LARSEN & TOUBRO LIMITED

ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Inlet Chamber 2.5m x2.5mx 3.4m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 4.65 4.65 2.00 43.25 m3
2-4m 1 4.65 4.65 1.20 25.95 m3

69.19 m3

2 Backfill 37.67 m3

3 Disposal
Longwall 2 3.05 0.275 2.80 4.70 m3
Shortwall 2 2.5 0.275 2.80 3.85 m3
Inside chamber 1 2.5 2.5 2.80 17.50 m3
Base Slab 1 3.65 3.65 0.3 4.00 m3
PCC 1.48 m3 31.53 m3

4 PCC 1 3.85 3.85 0.1 1.48 m3 1.48 m3

5 RCC M20 - Below GL


Long wall 2 3.05 0.275 2.80 4.70 m3
Short wall 2 2.5 0.275 2.80 3.85 m3
Base Slab 1 3.65 3.65 0.3 4.00 m3
Pedestal 1 0.5 0.5 0.3 0.08 m3 12.62 m3

6 RCC M20 - Above GL


Long wall 2 3.05 0.275 0.6 1.01 m3
Short wall 2 2.5 0.275 0.6 0.83 m3
Cover slab 1 2.5 2.5 0.150 0.94 m3
Beam 0 3.05 0.3 0.400 0.00 m3 2.77 m3

6 Shuttering BGL
Long wall 4 3.05 - 2.80 34.16 m2
Short wall 4 2.5 - 2.8 28.00 m2
Base Slab 1 14.6 - 0.3 4.38 m2
Pedestal 1 2 - 0.3 0.60 m2 67.14 m2

7 Shuttering AGL
Long wall 4 3.05 - 0.6 7.32 m2
Short wall 4 2.5 - 0.6 6.00 m2
Cover slab 1 2.5 2.5 - 6.25 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Inlet Chamber 2.5m x2.5mx 3.4m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 0 3.05 1.1 - 0.00 m2 19.57 m2

7 HYSD Reinforcement
Walls 85 10.38 - - 882.17 kg
Slab 80 4.93 - - 394.74 kg
Pedestal 100 0.08 - - 7.50 kg
Beam 150 0.00 - - 0.00 kg 1.28 MT

8 Ferro cement manhole 1.00 No

9 Structural steel 1.05 10 5.80 60.90 kg 0.06 MT

10 M.S.rungs 11.33 11.33 Nos 12.00 Nos

11 Painting outside
Longwall 2 3.05 - 0.60 3.66 m2
shortwall 2 3.05 - 0.60 3.66 m2 7.32 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Sluice valve Chamber 5.5m x3mx 2.8m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 7.8 5.3 2.00 82.68 m3
2-4m 1 7.8 5.3 0.70 28.94 m3

111.62 m3

2 Backfill 49.19 m3

3 Disposal
Longwall 2 6.1 0.3 2.30 8.42 m3
Shortwall 2 3 0.3 2.30 4.14 m3
Inside chamber 1 5.5 3 2.30 37.95 m3
Base Slab 1 6.8 4.3 0.3 8.77 m3
PCC 3.15 m3 62.43 m3

4 PCC 1 7 4.5 0.1 3.15 m3 3.15 m3

5 RCC M20 - Below GL


Long wall 2 6.1 0.3 2.30 8.42 m3
Short wall 2 3 0.3 2.30 4.14 m3
Base Slab 1 6.8 4.3 0.3 8.77 m3
Pedestal 1 0.5 0.5 0.3 0.08 m3 21.41 m3

6 RCC M20 - Above GL


Long wall 2 6.1 0.3 0.5 1.83 m3
Short wall 2 3 0.3 0.5 0.90 m3
Cover slab 1 5.5 3 0.150 2.48 m3
Beam 2 3.6 0.3 0.400 0.86 m3 6.07 m3

6 Shuttering BGL
Long wall 4 6.1 - 2.30 56.12 m2
Short wall 4 3 - 2.3 27.60 m2
Base Slab 1 22.2 - 0.3 6.66 m2
Pedestal 1 2 - 0.3 0.60 m2 90.98 m2

7 Shuttering AGL
Long wall 4 6.1 - 0.5 12.20 m2
Short wall 4 3 - 0.5 6.00 m2
Cover slab 1 5.5 3 - 16.50 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Sluice valve Chamber 5.5m x3mx 2.8m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 2 3.6 1.1 - 7.92 m2 42.62 m2

7 HYSD Reinforcement
Walls 85 15.29 - - 1299.48 kg
Slab 80 11.25 - - 899.76 kg
Pedestal 100 0.08 - - 7.50 kg
Beam 150 0.86 - - 129.60 kg 2.34 MT

