3003 MEIKARTA DISTRICT 2 - BLOCK 60007

MECHANICAL, ELECTRICAL & PLUMBING


GRAND SUMMARY

Material Amount Installation


Description Page No.
(IDR) Amount (IDR)

BILL 1 - PRELIMINARIES Page: Bill 1 / 9

BILL 2 - PODIUM (LG ~ L.3) Page: Bill 2 / 39 17,502,172,198 2,530,770,000

BILL 3 - APARTMENT (F1 ~ ROOF) Page: Bill 3 / 27 59,142,107,700 13,151,299,000

BILL 4 - MISCELLANEOUS, TESTING


Page: BILL 4 / 4 249,500,000
AND COMMISSIONING

TOTAL CARRIED TO LETTER OF TENDER IDR 76,644,279,898 15,931,569,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

GENERAL NOTES :

The Contractor is referred to the Preliminaries, Specification and


A
Drawings which form an integral part of the Contract Documents.

Subject to the terms of the Conditions of Contract, the Contract


Documents are mutually explanatory and the rates inserted against the
B
items in the Bills of Quantities shall be deemed to cover the complete
and total requirements of the Contract Documents.

The Contract is a fixed price lump sum contract. The Contract Price is
not subject to adjustment due to construction cost escalation, material or
C labour price fluctuations. The Contractor is to take note of the
requirements in respect of the fixed price lump sum and all inclusive
pricing nature of the Contract.

The Contractor is advised that the Bill of Quantities does not form part
of the Contract and has no contractual effect. The description of any
items herein is not intended to be complete but merely serves to identify
D
items for interim payments only. Details of the various items are shown
and/or described in the Contract Documents (including but not limited
to the Drawings and Specification).

Any other items of work referred to in the Contract Drawings or


E Specification but not specifically mentioned herein shall be priced
accordingly in the Bill of Quantities.

The rates inserted herein shall form the basis for valuing all variations
under the Contract. All items or quantities (as the case may be) stated in
F
the Bills of Quantities unless otherwise provided, have been adopted as
a basis for measurements together with the Trade Preambles.

The rates inserted herein shall be treated as inclusive of all Plant,


Materials, work (whether permanent or temporary) and expenditure,
which are either indispensably necessary to complete the Works as
G described in or to be inferred from the Contract Documents taken as a
whole, or which may contingently become necessary to overcome
difficulties and bring the said Works so described or inferred to
satisfactory completion.
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 1 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

GENERAL NOTES : (Cont'd)

Without prejudice to the above, the Contractor shall be deemed to have


included in his rates for all costs in connection with the Works
including but not limited to all costs for all labour including overtime
costs, Plant, Materials, Goods, Temporary Works including all
fabrication costs; delivering, unloading, transferring, storing, returning
packaging, handling, hoisting and lowering; setting, fitting and fixing
Materials and Plant in position; Materials required for lapping, jointing
A
and the like; conveyance, transportation and equipment costs; fees,
duties and taxes; all cutting and wastage of Materials; all incidental
Materials such as nails, screws, spikes, plugs, putty, tow, solder and the
like whether or not specifically mentioned; protection and protection
removal, supervision, attendance; all costs incidental or ancillary to the
provision of any of the aforesaid; all establishment costs, overheads and
profit

The Contractor shall be deemed to have included for all costs in respect
of all time delays caused by workmen, for annual and public holidays,
rest days, travelling time, expenses, fares and transport, non-productive
B time and all incentive and bonus payments, government levies and other
payments mandated by law or which are in accordance with industry
practice and any other costs, liabilities or disbursements arising from
the employment of labour.

Unless otherwise stated, all items in the rates specifying Materials,


C fittings and the like are to be read as implying that such Materials,
fittings and the like are to be provided and fixed by the Contractor.

All Plant and Materials to be used in the Permanent Works shall be new
D
and fixed in position by the Contractor.

The Contractor is deemed to have included all cost and/or time


E
implications in compliance with the above conditions and requirements.
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 2 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

GENERAL

A 1.1 Definitions Item

B 1.2 Brief description of the Works Item

C 1.3 Completion of Sections of the Works Item

D 1.4 Gross areas Item

E 1.5 Access to Site Item

DOCUMENTS

F 2.1 Pricing Documents Item

G 2.2 Discrepancies Item

H 2.3 Guarantees and operating instructions Item

I 2.4 Drawings Item

J 2.5 Shop drawings and co-ordination drawings Item

K 2.6 As-built drawings Item

CONTRACT AND PRICING OF PRELIMINARIES

L 3.1 Pricing Preliminaries Item

M 3.2 Form of Contract Item

N 3.3 Fixed price contract Item

O 3.4 Insurances Item

P 3.5 Performance Security Item

Q 3.6 Date for Commencement Item

R 3.7 Exceptionally adverse weather Item

S 3.8 Working hours and rates of wages Item

T 3.9 Works requiring Employer's site supervision Item

U 3.10 Currency payable Item

V 3.11 Contractor's acceptance of Site conditions Item

W 3.12 Treasure trove Item


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 3 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

CONTRACT AND PRICING OF PRELIMINARIES (Cont'd)

A 3.13 Prime Cost Sum expenditure Item

B 3.14 Provisional Sum expenditure Item

C 3.15 Omission of Provisional Sums Item

D 3.16 Adjustment of Prime Cost rates Item

SUB-CONTRACTORS, SUPPLIERS AND OTHERS


EMPLOYED ON THE WORKS

E 4.1 Forward Contracts Item

F 4.2 Nominated Subcontractors Item

G 4.3 Nominated suppliers Item

H 4.4 Artists, tradesmen and other contractors Item

I 4.5 Installation of Authorities incoming services Item

J 4.6 Contractor's responsibility for all Subcontractors Item


and suppliers

K 4.7 Fix Only Item

L 4.8 Attendance Item

M 4.9 Nominated supply or nominated subcontract Item


work tendered by the Contractor

ADMINISTRATION OF CONTRACT AND WORKS

N 5.1 Illegal foreign workers Item

O 5.2 Contractor's superintendence Item

P 5.3 Workmen to be confined to Site Item

Q 5.4 Trespassing and acts of nuisance Item

R 5.5 Publicity of the Works Item

S 5.6 Public relations measures Item

T 5.7 Resident Engineer Item

U 5.8 Access for the Employer to the Works Item

V 5.9 Access for inspection and testing Item


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 4 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

ADMINISTRATION OF CONTRACT AND WORKS (Cont'd)

A 5.10 Welfare and site safety Item

B 5.11 Visitors Item

C 5.12 Variations and methods of measuring anvaluing Item

D 5.13 Payment of Preliminaries Item

E 5.14 Procedures for payment Item

F 5.15 Construction programme Item

G 5.16 Cash flow forecasts Item

H 5.17 Meetings Item

I 5.18 Variation Meetings Item

J 5.19 Progress photographs Item

K 5.20 Photographs of completed development project Item

L 5.21 Progress reports Item

SITE AND WORKS

M 6.1 Setting out of the Works Item

N 6.2 Boundary relationship Item

O 6.3 Progress surveys Item

P 6.4 Final surveys Item

Q 6.5 Possession of Site for the Works only Item

R 6.6 Restrict nuisance of dust and noise Item

S 6.7 Interference with traffic and adjoining properties Item

T 6.8 Extraordinary traffic and special loads Item

U 6.9 Cables/services detection Item

V 6.10 Maintain existing services Item

W 6.11 Response to interruption or disruption to Item


existing services

X 6.12 Maintenance and protection of existing roads Item


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 5 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

SITE AND WORKS (Cont'd)

A 6.13 Silt control and protection of exposed


excavation surfaces Item

B 6.14 Vector control Item

C 6.15 Damage and theft Item

D 6.16 Protecting the Works from inclement weather Item

E 6.17 Site security Item

F 6.18 Fuel Storage Item

G 6.19 Industry Awards (Not Applicable) Item

H 6.20 Environmental Sustainability Item

I 6.21 Licensing Requirements Item

PLANT AND TEMPORARY WORKS

J 7.1 Offices for Resident Engineer and Resident Item


Site Staff

K 7.2 Temporary access and temporary roads Item

L 7.3 Removal of water and temporary drainage Item

M 7.4 Shoring and Temporary Works Item

N 7.5 Signs and advertisements Item

O 7.6 Hoardings, fencing and gates Item

P 7.7 Project Name Board Item

Q 7.8 Scaffolding and staging Item

R 7.9 Contractor's temporary offices, stores,workshops Item

S 7.10 Temporary water and electrical services Item

T 7.11 Temporary fire protection services Item

U 7.12 Temporary lightning protection system Item

V 7.13 Temporary telephone service Item

W 7.14 Plant, tools and vehicles Item


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 6 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

PLANT AND TEMPORARY WORKS (Cont'd)

A 7.15 Use of explosive powder tools Item

B 7.16 Public address system Item

C 7.17 Loading in excess of design load Item

D 7.18 Maintenance of Contractor's Equipment and Item


Employer's Equipment

E 7.19 Submission of drawings for Temporary Works Item

COMPLETION

F 8.1 Occupation Permits Item

G 8.2 Completion and maintenance followingcompletion Item

H 8.3 Final Payment Claim Item

I 8.4 Removal of rubbish Item

J 8.5 Leave clean on Completion Item

MATERIALS AND WORKMANSHIP

K 9.1 Standards and codes of practice Item

L 9.2 Testing of Materials Item

M 9.3 Materials approval Item

N 9.4 Samples Item

O 9.5 Items specified by name Item

P 9.6 Substitution of materials Item

Q 9.7 Storage of materials (including those of Subcontractors Item


and Nominated Direct Contractors)

R 9.8 Transporting materials (including those of Subcontractors Item


and Nominated Direct Contractors)

S 9.9 Labour Item

T 9.10 Protection of completed work Item

U 9.11 Special protection Item

V 9.12 Site mock-up Item

W 9.13 Prototype Item


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 7 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Ref Description Unit Amount (IDR)

OTHERS

The Contractor shall provide and allow for any other


items not included in the foregoing but which are
required by the Contract (in particular, the
Specification, the Preliminaries and the Trade
Preambles).

A ……………………………….. Item

B ……………………………….. Item

C ……………………………….. Item

D ……………………………….. Item

E ……………………………….. Item
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 8 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Description Amount (IDR)

COLLECTION

Page: Bill 1 / 3 -

Page: Bill 1 / 4 -

Page: Bill 1 / 5 -

Page: Bill 1 / 6 -

Page: Bill 1 / 7 -

Page: Bill 1 / 8 -
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

Page: Bill 1 / 9 Grand Summary -


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 1 - PRELIMINARIES

90,000.00

90,000.00
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM

CLEAN WATER SYSTEM

MAIN EQUIPMENT

Supply and Install of following plumbing pumps including


local control panel, supporting frame, connection, fixing,
testing, commissioning and all necessary accessories in
accordance to the technical specification and drawing, all
as described;

TP-01 A/B; Horizontal multistage type; Capacity 70 m3/hour;


A Head 120 m; Power 2 x 48 kw; operation automatic single no 2 95,000,000 5,000,000 190,000,000 10,000,000
alternate

B TN-01 (CWT); Capacity 1500 m3; Concrete no 1 BY CIVIL BY CIVIL

PUMP ROOM

PIPEWORKS INSTALLATIONS

Supply and install clean water pipeworks; Galvanized Iron


Pipe Medium, branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

Pipeworks

C Header Pipe; 150mmD (2m; 3 connection) no 1 1,900,000 150,000 1,900,000 150,000

D Pipe; 100mmD (GIP Medium Pipe) m 4 590,000 150,000 2,360,000 600,000

E Pipe; 100mmD (PPR PN-10 Pipe) (PDAM) m 15 250,000 150,000 3,750,000 2,250,000

F Pipe; 65mmD (GIP Medium Pipe) m 3 300,000 150,000 900,000 450,000

Extra Over Pipeworks

G Bend; 100mmD (GIP Medium Pipe) no 1 250,000 100,000 250,000 100,000

H Bend; 100mmD (PPR PN-10 Pipe) no 2 426,000 100,000 852,000 200,000

I Tee; 100mmD (PPR PN-10 Pipe) no 1 500,000 100,000 500,000 100,000

Valve & Ancillaries

J Gate Valve; 100mmD no 3 4,875,000 125,000 14,625,000 375,000

K Gate Valve; 65mmD no 4 3,585,000 125,000 14,340,000 500,000

L Check Valve; 65mmD no 2 3,458,000 125,000 6,916,000 250,000

M Strainer; 65mmD no 2 2,966,000 125,000 5,932,000 250,000

N Flexible Joint; 65mmD no 4 758,000 125,000 3,032,000 500,000

O Water hammer absorber 100mmD no 1 15,265,400 250,000 15,265,400 250,000

P Pressure Gauge no 1 1,250,000 125,000 1,250,000 125,000

Q Floating Valve; 100mmD no 2 5,568,000 250,000 11,136,000 500,000

Page: Bill 2 / 1 To Collection Bill 2.1 273,008,400 16,600,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

CLEAN WATER SYSTEM (Cont'd)

SITE PLAN

Supply and install clean water pipeworks; PPR PN, branch


pipe including all fitting for 2 inch (50mm) inside diameter
run in pipe or less, supports, hangers, jointing materials
and fixing accessories, all fully in accordance with the
technical specification, and or as shown in the drawings.

