N0 ACTUAL CHECK/ PEKERJAAN

1 PEKERJAAN KOLOM TYPE K 1 LANTAI BASEMENT - LANTAI GROUND (600X15

a. Beton
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 4.00 m
Jumlah Kolom = 1 titik

b. Pembesian
Panjang Besi Utama 36D32
Panjang Besi Kolom = 4.00 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 4.38 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 157.82 m


Berat Besi = 996.61 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 42 bh
Banyak kolom = 1 bh
Panjang Besi = 352.80 m
Berat besi = 217.56 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 21 bh
Banyak kolom = 1 bh
Panjang Besi = 88.20 m
Berat Besi = 54.39 kg

Pengikat
- Horizontal
Panjang = 0.60 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 3.36 m
Berat Besi = 2.07 kg

- Vertikal
Panjang = 1.50 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 2.76 m
Berat besi = 1.70 kg

c. Bekisting
Panjang = 4.20 m
Tinggi = 4.00 m
Jumlah Kolom = 1 titik

2. LANTAI GROUND - LANTAI 7


PEKERJAAN KOLOM TYPE K 1 LANTAI GROUND - LANTAI 7 (600X1500)

Lantai 1

a. Beton L1
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 5.40 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 1-2


Panjang Besi Utama 36D32
Panjang Besi Kolom = 5.40 m
Add Balok = - m
Overlap = 1.28 m
Panjang Besi Utama = 6.68 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh
Total Panjang Besi = 240.48 m
Berat Besi = 1,518.55 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 15 bh
Banyak kolom = 1 bh
Panjang Besi = 60.90 m
Berat besi = 75.11 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 15 bh
Banyak kolom = 1 bh
Panjang Besi = 60.90 m
Berat Besi = 37.56 kg

Pengikat D10-100
- Horizontal
Panjang = 0.60 m
Less selmut beyon
Bengkokan = 0.12 m
Jumlah besi = 7 bh dikali banyak sengkan
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Less selimut beton
Bengkokan = 0.12 m
Jumlah besi = 2 bh dikali banyak sengkan
Panjang besi = 3.24 m
Berat besi = 2.00 kg

c. Bekisting L1
Panjang = 4.20 m
Tinggi = 5.40 m
Jumlah Kolom = 1 titik
Lantai 2

b. Beton L2
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 2-3


Panjang Besi Utama 36D32
Panjang Besi Kolom = 3.20 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 3.58 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 129.02 m


Berat Besi = 814.74 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat besi = 46.62 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat Besi = 23.31 kg

Pengikat D10-100

- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 3.24 m
Berat besi = 2.00 kg
Jumlah Kolom = 1 titik

c. Bekisting L2
Panjang = 4.20 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

Lantai 3

a. Beton L3
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 3-4


Panjang Besi Utama 36D32
Panjang Besi Kolom = 3.20 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 3.58 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 129.02 m


Berat Besi = 814.74 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat besi = 46.62 kg

Besi Sengkang D10-200 (Lapangan)


- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat Besi = 23.31 kg

Pengikat D10-100

- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 3.24 m
Berat besi = 2.00 kg
Jumlah Kolom = 1 titik

c. Bekisting L3
Panjang = 4.20 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

Lantai 4

a. Beton L4
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 4-5


Panjang Besi Utama 36D32
Panjang Besi Kolom = 3.20 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 3.58 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 129.02 m


Berat Besi = 814.74 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat besi = 46.62 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat Besi = 23.31 kg

Pengikat D10-100

- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 3.24 m
Berat besi = 2.00 kg
Jumlah Kolom = 1 titik

c. Bekisting L4
Panjang = 4.20 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

Lantai 5

e. Beton L5
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 5-6


Panjang Besi Utama 36D32
Panjang Besi Kolom = 3.20 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 3.58 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 129.02 m


Berat Besi = 814.74 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat besi = 46.62 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat Besi = 23.31 kg

Pengikat D10-100

- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 3.24 m
Berat besi = 2.00 kg
Jumlah Kolom = 1 titik

c. Bekisting L5
Panjang = 4.20 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

Lantai 6

a. Beton L6
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 4-5


Panjang Besi Utama 36D32
Panjang Besi Kolom = 3.20 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 3.58 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 129.02 m


Berat Besi = 814.74 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat besi = 46.62 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 9 bh
Banyak kolom = 1 bh
Panjang Besi = 37.80 m
Berat Besi = 23.31 kg

Pengikat D10-100

- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 3.24 m
Berat besi = 2.00 kg
Jumlah Kolom = 1 titik

c. Bekisting L6
Panjang = 4.20 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

Lantai 7

g. Beton L7
Panjang = 0.60 m
Lebar = 1.50 m
Tinggi = 4.80 m
Jumlah Kolom = 1 titik

b. Pembesian Lantai 4-5


Panjang Besi Utama 36D32
Panjang Besi Kolom = 4.80 m
Add Balok = - m
Bengkokan = 0.38 m
Panjang Besi Utama = 5.18 m
Banyak besi utama = 36 bh
Banyak kolom = 1 bh

Total Panjang Besi = 186.62 m


Berat Besi = 1,178.47 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 13 bh
Banyak kolom = 1 bh
Panjang Besi = 54.60 m
Berat besi = 67.34 kg

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.24 m
Jumlah Sengkang = 13 bh
Banyak kolom = 1 bh
Panjang Besi = 54.60 m
Berat Besi = 33.67 kg

Pengikat D10-100

- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m
Berat Besi = 3.11 kg

- Vertikal
Panjang = 1.50 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 3.24 m
Berat besi = 2.00 kg
Jumlah Kolom = 1 titik

c. Bekisting L7
Panjang = 4.20 m
Tinggi = 3.20 m
Jumlah Kolom = 1 titik

3. LANTAI 7 - LANTAI 20
PEKERJAAN KOLOM TYPE K 1 LANTAI 7 - LANTAI 20 (600X1200)

a. Beton
Panjang = 0.60 m
Lebar = 1.20 m
Tinggi = 46.60 m
Jumlah Kolom = 13 titik

b. Pembesian
Panjang Besi Utama 36D28
Panjang Besi Kolom = 46.60 m
Add Balok = 0.40 m
Bengkokan = 0.34 m
Panjang Besi Utama = 47.34 m
Banyak besi utama = 36 bh
Banyak kolom = 13 bh

Total Panjang Besi = 22,153.25 m


Berat Besi = 139,890.38 kg

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 3.60 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Jumlah Sengkang = 36 bh
Banyak kolom = 13 bh
Panjang Besi = 3,257.28 m

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Jumlah Sengkang = 21 bh
Banyak kolom = 1 bh
Panjang Besi = 85.68 m

Total Panjang Besi = 3,342.96 m


Berat Besi = 2,061.49 kg

Pengikat
- Horizontal
Panjang = 0.60 m
Bengkokan = 0.12 m
Jumlah besi = 7 bh
Panjang besi = 5.04 m

- Vertikal
Panjang = 1.90 m
Bengkokan = 0.12 m
Jumlah besi = 2 bh
Panjang besi = 4.04 m

Total panjang besi = 5,327.85 m


Berat besi = 3,285.51 kg
c. Bekisting
Panjang = 4.20 m
Tinggi = 4.00 m
Jumlah Kolom = 1 titik
ERJAAN VOLUME

TAI GROUND (600X1500)

1 0.60
1.50
4.00

996.61
1
4.20
4.00

I 7 (600X1500)

1 0.60
1.50
5.40
dikali banyak sengkang

dikali banyak sengkang

1
4.20
5.40
1 0.60
1.50
3.20
1
4.20
3.20

1 0.60
1.50
3.20
1
4.20
3.20

1 0.60
1.50
3.20
1
4.20
3.20

1 0.60
1.50
3.20
1
4.20
3.20

1 0.60
1.50
3.20
1
4.20
3.20

1 0.60
1.50
4.80
1
4.20
3.20

13 0.60
1.20
46.60

139,890.38
7
3,285.51
1
4.20
4.00
SATUAN

3.60 M3

996.61 kg
12.80 m2

4.86 M3
12.80 m2
2.88 M3
13.44 m2

2.88 M3
13.44 m2

2.88 M3
13.44 m2

2.88 M3
13.44 m2

2.88 M3
13.44 m2

4.32 M3
13.44 m2

436.18 M3

139,890.38 kg
22,998.56 kg
12.80 m2
ITEM BETON BEKISTING BESI
K1 M3 M2 KG RASIO BESI
LANTAI BASEMENT 3.60 12.80 1,272.33 353.42
LANTAI 1 - 7 Err:509 Err:509 Err:509 Err:509
RASIO BEKISTING
3.56
Err:509
N0 ACTUAL CHECK/ PEKE

1. LANTAI BASEMENT - LANTAI GROUND


PEKERJAAN RAAF

b. Pembesian
Panjang Besi Bawah D32-100 (2LAPIS)
Panjang Besi Raaf arah x lapis 2 = 21.92
Panjang Besi Utama = 21.92
Overlaphing = 1.28
Banyak besi utama = 592

Total Panjang Besi = 13,727.44


Berat Besi = 86,684.2

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf arah x = 22.12


Panjang Besi Utama = 22.12
Overlaphing = 1.00
Banyak Besi Utama = 592

total panjang besi = 13,680.10


Berat besi = 52,725.40

besi bawah
Panjang Besi Raaf arah y lapis 1 = 66.53
Panjang Besi Utama = 66.53
Overlaphing = 1.28
Banyak besi utama = 198

Total Panjang Besi = 13,419.60


Berat Besi = 84,740.3

besi bawah
Panjang Besi Raaf arah y lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 198
Total Panjang Besi = 7,411.36
Berat Besi = 46,800.2

besi atas
Panjang Besi Raaf arah y lapis 1 = 65.78
Panjang Besi Utama = 65.78
Overlaphing = 1.28
Banyak besi utama = 198

