3500
3000
2500
2000
Pwf, psi
1500
1000
500
0
0 500 1000 1500 2000 2500 3000 3500 4000 4500
Qt, BFPD
Data
Datum = 6174 ft TVD SS 6204 ft TVD KB
Reservoir Pressure (Pr)@Datum = 2650 psi
Bubble Point Pressure (Pb) = 2450 psi
Water Spesific Gravity (Sgw) = 1.023
Oil Spesific Gravity (Sgo) = 39.9 ⁰API
Gas Spesific Gravity (Sg gas) = 0.65
Water Cut (WC) = 0.87 87 % 0.134854 0.865146
D (Mid Perforation) = 7469 ft TVD
Laju Produksi Minyak (Qo) = 597 BOPD
Laju Produksi Total (Qt) = 4427 BFPD
Static Fluid Level (SFL) = 0 ft 0.47972 Aldo:
aktual
Working Fluid Level (WFL) = 4857 ft
Pump Setting Depth (PSD) = 5614 ft Aldo:
Pump Intake Pressure (PIP) = 2330 psig data aktua
1. Pwf/Pr = 0.3526
2. (Pwf/Pr)^2 = 0.1243
3. Pwf/Pb = 0.4600
4. (Pwf/Pb)^2 = 0.2116
5. A = 0.7388
Pada kondisi tekanan reservoir (Pr) berada diatas tekanan bubble point (Pr>Pb) dan Pwf<Pb, sehingga
d. Menghitung Qt max
Qb = 1885 BFPD
Qx = 3441 BFPD
Qt max = 5326 BFPD
Qo = 4741 BFPD
Pwf Qo
3112 0
2700 147
2400 228
2100 303
1800 373
1500 436
1200 494
952 537
0 666
Pwf Qo WC Qw Qt
3112 0 85.17 0 0
2700 147 84.90 827.70 974.93
2400 228 84.70 1263.74 1491.96
2100 303 84.51 1654.93 1958.28
1800 373 84.32 2003.19 2375.83
1500 436 84.12 2310.34 2746.42
1200 494 83.93 2578.12 3071.78
952 537 83.77 2770.91 3307.77 Q yang diinginkan
500 605 83.48 3058.80 3664.10
0 666 83.16 3286.89 3952.42
-F = 57.732631 /1000 ft
- HF = 324.11099 ft 1.76342
- HT = 417 ft
4. Total Dynamic Head
- TDH = 955 ft
3,9
Aldo:
aktual
Aldo:
data aktual
Aldo:
data aktual
Pwf<Pb, sehingga
ndisi tekanan reservoir (Pr) berada diatas tekanan bubble point (Pr>Pb) dan Pwf<Pb, sehingga
Q yang diinginkan
Pwf
952
952
0
3100
Perhitungan Gas Bebas
Data
Water Cut = 0.86515 86.515 %
PIP = 2330 psi 2344.70 psig PIP eksisting atau PIP calculasi? Existing
T @ intake = 225.00 F
Ts = 165.00 F
SGo (ɣo) = 0.83
SGw (ɣw) = 1.02
SGg (ɣg) = 0.65
Qt = 4427 BFPD
Qo = 597 BOPD
WOR = 1.02
GOR = 1529 scf/stb
Gravity = ft/sec2
Casing = 7.000 OD inc 8.681 ID
Tubing = 2.992 ID inc 3.5 OD
SG (ɣ) = -0.294
Rs = 100.8565 scf/stb
Z = 0.689452
0.272683
= 0.037865
c. Mencari Bo dan Bg
F = 370.7427 F
Bg = 0.000315 cuft/scf
Bo = 1.125454 bbls/stb
Bw = 1.039336 bbls/stb
j. Menghitung total volume fluida yang harus diterima oleh pompa ESP
q't = 1371.713 BPD q’t = q’l – q’ing
f. Karena Ф ≥ 1 , maka pompa beroperasi tidak cukup stabil. Pada pompa ESP yang terpasang sudah terpasang gas separator
Gas yang masuk kedalam pompa setelah menggunakan gas separator adalah sebagai berikut :
Laju alir gas setelah menggunakan gas separator dimana efisiensi gas separator antara 80-95% (asumsikan digunakan 80%),
GVF GS = 20.00 %
Jumlah gas yang masuk ke pompa sebesar 14,40% sehingga tidak diperlukan gas handler
Ф = 0.059
Karena Ф ≤ 1 sehingga tidak diperlukan gas handler
Evaluasi Pump Curve (Volumetrik eff) pada head per stages 3,9
41
0,25
Data Q target sebesar 80% Qmax
Q target sebesar 80% Qmax = 3600 BFPD
