Professional Documents
Culture Documents
Protection Meeting
Protection Meeting
PHTY: Phone:
- :cecs@upsldc.org UPSLDC E-mail: cecs@upsldc.org
sera@upsldc.org sera@upsldc.org
To,
(Through E-mail)
Subject:-Meeting to discuss variousissues relatedto tripping in UP Control Area for month
ofMay 2021
A meeting to discuss various issues related to tripping in UP Control Area for
meeting shall be organized through video conferencing (by 'Google Meet App'). Link for
the meeting shall be sent to the members through e-mail. The agenda of the meeting is
Encl: As above
s. Chief Engineer (Trans. North East). 132kv Sub-station complex Mohaddipur old
Gorakhpur-273008 (cetne@upptcl.org)
6. Chief Engineer (Trans. Central),UPPTCL, Pareshan Bhawan, Vibhuti Khand. Gomti Nagar
Lucknow (cetcupptcl@gmail.com)
7 Chief Engineer, (Trans South west), U.P. Power Transmission Corporation Litd, 64.
8. Chief Engineer (Trans. South - East), U.P. Power Transmission Corporation Ltd. 57.
12. Superintending Engineer, (T&C) Circle Pareshan Bhawan, Vibhuti Khand Il, Gomti
Nagar, Lucknow.
16. Superintending Fngineer (T&C) Cirele, I132KV S/S Minto Park, Varhena Road, Allahabad.
sectcalbd@upptcl.org)
21.
Superintending Engineer, Electricity Transmission Circle-Gazipur. (setgazipur@upptcl.org)
22. CGM
(SEUPPTCL), Lavana Cyber Height, Ist Floor, Office No. -
1 Due to DC suppty failure, bus bar protection operated at 220kV side of 400/220kv s/s
Rewa road and all the connected elements of bus I and bus - Il tripped.
2. 220kv Rewa Road{400kV) - Chitrakoot ckt- Il ine trppied again on distance protection
400 kVRewa Road 01.05.21 09:37:00 (Rphase, 2-1, Dist: 2747km ) on first try taken at 1254 hrs. After patrolling R-Phase jumper
of the line found open at fault distance and line charged 19:20 hrs after completion of
work
As reported, 400 KV Muradnagar_2-Mathura (UP) Ckt-1 tripped on B-N phase to earth fault.
|Line successfully autoreclosed from Muradnagar_2 end but tripped from Mathura end.
400kV Muradnagar 06.05.21 17:34:00 Fault distance 132.1Km and fault current was 2.591kA from Mathura end. At the same
was
time, 400/220 kV 240 MVA ICT 3 at Muradnagar_2(UP) tripped on over flux protection
operation and 125 MVAR Bus Reactor No 1 at 400KV Agra Fatehabad(UP) tripped on
backup impedance protection operation
As per information received from concerned, line fault sensed by relay of 220kv Orai -
220kv Ora 07.05.21 09:54:00 Orail400kV) Iine but due to delayed operation of CB of said line LBB protection operated
and all the elements at 200kv Orai s/s tripped resulting into blackout.
As per information received from concerned, R- Phase insulator of the base of wave
trap
got damage due to which 400&V Anpara - Obra line tripped on above mention flags. At the
at 220kV side at
As per information received from concerned, due to over voltage
220kv Chandausi was only
400/220/132 kV s/s Badaun all 220kV line tripped. Since
400kV Badaun 19.05.21 05:54:00 to 220kV Badaun(400kv) supply at 220kV Chandusi also got
fail. Supply at 220kv
|connected Sambhal line.
Chandusi resume at 06:47 hrs by charging of 220kv Chandusi
As per information received from concerned, a heavy fault occurred at 33kV feeder
of the
emanating from 220/132/33 kV Sikandra (Agra) s/s. At the same time DC supply
substation got fail and circuit breaker of faulty feeder was not open. Due to this all 220kV
lines connected to 220kv Sikandra tripped from other end to clear the fault.
Following damages also has been reported in the said incident:
132 KV BUs & HV side R ph LA
220kV Agra 20.05.21 11:16
1.63 MVA ICT-I: HVside R phdamaged.
jumperbroken and drop
&R ph CTdamage.
on
3. The reason for non operation ofprotection of 220KV Mainpuri- Chhibramau line was
Concerned are requested to provide the detailed analysis report of the incident mention above as per format
attached as Annexure IlI
ANNEXURE-II
/TRIPPING STATEMENT OF TRANSMISSION ELEMENTS FOR400KV AND ABOVE FOR THE
Trippings Restoration
Name of Line/Trans. Equip.
NO. Date Time Date Time
ole ikuif