
NOTES

ALL DIMENSION ARE IN MUMETERS UNLESS NOTED


OTHERWISE.
CONCRETE PEDESTAL 2 THE SIZE OF DOWNSTREAM
.
METER COMPONENTS SHAH
BE MATCH wrTH THE INSTALLATION PIPEWORK.
.
1 474x295x130 3 PI*E NIPPLE MAY 6E SUBSTTTUTED WITH GALVANIZED PIPE.
.

4. SUPPORT G40. SHALL BE DESIGNED fff VENDOR/


COHTRACTOR.

SC-tOi 8
J

TOP VIEW

1735

310

REFERENCES

iktfroy I
9-n-n rsajo ror trjwiuioi OH/HZ JA/MH HP
o a-i3-i7 esura rot fcraerum* m/m nmjn*i mu

K*. M( BfJCAlFTIOt. nrt> ©*t i«

Pgn PT. PERUSAHAAN GAS NEGARA Tbk.

WORK EXECUTOR / CONSULTANT LOGO AND NAME

[ PROJECT NAME ]

TYPICAL GENERAL ARANGEMENT


MRS T7PE P3 El G40