Pipeworks

A Pipe; 100mmD (PDAM) m 30 250,000 150,000 7,500,000 4,500,000

B Pipe; 25mmD m 224 18,000 100,000 4,032,000 22,400,000

C Pipe; 20mmD m 48 15,000 50,000 720,000 2,400,000

Extra Over Pipeworks

D Bend; 100mmD no 4 426,000 100,000 1,704,000 400,000

Valve & Ancillaries

E Water meter set c/w valve ; 100mmD no 1 8,500,000 300,000 8,500,000 300,000

F Faucet; 20mmD no 5 250,000 100,000 1,250,000 500,000

PUBLIC AREA

Supply and install clean water pipeworks; Galvanized Iron


Pipe Medium and PPR PN, branch pipe including all fitting
for 2 inch (50mm) inside diameter run in pipe or less,
supports, hangers, jointing materials and fixing
accessories, all fully in accordance with the technical
specification, and or as shown in the drawings.

Pipeworks

G Pipe; 150mmD (Riser) (GIP Medium Pipe) m 17 801,000 215,000 13,617,000 3,655,000

H Pipe; 100mmD (Riser) (GIP Medium Pipe) m 14 460,000 145,000 6,440,000 2,030,000

I Pipe; 65mmD (Riser) (GIP Medium Pipe) m 9 248,000 100,000 2,232,000 900,000

J Pipe; 50mmD (Riser) (GIP Medium Pipe) m 1 155,000 85,000 155,000 85,000

K Pipe; 150mmD (GIP Medium Pipe) m 17 801,000 215,000 13,617,000 3,655,000

L Pipe; 100mmD (GIP Medium Pipe) m 26 460,000 145,000 11,960,000 3,770,000

M Pipe; 32mmD (GIP Medium Pipe) m 8 155,000 85,000 1,240,000 680,000

N Pipe; 25mmD (GIP Medium Pipe) m 13 155,000 85,000 2,015,000 1,105,000

O Pipe; 100mmD (PPR Pipe) m 7 460,000 145,000 3,220,000 1,015,000

P Pipe; 50mmD (PPR Pipe) m 4 155,000 85,000 620,000 340,000

Q Pipe; 32mmD (PPR Pipe) m 226 134,000 85,000 30,284,000 19,210,000

R Pipe; 25mmD (PPR Pipe) m 1,014 25,000 25,000 25,350,000 25,350,000

S Pipe; 20mmD (PPR Pipe) m 96 20,000 25,000 1,920,000 2,400,000

Page: Bill 2 / 2 To Collection Bill 2.1 136,376,000 94,695,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

CLEAN WATER SYSTEM (Cont'd)

PUBLIC AREA (Cont'd)

Supply and install clean water pipeworks; Galvanized Iron


Pipe Medium and PPR PN, branch pipe including all fitting
for 2 inch (50mm) inside diameter run in pipe or less,
supports, hangers, jointing materials and fixing
accessories, all fully in accordance with the technical
specification, and or as shown in the drawings.

Extra Over Pipeworks

A Bend; 150mmD (GIP Medium Pipe) no 11 1,900,000 125,000 20,900,000 1,375,000

B Bend; 100mmD (GIP Medium Pipe) no 8 585,000 125,000 4,680,000 1,000,000

C Tee; 150mmD (GIP Medium Pipe) no 43 715,000 125,000 30,745,000 5,375,000

D Tee; 65mmD (GIP Medium Pipe) no 1 310,000 125,000 310,000 125,000

E Bend; 100mmD (PPR Pipe) no 1 585,000 125,000 585,000 125,000

Valve & Ancillaries

F Gate Valve; 50mmD no 1 10,355,000 125,000 10,355,000 125,000

G Gate Valve; 32mmD no 33 3,585,000 125,000 118,305,000 4,125,000

H Gate Valve; 25mmD no 77 5,911,100 125,000 455,154,700 9,625,000

I Water Meter; 32mmD no 11

J Water Meter; 25mmD no 32 3,250,000 125,000 104,000,000 4,000,000

K PRV Set; 100mmD (Double PRV) set 2 30,888,000 125,000 61,776,000 250,000

L Handhole / Access panel 400x400 no 43

UNIT LOFT (L.3)

Supply and install clean water pipeworks; PPR PN, branch


pipe including all fitting for 2 inch (50mm) inside diameter
run in pipe or less, supports, hangers, jointing materials
and fixing accessories, all fully in accordance with the
technical specification, and or as shown in the drawings.

Pipeworks

M Pipe; 25mmD m 280 25,000 25,000 7,000,000 7,000,000

N Pipe; 20mmD m 546 20,000 25,000 10,920,000 13,650,000

Valve & Ancillaries

O Gate Valve; 25mmD no 32 199,000 50,000 6,368,000 1,600,000

P Gate Valve; 20mmD no 32 157,000 50,000 5,024,000 1,600,000

Page: Bill 2 / 3 To Collection Bill 2.1 836,122,700 49,975,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

HOT WATER SYSTEM

Supply and install hot water pipeworks; PPR-PN 20 Pipe,


branch pipe including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, all fully in accordance
with the technical specification, and or as shown in the
drawings.

UNIT LOFT (L.3)

Pipeworks

A Pipe; 20mmD m 190 30,000 5,700,000

Valve & Ancillaries

B Electric Water Heater Cap. 50 ltr no 32 4,050,000 250,000 129,600,000 8,000,000

C Gate Valve; 20mmD no 32 199,000 50,000 6,368,000 1,600,000

D Check Valve; 20mmD no 32 3,380,000 87,000 108,160,000 2,784,000

WASTE WATER AND SEWAGE WATER SYSTEM

MAIN EQUIPMENT

Supply and Install of following plumbing equipment


including local control panel, supporting frame,
connection, fixing, testing, commissioning and all
necessary accessories in accordance to the technical
specification and drawing, all as described;

SWP-01; Submersible type; Capacity 10 m3/hour; Head 20


E m; Power 2 x 1.5 kw; operation auto automatic paralel no 2
alternate

F STP; Capacity 800 m3/day set 1 by other by other

Supply and install waste and sewage water pipework; PVC


Pipe (AW Class), branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

SITE PLAN

Pipeworks

G Pipe; 200mmD m 175 435,000 135,000 76,125,000 23,625,000

H Pipe; 150mmD m 16 260,000 127,000 4,160,000 2,032,000

I Pipe; 80mmD m 3 116,000 97,000 348,000 291,000

Extra Over Pipeworks

J Bend 90'; 200mmD no 6 260,000 87,000 1,560,000 522,000

K Bend 90'; 150mmD no 6 260,000 87,000 1,560,000 522,000

L Bend 90'; 80mmD no 1 260,000 87,000 260,000 87,000

M Bend 45'; 200mmD no 10 402,300 87,000 4,023,000 870,000

N Bend 45'; 150mmD no 6 177,600 87,000 1,065,600 522,000

O Bend 45'; 80mmD no 1 70,200 87,000 70,200 87,000

P Tee; 200mmD no 17 487,400 87,000 8,285,800 1,479,000

Page: Bill 2 / 4 To Collection Bill 2.1 347,285,600 42,421,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

WASTE WATER AND SEWAGE WATER SYSTEM (Cont'd)

Supply and install waste and sewage water pipework; PVC


Pipe (AW Class), branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 200mmD (Riser) m 97 435,000 135,000 42,195,000 13,095,000

B Pipe; 150mmD (Riser) m 84 260,000 127,000 21,840,000 10,668,000

C Pipe; 100mmD (Riser) m 64 116,000 97,000 7,424,000 6,208,000

B Pipe; 200mmD m 168 435,000 135,000 73,080,000 22,680,000

C Pipe; 150mmD m 129 260,000 127,000 33,540,000 16,383,000

D Pipe; 100mmD m 227 116,000 97,000 26,332,000 22,019,000

E Pipe; 80mmD m 17 116,000 87,000 1,972,000 1,479,000

F Pipe; 50mmD m 33 34,000 87,000 1,122,000 2,871,000

G Pipe; 32mmD m 29 25,000 87,000 725,000 2,523,000

Extra Over Pipeworks

H Bend 90'; 200mmD no 4 402,300 135,000 1,609,200 540,000

I Bend 90'; 100mmD no 24 105,000 87,000 2,520,000 2,088,000

J Bend 90'; 80mmD no 2 105,000 87,000 210,000 174,000

K Bend 45'; 200mmD no 15 402,300 135,000 6,034,500 2,025,000

L Bend 45'; 150mmD no 10 177,600 87,000 1,776,000 870,000

M Bend 45'; 100mmD no 72 105,000 87,000 7,560,000 6,264,000

N Tee; 200mmD no 56 487,700 135,000 27,311,200 7,560,000

O Tee; 150mmD no 29 345,000 87,000 10,005,000 2,523,000

P Tee; 100mmD no 26 140,000 87,000 3,640,000 2,262,000

Valve & Ancillaries

Q CCO; 200mmD no 19

R CCO; 150mmD no 9

S CCO; 100mmD no 1

T FCO; 150mmD no 2 by other by other

U FCO; 100mmD no 1 by other by other

V Gate Valve; 80mmD no 1

FD + P-Trap; 50mmD (P-Trap By MEP Contractor, FD By


W no 21
Other)

Page: Bill 2 / 5 To Collection Bill 2.1 268,895,900 122,232,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

WASTE WATER AND SEWAGE WATER SYSTEM (Cont'd)

Supply and install waste and sewage water pipework; PVC


Pipe (AW Class), branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

UNIT LOFT (L.3)

Pipeworks

A Pipe; 100mmD m 69 116,000 97,000 8,004,000 6,693,000

B Pipe; 50mmD m 30 34,000 87,000 1,020,000 2,610,000

C Pipe; 32mmD m 70 25,000 87,000 1,750,000 6,090,000

Extra Over Pipeworks

D Bend 90'; 100mmD no 32 105,000 87,000 3,360,000 2,784,000

E Bend 45'; 100mmD no 3 105,000 87,000 315,000 261,000

F Tee; 100mmD no 59 140,000 87,000 8,260,000 5,133,000

Valve & Ancillaries

G Floor Drain Incl. Gully-Trap & Multiple Inlet Riser; 50mmD no 32 350,000 100,000 11,200,000 3,200,000

H FCO; 100mmD no 29 by other by other

I P-Trap for Lavatory no 32 Include Lavatory

VENT PIPE SYSTEM

Supply and install venting pipeworks; PVC Class D


5kg/cm2, branch pipe including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories, all fully in
accordance with the technical specification, and or as
shown in the drawings.

PUBLIC AREA

Pipeworks

J Pipe; 100mmD (Riser) m 38 75,000 87,000 2,850,000 3,306,000

K Pipe; 50mmD (Riser) m 9 65,000 87,000 585,000 783,000

L Pipe; 50mmD m 378 65,000 87,000 24,570,000 32,886,000

M Pipe; 32mmD m 113 35,000 87,000 3,955,000 9,831,000

Extra Over Pipeworks

N Tee; 100mmD no 11 105,000 87,000 1,155,000 957,000

UNIT LOFT (L.3)

Pipeworks

O Pipe; 50mmD m 240 65,000 87,000 15,600,000 20,880,000

P Pipe; 32mmD m 368 35,000 87,000 12,880,000 32,016,000

Page: Bill 2 / 6 To Collection Bill 2.1 95,504,000 127,430,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

KITCHEN WASTE SYSTEM

Supply and install kitchen waste pipework; Cast Iron,


branch pipe including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, all fully in accordance
with the technical specification, and or as shown in the
drawings.

SITE PLAN

Pipeworks

A Pipe; 200mmD m 90 1,230,000 245,000 110,700,000 22,050,000

B Pipe; 100mmD m 60 460,000 145,000 27,600,000 8,700,000

Extra Over Pipeworks

C Bend 90'; 200mmD no 2 1,356,000 125,000 2,712,000 250,000

D Bend 90'; 100mmD no 3 585,000 125,000 1,755,000 375,000

E Bend 45'; 200mmD no 5 1,356,000 125,000 6,780,000 625,000

F Bend 45'; 100mmD no 4 585,000 125,000 2,340,000 500,000

G Tee; 200mmD no 8 1,755,000 125,000 14,040,000 1,000,000

H Tee; 100mmD no 1 835,000 125,000 835,000 125,000

PUBLIC AREA

Pipeworks

I Pipe; 200mmD (Riser) m 45 1,230,000 245,000 55,350,000 11,025,000

J Pipe; 100mmD (Riser) m 62 460,000 145,000 28,520,000 8,990,000

K Pipe; 200mmD m 97 1,230,000 245,000 119,310,000 23,765,000

L Pipe; 150mmD m 199 802,000 215,000 159,598,000 42,785,000

M Pipe; 100mmD m 114 460,000 145,000 52,440,000 16,530,000

N Pipe; 50mmD m 31 155,000 85,000 4,805,000 2,635,000

Extra Over Pipeworks

O Bend 90'; 200mmD no 4 1,356,000 125,000 5,424,000 500,000

P Bend 45'; 200mmD no 7 900,000 125,000 6,300,000 875,000

Q Bend 45'; 150mmD no 14 785,000 125,000 10,990,000 1,750,000

R Bend 45'; 100mmD no 50 585,000 125,000 29,250,000 6,250,000

S Tee; 200mmD no 33 1,755,000 125,000 57,915,000 4,125,000

T Tee; 150mmD no 68 835,000 125,000 56,780,000 8,500,000

Valve & Ancillaries

U CCO; 200mmD no 11 670,000 125,000 7,370,000 1,375,000

V CCO; 150mmD no 15 190,000 125,000 2,850,000 1,875,000

W FCO; 150mmD no 2 by other by other

Page: Bill 2 / 7 To Collection Bill 2.1 763,664,000 164,605,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

KITCHEN WASTE SYSTEM (Cont'd)

Supply and install kitchen waste pipework; Cast Iron,


branch pipe including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, all fully in accordance
with the technical specification, and or as shown in the
drawings.