Total Panjang Besi = 13,271.17


Berat Besi = 83,803.0

Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 44.82


Panjang Besi Utama = 44.82
Overlaphing = 1.3
Banyak besi utama = 602

Total Panjang Besi = 27,756.81


Berat Besi = 175,275.0

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 45.02


Panjang Besi Utama = 45.02
Overlaphing = 1.00
Banyak Besi Utama = 602

total panjang besi = 27,708.64


Berat besi = 106,793.72

Panjang Besi Raaf arah y lapis 1 = 66.53


Panjang Besi Utama = 66.53
Overlaphing = 1.28
Banyak besi utama = 198
Total Panjang Besi = 13,419.60
Berat Besi = 84,740.3

besi bawah
Panjang Besi Raaf arah x lapis 1 = 64.80
Panjang Besi Utama = 64.80
Overlaphing = 1.28
Banyak besi utama = 157

Total Panjang Besi = 10,367.95


Berat Besi = 65,470.2

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 157

besi atas
Panjang Besi Raaf arah x lapis 1 = 66.37
Panjang Besi Utama = 66.37
Overlaphing = 1.28
Banyak besi utama = 413

Total Panjang Besi = 27,925.92


Berat Besi = 176,342.9

Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 21.56


Less selimut beton = 0.15
Panjang Besi Utama = 42.82
Overlaphing = 1.3
Banyak besi utama = 267

Total Panjang Besi = 11,783.52


Berat Besi = 74,409.0

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 21.76


Less selimut beton = 0.15
Panjang Besi Utama = 43.22
Overlaphing = 1.00
Banyak Besi Utama = 267

total panjang besi = 11,815.58


Berat besi = 45,539.23

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 140

total panjang besi = 5,254.24


Berat besi = 20,250.70

besi bawah
Panjang Besi Raaf arah y lapis 1 = 36.62
Panjang Besi Utama = 36.62
Overlaphing = 1.28
Banyak besi utama = 140

Total Panjang Besi = 5,317.37


Berat Besi = 33,577.4

besi atas
Panjang Besi Raaf arah x lapis 1 = 48.45
Panjang Besi Utama = 48.45
Overlaphing = 1.28
Banyak besi utama = 140

Total Panjang Besi = 6,977.12


Berat Besi = 44,058.2

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 296
Total Panjang Besi = 302.47
Berat Besi = 1,165.8

besi D25 - 200 arah y

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 100

Total Panjang Besi = 105.62


Berat Besi = 407.1

besi D25-200 arah y

Panjang Besi Raaf arah y = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 99

Total Panjang Besi = 608.63


Berat Besi = 3,843.3

besi D25-200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 157

Total Panjang Besi = 960.23


Berat Besi = 6,063.5

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 140

total panjang besi = 858.64


Berat besi = 3,309.33

besi D25 - 200 arah y


Panjang Besi Raaf arah y = 6.12
Panjang Besi Utama = 6.12
Banyak besi utama = 140

Total Panjang Besi = 858.64


Berat Besi = 5,422.0

beton raft
- volume 1 = 593.82
- volume 2 (7.550 - 6.550) = 160.53
- volume 3 (7.550 - 4.050) = 139.78
- volume 4 (6.550 - 4.050) = 635.25
total volume = 1,529.39
``

2. LANTAI GROUND - LANTAI 7


PEKERJAAN KOLOM TYPE K 1 LANTAI GROUND - LANTAI 7 (600X1500)

a. Beton L1
Panjang = 0.60
Lebar = 1.50
Tinggi = 5.40
Jumlah Kolom = 1

a. Beton L2
Panjang = 0.60
Lebar = 1.50
Tinggi = 3.20
Jumlah Kolom = 1

a. Beton L3
Panjang = 0.60
Lebar = 1.50
Tinggi = 3.20
Jumlah Kolom = 1

a. Beton L4
Panjang = 0.60
Lebar = 1.50
Tinggi = 3.20
Jumlah Kolom = 1
a. Beton L5
Panjang = 0.60
Lebar = 1.50
Tinggi = 3.20
Jumlah Kolom = 1

a. Beton L6
Panjang = 0.60
Lebar = 1.50
Tinggi = 3.20
Jumlah Kolom = 1

a. Beton L7
Panjang = 0.60
Lebar = 1.50
Tinggi = 3.20
Jumlah Kolom = 1

Total beton = 22.14

b. Pembesian
Panjang Besi Utama 36D32
Panjang Besi Kolom = 23.00
Add Balok = -
Bengkokan = 0.38
Panjang Besi Utama = 23.38
Banyak besi utama = 36
Banyak kolom = 1

Total Panjang Besi = 841.82


Berat Besi = 5,315.84

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 4.20
Less selimut beton = 0.24
Bengkokan = 0.12
Jumlah Sengkang = 42
Banyak kolom = 1
Panjang Besi = 342.72
Berat besi = 211.34

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20
Less selimut beton = 0.24
Bengkokan = 0.12
Jumlah Sengkang = 21
Banyak kolom = 1
Panjang Besi = 85.68
Berat Besi = 52.84

Pengikat
- Horizontal
Panjang = 0.60
Less selimut beton = 0.24
Bengkokan = 0.12
Jumlah besi = 7
Panjang besi = 5.04
Berat besi = 3.11

- Vertikal
Panjang = 1.90
Less selimut beton = 0.24
Bengkokan = 0.12
Jumlah besi = 2
Panjang besi = 4.04
Berat besi = 2.49

c. Bekisting L1
Panjang = 4.20
Tinggi = 5.40
Jumlah Kolom = 1

c. Bekisting L2
Panjang = 4.20
Tinggi = 3.20
Jumlah Kolom = 1
c. Bekisting L3
Panjang = 4.20
Tinggi = 3.20
Jumlah Kolom = 1

c. Bekisting L4
Panjang = 4.20
Tinggi = 3.20
Jumlah Kolom = 1

c. Bekisting L5
Panjang = 4.20
Tinggi = 3.20
Jumlah Kolom = 1

c. Bekisting L6
Panjang = 4.20
Tinggi = 3.20
Jumlah Kolom = 1

c. Bekisting L7
Panjang = 4.20
Tinggi = 3.20
Jumlah Kolom = 1

3. LANTAI 7 - LANTAI 20
PEKERJAAN KOLOM TYPE K 1 LANTAI 7 - LANTAI 20 (600X1200)

a. Beton
Panjang = 0.60
Lebar = 1.20
Tinggi = 46.60
Jumlah Kolom = 13

b. Pembesian
Panjang Besi Utama 36D28
Panjang Besi Kolom = 46.60
Add Balok = 0.40
Bengkokan = 0.34
Panjang Besi Utama = 47.34
Banyak besi utama = 36
Banyak kolom = 13

Total Panjang Besi = 22,153.25


Berat Besi = 139,890.38

Besi Sengkang D10-100 (Tumpuan)

- Tumpuan
Panjang Sengkang = 3.60
Less selimut beton = 0.24
Bengkokan = 0.12
Jumlah Sengkang = 36
Banyak kolom = 13
Panjang Besi = 3,257.28

Besi Sengkang D10-200 (Lapangan)

- Lapangan
Panjang Sengkang = 4.20
Less selimut beton = 0.24
Bengkokan = 0.12
Jumlah Sengkang = 21
Banyak kolom = 1
Panjang Besi = 85.68

Total Panjang Besi = 3,342.96


Berat Besi = 2,061.49

Pengikat
- Horizontal
Panjang = 0.60
Bengkokan = 0.12
Jumlah besi = 7
Panjang besi = 5.04
- Vertikal
Panjang = 1.90
Bengkokan = 0.12
Jumlah besi = 2
Panjang besi = 4.04

Total panjang besi = 5,327.85


Berat besi = 3,285.51
c. Bekisting
Panjang = 4.20
Tinggi = 4.00
Jumlah Kolom = 1
TUAL CHECK/ PEKERJAAN VO

m
m

bh

m
kg

m
m
bh
m

kg

m
m

bh

m
kg

m
m

bh
m
kg

m
m

bh

m
kg

m
m

bh

m
kg

m
m
bh
m

kg

m
m

bh
m
kg

m
m

bh

m
kg

m
m

bh

m
m

bh

m
kg

m
m
m

bh

m
kg

m
m
m
bh
m

kg

m
m

bh

kg

m
m

bh

m
kg

m
m

bh

m
kg

m
m
bh
m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh

kg
m
m
bh

m
kg

m3
m3
m3 13.30
m3 9.76 65.10 635.25
m3
600X1500)

m
m
m
titik

m
m
m
titik

m
m
m
titik

m
m
m
titik
m
m
m
titik

m
m
m
titik

m
m
m
titik

m3

m
m
m
m
bh
bh

m
kg

m
m
m
bh
bh
m
kg

m
m
m
bh
bh
m
kg

m
m
m
bh
m

m
m
m
bh
m
kg

m
m
titik

m
m
titik
F

m
m
titik

m
m
titik

m
m
titik

m
m
titik

m
m
titik

m
m
m
titik

m
m
m
m
bh
bh

m
kg

m
m
m
bh
bh
m

m
m
m
bh
bh
m

m
kg

m
m
bh
m
m
m
bh
m

m
kg
m
m
titik
VOLUME SATUAN
1 0.60
1.50
5.40
4.86 M3

1 0.60
1.50
3.20
2.88 M3

1 0.60
1.50
3.20
2.88 M3

1 0.60
1.50
3.20
2.88 M3
1 0.60
1.50
3.20
2.88 M3

1 0.60
1.50
3.20
2.88 M3

1 0.60
1.50
3.20
2.88 M3

22.14

###
### kg
1
4.20
5.40
12.80 m2

1
4.20
3.20
13.44 m2
1
4.20
3.20
13.44 m2

1
4.20
3.20
13.44 m2

1
4.20
3.20
13.44 m2

1
4.20
3.20
13.44 m2

1
4.20
3.20
13.44 m2
93.44

13 0.60
1.20
46.60
436.18 M3

###
### kg
7
###
### kg
1
4.20
4.00
12.80 m2
N0 ACTUAL CHECK/

1. LANTAI BASEMENT - LANTAI GROUND


PEKERJAAN RAAF

Bor PileTipe 1
Diameter = 1.2
Diameter spiral = 1.06
panjang = 35.50
diameter besi utama = 19
diameter besi spiral = 13

a. pengeboran
panjang = 35.50

b. beton

Luas = 1.13
Panjang = 35.50
volume = 40.13

c. Pembesian

- besi utama
sec d Besi 8D19
Panjang Besi = 2.56
Panjang total = 2.56
Banyak besi utama = 8
Panjang total keseluruhan = 20.48
Berat Besi = 45.59

sec c Besi 10D19


Panjang Besi = 12.00
Panjang total = 12.00
Banyak besi utama = 10
Panjang total keseluruhan = 120.00
Berat Besi = 267.14

sec b Besi 14D19


Panjang Besi = 12.00
Panjang total = 12.00
Banyak besi utama = 14
Panjang total keseluruhan = 168.00
Berat Besi = 374.00
sec a Besi 20D19
Panjang Besi = 11.34
tulangan ekstra = 0.87
Panjang total = 12.21
Banyak besi utama = 20
Panjang total keseluruhan = 244.28
Berat Besi = 543.81

