SR NO COMMENTS

CALC 1 STRC CALC UCW 6 MTR FLOOR


Specify shop or system drawing calculation.
1 Share MTC to support the material properties.
2 Share glass check calculations.
Share calculation for toggle chart ,sash as this is different separate doc for 6 mtr.
3

4 Ensure encure cad filling is done as per calculations.


5 Share weld calculations for bracket plates.
6 Specify the details for 5m height semiunitised glazing
Tabulate or provide the schedule of dies/connection , brackets/sash/toggle cleat / Top
7 anchor/ bottom anchor for all different heights /wind pressure
8 All mismatch, Detail req & resubmit seperately else submission become void
9 it should be 250 grade material (Insert)
10 16 MM
11 weld (Part penetration)
12 Mullion profile mismatching with drawings
13 toggle & Sash mismatch with drawing share calculation for the same
14 Max span should be 1.29m for Transom
15 Length anchor 11
16 Ensure ancure gaps are filled as per calculations
17 PMC to ensure this parameter.
18 Check and ensure the locking DIMENSIONS.
19 Length of the Bolt.
20 PMC to ensure type, Depth & grade of base Material
21 Anchor C/C distance mismatch with drawings
22 connector profile mismatch with drawings
23 specifically submit calculation for this type

CALC 2 STRUCTURAL CALC OF SCW (BRACKETS)


1 Ensure reaction used for anchor design ,Brackets are as per actual analysis
2 Ensure Locking dimension of anchor, type,grade and Depth of concrete is as per actuals.
3 Annular Gap filling sholud be done as per calculations on site
4 Tabulate List Items ?
5 Weld check for Brackets
6 specify the height clearly with drawing specifically no to check.
7 Make and mention of bolt length as in drawings
8 Length of anchor
9 PMC to ensure this parameter.
Ensure Locking dimension of anchor, type,grade and Depth of concrete is as per actuals.
10

11 Weld check for Brackets Projected plate. Proceed with 5mm fillet weld
12 Length of anchor
13 check emb depth in dwg will not sufficient
Ensure Locking dimension of anchor, type,grade and Depth of concrete is as per actuals.
14

15 Mention Refrence drawing for bottom bracket


16 height of panel shold be as per dwg.
17 Weld check for Brackets
18 Weld check for Brackets Projected plate. Proceed with 5mm fillet weld
19 with annular gap fill

CALC 3 STRC CALC FOR FRAME DOOR- 3.25kpa (1.154m X 2.731m)


1 Share MTC to support the material properties.
2 Share Quality Certifoicates of all the Hardwares.
3 Share Architect ,PMC confirmation for reduce wind pressure considered.
4 Glasss check deflection exceed permissable
5 Ensure Architect approval is obtain for all products / Hardwares in frame Door.
6 Share architechtural confirmation for this type of handle.
7 Mismatch with DRG CHK.( DIES)
8 Architect/ PMC Approval for this consideration ?? For 25% of design wind pressure in
open condition
9 Why there valus are different when profile is same
10 Without ARC/PMC confirmation of this reduced wind pressue approval would Become void.
11 Check ensure the permissable difflection.
12 1.017 KN shear force for open condition.
13 Load distribution needs to be rechecked. (glass design)
14 Approval need to be obtained from PMC/ Architech for hardware
15 Kindly confirm with the architech the ….. proposed.page no 109

CALC STRC CALC UCW 3.75 MTR FLOOR-3.25kpA

1 Mullion thickness 2mm as per cad file


2 max cross span for transom update wrt drawings
This consideration with 2 fastners is failing & If recommended, the reduired is more
update wrt below comment. WRT
submission WL is considered at top & DL is condidered at bottom. Kindly reverese. The
3 consideration as discussed with Mr. Baiju & Mr. Gajanan. Also provide 4 anchor.

4 kindly revise the bracket design with 4 anchors


5 Recommended 15mm base plate
6 for setting block calc confirm width 1.157 or 1.125m
7 length of toggle cleat mismatching with DWG no 412-B

4.65m @ 2.75kpa
8 kindly update 1.125m or 1.157m
9 same comments on brackets & anchors as per above calcualton
RESPONSE FROM
RESPONSE TO L&T
ALUVISION

will done

Ht (mtr) WP (kpa) Top

5.65 3.25 12kN


3.65 3.25 12Kn/17.8

4.65 2.75
4.65 2.75

3.65 2.75
3.65 2.75

Ht (mtr) WP (kpa) Top BOTTm

3.65 3.25
3.65 3.25

4.65 2.75
4.65 2.75

3.65 2.75
3.65 2.75
Become void.
BOTTm thk (fork/bp) anch deo

17.8Kn 08-12mm M16 HAS-R 92


08-12mm M16 HAS-R 100

08-12mm M10 HAS-R 60


08-12mm M10 HST3-R 70

08-10mm M10 HAS-R 60


08-10mm M10 HST3-R 50

thk (fork/bp) anch deo

08-10mm M10 HAS-R 60


08-12mm M10 HST3-R 70

08-12mm M10 HAS-R 60


08-12mm M10 HST3-R 70

08-10mm M10 HAS-R 60


08-10mm M10 HST3-R 50