No 9z/CE(C&SYSE(R&A/EE-IUMeeting Dated:- 04-ob-2021

To,

As per distribution list.

(Through E-mail)
Subject:-Meeting to discuss variousissues relatedto tripping in UP Control Area for month
ofMay 2021
A meeting to discuss various issues related to tripping in UP Control Area for

month of May 2021 is scheduled to be held on 10.06.2021 from 11:00Hrs. .This

meeting shall be organized through video conferencing (by 'Google Meet App'). Link for

the meeting shall be sent to the members through e-mail. The agenda of the meeting is

attached herewith as Annexure l&lI.

It is therefore, requested to kindly depute senior officers, well conversant with

the subject issue to attend the meeting.

Encl: As above

(Akhílesh Kumar Singh)


Chief Engineer(C&S)
i
Distribution List
.Director, UPSLDC, Vibhuti Khand I1, Gomti Nagar, Iucknow.
t h Floor, Shakti Bhawan Extn., Lucknow.
2. Director(Operation). UPPTCL,
. Gomti Nagar, Lucknow.
3 Chief Engineer (PSso). Vibhuti Khand
4. Chief Engineer (1rans.West), Pareshan Bhawan. 130D, Hydel Colony. Victoria

Park. Mecrut 250001 (cetwmrt@gmail.com)

s. Chief Engineer (Trans. North East). 132kv Sub-station complex Mohaddipur old

Gorakhpur-273008 (cetne@upptcl.org)
6. Chief Engineer (Trans. Central),UPPTCL, Pareshan Bhawan, Vibhuti Khand. Gomti Nagar

Lucknow (cetcupptcl@gmail.com)

7 Chief Engineer, (Trans South west), U.P. Power Transmission Corporation Litd, 64.

Khambha, By pass road, Agra -282007 (cets@upptcl.org).

8. Chief Engineer (Trans. South - East), U.P. Power Transmission Corporation Ltd. 57.

George Town, Allahabad - 211003.(cete@upptcl.org)

9. Chief Engineer (Trans. South Central), UPPTCL, 132KV Sub-station Hasai.

Lalitpur Road Jhansi-284135 (cetsc@upptel.org)


10. Chief General Manager, Anpara, Thermal Power Station, Anpara.

11.Superintending Engineer (System Control), UPSLDC, Vibhuti Khand II, Gomti


Nagar, Lucknow.

12. Superintending Engineer, (T&C) Circle Pareshan Bhawan, Vibhuti Khand Il, Gomti
Nagar, Lucknow.

13. Superintending Engineer. (T&C) Circle, 132KV S/s Hasari (Jhansi).

14. Superintending Engineer, (T&C) Circle, 132KV S/S Mohaddipur(CGiorakhpur)


15. Superintending Fngineer, (T&C) Circle, Pareshan Bhawan, Vistoria Park, Meerut.

16. Superintending Fngineer (T&C) Cirele, I132KV S/S Minto Park, Varhena Road, Allahabad.

17. Superintending Eingineer (T&C) Circle, 64 Khamba Bypass Road, Agra.

18. Superintending Engineer, Flectricity Transmission Cirele-I, Kanpur (setknp@upptcl.org)


19. Superintending Engineer, Electricity Transmission Circle, Mathura,
UPPTCI
(setmthra@upptcl.org)
20. Superintending Engineer, Electricity Transmission Circle-l1, Allahabad

sectcalbd@upptcl.org)
21.
Superintending Engineer, Electricity Transmission Circle-Gazipur. (setgazipur@upptcl.org)
22. CGM
(SEUPPTCL), Lavana Cyber Height, Ist Floor, Office No. -

116, Vibhuti Khand,


Gomti Nagar, Lucknow 226010.
-

23. SIC, 400/220/132kV Badaun (OCBTL) GIS


(sic.badaun@adani.com).
24. M/s Alaknanda Hydro Power Company Ltd.,
Srinagar Hydro Electric project, Koteshwar
Colony, Srinagar, Garhwal-246174 (Uttrakhand). (sadanand.saw@gvk.com,
shepcontrol@gvk.com)
Annexure
Blackouts and Simultaneous Tripping Incident ofthe month of May 2021
.N Name of Sub station Date&Time ofincident Brief Discription