UNIT LOFT (L.3)

Pipeworks

A Pipe; 100mmD m 4 460,000 145,000 1,840,000 580,000

B Pipe; 50mmD m 144 155,000 85,000 22,320,000 12,240,000

Valve & Ancillaries

C Portable Grase Trap Cap. 15 Liter/menit no 32 by other by other

RAIN WATER SYSTEM

MAIN EQUIPMENT

Supply and Install of following plumbing equipment


including local control panel, supporting frame,
connection, fixing, testing, commissioning and all
necessary accessories in accordance to the technical
specification and drawing, all as described;

SP-01; Submersible type; Capacity 10 m3/hour; Head 20 m;


D no 2 42,000,000 2,500,000 84,000,000 5,000,000
Power 2 x 1.5 kw; operation auto automatic paralel alternate

Supply and install rain water pipework; PVC Pipe (AW


Class), branch pipe including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories, all fully in
accordance with the technical specification, and or as
shown in the drawings.

SITE PLAN

Pipeworks

E Pipe; 150mmD m 2 260,000 127,000 520,000 254,000

F Pipe; 100mmD m 8 116,000 97,000 928,000 776,000

G Pipe; 80mmD m 1 116,000 97,000 116,000 97,000

Extra Over Pipeworks

H Bend 90'; 150mmD no 4 260,000 87,000 1,040,000 348,000

I Bend 90'; 100mmD no 16 105,000 87,000 1,680,000 1,392,000

J Bend 90'; 80mmD no 1 105,000 87,000 105,000 87,000

Page: Bill 2 / 8 To Collection Bill 2.1 112,549,000 20,774,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

RAIN WATER SYSTEM (Cont'd)

Supply and install rain water pipework; PVC Pipe (AW


Class), branch pipe including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories, all fully in
accordance with the technical specification, and or as
shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD (Riser) m 52 260,000 127,000 13,520,000 6,604,000

B Pipe; 100mmD (Riser) m 369 116,000 97,000 42,804,000 35,793,000

C Pipe; 65mmD (Riser) m 4 50,000 87,000 200,000 348,000

D Pipe; 150mmD m 80 260,000 97,000 20,800,000 7,760,000

E Pipe; 100mmD m 16 116,000 97,000 1,856,000 1,552,000

F Pipe; 80mmD m 3 116,000 97,000 348,000 291,000

G Pipe; 65mmD m 33 50,000 87,000 1,650,000 2,871,000

Extra Over Pipeworks

H Bend 90'; 100mmD no 6 105,000 87,000 630,000 522,000

I Bend 90'; 80mmD no 2 105,000 87,000 210,000 174,000

J Bend 90'; 65mmD no 2 35,000 87,000 70,000 174,000

K Bend 45'; 100mmD no 21 105,000 87,000 2,205,000 1,827,000

L Bend 45'; 65mmD no 2 37,000 87,000 74,000 174,000

M Tee; 100mmD no 15 140,000 87,000 2,100,000 1,305,000

Valve & Ancillaries

N Gate Valve; 80mmD no 1 4,875,000 125,000 4,875,000 125,000

Page: Bill 2 / 9 To Collection Bill 2.1 91,342,000 59,520,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.1 PLUMBING SYSTEM (Cont'd)

Collection

Page: Bill 2 / 1 273,008,400 16,600,000

Page: Bill 2 / 2 136,376,000 94,695,000

Page: Bill 2 / 3 836,122,700 49,975,000

Page: Bill 2 / 4 347,285,600 42,421,000

Page: Bill 2 / 5 268,895,900 122,232,000

Page: Bill 2 / 6 95,504,000 127,430,000

Page: Bill 2 / 7 763,664,000 164,605,000

Page: Bill 2 / 8 112,549,000 20,774,000

Page: Bill 2 / 9 91,342,000 59,520,000

Page: Bill 2 / 10 To Collection Bill 2 2,924,747,600 698,252,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.2 VAC SYSTEM

MAIN EQUIPMENT

AC UNITS

Supply and Install of following AC units including control


panel, supporting frame, connection, fixing, testing,
commissioning and all necessary accessories in
accordance to the technical specification and drawing, all
as described

PUBLIC AREA

IU&OU-L1.13, Split wall type, Cap. 24.000 BTUH, 700 CFM,


A no 1 31,284,000 1,500,000 31,284,000 1,500,000
Power 0.05 Kw, 220V/50Hz/1Ph

IU&OU-L1.14 & 16, Split wall type, Cap. 9.000 BTUH, 300
B no 4 4,631,000 600,000 18,524,000 2,400,000
CFM, Power 0.03 Kw, 220V/50Hz/1Ph

IU&OU-L1.15, Cassete type, Cap. 47.800 BTUH, CFM,


C no 1 30,019,000 1,500,000 30,019,000 1,500,000
Power 0.22 Kw, 220V/50Hz/1Ph

D IU&OU-Unit Retail L.1, Split wall type, Cap. . . . BTUH no 21

E IU&OU-Unit Retail L.2, Split wall type, Cap. . . . BTUH no 28

IU-L1.17 & 18 (Mini FRV), Cassete type, Cap. 27.300 BTUH,


F no 2 27,558,000 1,500,000 55,116,000 3,000,000
794 CFM, Power 0.09 Kw, 220V/50Hz/1Ph

IU-L1.19 (Mini FRV), Cassete type, Cap. 19.100 BTUH, 493


G no 1 26,521,000 1,500,000 26,521,000 1,500,000
CFM, Power 0.115 Kw, 220V/50Hz/1Ph

OU-1.1 (Mini FRV), Cap. 76.400 BTUH, Power 5.2 Kw,


H no 1 92,312,000 5,000,000 92,312,000 5,000,000
380V/50Hz/3Ph

I Refnet Joint no 2 400,000 100,000 800,000 200,000

UNIT LOFT (L.3)

J IU&OU-Unit Loft, Split wall type, Cap. . . . BTUH no 82 By Other By Other

FAN UNITS

Supply and Install of following fan units including control


panel, supporting frame, connection, fixing, testing,
commissioning and all necessary accessories in
accordance to the technical specification and drawing, all
as described

PUBLIC AREA

CF-LG.1, Ceiling Fan type, Cap. 3.500 CFM, Power 0.06


K no 1 8,000,000 500,000 8,000,000 500,000
KW, 220V/50Hz/1Ph

EF-LG.1 & 2, Axial Fan type, Cap. 11.250 CFM, Stat Press
L no 2 36,000,000 2,000,000 72,000,000 4,000,000
2.1 In.Wg, Power 7.5 KW, 220V/50Hz/1Ph

EF-LG.3 & 4, Wall Fan type, Cap. 1.000 CFM, Power 0.5
M no 2 8,000,000 500,000 16,000,000 1,000,000
KW, 220V/50Hz/1Ph

EF-LG.5, Ceiling Cassete Fan type, Cap. 50 CFM, Stat Press


N no 4 8,000,000 500,000 32,000,000 2,000,000
0.35 In.Wg, Power 0.03 KW, 220V/50Hz/1Ph

EF-LG.6 & 07, Ceiling Cassete Fan type, Cap. 100 CFM, Stat
O no 4 8,000,000 500,000 32,000,000 2,000,000
Press 0.4 In.Wg, Power 0.06 KW, 220V/50Hz/1Ph

EF-1.1, Wall Fan type, Cap. 1.500 CFM, Power 0.75 KW,
P no 1 8,000,000 500,000 8,000,000 500,000
220V/50Hz/1Ph

Page: Bill 2 / 11 To Collection Bill 2.2 422,576,000 25,100,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.2 VAC SYSTEM (Cont'd)

MAIN EQUIPMENT (Cont'd)

FAN UNITS (Cont'd)

Supply and Install of following fan units including control


panel, supporting frame, connection, fixing, testing,
commissioning and all necessary accessories in
accordance to the technical specification and drawing, all
as described

PUBLIC AREA (Cont'd)

EF-1.2, Wall Fan type, Cap. 500 CFM, Power 0.35 KW,
A no 1 15,000,000 1,500,000 15,000,000 1,500,000
220V/50Hz/1Ph

EF-1.3, Wall Fan type, Cap. 50 CFM, Stat Press 0.35 In.Wg,
B no 2 7,500,000 500,000 15,000,000 1,000,000
Power 0.03 KW, 220V/50Hz/1Ph

EF-L2.1 & 2, Axial type, Cap. 5.000 CFM, Stat Press 0.35
C no 2 28,000,000 1,000,000 56,000,000 2,000,000
In.Wg, Power 1.5 KW, 220V/50Hz/1Ph

EF/SEF-L3.1 & 2, Axial type, Cap. 925 CFM, Stat Press 0.35
D no 2 42,000,000 2,000,000 84,000,000 4,000,000
In.Wg, Power 0.5 KW, 380V/50Hz/3Ph

FAF/SEF-L3.1 & 2, Axial type, Cap. 925 CFM, Stat Press


E no 2 42,000,000 2,000,000 84,000,000 4,000,000
0.35 In.Wg, Power 0.5 KW, 380V/50Hz/3Ph

UNIT LOFT (L.3)

EF Unit Apartment - Ceiling Sirrocco type


F no 32 982,000 150,000 31,424,000 4,800,000
Tapping power with lighting

G KEF Unit Apartment no 32 By Other By Other

REFRIGERANT PIPES

Supply and Install of copper, seamless copper tube tube


type ACR complete with fittings (tee, elbow, etc.) flanges,
adaptors, hangers, mounting support, and other
miscellaneous Item in accordance to technical and as
shown on drawings

PUBLIC AREA

H Approved size Refrigerant Pipe for retail L.1 m 273 330,000 45,000 90,090,000 12,285,000

I Approved size Refrigerant Pipe for retail L.2 m 338 330,000 45,000 111,540,000 15,210,000

J Ref Pipe - Li 6.4 + Gas 12.7 m 73 190,000 45,000 13,870,000 3,285,000

K Ref Pipe - Li 9.5 + Gas 15.9 m 40 260,000 45,000 10,400,000 1,800,000

L Ref Pipe - Li 9.5 + Gas 19.1 m 17 330,000 45,000 5,610,000 765,000

UNIT LOFT (L.3)

M Approved size Refrigerant Pipe m 859 330,000 45,000 283,470,000 38,655,000

Page: Bill 2 / 12 To Collection Bill 2.2 800,404,000 89,300,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.2 VAC SYSTEM (Cont'd)

DRAIN PIPES

Supply and Install of PVC Pipe (AW Class) 10 kg/cm2


complete with fittings and insulations (tee, elbow, etc.),
flanges, adaptors, hangers, mounting supports, and other
miscellaneous items in accordance to technical
specification and as shown on drawings

PUBLIC AREA

A Approved size Drain Pipe for retail L.1 m 274 330,000 45,000 90,420,000 12,330,000

B Approved size Drain Pipe for retail L.2 m 225 330,000 45,000 74,250,000 10,125,000

C Drain Pipe; 25mmD m 83 43,300 45,000 3,593,900 3,735,000

D Drain Pipe; 20mmD m 7 31,700 45,000 221,900 315,000

UNIT LOFT (L.3)

E Approved size Drain Pipe m 425 330,000 45,000 140,250,000 19,125,000

DUCTWORKS

Supply and Install the following ductworks c/w jointing


material, Insulation, hangers / supporting material and
accessories as described and shown on drawings and
specification

PUBLIC AREA

BJLS without insulation

F BJLS 50 (Smoke Extract Duct) m2 9 205,000 165,000 1,845,000 1,485,000

G BJLS 60 (Exhaust & Fresh Air Duct) m2 62 280,000 165,000 17,360,000 10,230,000

H BJLS 80 (Smoke Extract Duct) m2 71 310,000 251,000 22,010,000 17,821,000

I BJLS 80 (Exhaust Duct) m2 193 310,000 251,000 59,830,000 48,443,000

J BJLS 80 (Press Duct) m2 89 310,000 251,000 27,590,000 22,339,000

K BJLS 100 (Exhaust Duct) m2 108 445,000 342,000 48,060,000 36,936,000

L BJLS 120 (Press Duct) m2 236 445,000 342,000 105,020,000 80,712,000

PVC Pipe

M Duct Pipe; 150mmD (Include Fitting) m 6 280,000 251,000 1,680,000 1,506,000

N Duct Pipe; 100mmD (Include Fitting) m 41 280,000 251,000 11,480,000 10,291,000

UNIT LOFT (L.3)