Datum = 6174 ft TVD SS 6204 ft TVD KB
Reservoir Pressure (Pr)@Datum = 2650 psi
Flowing Bottom Hole Pressure (Pwf) = 1127 psi
Pressure perfo (Pr) = 3196 psi
Bubble Point Pressure (Pb) = 2450 psi
Water Spesific Gravity (Sgw) = 1.023
⁰API = 39
Water Cut (WC) = 0.85 85 %
D (Mid Perforation) = 7687.5 ft TVD
Laju Produksi Minyak (Qo) = 675 BOPD
Laju Produksi Total (Qt) = 4500 BFPD
Static Fluid Level (SFL) = 0 ft
Working Fluid Level (WFL) = 3995 ft
1. Pwf/Pr = 0.352622
2. (Pwf/Pr)^2 = 0.124342
3. Pwf/Pb = 0.459957
4. (Pwf/Pb)^2 = 0.211561
5. A = 0.73876
Pada kondisi tekanan reservoir (Pr) berada diatas tekanan bubble point (Pr>Pb) dan Pwf<Pb, sehingga
1. PI (J) = 2.569529
b. Menghitung WC@Pwf = Pr
1. P1 = 1.026676
2. P2 = -0.026417
3. WC@Pwf = 83.80353 %
d. Menghitung Qt max
Qb = 1916.25 BFPD
Qx = 3497.415 BFPD
Qt max = 5413.665 BFPD
Pwf Qo
2650 0
2400 254
2200 310
2000 364
1800 415
1600 462
1000 588
800 625
0 741
Pwf Qo WC Qw Qt
2650 0 83.43 0 0
2400 254 83.26 1262.74 1516.59
2300 282 83.19 1398.02 1680.46
2200 310 83.12 1528.42 1838.72
2000 364 82.99 1774.83 2138.69
1800 415 82.85 2002.51 2417.04
1600 462 82.71 2211.99 2674.30
1244 540 82.47 2541.38 3081.59 Q yang diinginkan
400 688 81.90 3113.75 3802.06
0 741 81.63 3289.78 4030.30
1500 Q
1000 0
500 3081.59
0 3081.59
0 500 1000 1500 2000 2500 3000 3500 4000 4500
Qt, BFPD
- HT = 1267.207 ft
j. Pemilihan Motor
BHP = 27.9 HP
HP = 34.9 HP
h. Pemilihan Motor
Data
Stage Name ING 2500
OD 5.43 inch
HP 140
Voltase 2200 volt
Ampere 88 ampere
1. Pemilihan Transformator
- 400 KVA 60 Hz
2. Pemilihan Switchboard
- RPR-2 2400 Volt, 700 HP, 360 Ampere
Gf = SGmix x 0,433
n Pwf<Pb, sehingga
Q yang diinginkan
Pwf
1244
1244
0
Aldo:
pakai PIP yang mana?
52 %
590,4
0.84
Perhitungan Gas Bebas
Data
Water Cut = 0.86515 86.515 %
PIP = 355.48 psi 370.18 psig
T @ intake = 225.00 F
Ts = 165.00 F
SGo (ɣo) = 0.83
SGw (ɣw) = 1.02
SGg (ɣg) = 0.65
Qt = 4500.00 BFPD
Qo = 675.00 BOPD
WOR = 1.02
GOR = 1833.00 scf/stb
Gravity = 32.00 ft/sec2
Casing = 7.000 OD inc 8.681 ID
Tubing = 2.992 ID inc 3.5 OD
SG (ɣ) = -0.294
Rs = 10.46571 scf/stb
Z = 0.105187
0.006347
= 0.888466
c. Mencari Bo dan Bg
F = 290.5365 F
Bg = 0.048451 cuft/scf
Bo = 1.087233 bbls/stb
Bw = 1.045852 bbls/stb
j. Menghitung total volume fluida yang harus diterima oleh pompa ESP
q't = 8780.678 BPD q’t = q’l – q’ing
f. Karena Ф ≥ 1 , maka pompa beroperasi tidak cukup stabil. Pada pompa ESP yang terpasang sudah terpasang gas separator
Gas yang masuk kedalam pompa setelah menggunakan gas separator adalah sebagai berikut :
Laju alir gas setelah menggunakan gas separator dimana efisiensi gas separator antara 80-95% (asumsikan digunakan 80%),
GVF GS = 13.75 %
Jumlah gas yang masuk ke pompa sebesar 9,05% sehingga tidak diperlukan gas handler
18,35
Ф = 1.535
Karena Ф ≤ 1 sehingga tidak diperlukan gas handler
Evaluasi Pump Curve (Volumetrik eff) pada head per stages 18,35
41
0,25
738