1 Due to DC suppty failure, bus bar protection operated at 220kV side of 400/220kv s/s
Rewa road and all the connected elements of bus I and bus - Il tripped.
2. 220kv Rewa Road{400kV) - Chitrakoot ckt- Il ine trppied again on distance protection
400 kVRewa Road 01.05.21 09:37:00 (Rphase, 2-1, Dist: 2747km ) on first try taken at 1254 hrs. After patrolling R-Phase jumper
of the line found open at fault distance and line charged 19:20 hrs after completion of
work

As reported, 400 KV Muradnagar_2-Mathura (UP) Ckt-1 tripped on B-N phase to earth fault.
|Line successfully autoreclosed from Muradnagar_2 end but tripped from Mathura end.
400kV Muradnagar 06.05.21 17:34:00 Fault distance 132.1Km and fault current was 2.591kA from Mathura end. At the same
was

time, 400/220 kV 240 MVA ICT 3 at Muradnagar_2(UP) tripped on over flux protection
operation and 125 MVAR Bus Reactor No 1 at 400KV Agra Fatehabad(UP) tripped on
backup impedance protection operation

As per information received from concerned, line fault sensed by relay of 220kv Orai -
220kv Ora 07.05.21 09:54:00 Orail400kV) Iine but due to delayed operation of CB of said line LBB protection operated
and all the elements at 200kv Orai s/s tripped resulting into blackout.

As per information received from concerned, R- Phase insulator of the base of wave
trap
got damage due to which 400&V Anpara - Obra line tripped on above mention flags. At the

400kV Anpara 07.05.21 16:13:00


same time
Anpara
40kV Anpara- Sungauk line triped only from 400V Anpara end and 400kv
Sarnath line trippedfrom boi end. Work of replacement of damaged insulator in
on progress
to earth fault. At
Ckt-1 tripped on B-N phase
As reported, 400 KV Orai(PG)-Orai(UP) (PG) to earth
Ckt-2 also tripped on R-N phase
the same time, 400 KV Orai(PG)-Orai(UP) (PG) earth fault is
followed by B-N phase to
10.05.21 21:34:00 fault. As per PMU, R-N phase to earth fault
400kV Orai
observed. In antecedent condition, 400 KV
Orai(PG)-Orai(UP) (PG)
Ckt-1&400 KV Orai(PG}
Orai(UP) (PG) Ckt-2 carrying approx. 220MW each.

As reported, 400 KV Bareilly-Unnao (UP) Ckt-1 & 400 KV


Bareilly-Unnao (UP) Ckt-2 both
tower
occurred due to to double circuit
tripped on R-Y-B-N three phase to earth fault. Fault
no 456 & 457 of Unnao Ckt-1 and Ckt-2 collapsed during heavy thunderstorm. As per PMU,
400kV Unnao 12.05.21 18:52:00 R-Y-B-N three phase to earth fault is observed. In antecedent
condition, 400 KV Bareilly-
111MW & 109MW
Unnao (UP) Ckt-1& 400 KV Bareilly-Unnao (UP) Ckt-2 carrying
respectively.

at 220kV side at
As per information received from concerned, due to over voltage
220kv Chandausi was only
400/220/132 kV s/s Badaun all 220kV line tripped. Since
400kV Badaun 19.05.21 05:54:00 to 220kV Badaun(400kv) supply at 220kV Chandusi also got
fail. Supply at 220kv
|connected Sambhal line.
Chandusi resume at 06:47 hrs by charging of 220kv Chandusi

As per information received from concerned, a heavy fault occurred at 33kV feeder
of the
emanating from 220/132/33 kV Sikandra (Agra) s/s. At the same time DC supply
substation got fail and circuit breaker of faulty feeder was not open. Due to this all 220kV

lines connected to 220kv Sikandra tripped from other end to clear the fault.
Following damages also has been reported in the said incident:
132 KV BUs & HV side R ph LA
220kV Agra 20.05.21 11:16
1.63 MVA ICT-I: HVside R phdamaged.
jumperbroken and drop
&R ph CTdamage.
on

2.33 KV UPSIDC: Line jumper Y&8 ph broken, CB jumper of R ph broken.


3.33 KVJal Sansthan: Line jumper R,Y&B ph broken, R,Y&B ph CT Damage.
4. 33 KV 630 KVA Station T/F: All CT, CB, Isolator & jumper Damaged.
5.160 MVA ICT-1 - LV side R ph CT Damaged due to jumper broken from CT terminal.