BJLS without insulation

O Exhaust Pipe class D, from toilet to balcon (Unit Apartment) ls 32 120,000 45,000 3,840,000 1,440,000

Page: Bill 2 / 13 To Collection Bill 2.2 607,450,800 276,833,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.2 VAC SYSTEM (Cont'd)

DAMPERS , GRILLES, LOUVERES AND DIFFUSERS

Supply and installation of the following Air Register


connections, plenum, hangers / supporting material and
accessories as described and shown on drawings and
specification

PUBLIC AREA

A EAG 900x300 c/w OBD no 2 800,000 150,000 1,600,000 300,000

B EAG 1000x250 c/w OBD no 24 800,000 150,000 19,200,000 3,600,000

C EAL 150x150 no 1 800,000 150,000 800,000 150,000

D EAL 200x300 no 3 800,000 150,000 2,400,000 450,000

E EAL 800x300 no 2 800,000 150,000 1,600,000 300,000

F FAG 800x300 c/w OBD no 2 800,000 150,000 1,600,000 300,000

G FAL 900x300 no 2 800,000 150,000 1,600,000 300,000

H IAG 200x200 c/w OBD no 12 800,000 150,000 9,600,000 1,800,000

I PAR 500x900 c/w OBD no 12 800,000 150,000 9,600,000 1,800,000

J SEG 300x250 c/w OBD no 6 800,000 150,000 4,800,000 900,000

K Intake Grille 3000x1000 no 1 800,000 150,000 800,000 150,000

L Louvre Exhaust Air 1500x2500 no 1 800,000 150,000 800,000 150,000

M Sound Attenuator no 4 1,500,000 250,000 6,000,000 1,000,000

N NRD 1500x400 no 2 3,000,000 400,000 6,000,000 800,000

O VD 100 no 10 3,000,000 400,000 30,000,000 4,000,000

UNIT LOFT (L.3)

P Vent-cup Balcon Arera (Unit Apartment) no 32 150,000 50,000 4,800,000 1,600,000

CONTROL CABLING

Q Control Cabling for unit Public Area m 741 250,000 75,000 185,250,000 55,575,000

R Control Cabling for unit Apartment m 859 250,000 75,000 214,750,000 64,425,000

Page: Bill 2 / 14 To Collection Bill 2.2 501,200,000 137,600,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.2 VAC SYSTEM (Cont'd)

Collection

Page: Bill 2 / 11 422,576,000 25,100,000

Page: Bill 2 / 12 800,404,000 89,300,000

Page: Bill 2 / 13 607,450,800 276,833,000

Page: Bill 2 / 14 501,200,000 137,600,000

Page: Bill 2 / 15 To Collection Bill 2 2,331,630,800 528,833,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM

MV-MDP & TRANSFORMATOR

Supply and install of following medium voltage main


distribution panel as indicated in equipment schedule
including delivery to site, support bracket, vibration
isolation and all necessary accessories in accordance with
the Technical Specification and as shown on drawings.

A MVMDP (1 Incoming + metering & 1 Outgoing) no 1 475,000,000 30,000,000 475,000,000 30,000,000

Supply and install of following transformer as indicated in


equipment schedule including delivery to site, support
bracket, vibration isolation and all necessary accessories
in accordance with the Technical Specification and as
shown on drawings.

B Transformer, oil type, capacity 2000 Kva (Wending AL-AL) no 1 378,000,000 12,500,000 475,000,000 12,500,000

Supply and Installation the following Medium Cables run


and fixed on cable ladders including end cable,
connecting, termination, protection system and all
necessary accessories in accordance with specification
and as shown on drawing.

Cabling from MV-MDP 20 KV to:

C PLN Substation; N2XSEBY 3x120mm (Prov. Qty) m 200 1,363,000 60,000 272,600,000 12,000,000

D Trafo 2000 Kva; N2XSY 3x1Cx95mm m 9 325,000 20,000 2,925,000 180,000

LV DISTRIBUTION BOARDS

Supply and Installation of low voltage distribution boards


including provision of all interconnecting, control, ancillary
wirings, support bracket vibration isolation and all
necessary accessories in accordance with specification
and as shown on drawings.

PUBLIC AREA

E LVMDP no 1 450,000,000 6,500,000 450,000,000 6,500,000

F Cap. Bank no 1 375,000,000 5,500,000 375,000,000 5,500,000

G P-EF.LG no 1 48,500,000 3,500,000 48,500,000 3,500,000

H P-LG no 1 45,600,000 3,500,000 45,600,000 3,500,000

I P-Hyd no 1 45,600,000 3,500,000 45,600,000 3,500,000

J P-TP.60007 no 1 38,500,000 2,500,000 38,500,000 2,500,000

K P-OL no 1 34,500,000 2,500,000 34,500,000 2,500,000

L LCP-SP no 1 28,500,000 2,500,000 28,500,000 2,500,000

M LCP-SWP.1 no 1 28,500,000 2,500,000 28,500,000 2,500,000

N P-STP no 1 28,500,000 2,500,000 28,500,000 2,500,000

Equipment Billing System (Converter, Server Billing System,


O Report & Alarm Printer, Billing System for KWH Meter, SMS no 1 35,000,000 7,500,000 35,000,000 7,500,000
Report Modem + UPS)

P P-L1 no 2 27,500,000 3,500,000 55,000,000 7,000,000

Q P-ELC Incl. UPS 15 KVA Back up 15 Menit (By ELC) no 1 48,500,000 3,500,000 48,500,000 3,500,000

R MB-RT.1 (3.5 kVA) no 1 10,000,000 250,000 10,000,000 250,000

Page: Bill 2 / 16 To Collection Bill 2.3 2,497,225,000 107,930,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

LV DISTRIBUTION BOARDS (Cont'd)

Supply and Installation of low voltage distribution boards


including provision of all interconnecting, control, ancillary
wirings, support bracket vibration isolation and all
necessary accessories in accordance with specification
and as shown on drawings.

PUBLIC AREA (Cont'd)

A MB-RT.1 (16.5 kVA) no 2 10,000,000 250,000 20,000,000 500,000

B MB-RT.1 (21 kVA) no 4 10,000,000 250,000 40,000,000 1,000,000

C MB-RT.1 (26 kVA) no 2 10,000,000 250,000 20,000,000 500,000

D MB-RT.1 (33 kVA) no 3 10,000,000 250,000 30,000,000 750,000

E P-L2 no 2 25,000,000 250,000 50,000,000 500,000

F MB-RT.2 (16.5 kVA) no 2 10,000,000 250,000 20,000,000 500,000

G MB-RT.2 (21 kVA) no 4 10,000,000 250,000 40,000,000 1,000,000

H MB-RT.2 (26 kVA) no 2 10,000,000 250,000 20,000,000 500,000

I MB-RT.2 (33 kVA) no 3 10,000,000 250,000 30,000,000 750,000

J P-L3 no 2 25,000,000 1,750,000 50,000,000 3,500,000

K P-SEF L3 (By VAC) no 1 27,000,000 1,750,000 27,000,000 1,750,000

UNIT LOFT (L.3)

L MB-3BR (3.5 KVA) no 8 4,500,000 500,000 36,000,000 4,000,000

M MB-2BR (2.6 KVA) no 4 3,500,000 500,000 14,000,000 2,000,000

N MB-1BR (1.3 KVA) no 20 2,500,000 500,000 50,000,000 10,000,000

BUSDUCT

Supply and installation of Busduct including fixing, bends,


tees, supporting brackets, connecting, termination and all
necessary accessories in accordance with specification
and as shown on drawings

From LVMDP to:

O Trafo; Busduct AL 3.200A m 14 9,750,000 1,750,000 136,500,000 24,500,000

P GCP; Busduct AL 1.000A m 20 7,750,000 1,750,000 155,000,000 35,000,000

LOW VOLTAGE CABLES

Supply and Installation the following Low Voltage Cables


run and fixed on cable ladders including end cable,
connecting, termination, protection system andall
necessary accessories in accordance with specification
and as shown on drawing.

From LVMDP to:

Q Cap. Bank; NYY 2(3x1Cx185mm) m 16 2,340,000 120,000 37,440,000 1,920,000

R P-Hyd; FRC 4x1Cx300mm + NYA 95mm m 78 3,250,000 160,000 253,500,000 12,480,000

S P-Fire.RF.D1; FRC 4x50mm + NYA 25mm m 157 1,650,000 100,000 259,050,000 15,700,000

Page: Bill 2 / 17 To Collection Bill 2.3 1,288,490,000 116,850,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

LOW VOLTAGE CABLES (Cont'd)

Supply and Installation the following Low Voltage Cables


run and fixed on cable ladders including end cable,
connecting, termination, protection system andall
necessary accessories in accordance with specification
and as shown on drawing.

From LVMDP to: (Cont'd)

A P-Fire.RF.D2; FRC 4x50mm + NYA 25mm m 176 1,500,000 50,000 264,000,000 8,800,000

B P-ELC; FRC 4x10mm + NYA 10mm m 69 425,000 30,000 29,325,000 2,070,000

C P-EF.LG; FRC 4x10mm + NYA 10mm m 72 425,000 30,000 30,600,000 2,160,000

D P-SEF.L3; FRC 4x4mm + NYA 4mm (Prov. Qty) m 60 250,000 20,000 15,000,000 1,200,000

E End Feed Box.D1; NYY 2(4x1Cx240mm) + NYA 95mm m 62 4,715,000 180,000 292,330,000 11,160,000

F End Feed Box.D2; NYY 2(4x1Cx240mm) + NYA 95mm m 83 4,715,000 180,000 391,345,000 14,940,000

G P-LG; NYY 4x6mm + NYA 6mm m 71 95,000 20,000 6,745,000 1,420,000

H P-L1.1; NYY 4x1Cx120mm + NYA 70mm m 56 1,295,000 60,000 72,520,000 3,360,000

I P-L1.2; NYY 4x1Cx120mm + NYA 70mm m 77 1,295,000 60,000 99,715,000 4,620,000

J P-L2.1; NYY 4x4mm + NYA 4mm m 52 85,000 20,000 4,420,000 1,040,000

K P-L2.2; NYY 4x4mm + NYA 4mm m 73 85,000 20,000 6,205,000 1,460,000

L P-L3.1; NYY 4x25mm + NYA 16mm m 59 315,000 20,000 18,585,000 1,180,000

M P-L3.2; NYY 4x25mm + NYA 16mm m 79 315,000 20,000 24,885,000 1,580,000

N P-TP.60007; NYY 4x95mm + NYA 50mm m 78 1,176,000 45,000 91,728,000 3,510,000

O P-STP; NYY 4x50mm + NYA 25mm (Prov. Qty) m 100 650,000 30,000 65,000,000 3,000,000

P P-OL; NYRGby 5x6mm (Prov. Qty) m 100 98,500 20,000 9,850,000 2,000,000

From P-EF.LG to:

Q EF-LG.1 & 2; NYY 3x4mm + NYY 4x4mm m 118 75,000 15,000 8,850,000 1,770,000

Power Cable For: (No SLD)

R CF-LG.1 (Asumsi From P-EF.LG) m 22 250,000 20,000 5,500,000 440,000

S EF-LG.3 & 4 (Asumsi From P-EF.LG) m 68 250,000 20,000 17,000,000 1,360,000

T EF-LG.5 (Asumsi From P-EF.LG) m 23 250,000 20,000 5,750,000 460,000

U EF-LG.6 (Asumsi From P-EF.LG) m 24 250,000 20,000 6,000,000 480,000

V EF-LG.7 (Asumsi From P-EF.LG) m 8 250,000 20,000 2,000,000 160,000

From P-TP.60007 to:

W TP.01.A; NYY 3x25mm + NYY 4x25mm m 7 485,000 30,000 3,395,000 210,000

X TP.01.B; NYY 3x25mm + NYY 4x25mm m 6 485,000 30,000 2,910,000 180,000

Y LCP-SP; NYY 4x4mm + NYA 4mm m 25 50,000 15,000 1,250,000 375,000

Page: Bill 2 / 18 To Collection Bill 2.3 1,474,908,000 68,935,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

LOW VOLTAGE CABLES (Cont'd)

Supply and Installation the following Low Voltage Cables


run and fixed on cable ladders including end cable,
connecting, termination, protection system andall
necessary accessories in accordance with specification
and as shown on drawing.