- besi spiral
Tumpuan (besi D13-100)
Panjang Besi = 22.54
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping spiral = 64.35
Panjang total dan banyak besi = 760.21
Berat Besi spiral = 792.26
berat besi overlap = 45.34
837.60

Lapangan (D13-150)
Panjang Besi = 12.96
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 26.56
Panjang total = 306.67
Berat Besi = 319.60
berat besi spiral = 18.71
338.31

Bor PileTipe 2
Diameter = 1.2
Diameter spiral = 1.06
panjang = 39.50
diameter besi utama = 19
diameter besi spiral = 13

a. pengeboran
panjang = 39.50

b. beton

Luas = 1.13
Panjang = 39.50
volume = 44.65

c. Pembesian
- besi utama
sec d Besi 8D19
Panjang Besi = 6.56
Panjang total = 6.56
Banyak besi utama = 8
Panjang total keseluruhan = 52.48
Berat Besi = 116.83

sec c Besi 8D19


Panjang Besi = 12.00
Panjang total = 12.00
Banyak besi utama = 8
Panjang total keseluruhan = 96.00
Berat Besi = 213.71

sec b Besi 14D19


Panjang Besi = 12.00
Panjang total = 12.00
Banyak besi utama = 14
Panjang total keseluruhan = 168.00
Berat Besi = 374.00

sec a Besi 20D19


Panjang Besi = 11.34
tulangan ekstra = 0.87
Panjang total = 12.21
Banyak besi utama = 20
Panjang total keseluruhan = 244.28
Berat Besi = 543.81

- besi spiral
Tumpuan (besi D13-100)
Panjang Besi = 22.54
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 64.35
Panjang total = 760.21
Berat Besi spiral = 792.26
berat besi overlap = 45.34
837.60

Lapangan (D13-150)
Panjang Besi = 16.96
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 34.44
Panjang total = 401.33
Berat Besi = 418.25
berat besi spiral = 24.27
442.51

Bor PileTipe 3
Diameter = 0.8
Diameter spiral = 0.66
panjang = 32.80
diameter besi utama = 19
diameter besi spiral = 13

a. pengeboran
panjang = 32.80

b. beton

Luas = 0.5024
Panjang = 32.80
volume = 16.48

c. Pembesian

- besi utama
sec d Besi 5D16
Panjang Besi = 10.76
Panjang total = 10.76
Banyak besi utama = 8
Panjang total keseluruhan = 86.08
Berat Besi = 135.89

sec c Besi 9D16


Panjang Besi = 12.00
Panjang total = 12.00
Banyak besi utama = 9
Panjang total keseluruhan = 108.00
Berat Besi = 170.50

sec a Besi 13D16


Panjang Besi = 11.44
tulangan ekstra = 0.87
Panjang total = 12.31
Banyak besi utama = 13
Panjang total keseluruhan = 160.08
Berat Besi = 252.72

- besi spiral
Tumpuan (besi D13-100)
Panjang Besi = 22.64
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 40.62
Panjang total = 475.41
Berat Besi spiral = 495.45
berat besi overlap = 28.62
= 524.07

Lapangan (D13-150)
Panjang Besi = 9.96
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 9.73
Panjang total = 104.75
Berat Besi = 109.17
berat besi spiral = 6.85
116.02

Bor PileTipe 4
Diameter = 0.80
Diameter spiral = 0.66
panjang = 29.20
diameter besi utama = 19
diameter besi spiral = 13

a. pengeboran
panjang = 29.20

b. beton

Luas = 0.5024
Panjang = 29.20
volume = 14.67

c. Pembesian

- besi utama
sec d Besi 5D16
Panjang Besi = 6.72
Panjang total = 6.72
Banyak besi utama = 5
Panjang total keseluruhan = 33.60
Berat Besi = 53.04

sec c Besi 9D16


Panjang Besi = 12.00
Panjang total = 12.00
Banyak besi utama = 9
Panjang total keseluruhan = 108.00
Berat Besi = 170.50

sec a Besi 13D16


Panjang Besi = 11.44
tulangan ekstra = 0.87
Panjang total = 12.31
Banyak besi utama = 13
Panjang total keseluruhan = 160.08
Berat Besi = 252.72

- besi spiral
Tumpuan (besi D13-100)
Panjang Besi = 22.84
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 40.96
Panjang total = 479.55
Berat Besi spiral = 499.77
berat besi overlap = 28.86
528.63

Lapangan (D13-150)
Panjang Besi = 6.36
overlaping 12 m (satu setengah) = 0.16
overlaping = 0.52
jumlah overlaping = 6.57
Panjang total = 66.89
Berat Besi = 69.71
berat besi spiral = 4.63
berat besi overlap = 4.63
9.26
Besi Bawah D32-100 (2LAPIS)
- Panjang Besi Raaf = 44.82
Panjang Besi Utama = 44.82
Overlaphing = 1.3
Banyak besi utama = 602

Total Panjang Besi = 27,756.81


Berat Besi = 175,275.0

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 45.02


Panjang Besi Utama = 45.02
Overlaphing = 1.00
Banyak Besi Utama = 602

total panjang besi = 27,708.64


Berat besi = 106,793.72

Panjang Besi Raaf arah y lapis 1 = 66.53


Panjang Besi Utama = 66.53
Overlaphing = 1.28
Banyak besi utama = 198

Total Panjang Besi = 13,419.60


Berat Besi = 84,740.3

besi bawah
Panjang Besi Raaf arah x lapis 1 = 64.80
Panjang Besi Utama = 64.80
Overlaphing = 1.28
Banyak besi utama = 157

Total Panjang Besi = 10,367.95


Berat Besi = 65,470.2

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 157

besi atas
Panjang Besi Raaf arah x lapis 1 = 66.37
Panjang Besi Utama = 66.37
Overlaphing = 1.28
Banyak besi utama = 413

Total Panjang Besi = 27,925.92


Berat Besi = 176,342.9

Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 21.56


Less selimut beton = 0.15
Panjang Besi Utama = 42.82
Overlaphing = 1.3
Banyak besi utama = 267

Total Panjang Besi = 11,783.52


Berat Besi = 74,409.0

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 21.76


Less selimut beton = 0.15
Panjang Besi Utama = 43.22
Overlaphing = 1.00
Banyak Besi Utama = 267

total panjang besi = 11,815.58


Berat besi = 45,539.23

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 140

total panjang besi = 5,254.24


Berat besi = 20,250.70

besi bawah
Panjang Besi Raaf arah y lapis 1 = 36.62
Panjang Besi Utama = 36.62
Overlaphing = 1.28
Banyak besi utama = 140

Total Panjang Besi = 5,317.37


Berat Besi = 33,577.4

besi atas
Panjang Besi Raaf arah x lapis 1 = 48.45
Panjang Besi Utama = 48.45
Overlaphing = 1.28
Banyak besi utama = 140

Total Panjang Besi = 6,977.12


Berat Besi = 44,058.2

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 296

Total Panjang Besi = 302.47


Berat Besi = 1,165.8

besi D25 - 200 arah y

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 100

Total Panjang Besi = 105.62


Berat Besi = 407.1

besi D25-200 arah y

Panjang Besi Raaf arah y = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 99

Total Panjang Besi = 608.63


Berat Besi = 3,843.3

besi D25-200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 157
Total Panjang Besi = 960.23
Berat Besi = 6,063.5

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 140

total panjang besi = 858.64


Berat besi = 3,309.33

besi D25 - 200 arah y

Panjang Besi Raaf arah y = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 140

Total Panjang Besi = 858.64


Berat Besi = 5,422.0

beton raft
- volume 1 = 593.82
- volume 2 (7.550 - 6.550) = 160.53
- volume 3 (7.550 - 4.050) = 139.78
- volume 4 (6.550 - 4.050) = 635.25
total volume = 1,529.39
ACTUAL CHECK/ PEKERJAAN

m
m
m

m2 luas lingkaran
m
m3

m kurang overlap
m kurang overlap
bh
m
kg

m
m
bh
m
kg

m
m
bh
m
kg
m
m 40D+6D
m
bh
m
kg 1,230.54

m ada perkuatan 3kali putaran


m
m
bh
m
kg ditambahi overlap
kg

m tambah 11,2 35.50


m
m

m
kg ditambahi overlap
kg

m
m
m

m
m kurang overlap
m kurang overlap
bh
m
kg

m
m
bh
m
kg

m
m
bh
m
kg

m
m 40D+6D
m
bh
m
kg

m ada perkuatan 3kali putaran


m
m
bh
m
kg ditambahi overlap
kg

m tambah 11,2 39.50


m
m
bh
m
kg ditambahi overlap
kg

m
m
m

m kurang overlap
m kurang overlap
bh
m
kg

m
m
bh
m
kg

m
m 40D+6D
m
bh
m
kg
m ada perkuatan 3kali putaran
m
m
bh
m
kg ditambahi overlap
kg

m tambah 11,2 32.60


m
m

m
kg ditambahi overlap
kg

m
m
m

m kurang overlap
m kurang overlap
bh
m
kg
m
m
bh
m
kg

m
m 40D+6D
m
bh
m
kg

m ada perkuatan 3kali putaran


m
m
bh
m
kg ditambahi overlap
kg

m tambah 11,2 29.20


m
m

m
kg ditambahi overlap
kg
kg
m
m

bh

m
kg

m
m
bh
m

kg

m
m

bh

m
kg

m
m

bh

m
kg

m
m

bh

m
m
bh

m
kg

m
m
m

bh

m
kg

m
m
m
bh
m

kg

m
m

bh

kg

m
m

bh

m
kg

m
m

bh

m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh
m
kg

m
m
bh

kg

m
m
bh

m
kg

m3
m3
m3 13.30
m3 9.76 65.10 635.25
m3
VOLUME SATUAN
PENGEBORAN BETON BESI
TIPE
M1 M3 UTAMA
diameter 1,2 m 1 35.50 40.13 1,230.54
diameter 1,2 m 2 39.50 44.65 1,248.35
diameter 0,8 m 3 32.80 16.48 559.10
diameter 0,8 m 4 29.20 14.67 476.26
BESI
SPIRAL
1,175.91 2,406.45 59.96746
1,280.11 2,528.46 56.62734
640.09 1,199.19 72.77223
537.90 1,014.15 69.13058
NO ACTUAL CHECK/ P