8 Ferro cement manhole 1.00 No

9 Structural steel 1.05 28 5.80 170.52 kg 0.17 MT

10 M.S.rungs 9.333 9.33 Nos 10.00 Nos

11 Painting outside
Longwall 2 6.1 - 0.50 6.10 m2
shortwall 2 3.6 - 0.50 3.60 m2 9.70 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED
S SCOUR VALVE CHAMBER 1.2m x 1.2m x 2.8 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 2.95 2.95 2.00 17.41 m3
2-4m 1 2.95 2.95 0.60 5.22 m3

22.63 m3

2 Backfill 16.23 m3

3 Disposal
Longwall 2 1.5 0.15 2.30 1.04 m3
Shortwall 2 1.2 0.15 2.30 0.83 m3
Inside chamber 1 1.2 1.2 2.30 3.31 m3
Base Slab 1 1.95 1.95 0.2 0.76 m3
PCC 0.46 m3 6.40 m3

4 PCC 1 2.15 2.15 0.1 0.46 m3 0.46 m3

5 RCC M20 - Below GL


Long wall 2 1.5 0.15 2.30 1.04 m3
Short wall 2 1.2 0.15 2.30 0.83 m3
Base Slab 1 1.95 1.95 0.2 0.76 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 2.62 m3

6 RCC M20 - Above GL


Long wall 2 1.5 0.15 0.5 0.23 m3
Short wall 2 1.2 0.15 0.5 0.18 m3
Cover slab 1 1.2 1.2 0.150 0.22 m3
Beam 0 1.2 0.3 0.400 0.00 m3 0.62 m3

6 Shuttering BGL
Long wall 4 1.5 - 2.30 13.80 m2
Short wall 4 1.2 - 2.3 11.04 m2
Base Slab 1 7.8 - 0.2 1.56 m2
Pedestal 0 2 - 0.3 0.00 m2 26.40 m2

7 Shuttering AGL
Long wall 4 1.5 - 0.5 3.00 m2
Short wall 4 1.2 - 0.5 2.40 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED
S SCOUR VALVE CHAMBER 1.2m x 1.2m x 2.8 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Cover slab 1 1.2 1.2 - 1.44 m2
Beam 0 1.2 1.1 - 0.00 m2 6.84 m2

7 HYSD Reinforcement
Walls 85 2.27 - - 192.78 kg
Slab 80 0.98 - - 78.12 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.27 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 4.8 5.80 29.23 kg 0.03 MT

10 M.S.rungs 9.333 9.33 Nos 10.00 Nos

11 Painting outside
Longwall 2 1.5 - 0.50 1.50 m2
shortwall 2 1.5 - 0.50 1.50 m2 3.00 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S SCOUR VALVE CHAMBER 1.8m x 2.1m x 2.8 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 3.65 3.95 2.00 28.84 m3
2-4m 1 3.65 3.95 0.60 8.65 m3

37.49 m3

2 Backfill 22.37 m3

3 Disposal
Longwall 2 2.2 0.2 2.30 2.02 m3
Shortwall 2 2.1 0.2 2.30 1.93 m3
Inside chamber 1 1.8 2.1 2.30 8.69 m3
Base Slab 1 2.65 2.95 0.2 1.56 m3
PCC 0.90 m3 15.11 m3

4 PCC 1 2.85 3.15 0.1 0.90 m3 0.90 m3

5 RCC M20 - Below GL


Long wall 2 2.2 0.2 2.30 2.02 m3
Short wall 2 2.1 0.2 2.30 1.93 m3
Base Slab 1 2.65 2.95 0.2 1.56 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 5.52 m3

6 RCC M20 - Above GL


Long wall 2 2.2 0.2 0.5 0.44 m3
Short wall 2 2.1 0.2 0.5 0.42 m3
Cover slab 1 1.8 2.1 0.150 0.57 m3
Beam 0 2.1 0.3 0.400 0.00 m3 1.43 m3

6 Shuttering BGL
Long wall 4 2.2 - 2.30 20.24 m2
Short wall 4 2.1 - 2.3 19.32 m2
Base Slab 1 11.2 - 0.2 2.24 m2
Pedestal 0 2 - 0.3 0.00 m2 41.80 m2

7 Shuttering AGL
Long wall 4 2.2 - 0.5 4.40 m2
Short wall 4 2.1 - 0.5 4.20 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S SCOUR VALVE CHAMBER 1.8m x 2.1m x 2.8 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Cover slab 1 1.8 2.1 - 3.78 m2
Beam 0 2.1 1.1 - 0.00 m2 12.38 m2