From P-L1.1 to:

A OU/IU-1.13; NYY 3x4mm m 38 32,000 10,000 1,216,000 380,000

B OU/IU-1.14.1 & 2; NYY 3x2.5mm m 52 20,000 10,000 1,040,000 520,000

C OU/IU-1.15; NYY 4x4mm + NYA 4mm m 21 35,000 10,000 735,000 210,000

D OU/IU-1.16.1 & 2; NYY 3x2.5mm (2x) m 34 20,000 10,000 680,000 340,000

E IU-1.17; NYY 3x2.5mm m 15 20,000 10,000 300,000 150,000

F OU-L1; NYY 4x4mm + NYA 4mm m 32 35,000 10,000 1,120,000 320,000

G MB-RT.(1, 2 & 3).1 (21 KVA); NYY 4x6mm + NYA 6mm m 88 65,000 10,000 5,720,000 880,000

H MB-RT.10.1 (26 KVA); NYY 4x10mm + NYA 10mm m 63 95,000 10,000 5,985,000 630,000

I MB-RT.11.1 (33 KVA); NYY 4x16mm + NYA 16mm m 58 65,000 10,000 3,770,000 580,000

J MB-RT.12.1 (3.5 KVA); NYY 3x4mm m 48 30,000 10,000 1,440,000 480,000

Power Cable For: (No SLD)

K EF-1.1 (Asumsi From P-L1.1 ) m 40 250,000 20,000 10,000,000 800,000

L EF-1.2 (Asumsi From P-L1.1 ) m 28 250,000 20,000 7,000,000 560,000

M EF-1.3 (Asumsi From P-L1.1 ) m 11 250,000 20,000 2,750,000 220,000

From P-L1.2 to:

N IU-1.18 & 19; NYY 3x2.5mm m 24 20,000 10,000 480,000 240,000

MB-RT.(4, 5 & 7).1 (16.5 KVA & 21 KVA); NYY 4x6mm +


O m 89 65,000 10,000 5,785,000 890,000
NYA 6mm

P MB-RT.6.1 (26 KVA); NYY 4x10mm + NYA 10mm m 30 95,000 10,000 2,850,000 300,000

Q MB-RT.(8 & 9).1 (33 KVA); NYY 4x16mm + NYA 16mm m 115 208,000 20,000 23,920,000 2,300,000

From MB-RT.(1,2,3,4,5,7).1 (21 KVA & 16.5 KVA) to:

R MB-RT.(1,2,3,4,5,7).2; NYY 4x4mm + NYA 4mm m 104 35,000 10,000 3,640,000 1,040,000

From MB-RT.(6,10).1 (26 KVA) to:

S MB-RT.(6,10).2; NYY 4x6mm + NYA 6mm m 32 65,000 10,000 2,080,000 320,000

From MB-RT.(8,9,11).1 (33 KVA) to:

T MB-RT.(8,9,11).2; NYY 4x6mm + NYA 6mm m 51 65,000 10,000 3,315,000 510,000

From P-ELC to: (By ELC)

U Rack Server GPON; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

V Rack ONU Tower D.1; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

W Rack ONU Tower D.1; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

X Rack ONU Tower D.2; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

Page: Bill 2 / 19 To Collection Bill 2.3 85,626,000 12,870,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

LOW VOLTAGE CABLES (Cont'd)

Supply and Installation the following Low Voltage Cables


run and fixed on cable ladders including end cable,
connecting, termination, protection system andall
necessary accessories in accordance with specification
and as shown on drawing.

From P-ELC to: (By ELC) (Cont'd)

A Rack ONU Tower D.2; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

B MCP-FA; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

C Rack Sound System; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

D Rack NVR CCTV; NYY 3x2.5mm + Conduit 20mm m 10 45,000 30,000 450,000 300,000

Monitor LED CCTV & PC Workstation; NYY 3x2.5mm +


E m 10 45,000 30,000 450,000 300,000
Conduit 20mm

Main Equipment Access Control; NYY 3x2.5mm + Conduit


F m 10 45,000 30,000 450,000 300,000
20mm

From P-L2.1 to:

G EF-2.1 & 2; NYY 3x2.5mm + PVC Conduit Ø 20mm m 98 25,000 30,000 2,450,000 2,940,000

From P-L3.1 to:

H MB-(1~9); NYY 3x4mm m 220 27,000 30,000 5,940,000 6,600,000

I MB-(25~32); NYY 3x4mm m 283 27,000 30,000 7,641,000 8,490,000

J FAF-L3.1; NYY 4x2.5mm + NYA 2.5mm m 40 35,000 30,000 1,400,000 1,200,000

From P-L3.2 to:

K MB-(10~24); NYY 3x4mm m 460 27,000 30,000 12,420,000 13,800,000

L FAF-L3.2; NYY 4x2.5mm + NYA 2.5mm m 41 27,000 30,000 1,107,000 1,230,000

From P-SEF.L3 to: (By VAC)

M EF/SF.L3.1 & L3.2; FRC 4x2.5mm + NYA 2.5mm m 86 150,000 20,000 12,900,000 1,720,000

N Motorized Fire Damper; FRC 3x2.5mm m 86 150,000 20,000 12,900,000 1,720,000

CABLE CONTAIMENT

Supply and install cable cage above/under ceiling


galvanized mild steel, including bends, tees, elbows and all
necessary accessories in accordance with specification
and as shown on drawings

O 800mm x 100mm; Cable Tray m 8 962,000 75,000 7,696,000 600,000

P 400mm x 100mm; Cable Tray m 54 575,000 75,000 31,050,000 4,050,000

Q 300mm x 100mm; Cable Tray m 64 479,000 75,000 30,656,000 4,800,000

R 200mm x 100mm; Cable Tray m 332 383,000 75,000 127,156,000 24,900,000

S 1000mm x 100mm; Cable Ladder m 33 1,158,000 75,000 38,214,000 2,475,000

T 400mm x 100mm; Cable Ladder m 65 575,000 75,000 37,375,000 4,875,000

U 300mm x 100mm; Cable Ladder m 24 479,000 75,000 11,496,000 1,800,000

Page: Bill 2 / 20 To Collection Bill 2.3 343,101,000 83,000,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

LIGHTING

Supply and installation of following lighting fixtures


including supporting bracket, connection, fixing, testing,
commissioning and all necessary accessories

PUBLIC AREA

A Garden Lamp, Tipe Bollar, LED 1 x 50 W no 8 1,200,000 75,000 9,600,000 600,000

B Street Light, SON 1 x 150 W c/w Pole 7m no 13 3,200,000 75,000 41,600,000 975,000

C Street Light, SON 1 x 150 W c/w Pole 7m (2 lamp 1 Pole) no 5 3,700,000 75,000 18,500,000 375,000

D Down Light, LED 9 W no 175 85,000 75,000 14,875,000 13,125,000

E Down Light, LED 9 W + Niccad Battery no 48 885,000 75,000 42,480,000 3,600,000

F Exit Lamp FL 1 x 10 W, c/w Battery no 39 715,000 75,000 27,885,000 2,925,000

G Light Motion Sensor no 4 550,000 125,000 2,200,000 500,000

H Stair Lamp T5 1 x 8 W, c/w Battery no 9 1,244,000 125,000 11,196,000 1,125,000

I Stair Lamp T5 1 x 16 W, c/w Battery no 19 1,244,000 125,000 23,636,000 2,375,000

J TL 1 x 16 W Weather Proof no 4 370,000 1,480,000

K TL LED 1 x 10 W, Tipe BALK no 2 117,000 75,000 234,000 150,000

L TL LED 1 x 10 W, Tipe BALK c/w Battery no 6 917,000 75,000 5,502,000 450,000

M TL LED 1 x 16 W, Tipe BALK no 121 117,000 75,000 14,157,000 9,075,000

N TL LED 1 x 16 W, Tipe BALK c/w Battery no 21 917,000 75,000 19,257,000 1,575,000

O TL LED 2 x 16 W, Tipe BALK no 30 344,000 75,000 10,320,000 2,250,000

P TL LED 2 x 16 W, Tipe BALK c/w Battery no 9 1,244,000 75,000 11,196,000 675,000

UNIT LOFT (L.3)

Q Lighting (Down Light, LED 9 W) no 171 85,000 75,000 14,535,000 12,825,000

Final circuits comprising PVC insulated copper cables,


drawing into cable containment systems, including
trunking, conduits and/or flexible conduits and fittings, and
earth continuity conductors

NYM 3 x 2.5 mm2 in PVC Conduit Ø 20 mm from


distribution board ; Lighting point

R Lighting Point For Public Area no 487 45,000 75,000 21,915,000 36,525,000

S Lighting Point For Unit Loft no 171 45,000 75,000 7,695,000 12,825,000

NYRGby 5 x 4 mm2 in PVC Conduit Ø 20 mm from


distribution board ; Lighting point

T Lighting Point no 18

NYRGby 3 x 2.5 mm2 in PVC Conduit Ø 20 mm from


distribution board ; Lighting point

U Lighting Point no 8 45,000 75,000 360,000 600,000

Page: Bill 2 / 21 To Collection Bill 2.3 298,623,000 102,550,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

POWER

Supply and installation of following power accessories


including supporting bracket, connection, fixing, testing,
commissioning and all necessary accessories

PUBLIC AREA

A Double Switch, 10A no 7 90,000 125,000 630,000 875,000

B Single Switch, 10A no 21 90,000 125,000 1,890,000 2,625,000

C Grid Switch no 4 142,000 125,000 568,000 500,000

D Socket Outlet 1Phase, 16A, 200W no 53 90,000 125,000 4,770,000 6,625,000

UNIT LOFT (L.3)

E Double Switch, 10A no 32 90,000 125,000 2,880,000 4,000,000

F Single Switch, 10A no 93 90,000 125,000 8,370,000 11,625,000

G Socket Outlet no 117 90,000 125,000 10,530,000 14,625,000

H Socket Outlet AC 16A no 81 115,000 95,000 9,315,000 7,695,000

I Socket Outlet WP no 31 90,000 125,000 2,790,000 3,875,000

Final circuits comprising PVC insulated copper cables,


drawing into cable containment systems, including
trunking, conduits and/or flexible conduits and fittings, and
earth continuity conductors

NYM 3 x 2.5 mm2 in PVC Conduit Ø 20 mm from


distribution board ; Electric Socket Point

J Electric Socket Outlet Point for Public Area no 53 45,000 90,000 2,385,000 4,770,000

K Electric Socket Outlet Point for Unit Loft no 229 45,000 90,000 10,305,000 20,610,000

GROUNDING SYSTEM

Installation of Earthing cable including fixing, connection,


testing and commissioning as per specification and
drawings necessary accessories:

L Grounding Body Genset & PKG no 1 15,000,000 7,500,000 15,000,000 7,500,000

M Grounding Body PUTM & TRAFO no 1 4,500,000 2,500,000 4,500,000 2,500,000

N Grounding Body PUTR no 1 4,500,000 2,500,000 4,500,000 2,500,000

O Grounding Electronic no 1 15,000,000 2,500,000 15,000,000 2,500,000

P Grounding Lift no 2 2,500,000 750,000 5,000,000 1,500,000

Q Grounding Netral Genset no 1 3,500,000 750,000 3,500,000 750,000

R Grounding Netral Trafo no 1 3,500,000 750,000 3,500,000 750,000

S Grounding P no 1 14,500,000 2,500,000 14,500,000 2,500,000

T Test Box no 2 12,500,000 7,500,000 25,000,000 15,000,000

Page: Bill 2 / 22 To Collection Bill 2.3 144,933,000 113,325,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.3 ELECTRICAL SYSTEM (Cont'd)

Collection

Page: Bill 2 / 16 2,497,225,000 107,930,000

Page: Bill 2 / 17 1,288,490,000 116,850,000

Page: Bill 2 / 18 1,474,908,000 68,935,000

Page: Bill 2 / 19 85,626,000 12,870,000

Page: Bill 2 / 20 343,101,000 83,000,000

Page: Bill 2 / 21 298,623,000

Page: Bill 2 / 22 144,933,000 113,325,000

Page: Bill 2 / 23 To Collection Bill 2 6,132,906,000 502,910,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

2.4 FIRE FIGHTING SYSTEM

MAIN EQUIPMENT

Supply and Install of following fire fighting pumps


including local control panel, supporting frame,
connection, fixing, testing, commissioning and all
necessary accessories in accordance to the technical
specification and drawing, all as described;

EFP-01 Electric Fire Pump; Capacity 1250 GPM; Head 190


m; 305 kW; Start Automatic Stop Manual c/w control panel
A no 1
and all accessoriess in accordance to the technical
specification and drawings for tender

DFP-01 Diesel Fire Pump; Capacity 1250 GPM; Head 190 m;


305 kW; Start Automatic Stop Manual c/w control panel and
B no 1
all accessoriess in accordance to the technical specification
and drawings for tender 1,500,000,000 25,000,000 1,500,000,000 25,000,000

JP-01 Jockey Pump; Capacity 25 GPM; Head 205 m; 6.5 kW;


Start Stop Automatic c/w control panel and all accessoriess
C no 1
in accordance to the technical specification and drawings for
tender

Tangki Solar Kap 500 Liter include pondasi Tinggi 1,5 Meter

PUMP ROOM

Supply and install hydrant pipe; Black steel pipe Sch.40


ASTM A53 including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, in accordance with the
technical specification, and or as shown in the drawings.