LANTAI BASEMENT - LANTAI GROUND


PEKERJAAN BALOK

Balok Type P-9.7


Panjang bentangan = 5.43
Panjang besi = 5.80

a. beton

Panjang = 5.43
Lebar = 0.35
Tebal = 0.68
Volume = 1.29

b. Pembesian

- besi utama
Tulangan menerus atas (2D22)
Panjang Besi = 5.80
Banyak besi utama = 2
Panjang total keseluruhan = 11.60
Berat Besi = 25.82

besi tumpuan 2D19


Panjang Besi = 1.45
overlaping 15D = 0.29
Banyak besi utama = 2
Panjang total keseluruhan = 3.47
Berat Besi = 15.45

Tulangan menerus bawah (2D22)


Panjang Besi = 5.80
Banyak besi utama = 2
Panjang total keseluruhan = 11.60
Berat Besi = 25.82

Tulangan menerus bawah (1D19)


Panjang Besi = 5.80
Banyak besi utama = 1
Panjang total keseluruhan = 5.80
Berat Besi = 12.91
- besi tengah
Besi 2D10
Panjang Besi = 5.80
Banyak besi utama = 2
Panjang total keseluruhan = 11.60
Berat Besi = 7.15

- besi sengkang
Tumpuan kiri dan kanan (D10-100)
Panjang Besi = 2.06
Bengkokan = 0.60
Selimut beton = 0.32
Banyak besi = 14.58
Panjang keseluruhan = 34.11
Berat Besi = 42.06

Lapangan (D10-200)
Panjang Besi = 2.06
Bengkokan = 0.60
Selimut beton = 0.32
Banyak besi = 14.58
Panjang keseluruhan = 34.11
Berat Besi = 21.03

c. Bekisting

panjang = 5.43
lebar = 1.36
volume = 7.38

Balok Type P-10.6


panjang bentangan = 5.25
panjang besi = 6.00

a. beton

Panjang = 5.25
Lebar = 0.35
Tebal = 0.68
Volume = 1.25

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 6.00
Banyak besi utama = 2
Panjang total keseluruhan = 12.00
Berat Besi = 35.82

Tulangan menerus bawah 2D22


Panjang Besi = 6.00
Banyak besi utama = 2
Panjang total keseluruhan = 12.00
Berat Besi = 35.82

Tulangan menerus bawah 1D19


Panjang Besi = 6.00
Banyak besi utama = 1
Panjang total keseluruhan = 6.00
Berat Besi = 13.36

besi tumpuan 2D19


Panjang Besi = 1.50
overlaping 15D = 0.29
Banyak besi utama = 2
Panjang total keseluruhan = 3.57
Berat Besi = 7.95

besi lapangan 3D22


Panjang Besi = 3.00
overlaping 15D = 0.33
Banyak besi utama = 3
Panjang total keseluruhan = 9.99
Berat Besi = 29.82

- besi tengah
Besi 2D10
Panjang Besi = 6.00
Banyak besi utama = 2
Panjang total keseluruhan = 12.00
Berat Besi = 7.40

c. bekisting

panjang = 5.25
lebar = 1.36
volume = 7.14

Balok Type P-12


panjang bentangan = 6.80
panjang besi = 7.18
a. beton

Panjang = 6.80
Lebar = 0.35
Tebal = 0.68
Volume = 1.62

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 7.18
Banyak besi utama = 2
Panjang total keseluruhan = 14.36
Berat Besi = 42.86

Tulangan menerus bawah 2D22


Panjang Besi = 7.18
Banyak besi utama = 2
Panjang total keseluruhan = 14.36
Berat Besi = 42.86

Tulangan menerus bawah 1D19


Panjang Besi = 7.18
Banyak besi utama = 1
Panjang total keseluruhan = 7.18
Berat Besi = 15.98

besi tumpuan 3D22


Panjang Besi = 1.80
overlaping 15D = 0.33
Banyak besi utama = 3
Panjang total keseluruhan = 6.38
Berat Besi = 38.05

besi lapangan 2D19


Panjang Besi = 3.59
overlaping 15D = 0.33
Banyak besi utama = 2
Panjang total keseluruhan = 7.84
Berat Besi = 17.45

- besi tengah
Besi 2D10
Panjang Besi = 7.18
Banyak besi utama = 2
Panjang total keseluruhan = 14.36
Berat Besi = 8.86

c. bekisting

panjang = 6.80
lebar = 1.36
volume = 9.25

Balok Type P-14


panjang bentangan = 5.53
panjang besi = 5.99

a. beton

Panjang = 5.53
Lebar = 0.35
Tebal = 0.68
Volume = 1.32

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 5.99
Banyak besi utama = 2
Panjang total keseluruhan = 11.98
Berat Besi = 35.76

Tulangan menerus bawah 2D22


Panjang Besi = 5.99
Banyak besi utama = 2
Panjang total keseluruhan = 11.98
Berat Besi = 35.76

Tulangan menerus bawah 1D19


Panjang Besi = 5.99
Banyak besi utama = 1
Panjang total keseluruhan = 5.99
Berat Besi = 13.33

besi tumpuan kiri 3D22


Panjang Besi = 1.50
overlaping 15D = 0.33
Banyak besi utama = 3
Panjang total keseluruhan = 5.48
Berat Besi = 32.73

besi tumpuann 2D25


Panjang Besi = 1.50
overlaping 15D = 0.33
Banyak besi utama = 2
Panjang total keseluruhan = 3.66
Berat Besi = 14.09

- besi tengah
Besi 2D10
Panjang Besi = 5.99
Banyak besi utama = 2
Panjang total keseluruhan = 11.98
Berat Besi = 7.39

c. bekisting

panjang = 5.53
lebar = 1.36
volume = 7.52

Balok Type P-15


panjang bentangan = 5.82
panjang besi = 6.37

a. beton

Panjang = 5.82
Lebar = 0.35
Tebal = 0.68
Volume = 1.39

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 6.37
tekukan akhir
Banyak besi utama = 2
Panjang total keseluruhan = 12.74
Berat Besi = 38.02

Tulangan menerus atas 1D25


Panjang Besi = 6.37
Banyak besi utama = 1
Panjang total keseluruhan = 6.37
Berat Besi = 24.55

Tulangan menerus bawah 2D22


Panjang Besi = 6.37
Banyak besi utama = 2
Panjang total keseluruhan = 12.74
Berat Besi = 38.02

Tulangan menerus bawah 1D19


Panjang Besi = 6.37
Banyak besi utama = 1
Panjang total keseluruhan = 6.37
Berat Besi = 14.18

besi tumpuann 1D25


Panjang Besi = 1.59
overlaping 15D = 0.38
Banyak besi utama = 1
Panjang total keseluruhan = 1.97
Berat Besi = 7.58

besi lapangan 3D25


Panjang Besi = 3.19
overlaping 15D = 0.33
Banyak besi utama = 3
Panjang total keseluruhan = 10.55
Berat Besi = 40.64

- besi tengah
Besi 2D10
Panjang Besi = 6.37
Banyak besi utama = 2
Panjang total keseluruhan = 12.74
Berat Besi = 7.86

c. bekisting

panjang = 5.82
lebar = 1.36
volume = 7.92
Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 44.82


Panjang Besi Utama = 44.82
Overlaphing = 1.3
Banyak besi utama = 602

Total Panjang Besi = 27,756.81


Berat Besi = 175,275.0

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 45.02


Panjang Besi Utama = 45.02
Overlaphing = 1.00
Banyak Besi Utama = 602

total panjang besi = 27,708.64


Berat besi = 106,793.72

Panjang Besi Raaf arah y lapis 1 = 66.53


Panjang Besi Utama = 66.53
Overlaphing = 1.28
Banyak besi utama = 198

Total Panjang Besi = 13,419.60


Berat Besi = 84,740.3

besi bawah
Panjang Besi Raaf arah x lapis 1 = 64.80
Panjang Besi Utama = 64.80
Overlaphing = 1.28
Banyak besi utama = 157

Total Panjang Besi = 10,367.95


Berat Besi = 65,470.2
besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 157

besi atas
Panjang Besi Raaf arah x lapis 1 = 66.37
Panjang Besi Utama = 66.37
Overlaphing = 1.28
Banyak besi utama = 413

Total Panjang Besi = 27,925.92


Berat Besi = 176,342.9

Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 21.56


Less selimut beton = 0.15
Panjang Besi Utama = 42.82
Overlaphing = 1.3
Banyak besi utama = 267

Total Panjang Besi = 11,783.52


Berat Besi = 74,409.0

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 21.76


Less selimut beton = 0.15
Panjang Besi Utama = 43.22
Overlaphing = 1.00
Banyak Besi Utama = 267

total panjang besi = 11,815.58


Berat besi = 45,539.23

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17
Panjang Besi Utama = 36.17
Overlaphing = 1.28
Banyak besi utama = 140
total panjang besi = 5,254.24
Berat besi = 20,250.70

besi bawah
Panjang Besi Raaf arah y lapis 1 = 36.62
Panjang Besi Utama = 36.62
Overlaphing = 1.28
Banyak besi utama = 140

Total Panjang Besi = 5,317.37


Berat Besi = 33,577.4

besi atas
Panjang Besi Raaf arah x lapis 1 = 48.45
Panjang Besi Utama = 48.45
Overlaphing = 1.28
Banyak besi utama = 140