7 HYSD Reinforcement
Walls 85 4.82 - - 409.36 kg
Slab 80 2.13 - - 170.44 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.58 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 7.8 5.80 47.50 kg 0.05 MT

10 M.S.rungs 9.333 9.33 Nos 10.00 Nos

11 Painting outside
Longwall 2 2.2 - 0.50 2.20 m2
shortwall 2 2.5 - 0.50 2.50 m2 4.70 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S AIR VALVE CHAMBER 1.2m x 2.1m x 2.8 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 3.1 4 2.00 24.80 m3
2-4m 1 3.1 4 0.65 8.06 m3

32.86 m3

2 Backfill 21.35 m3

3 Disposal
Longwall 2 1.6 0.2 2.30 1.47 m3
Shortwall 2 2.1 0.2 2.30 1.93 m3
Inside chamber 1 1.2 2.1 2.30 5.80 m3
Base Slab 1 2.1 3 0.25 1.58 m3
PCC 0.74 m3 11.51 m3

4 PCC 1 2.3 3.2 0.1 0.74 m3 0.74 m3

5 RCC M20 - Below GL


Long wall 2 1.6 0.2 2.30 1.47 m3
Short wall 2 2.1 0.2 2.30 1.93 m3
Base Slab 1 2.1 3 0.25 1.58 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 4.98 m3

6 RCC M20 - Above GL


Long wall 2 1.6 0.2 0.5 0.32 m3
Short wall 2 2.1 0.2 0.5 0.42 m3
Cover slab 1 1.2 2.1 0.150 0.38 m3
Beam 0 2.1 0.3 0.400 0.00 m3 1.12 m3

6 Shuttering BGL
Long wall 4 1.6 - 2.30 14.72 m2
Short wall 4 2.1 - 2.3 19.32 m2
Base Slab 1 10.2 - 0.25 2.55 m2
Pedestal 0 2 - 0.3 0.00 m2 36.59 m2

7 Shuttering AGL
Long wall 4 1.6 - 0.5 3.20 m2
Short wall 4 2.1 - 0.5 4.20 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S AIR VALVE CHAMBER 1.2m x 2.1m x 2.8 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Cover slab 1 1.2 2.1 - 2.52 m2
Beam 0 2.1 1.1 - 0.00 m2 9.92 m2

7 HYSD Reinforcement
Walls 85 4.14 - - 352.24 kg
Slab 80 1.95 - - 156.24 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.51 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 6.6 5.80 40.19 kg 0.04 MT

10 M.S.rungs 9.333 9.33 Nos 10.00 Nos

11 Painting outside
Longwall 2 1.6 - 0.50 1.60 m2
shortwall 2 2.5 - 0.50 2.50 m2 4.10 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Butterfly valve chamber -surge protection 1.8m x 1.4m x 2.1 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 3.6 3.2 1.90 21.89 m3

21.89 m3

2 Backfill 14.05 m3

3 Disposal
Longwall 2 2.15 0.175 1.60 1.20 m3
Shortwall 2 1.4 0.175 1.60 0.78 m3
Inside chamber 1 1.8 1.4 1.60 4.03 m3
Base Slab 1 2.6 2.2 0.2 1.14 m3
PCC 0.67 m3 7.84 m3

4 PCC 1 2.8 2.4 0.1 0.67 m3 0.67 m3

5 RCC M20 - Below GL


Long wall 2 2.15 0.175 1.60 1.20 m3
Short wall 2 1.4 0.175 1.60 0.78 m3
Base Slab 1 2.6 2.2 0.2 1.14 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 3.13 m3

6 RCC M20 - Above GL


Long wall 2 2.15 0.175 0.5 0.38 m3
Short wall 2 1.4 0.175 0.5 0.25 m3
Cover slab 1 1.8 1.4 0.150 0.38 m3
Beam 0 1.8 0.3 0.400 0.00 m3 1.00 m3

6 Shuttering BGL
Long wall 4 2.15 - 1.60 13.76 m2
Short wall 4 1.4 - 1.6 8.96 m2
Base Slab 1 9.6 - 0.2 1.92 m2
Pedestal 0 2 - 0.3 0.00 m2 24.64 m2

7 Shuttering AGL
Long wall 4 2.15 - 0.5 4.30 m2
Short wall 4 1.4 - 0.5 2.80 m2
Cover slab 1 1.8 1.4 - 2.52 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Butterfly valve chamber -surge protection 1.8m x 1.4m x 2.1 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 0 1.8 1.1 - 0.00 m2 9.62 m2

7 HYSD Reinforcement
Walls 85 2.61 - - 221.79 kg
Slab 80 1.52 - - 121.76 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.34 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 6.4 5.80 38.98 kg 0.04 MT