Pipeworks

D Header Pipe; 350mmD (14m; 8 connection) no 1 24,030,000 1,500,000 24,030,000 1,500,000

E Header Pipe; 350mmD (10m; 9 connection) no 1 24,030,000 1,500,000 24,030,000 1,500,000

F Pipe; 200mmD m 18 760,500 190,000 13,689,000 3,420,000

G Pipe; 150mmD m 34 655,000 190,000 22,270,000 6,460,000

H Pipe; 100mmD m 1 205,000 135,000 205,000 135,000

I Pipe; 50mmD m 5 95,000 100,000 475,000 500,000

Extra Over Pipeworks

J Bend; 200mmD no 8 1,797,100 125,000 14,376,800 1,000,000

K Bend; 150mmD no 10 1,100,000 125,000 11,000,000 1,250,000

L Bend; 100mmD no 2 526,400 125,000 1,052,800 250,000

M Tee; 150mmD no 1 530,000 125,000 530,000 125,000

Valve & Ancillaries

N Gate Valve; 350mmD no 2 73,568,000 125,000 147,136,000 250,000

O Gate Valve; 200mmD no 8 14,356,000 125,000 114,848,000 1,000,000

P Gate Valve; 150mmD no 4 11,700,000 125,000 46,800,000 500,000

Q Gate Valve; 50mmD no 2 3,585,000 125,000 7,170,000 250,000

R Check Valve; 200mmD no 2 8,356,000 125,000 16,712,000 250,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)
S Check Valve; 50mmD no 1 5,878,000 5,878,000

Page: Bill 2 / 24 To Collection Bill 2.4 1,950,202,600 43,390,000

2.4 FIRE FIGHTING SYSTEM (Cont'd)

PUMP ROOM (Cont'd)

Supply and install hydrant pipe; Black steel pipe Sch.40


ASTM A53 including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, in accordance with the
technical specification, and or as shown in the drawings.

Valve & Ancillaries (Cont'd)

A Strainer; 200mmD no 2 14,766,000 500,000 29,532,000 1,000,000

B Strainer; 50mmD no 1 800,000 125,000 800,000 125,000

C Flexible Joint; 200mmD no 4 3,075,000 400,000 12,300,000 1,600,000

D Flexible Joint; 50mmD no 2 790,000 125,000 1,580,000 250,000

E Anti Vortex; 350mmD no 2 5,512,000 500,000 11,024,000 1,000,000

F QM; 200mmD no 1 8,500,000 800,000 8,500,000 800,000

G Relive Valve; 150mmD no 2 37,650,000 2,500,000 75,300,000 5,000,000

H Safety Valve; 150mmD no 1 27,500,000 1,500,000 27,500,000 1,500,000

I Pressure Gauge no 6 1,300,000 150,000 7,800,000 900,000

HYDRANT SYSTEM INSTALLATIONS

Supply and install hydrant pipe; Black steel pipe Sch.40


ASTM A53 including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, in accordance with the
technical specification, and or as shown in the drawings.

SITE PLAN

Pipeworks

K Pipe; 200mmD m 5 760,500 190,000 3,802,500 950,000

L Pipe; 150mmD m 32 655,000 190,000 20,960,000 6,080,000

M Pipe; 100mmD m 175 205,000 100,000 35,875,000 17,500,000

Extra Over Pipeworks

N Bend; 200mmD no 2 1,797,100 190,000 3,594,200 380,000

O Bend; 100mmD no 19 442,300 100,000 8,403,700 1,900,000

P Tee; 200mmD no 1 2,293,000 190,000 2,293,000 190,000

Q Tee; 150mmD no 2 1,192,800 190,000 2,385,600 380,000

Valve & Ancillaries

R Check Valve; 100mmD no 2 9,760,000 400,000 19,520,000 800,000

S Gate Valve; 100mmD no 4 4,875,000 250,000 19,500,000 1,000,000

T Outdoor Hydrant Box no 4 4,800,000 250,000 19,200,000 1,000,000

U Pillar Hydrant no 4 6,046,700 150,000 24,186,800 600,000

V SC 4Way no 2 250,000 9,800,000 500,000


4,900,000
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 25 To Collection Bill 2.4 343,856,800 43,455,000

2.4 FIRE FIGHTING SYSTEM (Cont'd)

HYDRANT SYSTEM INSTALLATIONS (Cont'd)

Supply and install hydrant pipe; Black steel pipe Sch.40


ASTM A53 including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, in accordance with the
technical specification, and or as shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD (Riser) m 108 655,000 190,000 70,740,000 20,520,000

B Pipe; 100mmD (Riser) m 5 205,000 190,000 1,025,000 950,000

C Pipe; 200mmD m 84 760,500 190,000 63,882,000 15,960,000

D Pipe; 150mmD m 117 655,000 190,000 76,635,000 22,230,000

E Pipe; 100mmD m 39 205,000 150,000 7,995,000 5,850,000

F Pipe; 65mmD m 69 205,000 135,000 14,145,000 9,315,000

G Pipe; 40mmD m 120 95,000 75,000 11,400,000 9,000,000

Extra Over Pipeworks

H Bend; 200mmD no 4 1,797,100 150,000 7,188,400 600,000

I Bend; 150mmD no 20 1,100,000 75,000 22,000,000 1,500,000

J Bend; 100mmD no 4 442,300 75,000 1,769,200 300,000

K Bend; 65mmD no 40 182,200 75,000 7,288,000 3,000,000

L Tee; 150mmD no 19 1,192,800 190,000 22,663,200 3,610,000

M Tee; 65mmD no 7 330,200 75,000 2,311,400 525,000

Valve & Ancillaries

M FE CO2 25 Kg (Trolley) no 1 3,910,000 220,000 3,910,000 220,000

N FE CO2 5 Kg no 8 685,400 50,000 5,483,200 400,000

O FE Dry Powder 3 Kg + Box standart no 14 1,313,100 100,000 18,383,400 1,400,000

P Gate Valve; 150mmD no 6 11,700,000 500,000 70,200,000 3,000,000

Q Gate Valve; 65mmD no 7 3,585,000 250,000 25,095,000 1,750,000

R Indoor Hydrant Box no 14 3,151,000 250,000 44,114,000 3,500,000

S Landing Valve; 65mmD no 14 915,000 100,000 12,810,000 1,400,000

T PRV Set (Double PRV); 150mmD set 4 105,000,000 2,500,000 420,000,000 10,000,000
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 26 To Collection Bill 2.4 909,037,800 115,030,000

2.4 FIRE FIGHTING SYSTEM (Cont'd)

SPRINKLER SYSTEM INSTALLATIONS

Supply and install sprinkler pipe; Black steel pipe Sch.40


ASTM A53 for Vertical Pipeworks and Black steel pipe
medium after BCV, including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories fully in
accordance with the technical specification, and or as
shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD (Riser) (BSP Sch.40) m 54 1,100,000 150,000 59,400,000 8,100,000

B Pipe; 150mmD (BSP Sch.40) m 84 1,100,000 150,000 92,400,000 12,600,000

C Pipe; 100mmD (BSP Sch.40) m 23 442,300 75,000 10,172,900 1,725,000

D Pipe; 100mmD (BSP Medium) m 44 442,300 75,000 19,461,200 3,300,000

E Pipe; 80mmD (BSP Medium) m 39 284,666 50,000 11,101,974 1,950,000

F Pipe; 65mmD (BSP Medium) m 213 205,000 50,000 43,665,000 10,650,000

G Pipe; 50mmD (BSP Medium) m 118 127,000 50,000 14,986,000 5,900,000

H Pipe; 40mmD (BSP Medium) m 201 95,000 50,000 19,095,000 10,050,000

I Pipe; 32mmD (BSP Medium) m 212 85,000 50,000 18,020,000 10,600,000

J Pipe; 25mmD (BSP Medium) m 835 60,000 50,000 50,100,000 41,750,000

K Pipe; 25mmD (Dropper) (BSP Medium) m 386 60,000 50,000 23,160,000 19,300,000

Extra Over Pipeworks

L Bend; 150mmD no 16 1,100,000 150,000 17,600,000 2,400,000

M Bend; 100mmD no 16 442,300 75,000 7,076,800 1,200,000

N Bend; 80mmD no 2 442,300 75,000 569,332 150,000

O Bend; 65mmD no 5 205,000 50,000 1,025,000 250,000

P Tee; 150mmD no 7 1,192,800 150,000 8,349,600 1,050,000

Q Tee; 100mmD no 34 496,400 75,000 16,877,600 2,550,000

R Tee; 80mmD no 17 496,400 75,000 8,438,800 1,275,000

S Tee; 65mmD no 70 330,200 50,000 23,114,000 3,500,000

Valve & Ancillaries

T Gate Valve; 150mmD no 4 11,700,000 500,000 46,800,000 2,000,000

U BCV; 100mmD no 8 7,300,000 350,000 58,400,000 2,800,000

V SP Head Pendant Type (standard respond) no 386 117,332 50,000 45,290,152 19,300,000

W SP Head Up-Right Type (standard respond) no 96 117,332 50,000 11,263,872 4,800,000

X PRV Set (Double PRV) + MCV Set; 150mmD set 2 148,000,000 5,000,000 296,000,000 10,000,000
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 27 To Collection Bill 2.4 902,367,230 177,200,000

2.4 FIRE FIGHTING SYSTEM (Cont'd)

SPRINKLER SYSTEM INSTALLATIONS (Cont'd)

Supply and install sprinkler pipe; Black steel pipe Sch.40


ASTM A53 for Vertical Pipeworks and Black steel pipe
medium after BCV, including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories fully in
accordance with the technical specification, and or as
shown in the drawings.

UNIT LOFT (L.3)

Pipeworks

A Pipe; 50mmD m 22 127,000 50,000 2,794,000 1,100,000

B Pipe; 40mmD m 26 95,000 50,000 2,470,000 1,300,000

C Pipe; 32mmD m 45 85,000 50,000 3,825,000 2,250,000

D Pipe; 25mmD m 226 60,000 50,000 13,560,000 11,300,000

E Pipe; 25mmD (Dropper) m 22 60,000 50,000 1,320,000 1,100,000

Valve & Ancillaries

F SP Head Pendant Type no 44 117,372 50,000 5,164,368 2,200,000

G SP Head Side Wall Type no 96 145,500 50,000 13,968,000 4,800,000

DRAIN SPRINKLER SYSTEM INSTALLATIONS

Supply and install drain sprinkler pipe; Black steel pipe


Medium, including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories fully in accordance with
the technical specification, and or as shown in the
drawings.

PUBLIC AREA

Pipeworks

H Pipe; 50mmD (Riser) m 27 127,000 50,000 3,429,000 1,350,000

I Pipe; 65mmD m 13 205,000 50,000 2,665,000 650,000

J Pipe; 50mmD m 1 127,000 50,000 127,000 50,000

K Pipe; 25mmD m 206 60,000 50,000 12,360,000 10,300,000

Extra Over Pipeworks

L Tee; 65mmD no 2 127,000 50,000 254,000 100,000

Valve & Ancillaries

M Gate Valve; 25mmD no 13 199,000 50,000 2,587,000 650,000

N Orifice; 25mmD no 7 3,000,000 150,000 21,000,000 1,050,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 28 To Collection Bill 2.4 85,523,368 38,200,000

2.4 FIRE FIGHTING SYSTEM (Cont'd)

Collection

Page: Bill 2 / 24 1,950,202,600 43,390,000

Page: Bill 2 / 25 343,856,800 43,455,000

Page: Bill 2 / 26 909,037,800 115,030,000

Page: Bill 2 / 27 902,367,230 177,200,000

Page: Bill 2 / 28 85,523,368 38,200,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 29 To Collection Bill 2 4,190,987,798 417,275,000

2.5 ELECTRONIC SYSTEM

ACCESS CONTROL SYSTEM

MAIN EQUIPMENT

Supply and install of access control main equipment,


including all necessary interfacing, connecting, inter-
connecting cables and all necessary accessories in
accordance with specification and as shown on drawings

Master Access Control System (PC Server c/w Software


A set 1 15,000,000 3,500,000 15,000,000 3,500,000
Access Control)

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as
shown on drawings

PUBLIC AREA

B Junction Box c/w Access Module no 20 250,000 75,000 5,000,000 1,500,000

C Door Contact no 16 250,000 75,000 4,000,000 1,200,000

D Emergency Door Release no 7 350,000 75,000 2,450,000 525,000

E Exit Push Button no 7 225,000 75,000 1,575,000 525,000

F Magnetic Lock c/w Door Contact no 10 225,000 75,000 2,250,000 750,000

G Reader no 7 150,000 75,000 1,050,000 525,000

H Reader Elevator Passanger no 6 350,000 75,000 2,100,000 450,000

I Reader Elevator Service no 2 275,000 75,000 550,000 150,000

Cable STP #18 AWG 4 pair + FRC 2x1.5 mm2 + UTP CAT.6
in PVC high impact conduit 20mm diameter;

J Junction Box c/w Access Module Point no 20 500,000 250,000 10,000,000 5,000,000

Cable ITC 2 x 2 x 0.6mm in PVC high impact conduit 20mm


diameter;

K Door Contact Point no 16 500,000 250,000 8,000,000 4,000,000

Cable NYYHY 2 x 1.5mm in PVC high impact conduit 20mm


diameter;

L Emergency Door Release Point no 7 500,000 250,000 3,500,000 1,750,000

M Magnetic Lock c/w Door Contact Point no 10 500,000 150,000 5,000,000 1,500,000

Cable STP #18 AWG 1 pair in PVC high impact conduit


20mm diameter;

