Automation Från Kiruna Till Indonesien: Oscar Carlsson, Midroc Automation, Sweden
Automation Från Kiruna Till Indonesien: Oscar Carlsson, Midroc Automation, Sweden
1
Midroc Automation
Agenda
• Midroc Europe
– Midroc Electro AB
• Midroc Automation
• Project: LKAB concentration and pelletizing plant
• Project: LKAB new main haulage level in Kirunavaara
• Project: Freeport new main haulage level in Grasberg, Indonesia
• Research project: IMC-AESOP
• Research project: Arrowhead
2
Main owner Midroc Global
HEAD QUARTER
Midroc Holding Ltd
• Employees:
Mohammed2 800al-Amoudi, business man 10
and facilitator
Total turnover: €12 000 million
3 Total no of emplyees: 70 000+
Midroc Europe: business areas
Business areas
Scaffolding
GP Ställningar
4
Midroc Automation
Electro
One of Sweden’s leading long-term
industrial partners for Installation, Kiruna
Midroc
Electro
• • 45
production control & industrial IT
local offices Karlstad
Installation East
Stockholm
• electrical installation and in-house manufacturing Installation South
Malmö
5
Project: LKAB concentration and pelletizing
plant
6
LKAB’s new Concentrating &
Pelletizing Plant, KA3 & KK4
• 8.5 billion SEK investment
• Part of a capacity investment in 2005
• Midroc was awarded the contract for
process control systems
– Responsible to gather, on behalf of
LKAB, information from all machine
vendors, necessary to engineer the
solution
– Largest automation project of the
decade in Sweden
7
Project scope for Midroc
8
Project: LKAB new main haulage level in
Kirunavaara
9
The new main haulage level:
LKAB KUJ1365
• Lump sum contract for the Midroc
delivery
• Delivered in 5 stages up until 2017
• 60% delivered in the 1st stage,
finished Q2 2013
• In total 250 000 mh by Midroc, divided
into 50% engineering and 50%
installation
10
The new Haulage Level KUJ1365
In production 2013 Q2
Dumping
Blasting & 1 stations
Shaft
Dumping 4
3
5 Crusher
Train Stations
Transport
Chute
Galleries 2
11
Main Control Room for KUJ
12
Midroc & Bombardier Process & Train Control
SystemPTFI Interfacing systems
Power distribution – Crusher –
Drainage - Ventilation – Tracking -
Production Systems
Gates &
Barriers Derailing
Sensors
Equipment in : Catenary
Ø Chute Galleries System
Ø Unloading Stations
Ø Service Area
MCC, FRO, UPS, CCTV, ATP / ATO on
Field Equipment Train
CCTV on
Train
Balises
13
Project: Freeport new main haulage level in
Grasberg, Indonesia
14
New order 2012,
from PT Freeport Indonesia
• Freeport-McMoRan Copper & Gold Inc
• Grasberg (Ertsberg) District Location,
Indonesian province of Papua
• Mines are 120 km from the coast at
2,500-4,000 meters elevation
• Open pit copper and gold mine,
estimated as the worlds largest gold
deposit
• Operations going underground in 2017
15
Midroc & Bombardier Process & Train Control
System
In production 2017 Q1
16
Research project: IMC-AESOP
17
Research project: IMC-AESOP
SCADA
Services GW
/
Mediators
Services
Services for
Legacy
Devices
Services
PLC Device
DCS MES
18
IMC-AESOP demonstration at
LKAB
• The LKAB pelletizing plant KK4 in
Kiruna was selected for a use case in
IMC-AESOP
19
IMC-AESOP demonstration
DS IM AS ES OP EOW
Firewall
Client/Server network
• Interaction between high-level
Mediator
Monitoring and
control (Level 2)
CS CS CS
software on a standard laptop and low-
level devices
Control network
20
Research project: Arrowhead
21
Arrowhead
Process and energy system automation
4 years project
68M€
77 partners
Coordinated by
an ARTEMIS CoIE
www.arrowhead.eu
22
Midroc in Arrowhead
Engineering and operation methodology
• Development of an overall systems engineering concept
– To support life cycle management of the system
– Methods and models to support the overall systems engineering
approach
23