10 M.S.rungs 7 7.00 Nos 7.00 Nos

11 Painting outside
Longwall 2 2.15 - 0.50 2.15 m2
shortwall 2 1.75 - 0.50 1.75 m2 3.90 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR Non Return valve chamber -surge protection 2.5m x 1.4m x 2.1 CALCULATED CHECKED
S m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 4.3 3.2 1.90 26.14 m3

26.14 m3

2 Backfill 15.87 m3

3 Disposal
Longwall 2 2.85 0.175 1.60 1.60 m3
Shortwall 2 1.4 0.175 1.60 0.78 m3
Inside chamber 1 2.5 1.4 1.60 5.60 m3
Base Slab 1 3.3 2.2 0.2 1.45 m3
PCC 0.84 m3 10.27 m3

4 PCC 1 3.5 2.4 0.1 0.84 m3 0.84 m3

5 RCC M20 - Below GL


Long wall 2 2.85 0.175 1.60 1.60 m3
Short wall 2 1.4 0.175 1.60 0.78 m3
Base Slab 1 3.3 2.2 0.2 1.45 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 3.83 m3

6 RCC M20 - Above GL


Long wall 2 2.85 0.175 0.5 0.50 m3
Short wall 2 1.4 0.175 0.5 0.25 m3
Cover slab 1 2.5 1.4 0.150 0.53 m3
Beam 0 2.5 0.3 0.400 0.00 m3 1.27 m3

6 Shuttering BGL
Long wall 4 2.85 - 1.60 18.24 m2
Short wall 4 1.4 - 1.6 8.96 m2
Base Slab 1 11 - 0.2 2.20 m2
Pedestal 0 2 - 0.3 0.00 m2 29.40 m2

7 Shuttering AGL
Long wall 4 2.85 - 0.5 5.70 m2
Short wall 4 1.4 - 0.5 2.80 m2
Cover slab 1 2.5 1.4 - 3.50 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR Non Return valve chamber -surge protection 2.5m x 1.4m x 2.1 CALCULATED CHECKED
S m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 0 2.5 1.1 - 0.00 m2 12.00 m2

7 HYSD Reinforcement
Walls 85 3.12 - - 265.52 kg
Slab 80 1.98 - - 158.16 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.42 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 7.8 5.80 47.50 kg 0.05 MT

10 M.S.rungs 7 7.00 Nos 7.00 Nos

11 Painting outside
Longwall 2 2.85 - 0.50 2.85 m2
shortwall 2 1.75 - 0.50 1.75 m2 4.60 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Sluice valve chamber -surge protection 1.8m x 1m x 1.7 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 3.5 2.7 1.50 14.18 m3

14.18 m3

2 Backfill 9.54 m3

3 Disposal
Longwall 2 2.1 0.15 1.20 0.76 m3
Shortwall 2 1 0.15 1.20 0.36 m3
Inside chamber 1 1.8 1 1.20 2.16 m3
Base Slab 1 2.5 1.7 0.2 0.85 m3
PCC 0.51 m3 4.64 m3

4 PCC 1 2.7 1.9 0.1 0.51 m3 0.51 m3

5 RCC M20 - Below GL


Long wall 2 2.1 0.15 1.20 0.76 m3
Short wall 2 1 0.15 1.20 0.36 m3
Base Slab 1 2.5 1.7 0.2 0.85 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 1.97 m3

6 RCC M20 - Above GL


Long wall 2 2.1 0.15 0.5 0.32 m3
Short wall 2 1 0.15 0.5 0.15 m3
Cover slab 1 1.8 1 0.150 0.27 m3
Beam 0 1.8 0.3 0.400 0.00 m3 0.74 m3

6 Shuttering BGL
Long wall 4 2.1 - 1.20 10.08 m2
Short wall 4 1 - 1.2 4.80 m2
Base Slab 1 8.4 - 0.2 1.68 m2
Pedestal 0 2 - 0.3 0.00 m2 16.56 m2

7 Shuttering AGL
Long wall 4 2.1 - 0.5 4.20 m2
Short wall 4 1 - 0.5 2.00 m2
Cover slab 1 1.8 1 - 1.80 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Sluice valve chamber -surge protection 1.8m x 1m x 1.7 m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 0 1.8 1.1 - 0.00 m2 8.00 m2

7 HYSD Reinforcement
Walls 85 1.58 - - 134.39 kg
Slab 80 1.12 - - 89.60 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.22 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 5.6 5.80 34.10 kg 0.03 MT

