Service Data Bulletin: Problem

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

OPT5007B.

STN
LAS Technical Support Group
710 Bridgeport Avenue, MS219
Shelton, CT 06484-4794
DISTRIBUTION: ICP
INTERNAL DIST. ONLY: ⌧ YES NO

SERVICE DATA BULLETIN


PREPARED BY: Dave Mendillo June 6, 2008 PAGE 1 OF 2 PAGES

PROBLEM:

N/A

Optima 7000 Series Pre-Installation Checklist


PURPOSE:

To provide the field with a pre-installation checklist for the Optima 7000 series
instruments which includes the Optima 7100DV/7200DV/7300DV/7300V.

MATERIALS REQUIRED:

NA

GENERAL:

Refer to the attached Preparing Your Laboratory for the Optima 7X00 Series ICP-
OES Spectrometer for detailed PreInstallation Requirements. Fill out the following
PreInstallation Checklist by checking either Yes or No and provide comments as
necessary. Sign off when completed.
OPT5007B.doc June 6, 2008 Page 2

Pre-Installation Checklist – Optima 7X00 Series

Model: Order #:

Customer: Service Report #:

Date:

The following Pre-Installation Requirements have been met as stated in the attached “Preparing Your Laboratory for
the Optima 7000 DV ICP-OES Spectrometer”:

Yes No Comment

Room Temperature

Humidity

Dust

Free of Corrosive Fumes

Free of Excessive Vibrations

Exhaust Ventilation; location

Exhaust Ventilation; flow rate

Gasses

Lab Space (Working area; table)

Space allowed for Service access (18 inches around


instrument)

Voltage Requirements (200-254VAC under full


instrument load)

Frequency (50/60Hz +/-1%)

Common Mode Noise (Neutral to ground not more


then 0.5 volts peak to peak)

Normal Mode Noise (Hot to neutral not more then 10


volts peak to peak)

Cooling requirements

Customer Signature:_________________________________ Date:________________


PerkinElmer Service Engineer Signature:_________________ Date:________________

You might also like