Total Panjang Besi = 6,977.12


Berat Besi = 44,058.2

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 296

Total Panjang Besi = 302.47


Berat Besi = 1,165.8

besi D25 - 200 arah y

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 100

Total Panjang Besi = 105.62


Berat Besi = 407.1

besi D25-200 arah y

Panjang Besi Raaf arah y = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 99

Total Panjang Besi = 608.63


Berat Besi = 3,843.3

besi D25-200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 157

Total Panjang Besi = 960.23


Berat Besi = 6,063.5

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 140

total panjang besi = 858.64


Berat besi = 3,309.33

besi D25 - 200 arah y

Panjang Besi Raaf arah y = 6.12


Panjang Besi Utama = 6.12
Banyak besi utama = 140

Total Panjang Besi = 858.64


Berat Besi = 5,422.0

beton raft
- volume 1 = 593.82
- volume 2 (7.550 - 6.550) = 160.53
- volume 3 (7.550 - 4.050) = 139.78
- volume 4 (6.550 - 4.050) = 635.25
total volume = 1,529.39
ACTUAL CHECK/ PEKERJAAN

m
m

m
m
m
m3

m
bh
m
kg

m
m
bh
m
kg

m
bh
m
kg

m
bh
m
kg
m
bh
m
kg

m
m
m
bh
m
kg

m
m
m
bh
m
kg

m
m
m2

m
m

m
m
m
m3

m
bh
m
kg

m
bh
m
kg

m
bh
m
kg

m
m
bh
m
kg

m
m
bh
m
kg

m
bh
m
kg

m
m
m2

m
m
m
m
m
m3

m
bh
m
kg

m
bh
m
kg

m
bh
m
kg

m
m
bh
m
kg

m
m
bh
m
kg

m
bh
m
kg

m
m
m2

m
m

m
m
m
m3

m
bh
m
kg

m
bh
m
kg

m
bh
m
kg

m
m
bh
m
kg

m
m
bh
m
kg

m
bh
m
kg

m
m
m2

m
m

m
m
m
m3

bh
m
kg

m
bh
m
kg

m
bh
m
kg

m
bh
m
kg

m
m
bh
m
kg

m
m
bh
m
kg

m
bh
m
kg

m
m
m2
m
m

bh

m
kg

m
m
bh
m

kg

m
m

bh

m
kg

m
m

bh

m
kg
m
m

bh

m
m

bh

m
kg

m
m
m

bh

m
kg

m
m
m
bh
m

kg

m
m

bh
kg

m
m

bh

m
kg

m
m

bh

m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh

m
kg

m
m
bh

kg

m
m
bh

m
kg

m3
m3
m3 13.30
m3 9.76 65.10 635.25
m3
VOLUME SATUAN
NO ACTUAL CHECK/ PEKE

LANTAI BASEMENT - LANTAI GROUND


PEKERJAAN PLAT LANTAI

Plat Type A.1


Panjang bentangan = 5.43 m
Panjang besi = 5.80 m

a. beton

Panjang = 4.00 m
Lebar = 6.00 m
Tebal = 0.18 m
Volume = 4.32 m3

b. Pembesian

Horizontal

Besi tumpuan (atas) D10-250


Panjang Besi = 1.00 m
overlaping = 0.30 m
Banyak besi utama = 25 bh
Panjang total keseluruhan = 32.50 m
Berat Besi = 40.08 kg

Besi lapangan (bawah) D10-500


Panjang Besi = 2.00 m
overlaping 15D = 0.30 m
Banyak besi utama = 13 bh
Panjang total keseluruhan = 29.90 m
Berat Besi = 18.44 kg

Tulangan menerus bawah D10-500


Panjang Besi = 4.00 m
Banyak besi utama = 13 bh
Panjang total keseluruhan = 52.00 m
Berat Besi = 32.07 kg

Vertikal

Besi tumpuan (atas) D10-250


Panjang Besi = 1.00 m
overlaping = 0.30 m
Banyak besi utama = 17 bh
Panjang total keseluruhan = 22.10 m
Berat Besi = 27.26 kg

Besi lapangan (bawah) D10-500


Panjang Besi = 3.00 m
overlaping 15D = 0.30 m
Banyak besi utama = 9 bh
Panjang total keseluruhan = 29.70 m
Berat Besi = 18.32 kg

Tulangan menerus bawah D10-500


Panjang Besi = 6.00 m
Banyak besi utama = 9 bh
Panjang total keseluruhan = 54.00 m
Berat Besi = 33.30 kg

c. Bekisting

Sisi datar
Panjang = 4.00 m
Lebar = 6.00 m
Volume = 24 m2

Sisi tegak
Panjang = 20 m
Lebar = 0.18 m
Volume = 3.6 m2

Total volume = 27.6 m2

Total besi = 169.46


total beton = 4.32
Rasio besi = 39.23
Tulangan menerus bawah (2D22)
Panjang Besi = 4.00 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 8.00 m
Berat Besi = 17.81 kg

Tulangan menerus bawah (1D19)


Panjang Besi = 5.80 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 5.80 m
Berat Besi = 12.91 kg

- besi tengah
Besi 2D10
Panjang Besi = 5.80 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 11.60 m
Berat Besi = 7.15 kg

- besi sengkang
Tumpuan kiri dan kanan (D10-100)
Panjang Besi = 12.36 m
Bengkokan = 0.60 m
Selimut beton = 0.32 m
Banyak besi = 14.58 bh
Panjang keseluruhan = 184.23 m
Berat Besi = 227.21 kg

Lapangan (D10-200)
Panjang Besi = 12.36 m
Bengkokan = 0.60 m
Selimut beton = 0.32 m
Banyak besi = 11.00 bh
Panjang keseluruhan = 139.04 m
Berat Besi = 85.74 kg

c. Bekisting

panjang = 4.00 m
lebar = 0.36 m
volume = 1.44 m2

Balok Type P-10.6


panjang bentangan = 5.25 m
panjang besi = 6.00 m

a. beton

Panjang = 5.25 m
Lebar = 0.35 m
Tebal = 0.68 m
Volume = 1.25 m3

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 6.00 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 12.00 m
Berat Besi = 35.82 kg

Tulangan menerus bawah 2D22


Panjang Besi = 6.00 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 12.00 m
Berat Besi = 35.82 kg

Tulangan menerus bawah 1D19


Panjang Besi = 6.00 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 6.00 m
Berat Besi = 13.36 kg

besi tumpuan 2D19


Panjang Besi = 1.50 m
overlaping 15D = 0.29 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 3.57 m
Berat Besi = 7.95 kg

besi lapangan 3D22


Panjang Besi = 3.00 m
overlaping 15D = 0.33 m
Banyak besi utama = 3 bh
Panjang total keseluruhan = 9.99 m
Berat Besi = 29.82 kg

- besi tengah
Besi 2D10
Panjang Besi = 6.00 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 12.00 m
Berat Besi = 7.40 kg

c. bekisting

panjang = 5.25 m
lebar = 1.36 m
volume = 7.14 m2

Balok Type P-12


panjang bentangan = 6.80 m
panjang besi = 7.18 m

a. beton

Panjang = 6.80 m
Lebar = 0.35 m
Tebal = 0.68 m
Volume = 1.62 m3

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 7.18 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 14.36 m
Berat Besi = 42.86 kg

Tulangan menerus bawah 2D22


Panjang Besi = 7.18 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 14.36 m
Berat Besi = 42.86 kg

Tulangan menerus bawah 1D19


Panjang Besi = 7.18 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 7.18 m
Berat Besi = 15.98 kg

besi tumpuan 3D22


Panjang Besi = 1.80 m
overlaping 15D = 0.33 m
Banyak besi utama = 3 bh
Panjang total keseluruhan = 6.38 m
Berat Besi = 38.05 kg

besi lapangan 2D19


Panjang Besi = 3.59 m
overlaping 15D = 0.33 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 7.84 m
Berat Besi = 17.45 kg

- besi tengah
Besi 2D10
Panjang Besi = 7.18 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 14.36 m
Berat Besi = 8.86 kg

c. bekisting

panjang = 6.80 m
lebar = 1.36 m
volume = 9.25 m2

Balok Type P-14


panjang bentangan = 5.53 m
panjang besi = 5.99 m

a. beton

Panjang = 5.53 m
Lebar = 0.35 m
Tebal = 0.68 m
Volume = 1.32 m3

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 5.99 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 11.98 m
Berat Besi = 35.76 kg

Tulangan menerus bawah 2D22


Panjang Besi = 5.99 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 11.98 m
Berat Besi = 35.76 kg

Tulangan menerus bawah 1D19


Panjang Besi = 5.99 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 5.99 m
Berat Besi = 13.33 kg

besi tumpuan kiri 3D22


Panjang Besi = 1.50 m
overlaping 15D = 0.33 m
Banyak besi utama = 3 bh
Panjang total keseluruhan = 5.48 m
Berat Besi = 32.73 kg

besi tumpuann 2D25


Panjang Besi = 1.50 m
overlaping 15D = 0.33 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 3.66 m
Berat Besi = 14.09 kg

- besi tengah
Besi 2D10
Panjang Besi = 5.99 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 11.98 m
Berat Besi = 7.39 kg

c. bekisting

panjang = 5.53 m
lebar = 1.36 m
volume = 7.52 m2

Balok Type P-15


panjang bentangan = 5.82 m
panjang besi = 6.37 m
a. beton

Panjang = 5.82 m
Lebar = 0.35 m
Tebal = 0.68 m
Volume = 1.39 m3

b. Pembesian

- besi utama
Tulangan menerus atas 2D22
Panjang Besi = 6.37 m
tekukan akhir
Banyak besi utama = 2 bh
Panjang total keseluruhan = 12.74 m
Berat Besi = 38.02 kg

Tulangan menerus atas 1D25


Panjang Besi = 6.37 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 6.37 m
Berat Besi = 24.55 kg

Tulangan menerus bawah 2D22


Panjang Besi = 6.37 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 12.74 m
Berat Besi = 38.02 kg