10 M.S.rungs 5.667 5.67 Nos 6.00 Nos

11 Painting outside
Longwall 2 2.1 - 0.50 2.10 m2
shortwall 2 1.3 - 0.50 1.30 m2 3.40 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Flow meter Chamber 2.4m x2.4m x 2.5m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 4.45 4.45 2.00 39.61 m3
2-4m 1 4.45 4.45 0.35 6.93 m3

46.54 m3

2 Backfill 25.98 m3

3 Disposal
Longwall 2 2.85 0.225 2.00 2.57 m3
Shortwall 2 2.4 0.225 2.00 2.16 m3
Inside chamber 1 2.4 2.4 2.00 11.52 m3
Base Slab 1 3.45 3.45 0.25 2.98 m3
PCC 1.33 m3 20.55 m3

4 PCC 1 3.65 3.65 0.1 1.33 m3 1.33 m3

5 RCC M20 - Below GL


Long wall 2 2.85 0.225 2.00 2.57 m3
Short wall 2 2.4 0.225 2.00 2.16 m3
Base Slab 1 3.45 3.45 0.25 2.98 m3
Pedestal 1 0.5 0.5 0.3 0.08 m3 7.78 m3

6 RCC M20 - Above GL


Long wall 2 2.85 0.225 0.5 0.64 m3
Short wall 2 2.4 0.225 0.5 0.54 m3
Cover slab 1 2.4 2.4 0.150 0.86 m3
Beam 0 2.85 0.3 0.400 0.00 m3 2.05 m3

6 Shuttering BGL
Long wall 4 2.85 - 2.00 22.80 m2
Short wall 4 2.4 - 2 19.20 m2
Base Slab 1 13.8 - 0.25 3.45 m2
Pedestal 1 2 - 0.3 0.60 m2 46.05 m2

7 Shuttering AGL
Long wall 4 2.85 - 0.5 5.70 m2
Short wall 4 2.4 - 0.5 4.80 m2
Cover slab 1 2.4 2.4 - 5.76 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Flow meter Chamber 2.4m x2.4m x 2.5m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 0 2.85 1.1 - 0.00 m2 16.26 m2

7 HYSD Reinforcement
Walls 85 5.91 - - 502.03 kg
Slab 80 3.84 - - 307.17 kg
Pedestal 100 0.08 - - 7.50 kg
Beam 150 0.00 - - 0.00 kg 0.82 MT

8 Ferro cement manhole 1.00 No

9 Structural steel 1.05 9.6 5.80 58.46 kg 0.06 MT

10 M.S.rungs 8.333 8.33 Nos 9.00 Nos

11 Painting outside
Longwall 2 2.85 - 0.50 2.85 m2
shortwall 2 2.85 - 0.50 2.85 m2 5.70 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Chamber 2.4m x2.6mx2.5m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 4.55 4.75 2.00 43.23 m3
2-4m 1 4.55 4.75 0.38 8.10 m3

51.33 m3

2 Backfill 28.80 m3

3 Disposal
Longwall 2 2.85 0.225 2.00 2.57 m3
Shortwall 2 2.6 0.225 2.00 2.34 m3
Inside chamber 1 2.4 2.6 2.00 12.48 m3
Base Slab 1 3.55 3.75 0.275 3.66 m3
PCC 1.48 m3 22.53 m3

4 PCC 1 3.75 3.95 0.1 1.48 m3 1.48 m3

5 RCC M20 - Below GL


Long wall 2 2.85 0.225 2.00 2.57 m3
Short wall 2 2.6 0.225 2.00 2.34 m3
Base Slab 1 3.55 3.75 0.275 3.66 m3
Pedestal 1 0.5 0.5 0.3 0.08 m3 8.64 m3

6 RCC M20 - Above GL


Long wall 2 2.85 0.225 0.5 0.64 m3
Short wall 2 2.6 0.225 0.5 0.59 m3
Cover slab 1 2.4 2.6 0.150 0.94 m3
Beam 0 3.05 0.3 0.400 0.00 m3 2.16 m3

6 Shuttering BGL
Long wall 4 2.85 - 2.00 22.80 m2
Short wall 4 2.6 - 2 20.80 m2
Base Slab 1 14.6 - 0.275 4.02 m2
Pedestal 1 2 - 0.3 0.60 m2 48.22 m2

7 Shuttering AGL
Long wall 4 2.85 - 0.5 5.70 m2
Short wall 4 2.6 - 0.5 5.20 m2
Cover slab 1 2.4 2.6 - 6.24 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. PHED -FATEHPUR PKG-6
REV. NO. DATE
DOC NO
6/9/2021
CALCULATED CHECKED
PARTICULARS Chamber 2.4m x2.6mx2.5m

Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Beam 0 3.05 1.1 - 0.00 m2 17.14 m2