400kV Anpara 22.05.21 05:09


As reported, 210 MW Anpara TPS - UNIT 1, UNIT 2 & UNIT 3 all tripped on tripping of
cooling water pump.
As reported, 400 KV Alaknanda GVK(UPC)-Muzaffarnagar (UP) Ckt-1& 400 KV Alaknanda
GVK(UPC) VishnuprayaglUP) (UP) Ckt-1 both tripped at 17:20 Hrs on Y-N phase to earth fault
with delayed clearance in S60ms. At 17:36 Hrs, 400 KV Alaknanda GVK(UPC)-Srinagar(UK)
(UK) Ckt-1& Ckt-2 and 220 KV Singoli Bhatwari(Singoli(LTUHP)-Srinagar(UK) (PTCUL) Ckt-1
400kV Alaknanda 24.05.21 17:20 &Ckt-2 all tripped on DT received at Srinagar end. At the same time, 82.5MW Alaknanda
HEP UNIT 2 and 33MW Singoli UNIT 1& UNIT 2 also tripped. As per PMU, Y-N phase to
earth fault is observed at 17:20 Hrs. In antecedent condition, 400 KV Alaknanda GVK(UPC)
Muzaffarnagar (UP) Ckt-1 & 400 KV Alaknanda GVK[UPC) VishnuprayagUP) (UP) Ckt-1
carrying 57MW& 117MW respectively.

As per information received from UPPCL:


1. At 13:56 Hrs fault occurred in 220KV Mainpuri -Chibramau line at Distance 7.9KM.
zone-1 but the protection of the same line failed at 220kvVMainpuri end which results
operation of L88 protection and blackout occurred at 220KV Mainpuri S/s.
2. As per information received, due to issue in isolator contact bus tied condition occurred
while it was not physically occurred. Due to this both 220kv bus -I and bus lI tripped which
220kV Manipuri 25.05.21 13:56:00 results the tripping of all 220kv lines connected to these buses.

3. The reason for non operation ofprotection of 220KV Mainpuri- Chhibramau line was

due to damaged protection cable of line.

Concerned are requested to provide the detailed analysis report of the incident mention above as per format
attached as Annexure IlI
ANNEXURE-II
/TRIPPING STATEMENT OF TRANSMISSION ELEMENTS FOR400KV AND ABOVE FOR THE
Trippings Restoration
Name of Line/Trans. Equip.
NO. Date Time Date Time

17.05.21 15:59 17.05.21 23:42


400KV Rewa Road - Banda Ckt-1

400KV Rewa Road - Banda ckt-I 18.05.21 05:58 24.05.21 12:26


400KV Banda-Rewa Road ckt-I 26.05.21 15:56 26.05.21 18:04

07.05.21 16:13 07.05.21 17:01


400K VAnpara -Sarnmath (L-3)
17.05.21 16:49 17.05.21 17:53
400K V Anpara - Sarnath L-3

20.05.21 14:00 20.05.21 14:54


|400KV Anpara-Sarnath (L-3)
05.05.21 21:57 05.05.21 22:53
400KV Unnao -Agraline
06.05.21 05:09 06.05.21 06:17
3
|400K VUnnao -Agra line
06.05.21 05:08 06.05.21 06:17
|400KV Unnao Agra Line
07.05.21 01:34 07.05.21 03:07
|400KV Unnao Agra line
-

Muradnagar line 06.05.21 17:34 07.05.21 07:15


|400KV Mathura -

400KV Mathura - Muradnagar 13.05.21 05:02 13.05.21 08:35

|400KV Mathura-Muradnagar line 19.05.21 03:38 |19.05.21 09:07

19.05.21 11:25 20.05.21 19:44


400KVMathura-Murad Nagar line_