Tulangan menerus bawah 1D19


Panjang Besi = 6.37 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 6.37 m
Berat Besi = 14.18 kg

besi tumpuann 1D25


Panjang Besi = 1.59 m
overlaping 15D = 0.38 m
Banyak besi utama = 1 bh
Panjang total keseluruhan = 1.97 m
Berat Besi = 7.58 kg

besi lapangan 3D25


Panjang Besi = 3.19 m
overlaping 15D = 0.33 m
Banyak besi utama = 3 bh
Panjang total keseluruhan = 10.55 m
Berat Besi = 40.64 kg

- besi tengah
Besi 2D10
Panjang Besi = 6.37 m
Banyak besi utama = 2 bh
Panjang total keseluruhan = 12.74 m
Berat Besi = 7.86 kg

c. bekisting

panjang = 5.82 m
lebar = 1.36 m
volume = 7.92 m2
Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 44.82 m


Panjang Besi Utama = 44.82 m
Overlaphing = 1.3
Banyak besi utama = 602 bh

Total Panjang Besi = 27,756.81 m


Berat Besi = 175,275.0 kg

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 45.02 m


Panjang Besi Utama = 45.02 m
Overlaphing = 1.00 bh
Banyak Besi Utama = 602 m
total panjang besi = 27,708.64
Berat besi = 106,793.72 kg

Panjang Besi Raaf arah y lapis 1 = 66.53 m


Panjang Besi Utama = 66.53 m
Overlaphing = 1.28
Banyak besi utama = 198 bh

Total Panjang Besi = 13,419.60 m


Berat Besi = 84,740.3 kg

besi bawah
Panjang Besi Raaf arah x lapis 1 = 64.80 m
Panjang Besi Utama = 64.80 m
Overlaphing = 1.28
Banyak besi utama = 157 bh

Total Panjang Besi = 10,367.95 m


Berat Besi = 65,470.2 kg

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17 m
Panjang Besi Utama = 36.17 m
Overlaphing = 1.28
Banyak besi utama = 157 bh

besi atas
Panjang Besi Raaf arah x lapis 1 = 66.37 m
Panjang Besi Utama = 66.37 m
Overlaphing = 1.28
Banyak besi utama = 413 bh

Total Panjang Besi = 27,925.92 m


Berat Besi = 176,342.9 kg

Besi Bawah D32-100 (2LAPIS)

- Panjang Besi Raaf = 21.56 m


Less selimut beton = 0.15 m
Panjang Besi Utama = 42.82 m
Overlaphing = 1.3
Banyak besi utama = 267 bh
Total Panjang Besi = 11,783.52 m
Berat Besi = 74,409.0 kg

Panjang Besi Atas D25-100 (1 LAPIS)

- Panjang Besi Raaf = 21.76 m


Less selimut beton = 0.15 m
Panjang Besi Utama = 43.22 m
Overlaphing = 1.00 bh
Banyak Besi Utama = 267 m

total panjang besi = 11,815.58


Berat besi = 45,539.23 kg

besi bawah
Panjang Besi Raaf arah x lapis 2 = 36.17 m
Panjang Besi Utama = 36.17 m
Overlaphing = 1.28
Banyak besi utama = 140 bh

total panjang besi = 5,254.24


Berat besi = 20,250.70 kg

besi bawah
Panjang Besi Raaf arah y lapis 1 = 36.62 m
Panjang Besi Utama = 36.62 m
Overlaphing = 1.28
Banyak besi utama = 140 bh

Total Panjang Besi = 5,317.37 m


Berat Besi = 33,577.4 kg

besi atas
Panjang Besi Raaf arah x lapis 1 = 48.45 m
Panjang Besi Utama = 48.45 m
Overlaphing = 1.28
Banyak besi utama = 140 bh

Total Panjang Besi = 6,977.12 m


Berat Besi = 44,058.2 kg

besi D25 - 200 arah x


Panjang Besi Raaf arah x = 6.12 m
Panjang Besi Utama = 6.12 m
Banyak besi utama = 296 bh

Total Panjang Besi = 302.47 m


Berat Besi = 1,165.8 kg

besi D25 - 200 arah y

Panjang Besi Raaf arah x = 6.12 m


Panjang Besi Utama = 6.12 m
Banyak besi utama = 100 bh

Total Panjang Besi = 105.62 m


Berat Besi = 407.1 kg

besi D25-200 arah y

Panjang Besi Raaf arah y = 6.12 m


Panjang Besi Utama = 6.12 m
Banyak besi utama = 99 bh

Total Panjang Besi = 608.63 m


Berat Besi = 3,843.3 kg

besi D25-200 arah x

Panjang Besi Raaf arah x = 6.12 m


Panjang Besi Utama = 6.12 m
Banyak besi utama = 157 bh

Total Panjang Besi = 960.23 m


Berat Besi = 6,063.5 kg

besi D25 - 200 arah x

Panjang Besi Raaf arah x = 6.12 m


Panjang Besi Utama = 6.12 m
Banyak besi utama = 140 bh

total panjang besi = 858.64


Berat besi = 3,309.33 kg

besi D25 - 200 arah y


Panjang Besi Raaf arah y = 6.12 m
Panjang Besi Utama = 6.12 m
Banyak besi utama = 140 bh

Total Panjang Besi = 858.64 m


Berat Besi = 5,422.0 kg

beton raft
- volume 1 = 593.82 m3
- volume 2 (7.550 - 6.550) = 160.53 m3
- volume 3 (7.550 - 4.050) = 139.78 m3
- volume 4 (6.550 - 4.050) = 635.25 m3
total volume = 1,529.39 m3
CTUAL CHECK/ PEKERJAAN
13.30
9.76 65.10 635.25
VOLUME SATUAN
NO ACTUAL CHECK/ PEKERJ

PEKERJAAN SHEARWALL

1 Potongan 1 (Basement 2 - Basement 1)

a. beton

Panjang = 3.03 m
Lebar = 5.85 m
Tebal = 0.40 m
Volume = 7.09 m3

b. Pembesian

Besi vertikal 62D16


Panjang Besi = 3.15 m
overlaping = 0.64 m
Tebal raft = 1.50 m
Bengkokan = 0.19
Banyak besi utama = 62 bh
Panjang total keseluruhan = 339.88 m
Berat Besi = 536.56 kg

Besi sengkang D16-100


Panjang Besi = 12.50 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 31 bh
Panjang total keseluruhan = 389.75 m
Berat Besi = 615.28 kg

Besi ties 56D13-100


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 1,753 bh
Panjang total keseluruhan = 869.39 m
Berat Besi = 906.05 kg
c. Bekisting

Panjang = 12.50 m
Lebar = 3.03 m
Volume = 37.88 m2

2 Potongan 1 (Basement 1 - Semi Basement )

a. beton

Panjang = 2.98 m
Lebar = 5.85 m
Tebal = 0.40 m
Volume = 6.97 m3

b. Pembesian

Besi vertikal 62D16


Panjang Besi = 3.10 m
overlaping = 0.64 m
Bengkokan = 0.19
Banyak besi utama = 62 bh
Panjang total keseluruhan = 243.78 m
Berat Besi = 384.85 kg

Besi sengkang D16-100


Panjang Besi = 12.50 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 31 bh
Panjang total keseluruhan = 383.52 m
Berat Besi = 605.45 kg

Besi ties 56D13-100


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 1,725 bh
Panjang total keseluruhan = 855.50 m
Berat Besi = 891.57 kg

c. Bekisting
Panjang = 12.50 m
Lebar = 2.98 m
Volume = 37.25 m2

3 Potongan 1 (Lantai 2 - Lantai 3 )

a. beton

Panjang = 4.88 m
Lebar = 5.85 m
Tebal = 0.40 m
Volume = 11.42 m3

b. Pembesian

Besi vertikal 62D16


Panjang Besi = 5.00 m
overlaping = 0.64 m
Banyak besi utama = 62 bh
Panjang total keseluruhan = 349.68 m
Berat Besi = 552.03 kg

Besi sengkang D16-100


Panjang Besi = 12.50 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 50 bh
Panjang total keseluruhan = 620.11 m
Berat Besi = 978.95 kg

Besi ties 56D13-100


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 2,789 bh
Panjang total keseluruhan = 1,383.24 m
Berat Besi = 1,441.57 kg

c. Bekisting

Panjang = 12.50 m
Lebar = 4.88 m
Volume = 61.00 m2

4 Potongan 1A (Lantai Dasar - Lantai 2 )

a. beton

Panjang = 4.88 m
Lebar = 5.85 m
Tebal = 0.40 m
Volume = 11.42 m3

b. Pembesian

Besi vertikal 62D16


Panjang Besi = 5.00 m
overlaping = 0.64 m
Banyak besi utama = 62 bh
Panjang total keseluruhan = 349.68 m
Berat Besi = 552.03 kg

Besi sengkang D19-100


Panjang Besi = 12.50 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 50 bh
Panjang total keseluruhan = 620.11 m
Berat Besi = 1,380.47 kg

Besi ties 56D13-100


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 2,789 bh
Panjang total keseluruhan = 1,383.24 m
Berat Besi = 1,441.57 kg

c. Bekisting

Panjang = 12.50 m
Lebar = 4.88 m
Volume = 61.00 m2
5 Potongan 2 (Lantai 4 - Lantai 12)

- Lantai 4 - Lantai 6, dan Lantai 8 - Lantai 11


a. beton

Panjang = 3.08 m
Lebar = 5.85 m
Tebal = 0.40 m
Volume = 7.21 m3

b. Pembesian

Besi vertikal tumpuan 20D16


Panjang Besi = 3.20 m
overlaping = 0.64 m
Banyak besi utama = 20 bh
Panjang total keseluruhan = 76.80 m
Berat Besi = 242.48 kg

Besi vertikal lapangan1 16D16


Panjang Besi = 3.08 m
overlaping = 0.64 m
Tebal balok = 0.60 m
Bengkokan = 0.19 m
Banyak besi utama = 16 bh
Panjang total keseluruhan = 72.19 m
Berat Besi = 113.97 kg

Besi vertikal lapangan2 D16-200


Panjang Besi = 3.08 m
overlaping = 0.64 m
Banyak besi utama = 8 bh
Panjang total keseluruhan = 31.25 m
Berat Besi = 49.33 kg