7 HYSD Reinforcement
Walls 85 6.13 - - 521.16 kg
Slab 80 4.60 - - 367.76 kg
Pedestal 100 0.08 - - 7.50 kg
Beam 150 0.00 - - 0.00 kg 0.90 MT

8 Ferro cement manhole 1.00 No

9 Structural steel 1.05 10 5.80 60.90 kg 0.06 MT

10 M.S.rungs 8.333 8.33 Nos 9.00 Nos

11 Painting outside
Longwall 2 2.85 - 0.50 2.85 m2
shortwall 2 3.05 - 0.50 3.05 m2 5.90 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur PKH 6
REV. NO. DATE
DOC NO
22/11/11
PARTICULAR CALCULATED CHECKED
S chamber -at WTP outlet channel 3m x 2.8m x 2.7m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 0 5.15 4.95 2.00 0.00 m3
2-4m 0 5.15 4.95 0.65 0.00 m3

0.00 m3

2 Backfill -32.42 m3

3 Disposal
Longwall 2 3.45 0.225 2.20 3.42 m3
Shortwall 2 2.8 0.225 2.20 2.77 m3
Inside chamber 1 3 2.8 2.20 18.48 m3
Base Slab 1 4.15 3.95 0.3 4.92 m3
PCC 2.84 m3 32.42 m3

4 PCC 1 4.45 4.25 0.15 2.84 m3 2.84 m3

5 RCC M20 - Below GL


Long wall 2 3.45 0.225 2.20 3.42 m3
Short wall 2 2.8 0.225 2.20 2.77 m3
Base Slab 1 4.15 3.95 0.3 4.92 m3
Pedestal 1 0.5 0.5 0.3 0.08 m3 11.18 m3

6 RCC M20 - Above GL


Long wall 2 3.45 0.225 0.5 0.78 m3
Short wall 2 2.8 0.225 0.5 0.63 m3
Cover slab 1 3 2.8 0.150 1.26 m3
Beam 0 3 0.3 0.400 0.00 m3 2.67 m3

6 Shuttering BGL
Long wall 4 3.45 - 2.20 30.36 m2
Short wall 4 2.8 - 2.2 24.64 m2
Base Slab 1 16.2 - 0.3 4.86 m2
Pedestal 1 2 - 0.3 0.60 m2 60.46 m2

7 Shuttering AGL
Long wall 4 3.45 - 0.5 6.90 m2
Short wall 4 2.8 - 0.5 5.60 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur PKH 6
REV. NO. DATE
DOC NO
22/11/11
PARTICULAR CALCULATED CHECKED
S chamber -at WTP outlet channel 3m x 2.8m x 2.7m
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Cover slab 1 3 2.8 - 8.40 m2
Beam 0 3 1.1 - 0.00 m2 20.90 m2

7 HYSD Reinforcement
Walls 85 7.59 - - 645.47 kg
Slab 80 6.18 - - 494.22 kg
Pedestal 100 0.08 - - 7.50 kg
Beam 150 0.00 - - 0.00 kg 1.15 MT

8 Ferro cment man hole cover 1.00 No

9 Structural steel 1.05 17.6 5.80 107.18 kg 0.11 MT

10 M.S.rungs 9 9.00 Nos 9.00 Nos

11 Painting outside
Longwall 2 3.45 - 0.50 3.45 m2
shortwall 2 3.25 - 0.50 3.25 m2 6.70 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S 2m x 2.2m x 2.2 m-At pallu/sadasar
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 3.95 4.15 2.00 32.79 m3
2-4m 1 3.95 4.15 0.08 1.23 m3

34.01 m3

2 Backfill 19.80 m3

3 Disposal
Longwall 2 2.4 0.2 1.70 1.63 m3
Shortwall 2 2.2 0.2 1.70 1.50 m3
Inside chamber 1 2 2.2 1.70 7.48 m3
Base Slab 1 2.95 3.15 0.275 2.56 m3
PCC 1.06 m3 14.22 m3

4 PCC 1 3.15 3.35 0.1 1.06 m3 1.06 m3

5 RCC M20 - Below GL


Long wall 2 2.4 0.2 1.70 1.63 m3
Short wall 2 2.2 0.2 1.70 1.50 m3
Base Slab 1 2.95 3.15 0.275 2.56 m3
Pedestal 0 0.5 0.5 0.3 0.00 m3 5.68 m3

6 RCC M20 - Above GL


Long wall 2 2.4 0.2 0.5 0.48 m3
Short wall 2 2.2 0.2 0.5 0.44 m3
Cover slab 1 2 2.2 0.150 0.66 m3
Beam 0 2.2 0.3 0.400 0.00 m3 1.58 m3