N Exit Push Button Point no 7 215,000 150,000 1,505,000 1,050,000

Cable STP #18 AWG 2 pair in PVC high impact conduit


20mm diameter;

O Reader Point no 7 150,000 75,000 1,050,000 525,000

Cable STP #22 AWG 2 pair in PVC high impact conduit


20mm diameter;

P Reader Elevator Passanger Point no 6 350,000 75,000 2,100,000 450,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)
Q Reader Elevator Service Point no 2 350,000 75,000 700,000 150,000

Page: Bill 2 / 30 To Collection Bill 2.5 65,830,000 23,550,000

2.5 ELECTRONIC SYSTEM (Cont'd)

FIRE ALARM SYSTEM

MAIN EQUIPMENT

Supply and install of fire alarm main equipment, including


all necessary interfacing, connecting, inter-connecting
cables and all necessary accessories in accordance with
specification and as shown on drawings

MCP-FA Semi Addressable 12 loop (min 1225 address


A no 1 54,000,000 4,500,000 54,000,000 4,500,000
moudle & detector)

B Two way voice communication no 1 5,850,000 750,000 5,850,000 750,000

C Report & Alarm Printer no 1 21,650,000 1,500,000 21,650,000 1,500,000

D Battery selaed lead acid rechargeable Stand by 24 hour no 1 17,750,000 2,500,000 17,750,000 2,500,000

E Paging Microphone no 1 10,950,000 1,500,000 10,950,000 1,500,000

F Annunciator (Incl. Cabling) no 1 4,500,000 12,500,000 4,500,000 12,500,000

G MDF-FA no 1 8,500,000 750,000 8,500,000 750,000

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as
shown on drawings

PUBLIC AREA

H JB-FA w/ Module no 7 8,250,000 1,500,000 57,750,000 10,500,000

I Smoke Detector (Photo Electric) no 118 950,000 250,000 112,100,000 29,500,000

J ROR Temp. Heat Detector no 21 650,000 250,000 13,650,000 5,250,000

K Fixed Temp. Heat Detector no 1 750,000 250,000 750,000 250,000

L Remote LED Lamp no 23 250,000 250,000 5,750,000 5,750,000

M Manual Alarm Push Button no 9 1,500,000 250,000 13,500,000 2,250,000

N Horn & Strobe Light (Addressable) no 9 850,000 250,000 7,650,000 2,250,000

O Fire Intercom Jack no 9 450,000 250,000 4,050,000 2,250,000

P Flow Switch no 7 By Fire Fighting

Q Tamper Switch no 7 By Fire Fighting

R End Of Line no 10 750,000 250,000 7,500,000 2,500,000

UNIT LOFT (L.3)

S Smoke Detector (Photo Electric) no 90 950,000 250,000 85,500,000 22,500,000

T Remote LED Lamp no 32 250,000 250,000 8,000,000 8,000,000

U End Of Line no 5 75,000 50,000 375,000 250,000


,
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 31 To Collection Bill 2.5 439,775,000 115,250,000

2.5 ELECTRONIC SYSTEM (Cont'd)

FIRE ALARM SYSTEM (Cont'd)

FIELD EQUIPMENT & CABLE INSTALATION DEVICES (Cont'd)

Cable FRC STP #18 AWG 2 pair (Data) + FRC STP #16 AWG
1 pair (Intercom) + FRC 3x2.5 mm2 (Power Module) + NYA
25mm (Grounding) in PVC high impact conduit 20mm
diameter;

A JB-FA w/ Module Point no 7 2,500,000 500,000 17,500,000 3,500,000

Cable NYA 2x1.5 mm2 in PVC high impact conduit 20mm


diameter;

PUBLIC AREA

B Smoke Detector (Photo Electric) Point no 118 250,000 100,000 29,500,000 11,800,000

C ROR Temp. Heat Detector Point no 21 250,000 100,000 5,250,000 2,100,000

D Fixed Temp. Heat Detector Point no 1 250,000 100,000 250,000 100,000

UNIT LOFT (L.3)

E Smoke Detector (Photo Electric) Point no 90 250,000 100,000 22,500,000 9,000,000

Cable ITC 2x2x0.6 mm2 in PVC high impact conduit 20mm


diameter;

PUBLIC AREA

F Fire Intercom Jack Point no 9 250,000 100,000 2,250,000 900,000

G Remote LED Lamp Point no 23 250,000 100,000 5,750,000 2,300,000

UNIT LOFT (L.3)

H Remote LED Lamp Point no 32 250,000 100,000 8,000,000 3,200,000

Cable FRC 2x1.5 mm2 in PVC high impact conduit 20mm


diameter;

I Manual Alarm Push Button Point no 9 400,000 150,000 3,600,000 1,350,000

J Horn & Strobe Light (Addressable) Point no 9 400,000 150,000 3,600,000 1,350,000

K Flow Switch Point no 7 400,000 150,000 2,800,000 1,050,000

L Tamper Switch Point no 7 400,000 150,000 2,800,000 1,050,000

GPON SYSTEM

MAIN EQUIPMENT

Supply and install of GPON main equipment, including all


necessary interfacing, connecting, inter-connecting cables
and all necessary accessories in accordance with
specification and as shown on drawings

M ODF PP Output Rack 19" 42 U set 1 5,000,000 500,000 5,000,000 500,000

N OTB Rack 19" 42 U set 1 5,000,000 500,000 5,000,000 500,000

O OLT Rack 19" 42 U set 1 5,000,000 500,000 5,000,000 500,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 32 To Collection Bill 2.5 118,800,000 39,200,000

2.5 ELECTRONIC SYSTEM (Cont'd)

GPON SYSTEM (Cont'd)

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as
shown on drawings

PUBLIC AREA

A ODP-(16-Port SC-APC) no 6 2,750,000 150,000 16,500,000 900,000

UNIT LOFT (L.3)

B FO Outlet SC Port 1 Core (1-Gang) no 32 1,500,000 150,000 48,000,000 4,800,000

Cable FO (ADSS G 652 D Single) 24 Core;

C ODP-(16-Port SC-APC) point (Retail L.1 & L.2) no 4 2,750,000 150,000 11,000,000 600,000

Cable FO (ADSS G 652 D Single) 45 Core;

D ODP-(16-Port SC-APC) point (L.3) no 2 2,750,000 150,000 5,500,000 300,000

Cable FO Drop Wire (2 Core) in PVC high impact conduit


20mm diameter;

E FO Outlet SC Port 1 Core (1-Gang) point no 32 1,500,000 150,000 48,000,000 4,800,000

CCTV SYSTEM

MAIN EQUIPMENT

Supply and install of CCTV main equipment, including all


necessary interfacing, connecting, inter-connecting cables
and all necessary accessories in accordance with
specification and as shown on drawings

Rack Distribution (Distribution switch 1 x 24 port, Farm


F no 1 4,500,000 500,000 4,500,000 500,000
switch, Power outlet)

G Server Access Control no 1 4,500,000 500,000

H Rack Switch & NVR CCTV (Standing Rack 19" 27U) set 1 4,500,000 500,000 4,500,000 500,000

I Monitor LED CCTV 43" no 6 13,500,000 500,000 81,000,000 3,000,000

J Desktop PC c/w Monitoring Software set 1 7,250,000 500,000 7,250,000 500,000

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as
shown on drawings

K Rack Switch no 2 4,500,000 750,000 9,000,000 1,500,000

L IP-Dome Camera 2MP PoE no 38 6,500,000 750,000 247,000,000 28,500,000

M IP-Bullet IR Camera 2MP PoE no 23 7,500,000 1,500,000 172,500,000 34,500,000

N Outdoor Panel Switch no 6 12,500,000 1,250,000 75,000,000 7,500,000

O Outdoor CCTV PTZ Dome IP Camera 2MP c/w Pole 7m no 6 8,500,000 1,250,000 51,000,000 7,500,000
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 33 To Collection Bill 2.5 780,750,000 95,400,000

2.5 ELECTRONIC SYSTEM (Cont'd)

CCTV SYSTEM (Cont'd)

FIELD EQUIPMENT & CABLE INSTALATION DEVICES (Cont'd)

Cable Backbone FO Single Mode 4 Core in PVC high


impact conduit 20mm diameter;

A Rack Switch point no 2 4,500,000 500,000 9,000,000 1,000,000

B Outdoor Panel Switch point no 6 13,500,000 750,000 81,000,000 4,500,000

Cable UTP CAT.6 in PVC high impact conduit 20mm


diameter;

C IP-Dome Camera 2MP PoE point no 38 1,755,000 500,000 66,690,000 19,000,000

D IP-Bullet IR Camera 2MP PoE point no 23 1,755,000 500,000 40,365,000 11,500,000

Cable FTP CAT.6 in PVC high impact conduit 20mm


diameter;

E Outdoor CCTV PTZ Dome IP Camera 2MP c/w Pole 7m point no 6 1,500,000 500,000 9,000,000 3,000,000

SOUND SYSTEM

MAIN EQUIPMENT

Supply and install of sound system main equipment,


including all necessary interfacing, connecting, inter-
connecting cables and all necessary accessories in
accordance with specification and as shown on drawings

SOUND SYSTEM MAIN EQUIPMENT

F MDF-SS 100" no 1 1,755,000 400,000 1,755,000 400,000

G Speaker selector 7 x 10 CH no 1 4,750,000 300,000 4,750,000 300,000

H Power Amplifier 4 x 480W no 1 9,750,000 500,000 9,750,000 500,000

I Power Amplifier Emergency 12 x 480W no 1 10,860,000 500,000 10,860,000 500,000

J Mixer Pre Amplifier no 1 21,642,000 500,000 21,642,000 500,000

K CD Player w/ FM Turner no 1 2,500,000 150,000 2,500,000 150,000

L Fireman Mic no 1 2,500,000 150,000 2,500,000 150,000

M Sound Repeater no 1 1,500,000 150,000 1,500,000 150,000

N Antena no 1 1,500,000 150,000 1,500,000 150,000

O Remote Paging Mic no 1 1,250,000 150,000 1,250,000 150,000

P Rack Cabinet no 1 4,500,000 500,000 4,500,000 500,000

CAR CALL MAIN EQUIPMENT

Q MDF-CC 30" no 1 1,750,000 250,000 1,750,000 250,000

R Power Amplifier 2 x 480W no 1 9,791,000 500,000 9,791,000 500,000

S Equalizer no 1 3,500,000 500,000 3,500,000 500,000

T Mixer Pre Amplifier w/ module no 1 20,642,000 500,000 20,642,000 500,000

U Chime no 1 3,750,000 250,000 3,750,000 250,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)
V Remote Paging Mic no 1 2,650,000 250,000 2,650,000 250,000

Page: Bill 2 / 34 To Collection Bill 2.5 310,645,000 44,700,000

2.5 ELECTRONIC SYSTEM (Cont'd)

SOUND SYSTEM (Cont'd)

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as
shown on drawings

PUBLIC AREA

A JBSS no 7 1,150,000 150,000 8,050,000 1,050,000

B JBCC no 3 1,250,000 150,000 3,750,000 450,000

C Ceiling Speaker 3 W no 85 450,000 150,000 38,250,000 12,750,000

D Ceiling Speaker 3 W w/ Box no 23 450,000 150,000 10,350,000 3,450,000

E Horn Speaker 15 W no 2 450,000 150,000 900,000 300,000

F Horn Speaker 15 W (Car Call) no 38 450,000 150,000 17,100,000 5,700,000

G Wall Speaker 6 W no 8 450,000 150,000 3,600,000 1,200,000

H Wall Speaker Emergency 6 W no 8 350,000 150,000 2,800,000 1,200,000

I Column Speaker 20 W (Car Call) no 12 350,000 150,000 4,200,000 1,800,000

UNIT LOFT (L.3)

J Ceiling Speaker Emergency 6 W no 32 500,000 150,000 16,000,000 4,800,000

Cable NYMHY 3x2.5 mm2 + NYA 25mm2 in PVC high


impact conduit 20mm diameter;

K JBSS point no 7 2,750,000 150,000 19,250,000 1,050,000

Cable NYMHY 2x2.5 mm2 + NYA 25mm2 in PVC high


impact conduit 20mm diameter;

L JBCC point no 3 2,750,000 150,000 8,250,000 450,000

Cable NYMHY 2x1.5 mm2 in PVC high impact conduit


20mm diameter;

PUBLIC AREA

M Ceiling Speaker 3 W point no 85 350,000 150,000 29,750,000 12,750,000

N Ceiling Speaker 3 W w/ Box point no 23 350,000 150,000 8,050,000 3,450,000

O Horn Speaker 15 W point no 2 350,000 150,000 700,000 300,000

P Horn Speaker 15 W (Car Call) point no 38 350,000 150,000 13,300,000 5,700,000

Q Wall Speaker 6 W point no 8 350,000 150,000 2,800,000 1,200,000

R Column Speaker 20 W (Car Call) point no 12 350,000 150,000 4,200,000 1,800,000

UNIT LOFT (L.3)

S Ceiling Speaker Emergency 6 W point no 32 350,000 150,000 11,200,000 4,800,000

Cable FRC 2x2.5 mm2 in PVC high impact conduit 20mm


diameter;