Besi horizontal D16-200


Panjang Besi = 2.65 m
overlaping = 1.28 m
Banyak besi utama = 16 bh
Panjang total keseluruhan = 64.45 m
Berat Besi = 101.75 kg
Besi sengkang tumpuan D13-100
Panjang Besi = 4.00 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 32 bh
Panjang total keseluruhan = 125.67 m
Berat Besi = 261.95 kg

Besi sengkang lapangan D13-100


Panjang Besi = 3.14 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 32 bh
Panjang total keseluruhan = 98.33 m
Berat Besi = 102.47 kg

Besi ties tumpuan D13-100 panjang 0,4m


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 382 bh
Panjang total keseluruhan = 189.27 m
Berat Besi = 394.51 kg

Besi ties tumpuan D13-100 panjang 1,6m


Panjang Besi = 1.60 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 32 bh
Panjang total keseluruhan = 53.93 m
Berat Besi = 112.41 kg

Besi ties lapangan D13-100 panjang 0,4m


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 318 bh
Panjang total keseluruhan = 157.73 m
Berat Besi = 164.38 kg

Besi ties lapangan D13-100 panjang 1,6m


Panjang Besi = 1.17 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 32 bh
Panjang total keseluruhan = 40.26 m
Berat Besi = 41.96 kg

Besi perkuatan shearwall

Besi horizontal 2D19


Panjang Besi = 13.00 m
Banyak besi = 2 bh
Panjang total keseluruhan = 26.00 m
Berat Besi = 57.88 kg

Besi vertikal 4D22


Panjang Besi = 1.60 m
Banyak besi = 4 bh
Panjang total keseluruhan = 6.40 m
Berat Besi = 19.10 kg

Besi vertikal 2D25


Panjang Besi = 1.60 m
Banyak besi = 2 bh
Panjang total keseluruhan = 3.20 m
Berat Besi = 12.33 kg

c. Bekisting

Panjang = 12.50 m
Lebar = 3.08 m
Volume = 38.50 m2

- Lantai 7
a. beton

Panjang = 3.38 m
Lebar = 5.85 m
Tebal = 0.40 m
Volume = 7.91 m3

b. Pembesian
Besi vertikal tumpuan 20D16
Panjang Besi = 3.50 m
overlaping = 0.64 m
Banyak besi utama = 20 bh
Panjang total keseluruhan = 82.80 m
Berat Besi = 261.43 kg

Besi vertikal lapangan1 16D16


Panjang Besi = 3.38 m
overlaping = 0.64 m
Banyak besi utama = 16 bh
Panjang total keseluruhan = 64.32 m
Berat Besi = 101.54 kg

Besi vertikal lapangan2 D16-200


Panjang Besi = 3.38 m
overlaping = 0.64 m
Banyak besi utama = 8 bh
Panjang total keseluruhan = 33.77 m
Berat Besi = 53.31 kg

Besi horizontal D16-200


Panjang Besi = 2.65 m
overlaping = 1.28 m
Banyak besi utama = 18 bh
Panjang total keseluruhan = 70.35 m
Berat Besi = 111.05 kg

Besi sengkang tumpuan D13-100


Panjang Besi = 4.00 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 35 bh
Panjang total keseluruhan = 137.53 m
Berat Besi = 286.66 kg

Besi sengkang lapangan D13-100


Panjang Besi = 3.14 m
Less selimut beton = 0.24 m
Bengkokan = 0.19 m
Banyak besi sengkang = 35 bh
Panjang total keseluruhan = 107.60 m
Berat Besi = 112.14 kg
Besi ties tumpuan D13-100 panjang 0,4m
Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 418 bh
Panjang total keseluruhan = 207.13 m
Berat Besi = 431.73 kg

Besi ties tumpuan D13-100 panjang 1,6m


Panjang Besi = 1.60 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 35 bh
Panjang total keseluruhan = 59.02 m
Berat Besi = 123.02 kg

Besi ties lapangan D13-100 panjang 0,4m


Panjang Besi = 0.40 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 348 bh
Panjang total keseluruhan = 172.61 m
Berat Besi = 179.89 kg

Besi ties lapangan D13-100 panjang 1,6m


Panjang Besi = 1.17 m
Less selimut beton = 0.06 m
Bengkokan = 0.16 m
Banyak besi ties = 35 bh
Panjang total keseluruhan = 44.06 m
Berat Besi = 45.91 kg

Besi perkuatan shearwall

Besi horizontal 4D19


Panjang Besi = 13.00 m
Banyak besi = 4 bh
Panjang total keseluruhan = 52.00 m
Berat Besi = 115.76 kg

Besi vertikal 8D22


Panjang Besi = 1.60 m
Banyak besi = 8 bh
Panjang total keseluruhan = 12.80 m
Berat Besi = 38.20 kg

Besi vertikal 4D25


Panjang Besi = 1.60 m
Banyak besi = 4 bh
Panjang total keseluruhan = 6.40 m
Berat Besi = 24.67 kg

c. Bekisting

Panjang = 12.50 m
Lebar = 3.38 m
Volume = 42.25 m2
ACTUAL CHECK/ PEKERJAAN

beton bersih
besi full
bekisting bersih

2057.89 7.09 290.245


beton bersih
besi full
bekisting bersih
VOLUME SATUAN
JOB/ PROJECT (PEKERJAAN/ PROYEK) : TUGAS BESAR UKK
TAKER OFF : SERI JENI INAYAT M
ELEMENT : PEKERJAAN TANGG
DATE :
SHEET NO : 1 s/d ……………
H. PEKERJAAN TANGGA

SKET GAMBAR
H. PEKERJAAN TA
1.

2.

N0 ACTUAL CHECK/ PEKERJAAN


N0 ACTUAL CHECK/ PEKERJAAN

1. PEKERJAAN TANGGA LANTAI BASEMENT 2


a. Plat Tangga
a.1 Beton
Panjang = 2.80 m
Lebar = 1.35 m
Tinggi = 0.13 m

a.2 Bekisting
Panjang = 2.80 m
Lebar = 1.35 m
Tinggi = 0.13 m
Tebal plat = 0.18 m
Luas bawah = 3.78 m

a.3 Pembesian
Panjang Besi X D10-250
- Tulangan bawah
Panjang = 1.35 m
Banyak besi = 12.36 bh
Panjang keseluruhan = 16.69 m
Volume = 20.58 kg

- Tulangan atas
Panjang = 1.35 m
Banyak besi = 5.00 bh
Panjang keseluruhan = 6.75 m
Volume = 8.33 kg

Panjang Besi Y D10-250


- Tulangan bawah
Panjang = 2.06 m
Banyak besi = 6 bh
Panjang keseluruhan = 13.18 m
Volume = 8.13 kg

- Tulangan atas
Panjang = 4.59 m
Banyak besi = 6 bh
Panjang keseluruhan = 29.38 m
Volume = 18.12 kg
b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 8 bh

b.2 Bekisting
Panjang = 0.23 m
Luas Bidang Miring = 0.05 m
Banyak anak tangga = 8 bh

b.3 Pembesian
Panjang Besi D8-150 (Pendek)
Panjang = 0.73 m
Bengkokan = 0.10 m
Panjang Besi = 0.83 m
Banyak besi = 10 bh
Jumlah Anak tangga = 8 bh
Volume = 26.08 kg

Panjang Besi D10 (Panjang)


Panjang = 1.35 m
Bengkokan = 0.12 m
Panjang Besi = 1.47 m
Banyak besi = 8 bh
Jumlah Anak tangga = 8 bh
Volume = 58.02 kg

c. Bordes
c.1 Beton
Panjang = 1.35 m
Lebar = 2.80 m
Tinggi = 0.13 m

c.2 Bekisting
Panjang = 1.35 m
Lebar = 2.80 m
Tinggi = 0.13 m
tebal plat = 0.36 m
Luas bawah = 3.78 m

c.3 Pembesian
Panjang Besi X D10-250
Panjang = 2.80 m
Banyak Besi = 6 bh
Panjang keseluruhan = 15.68 m
Volume = 19.34 kg

Panjang Besi Y D10-250 (bawah)


Panjang = 1.68 m
Banyak besi = 12 bh
Panjang keseluruhan = 20.50 bh
Volume = 12.64 kg

Panjang Besi Y D10-250 (atas)


Panjang = 2.41 m
Banyak besi = 12 bh
Panjang keseluruhan = 29.40 bh
Volume = 18.13 kg

d. Kolom KT-1

c.1 Beton
Panjang = 0.25 m
Lebar = 0.30 m
Tinggi = 1.34 m

c.2 Bekisting
Panjang = 1.10 m
Lebar = 1.34 m

c.3 Pembesian
Besi utama 4D16
Panjang = 1.62 m
Tebal raft = 0.40 m
Panjang keseluruhan = 2.02 m
Banyak besi = 4 bh
Volume = 12.76 kg

Besi sengkang D10-150


Panjang = 1.10 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Banyak besi = 10 bh
Panjang keseluruhan = 9.73 bh
Volume = 6.00 kg
e. Balok BT-1

c.1 Beton
Panjang = 2.20 m
Lebar = 0.20 m
Tinggi = 0.27 m

c.2 Bekisting
Panjang = 2.20 m
Lebar = 0.20 m
Tinggi = 0.27 m
tebal balok = 0.05 m
Luas bawah = 0.44 m

c.3 Pembesian

Besi utama
Tulangan menerus atas 2D16
Panjang = 2.80 m
Banyak besi = 2 bh
Volume = 8.84 kg

Tulangan menerus bawah 2D16


Panjang = 2.80 m
Banyak besi = 2 bh
Volume = 8.84 kg

Besi tumpuan 1D16


Panjang = 0.70 m
Banyak besi = 1 bh
Volume = 2.21 kg

Besi lapangan 1D16


Panjang = 1.40 m
Banyak besi = 1 bh
Volume = 2.21 kg

Besi sengkang
Tumpuan D10-150
Panjang = 4.80 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Banyak besi = 5 bh
Panjang keseluruhan = 21.84 m
Volume = 26.94 kg
Lapangan D10-200
Panjang = 4.80 m
Less selimut beton = 0.24 m
Bengkokan = 0.12 m
Banyak besi = 7 bh
Panjang keseluruhan = 30.42 bh
Volume = 18.76 kg
2. PEKERJAAN TANGGA LANTAI 16
a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh

Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh

Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 bh
b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 m

b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 11 bh

Volume = 43.96 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 11 bh

Volume = 148.29 kg

c. Bordes
c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh

Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh

Volume = 69.56 kg

3. PEKERJAAN TANGGA LANTAI 17


a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh

Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh

Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 bh

b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 m

b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 11 bh
Volume = 43.96 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 11 bh

Volume = 148.29 kg

c. Bordes
c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh

Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh

Volume = 69.56 kg

4. PEKERJAAN TANGGA LANTAI 18


a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh

Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh
Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 bh

b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 m

b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 11 bh

Volume = 43.96 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 11 bh

Volume = 148.29 kg

c. Bordes
c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh

Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh

Volume = 69.56 kg

5. PEKERJAAN TANGGA LANTAI 19


a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh

Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh

Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 bh

b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 m
b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 11 bh

Volume = 43.96 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 11 bh

Volume = 148.29 kg

c. Bordes
c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh

Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh

Volume = 69.56 kg

6. PEKERJAAN TANGGA LANTAI 20


a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh
Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh

Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 bh

b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 m

b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 11 bh

Volume = 43.96 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 11 bh
Volume = 148.29 kg

c. Bordes
c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh
Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh

Volume = 69.56 kg

7. PEKERJAAN TANGGA LANTAI 21


a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh
Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh

Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 bh

b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 11 m

b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 11 bh
Volume = 43.96 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 11 bh

Volume = 148.29 kg

c. Bordes
c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m
c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh
Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh
Volume = 69.56 kg

8. PEKERJAAN TANGGA LANTAI 22- ATAP


a. Plat Tangga
a.1 Beton
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m

a.2 Bekisting
Panjang = 1.35 m
Lebar = 3.63 m
Tinggi = 0.15 m
Tebal plat = 0.54 m
Luas bawah = 4.90 m

a.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 3.16 m
Banyak besi = 18 bh
Volume = 35.28 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Lebar = 3.63 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 7.56 m
Banyak besi = 14 bh
Volume = 106.42 kg

b. Anak tangga
b.1 Beton
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 23 bh

b.2 Bekisting
Panjang = 1.35 m
Luas Bidang Miring = 0.03 m
Banyak anak tangga = 23 m

b.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 0.46 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.12 m
Panjang Besi = 0.48 m
Banyak besi = 7 bh
Jumlah Anak tangga = 23 bh
Volume = 45.95 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 1.35 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 1.41 m
Banyak besi = 5 bh
Jumlah Anak tangga = 23 bh
Volume = 155.03 kg

c. Bordes Type 1 (2,70x1,25)


c.1 Beton
Panjang = 2.70 m
Lebar = 1.25 m
Tinggi = 0.15 m

c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.25 m
Tinggi = 0.15 m
tebal plat = 0.19 m
Luas bawah = 3.38 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.25 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 6 bh
Volume = 22.57 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.25 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.81 m
Banyak besi = 27 bh
Volume = 79.13 kg

d. Bordes Type 2(2,7x1,08)


c.1 Beton
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
c.2 Bekisting
Panjang = 2.70 m
Lebar = 1.08 m
Tinggi = 0.15 m
tebal plat = 0.16 m
Luas bawah = 2.92 m

c.3 Pembesian
Panjang Besi X D10-200 (pendek)
Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.23 m
Panjang Besi = 5.86 m
Banyak besi = 5 bh
Volume = 19.50 kg

Panjang Besi Y D13-100 (Panjang)


Panjang = 2.70 m
Lebar = 1.08 m
Tebal = 0.15 m
Tebal selimut beton = 0.05 m
Bengkokan = 0.16 m
Panjang Besi = 2.47 m
Banyak besi = 27 bh
Volume = 69.56 kg
TUGAS BESAR UKK 3
SERI JENI INAYAT MANAO(16-066)/EGA PUJIWATI PUTRI (16-103)
PEKERJAAN TANGGA

1 s/d ……………

REKAP HITUNGAN VOLUME


PEKERJAAN TANGGA

a. Plat Tangga
a.1 Beton 0.49
a.2 Bekisting 4.13
a.3 Pembesian - Panjang Besi X D10-250 20.58
- Panjang Besi Y D10-250 8.13
b. Anak tangga
b.1 Beton 0.28
b.2 Bekisting -
b.3 Pembesian - Panjang Besi X D10-250 26.08
- Panjang Besi Y D10-250 58.02
c. Bordes
c.1 Beton 0.49
c.2 Bekisting 4.51
c.3 Pembesian - Panjang Besi X D10-250 19.34
- Panjang Besi Y D10-250 12.64
PEKERJAAN TANGGA LANTAI 22- ATAP
a. Plat Tangga
a.1 Beton 0.73
a.2 Bekisting 5.98
a.3 Pembesian - Panjang Besi X D10-250 35.28
- Panjang Besi Y D10-250 106.42
b. Anak tangga
b.1 Beton 0.78
b.2 Bekisting 15.40
b.3 Pembesian - Panjang Besi X D10-250 45.95
- Panjang Besi Y D10-250 155.03
c. Bordes Type 1 (2,70x1,25)
c.1 Beton 0.51
c.2 Bekisting 3.75
c.3 Pembesian - Panjang Besi X D10-250 22.57
- Panjang Besi Y D10-250 79.13
d. Bordes Type 2(2,7x1,08)
c.1 Beton 0.44
c.2 Bekisting 3.24
c.3 Pembesian - Panjang Besi X D10-250 19.50
- Panjang Besi Y D10-250 69.56
VOLUME
VOLUME

1.35
0.13
2.80
0.49

3.78
3.78
2
0.18
0.35
4.13
8
1.35
0.03
0.28

8
0.23
0.05
2.24

1.35
2.80
0.13
0.49

3.78
3.78
2
0.36
0.73
4.51
0.25
0.30
1.34
0.10

1.10
1.34
1.47
2.20
0.20
0.27
0.12

0.44
0.44
2
0.05
0.11
0.55
1.35
3.63
0.15
0.73

4.90
4.90
2
0.54
1.09
5.98

18
3.16
57.22

14
7.56
102.11

2
11
1.35
0.025
0.75
2
11
1.35
14.85
2
11
2
0.03
1.11
15.96

2
11
7
0.48
71.28

2
11
5
1.41
142.29

2.70
1.08
0.15
0.44

2.92
2.92
2
0.16
0.32
3.24

5
5.86
31.62

27
2.47
66.74

1.35
3.63
0.15
0.73

4.90
4.90
2
0.54
1.09
5.98
18
3.16
57.22

14
7.56
102.11

2
11
1.35
0.025
0.75

2
11
1.35
14.85
2
11
2
0.03
1.11
15.96

2
11
7
0.48
71.28
2
11
5
1.41
142.29

2.70
1.08
0.15
0.44

2.92
2.92
2
0.16
0.32
3.24

5
5.86
31.62

27
2.47
66.74

1.35
3.63
0.15
0.73

4.90
4.90
2
0.54
1.09
5.98

18
3.16
57.22

14
7.56
102.11
2
11
1.35
0.025
0.75

2
11
1.35
14.85
2
11
2
0.03
1.11
15.96

2
11
7
0.48
71.28

2
11
5
1.41
142.29

2.70
1.08
0.15
0.44

2.92
2.92
2
0.16
0.32
3.24

5
5.86
31.62

27
2.47
66.74

1.35
3.63
0.15
0.73
4.90
4.90
2
0.54
1.09
5.98

18
3.16
57.22

14
7.56
102.11

2
11
1.35
0.025
0.75

2
11
1.35
14.85
2
11
2
0.03
1.11
15.96

2
11
7
0.48
71.28

2
11
5
1.41
142.29

2.70
1.08
0.15
0.44

2.92
2.92
2
0.16
0.32
3.24

5
5.86
31.62
27
2.47
66.74

1.35
3.63
0.15
0.73

4.90
4.90
2
0.54
1.09
5.98

18
3.16
57.22
14
7.56
102.11

2
11
1.35
0.025
0.75

2
11
1.35
14.85
2
11
2
0.03
1.11
15.96

2
11
7
0.48
71.28

2
11
5
1.41
142.29

2.70
1.08
0.15
0.44

2.92
2.92
2
0.16
0.32
3.24

5
5.86
31.62

27
2.47
66.74
1.35
3.63
0.15
0.73

4.90
4.90
2
0.54
1.09
5.98

18
3.16
57.22

14
7.56
102.11

2
11
1.35
0.025
0.75

2
11
1.35
14.85
2
11
2
0.03
1.11
15.96

2
11
7
0.48
71.28

2
11
5
1.41
142.29

2.70
1.08
0.15
0.44

2.92
2.92
2
0.16
0.32
3.24
5
5.86
31.62

27
2.47
66.74

1.35
3.63
0.15
0.73

4.90
4.90
2
0.54
1.09
5.98

18
3.16
57.22
14
7.56
102.11

23
1.35
0.025
0.78

11
1.35
14.85

11
2
0.03
0.55
15.40

23
7
0.48
74.52

23
5
1.41
148.75
2.70
1.25
0.15
0.51

3.38
3.38
2
0.19
0.38
3.75

6
5.86
36.60

27
2.81
75.92

2.70
1.08
0.15
0.44
2.92
2.92
2
0.16
0.32
3.24

5
5.86
31.62

27
2.47
66.74
STN

m3
m2
kg
kg

m3
m2
kg
kg

m3
m2
kg
kg

m3
m2
kg
kg

m3
m2
kg
kg

m3
m2
kg
kg

m3
m2
kg
kg
SATUAN
SATUAN

m3

m2
M3

M2

m3

m2
m3

m2
m3

m2
m3

m2

m
m2

m3
m2

m3

m2
m

m2

m
m

m3

m2

m
m

m3

m2

m
m

m2

m
m3

m3
m2

m
m2

m3

m2

m
m

m3

m2

m
m

m2

m
m

m3

m2

m
m3

m2

m
m2

m3

m2
m

m3

m2

m
m

m2

m
m3

m2

m3
m2

You might also like