6 Shuttering BGL
Long wall 4 2.4 - 1.70 16.32 m2
Short wall 4 2.2 - 1.7 14.96 m2
Base Slab 1 12.2 - 0.275 3.36 m2
Pedestal 0 2 - 0.3 0.00 m2 34.64 m2

7 Shuttering AGL
Long wall 4 2.4 - 0.5 4.80 m2
Short wall 4 2.2 - 0.5 4.40 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Fatehpur pkg 6
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S 2m x 2.2m x 2.2 m-At pallu/sadasar
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
Cover slab 1 2 2.2 - 4.40 m2
Beam 0 2.2 1.1 - 0.00 m2 13.60 m2

7 HYSD Reinforcement
Walls 85 4.05 - - 344.08 kg
Slab 80 3.22 - - 257.24 kg
Pedestal 100 0.00 - - 0.00 kg
Beam 150 0.00 - - 0.00 kg 0.60 MT

8 Ferro cement manhole covers 1.00 No

9 Structural steel 1.05 8.4 5.80 51.16 kg 0.05 MT

10 M.S.rungs 7.333 7.33 Nos 8.00 Nos

11 Painting outside
Longwall 2 2.4 - 0.50 2.40 m2
shortwall 2 2.6 - 0.50 2.60 m2 5.00 m2
LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-150 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 1.45 1.45 2.00 4.21 cum

4.21 m3

2 Backfill 3.77 m3

3 Disposal
RCC 1 0.45 0.45 2.00 0.41 cum
PCC 1 0.6 0.6 0.08 0.03 cum

0.43 m3
4 PCC 1 0.6 0.6 0.08 0.03 cum
0.03 m3

5 RCC BGL
RCC 1 0.45 0.45 2.00 0.41 cum 0.41

6 RCC AGL
RCC 1 0.45 0.45 1.3 0.26 cum
Deduct pipe 0.785 0.15 0.15 0.45 0.01 cum
0.26 cum
7 Shuttering BGL
1 1.8 2.000 3.60 Sqm

3.60 Sqm
8 Shuttering AGL
1 1.8 1.30 2.34 cum
2.34 Sqm

9 HYSD
1 100 0.66 66.03 0.07 MT

10 Painting Outside 1 2.34 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-200 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 1.6 1.6 2.00 5.12 cum

5.12 m3

2 Backfill 4.36 m3

3 Disposal
RCC 1 0.6 0.6 2.00 0.72 cum
PCC 1 0.75 0.75 0.08 0.04 cum

0.76 m3
4 PCC 1 0.75 0.75 0.08 0.04 cum
0.04 m3

5 RCC BGL
RCC 1 0.6 0.6 2.00 0.72 cum 0.72 cum

6 RCC AGL
RCC 1 0.6 0.6 1.4 0.50 cum
Deduct pipe 0.785 0.2 0.2 0.6 0.02 cum
0.49 cum
7 Shuttering BGL
1 2.4 2.000 4.80 Sqm

4.80 Sqm
8 Shuttering AGL
1 2.4 1.40 3.36 cum
3.36 Sqm

9 HYSD
1 100 1.21 120.52 0.12 MT

10 Painting Outside 1 3.36 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-250 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 1.75 1.75 2.00 6.13 cum

6.13 m3

2 Backfill 4.94 m3

3 Disposal
RCC 1 0.75 0.75 2.00 1.13 cum
PCC 1 0.9 0.9 0.08 0.06 cum

1.19 m3
4 PCC 1 0.9 0.9 0.08 0.06 cum
0.06 m3

5 RCC BGL
RCC 1 0.75 0.75 2.00 1.13 cum 1.13 cum

6 RCC AGL
RCC 1 0.75 0.75 1.5 0.84 cum
Deduct pipe 0.785 0.25 0.25 0.75 0.04 cum
0.81 cum
7 Shuttering BGL
1 3 2.000 6.00 Sqm

6.00 Sqm
8 Shuttering AGL
1 3 1.50 4.50 cum
4.50 Sqm

9 HYSD
1 100 1.93 193.19 0.19 MT

10 Painting Outside 1 4.50 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-300 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 1.9 1.9 2.00 7.22 cum

7.22 m3

2 Backfill 5.52 m3

3 Disposal
RCC 1 0.9 0.9 2.00 1.62 cum
PCC 1 1.05 1.05 0.08 0.08 cum

1.70 m3
4 PCC 1 1.05 1.05 0.08 0.08 cum
0.08 m3

5 RCC BGL
RCC 1 0.9 0.9 2.00 1.62 cum 1.62 cum

6 RCC AGL
RCC 1 0.9 0.9 1.6 1.30 cum
Deduct pipe 0.785 0.3 0.3 0.9 0.06 cum
1.23 cum
7 Shuttering BGL
1 3.6 2.000 7.20 Sqm

7.20 Sqm
8 Shuttering AGL
1 3.6 1.60 5.76 cum
5.76 Sqm

9 HYSD
1 100 2.85 285.24 0.29 MT

10 Painting Outside 1 5.76 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-400 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 2.2 2.2 2.00 9.68 cum

9.68 m3

2 Backfill 6.66 m3

3 Disposal
RCC 1 1.2 1.2 2.00 2.88 cum
PCC 1 1.35 1.35 0.08 0.14 cum

3.02 m3
4 PCC 1 1.35 1.35 0.08 0.14 cum
0.14 m3

5 RCC BGL
RCC 1 1.2 1.2 2.00 2.88 cum 2.88 cum

6 RCC AGL
RCC 1 1.2 1.2 1.67 2.40 cum
Deduct pipe 0.785 0.4 0.4 1.2 0.15 cum
2.25 cum
7 Shuttering BGL
1 4.8 2.000 9.60 Sqm

9.60 Sqm
8 Shuttering AGL
1 4.8 1.67 8.02 cum
8.02 Sqm

9 HYSD
1 100 5.13 513.40 0.51 MT

10 Painting Outside 1 8.02 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-600 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 2.2 2.2 2.00 9.68 cum

9.68 m3

2 Backfill 6.66 m3

3 Disposal
RCC 1 1.2 1.2 2.00 2.88 cum
PCC 1 1.35 1.35 0.08 0.14 cum

3.02 m3
4 PCC 1 1.35 1.35 0.08 0.14 cum
0.14 m3

5 RCC BGL
RCC 1 1.2 1.2 2.00 2.88 cum 2.88 cum

6 RCC AGL
RCC 1 1.2 1.2 2 2.88 cum
Deduct pipe 0.785 0.6 0.6 1.2 0.34 cum
2.54 cum
7 Shuttering BGL
1 4.8 2.000 9.60 Sqm

9.60 Sqm
8 Shuttering AGL
1 4.8 2.00 9.60 cum
9.60 Sqm

9 HYSD
1 100 5.42 542.07 0.54 MT

10 Painting Outside 1 9.60 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-600 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 2.4 2.4 2.00 11.52 cum

11.52 m3

2 Backfill 7.42 m3

3 Disposal
RCC 1 1.4 1.4 2.00 3.92 cum
PCC 1 1.55 1.55 0.08 0.18 cum

4.10 m3
4 PCC 1 1.55 1.55 0.08 0.18 cum
0.18 m3

5 RCC BGL
RCC 1 1.4 1.4 2.00 3.92 cum 3.92 cum

6 RCC AGL
RCC 1 1.4 1.4 2.05 4.02 cum
Deduct pipe 0.785 0.7 0.7 1.4 0.54 cum
3.48 cum
7 Shuttering BGL
1 5.6 2.000 11.20 Sqm

11.20 Sqm
8 Shuttering AGL
1 5.6 2.05 11.48 cum
11.48 Sqm

9 HYSD
1 100 7.40 739.92 0.74 MT

10 Painting Outside 1 11.48 Sqm


LARSEN & TOUBRO LIMITED
ECC Division – EDRC BILL OF QUANTITIES

JOB NO SHEET
PROJECT. Muscat 135
REV. NO. DATE
DOC NO
6/9/2021
PARTICULAR CALCULATED CHECKED
S Diaphragm blocks-1100 DN
Dimensions
Sl No. Description of Work Numbers Total
No Length Breadth Height Contents or area
/Depth
1 Earthwork Excavation
0-2m 1 2.65 2.65 2.00 14.05 cum

14.05 m3

2 Backfill 8.36 m3

3 Disposal
RCC 1 1.65 1.65 2.00 5.45 cum
PCC 1 1.8 1.8 0.08 0.24 cum

5.69 m3
4 PCC 1 1.8 1.8 0.08 0.24 cum
0.24 m3

5 RCC BGL
RCC 1 1.65 1.65 2.00 5.45 cum 5.45 cum

6 RCC AGL
RCC 1 1.65 1.65 2.375 6.47 cum
Deduct pipe 0.785 1.1 1.1 1.65 1.57 cum
4.90 cum
7 Shuttering BGL
1 6.6 2.000 13.20 Sqm

13.20 Sqm
8 Shuttering AGL
1 6.6 2.38 15.68 cum
15.68 Sqm

9 HYSD
1 100 10.34 1034.29 1.03 MT

10 Painting Outside 1 15.68 Sqm

You might also like