T Wall Speaker Emergency 6 W point no 8 450,000 150,000 3,600,000 1,200,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 35 To Collection Bill 2.5 206,100,000 65,400,000

2.5 ELECTRONIC SYSTEM (Cont'd)

CABLE CONTAIMENT

Supply and install cable tray and cable ladder class A


electro galvanized mild steel, hot dip galvanized including
bends, tees, elbows and all necessary accessories in
accordance with specification and as shown on drawings

PUBLIC AREA

A 500mm x 100mm (Shaft); Tray m 30 681,000 75,000 20,430,000 2,250,000

B 300mm x 100mm; Tray m 113 489,000 75,000 55,257,000 8,475,000

C 500mm x 100mm; Cable Cage m 56 681,000 75,000 38,136,000 4,200,000

D 300mm x 100mm; Cable Cage m 249 489,000 75,000 121,761,000 18,675,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 36 To Collection Bill 2.5 235,584,000 33,600,000

2.5 ELECTRONIC SYSTEM (Cont'd)

Collection

Page: Bill 2 / 30 65,830,000 23,550,000

Page: Bill 2 / 31 439,775,000 115,250,000

Page: Bill 2 / 32 118,800,000 39,200,000

Page: Bill 2 / 33 780,750,000 95,400,000

Page: Bill 2 / 34 310,645,000 44,700,000

Page: Bill 2 / 35 206,100,000 65,400,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 37 To Collection Bill 2 1,921,900,000 383,500,000

2.6 OTHERS WORKS

Allow hereunder for any other work not mentioned but are
considered necessary for the full and satisfactory
completion of Works. The Contractor is to list out the items
below and indicate the cost breakdown against each Item

A a)________________________________________ Item

B b)________________________________________ Item

C c)________________________________________ Item

D d)________________________________________ Item

E e)________________________________________ Item
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 2 - PODIUM (LG ~ L.3)

Material Rate Installation Material Installation


Ref Description Unit QTY
(IDR) Rate (IDR) Amount (IDR) Amount (IDR)

Page: Bill 2 / 38 To Collection Bill 2

BILL 2 - PODIUM (LG ~ L.3)

Collection

2.1 PLUMBING SYSTEM 2,924,747,600 698,252,000

2.2 VAC SYSTEM 2,331,630,800 528,833,000

2.3 ELECTRICAL SYSTEM 6,132,906,000 502,910,000

2.4 FIRE FIGHTING SYSTEM 4,190,987,798 417,275,000

2.5 ELECTRONIC SYSTEM 1,921,900,000 383,500,000

2.6 OTHERS WORKS

Page: Bill 2 / 39 To Summary 17,502,172,198 2,530,770,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM

CLEAN WATER SYSTEM

MAIN EQUIPMENT

Supply and Install of following plumbing pumps including


local control panel, supporting frame, connection, fixing,
testing, commissioning and all necessary accessories in
accordance to the technical specification and drawing, all as
described;

Packaged Booster Pump (BP-01); Type: Centrifugal End


A Suction, Capacity: 3x12m3/hour, Head: 20M, Power: 3x1.4 set 3 178,000,000 25,000,000 534,000,000 75,000,000
kW, Operation: Auto Parallel Alternate, 1set = 3 pumps

B RT-01; Roof Tank Capacity 60 m3; FRP no 1 324,000,000 45,000,000 324,000,000 45,000,000

ROOF TANK

PIPEWORKS INSTALLATIONS

Supply and install clean water pipeworks; Galvanized Iron


Pipe Medium, branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

Pipeworks

C Header Pipe; 300mmD (8m; 9 connection) no 1 35,000,000 320,000 35,000,000 320,000

D Pipe; 150mmD m 15 801,000 215,000 12,015,000 3,225,000

E Pipe; 100mmD m 56 460,000 145,000 25,760,000 8,120,000

F Pipe; 65mmD m 5 248,000 100,000 1,240,000 500,000

Extra Over Pipeworks

G Bend; 150mmD no 13 1,900,000 125,000 24,700,000 1,625,000

H Bend; 100mmD no 31 585,000 125,000 18,135,000 3,875,000

I Tee; 100mmD no 1 835,000 125,000 835,000 125,000

Valve & Ancillaries

J Gate Valve; 150mmD no 4 11,700,000 125,000 46,800,000 500,000

K Gate Valve; 100mmD no 6 4,875,000 125,000 29,250,000 750,000

L Gate Valve; 65mmD no 6 3,585,000 125,000 21,510,000 750,000

M Check Valve; 100mmD no 2 9,760,000 125,000 19,520,000 250,000

N Check Valve; 65mmD no 3 5,878,000 125,000 17,634,000 375,000

O Strainer; 65mmD no 3 5,200,000 125,000 15,600,000 375,000

P Flexible Joint; 65mmD no 6 5,200,000 125,000 31,200,000 750,000

Q Floating Valve; 100mmD no 2 11,793,000 125,000 23,586,000 250,000

Page: Bill 3 / 1 To Collection Bill 3.1 1,180,785,000 141,790,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

CLEAN WATER SYSTEM (Cont'd)

Supply and install clean water pipeworks; Galvanized Iron


Pipe Medium and PPR PN, branch pipe including all fitting
for 2 inch (50mm) inside diameter run in pipe or less,
supports, hangers, jointing materials and fixing
accessories, all fully in accordance with the technical
specification, and or as shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD (Riser) (GIP Medium Pipe) m 145 801,000 215,000 116,145,000 31,175,000

B Pipe; 100mmD (Riser) (GIP Medium Pipe) m 90 460,000 145,000 41,400,000 13,050,000

C Pipe; 65mmD (Riser) (GIP Medium Pipe) m 417 248,000 100,000 103,416,000 41,700,000

D Pipe; 100mmD (GIP Medium Pipe) m 9 460,000 145,000 4,140,000 1,305,000

E Pipe; 80mmD (GIP Medium Pipe) m 75 325,000 125,000 24,375,000 9,375,000

F Pipe; 65mmD (GIP Medium Pipe) m 251 248,000 10,000 62,248,000 2,510,000

G Pipe; 50mmD (GIP Medium Pipe) m 180 155,000 85,000 27,900,000 15,300,000

H Pipe; 25mmD (PPR Pipe) m 5,960 22,000 10,000 131,120,000 59,600,000

Extra Over Pipeworks

I Bend; 80mmD (GIP Medium Pipe) no 2 445,000 125,000 890,000 250,000

J Bend; 65mmD (GIP Medium Pipe) no 76 256,000 125,000 19,456,000 9,500,000

K Tee; 150mmD (GIP Medium Pipe) no 8 715,000 125,000 5,720,000 1,000,000

L Tee; 100mmD (GIP Medium Pipe) no 14 835,000 125,000 11,690,000 1,750,000

M Tee; 80mmD (GIP Medium Pipe) no 10 510,000 125,000 5,100,000 1,250,000

N Tee; 65mmD (GIP Medium Pipe) no 144 310,000 125,000 44,640,000 18,000,000

Valve & Ancillaries

O Gate Valve; 50mmD no 150 10,355,000 125,000 1,553,250,000 18,750,000

P Gate Valve; 25mmD no 1,700 150,000 50,000 255,000,000 85,000,000

Q Water Meter; 25mmD no 850 1,250,000 50,000 1,062,500,000 42,500,000

R PRV Set; 100mmD set 6 30,888,000 125,000 185,328,000 750,000

Page: Bill 3 / 2 To Collection Bill 3.1 3,654,318,000 352,765,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

CLEAN WATER SYSTEM (Cont'd)

UNIT APARTMENT (F.1 ~ F.25)

Supply and install clean water pipeworks; PPR PN, branch


pipe including all fitting for 2 inch (50mm) inside diameter
run in pipe or less, supports, hangers, jointing materials and
fixing accessories, all fully in accordance with the technical
specification, and or as shown in the drawings.

Pipeworks

A Pipe; 25mmD m 9,708 25,000 25,000 242,700,000 242,700,000

B Pipe; 20mmD m 9,838 20,000 25,000 196,760,000 245,950,000

Valve & Ancillaries

C Gate Valve; 25mmD no 850 199,000 50,000 169,150,000 42,500,000

D Gate Valve; 20mmD no 850 157,000 50,000 133,450,000 42,500,000

HOT WATER SYSTEM

Supply and install hot water pipeworks; PPR-PN 20 Pipe,


branch pipe including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, all fully in accordance with
the technical specification, and or as shown in the drawings.

UNIT APARTMENT (F.1 ~ F.25)

Pipeworks

E Pipe; 20mmD m 3,758 30,000 25,000 112,740,000 93,950,000

Valve & Ancillaries

F Electric Water Heater Cap. 80 ltr no 100 4,800,000 750,000 480,000,000 75,000,000

G Electric Water Heater Cap. 50 ltr no 750 4,050,000 750,000 3,037,500,000 562,500,000

H Gate Valve; 20mmD no 850 157,000 50,000 133,450,000 42,500,000

I Check Valve; 20mmD no 850 3,380,000 87,000 2,873,000,000 73,950,000

Page: Bill 3 / 3 To Collection Bill 3.1 7,378,750,000 1,421,550,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

WASTE WATER AND SEWAGE WATER SYSTEM

Supply and install waste and sewage water pipework; PVC


Pipe (AW Class), branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 200mmD (Riser) m 29 435,000 135,000 12,615,000 3,915,000

B Pipe; 150mmD (Riser) m 122 260,000 127,000 31,720,000 15,494,000

C Pipe; 100mmD (Riser) m 99 116,000 97,000 11,484,000 9,603,000

D Pipe; 200mmD m 8 435,000 135,000 3,480,000 1,080,000

E Pipe; 150mmD m 389 260,000 127,000 101,140,000 49,403,000

F Pipe; 100mmD m 262 116,000 97,000 30,392,000 25,414,000

Extra Over Pipeworks

G Bend 90'; 150mmD no 40 260,000 87,000 10,400,000 3,480,000

H Bend 90'; 100mmD no 36 105,000 87,000 3,780,000 3,132,000

I Bend 45'; 150mmD no 154 287,000 87,000 44,198,000 13,398,000

J Bend 45'; 100mmD no 59 105,000 87,000 6,195,000 5,133,000

K Tee; 200mmD no 29 713,000 87,000 20,677,000 2,523,000

L Tee; 150mmD no 90 345,000 87,000 31,050,000 7,830,000

M Tee; 100mmD no 13 140,000 87,000 1,820,000 1,131,000

N CCO; 200mmD no 8 670,000 125,000 5,360,000 1,000,000

O CCO; 150mmD no 20 190,000 125,000 3,800,000 2,500,000

P CCO; 100mmD no 10 110,000 125,000 1,100,000 1,250,000

UNIT APARTMENT (F.1 ~ F.25)

Pipeworks

Q Pipe; 150mmD (Riser) m 2,755 260,000 40,000 716,300,000 110,200,000

R Pipe; 100mmD m 1,818 116,000 40,000 210,888,000 72,720,000

S Pipe; 50mmD m 915 35,000 40,000 32,025,000 36,600,000

T Pipe; 32mmD m 1,813 25,000 40,000 45,325,000 72,520,000

Extra Over Pipeworks

U Bend 90'; 100mmD no 950 105,000 40,000 99,750,000 38,000,000

V Bend 45'; 100mmD no 200 105,000 40,000 21,000,000 8,000,000

W Tee; 150mmD no 950 345,000 40,000 327,750,000 38,000,000

X Tee; 100mmD no 1,900 140,000 40,000 266,000,000 76,000,000

Page: Bill 3 / 4 To Collection Bill 3.1 2,038,249,000 598,326,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

WASTE WATER AND SEWAGE WATER SYSTEM (Cont'd)

Supply and install waste and sewage water pipework; PVC


Pipe (AW Class), branch pipe including all fitting for 2 inch
(50mm) inside diameter run in pipe or less, supports,
hangers, jointing materials and fixing accessories, all fully
in accordance with the technical specification, and or as
shown in the drawings.

UNIT APARTMENT (F.1 ~ F.25) (Cont'd)

Valve & Ancillaries

Floor Drain / Smart Drain dia 50mm Incl. Gully-Trap Inlet


A no 950 475,000 100,000 451,250,000 95,000,000
Riser; 50mmD

B Floor Drain / Smart Drain ; 50mmD no 100 by other by other

C FCO; 100mmD no 950 by other by other

D P-Trap for Lavatory no 800 Include Lavatory

VENT PIPE SYSTEM

Supply and install venting pipeworks; PVC Class D 5kg/cm2,


branch pipe including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, all fully in accordance with
the technical specification, and or as shown in the drawings.

PUBLIC AREA

Pipeworks

E Pipe; 100mmD (Riser) m 151 60,000 97,000 9,060,000 14,647,000

F Pipe; 100mmD m 36 60,000 97,000 2,160,000 3,492,000

Extra Over Pipeworks

G Bend; 100mmD no 12 72,000 87,000 864,000 1,044,000

Valve & Ancillaries

H Vent Cup no 48 209,000 125,000 10,032,000 6,000,000

UNIT APARTMENT (F.1 ~ F.25)

Pipeworks

I Pipe; 100mmD (Riser) m 3,045 55,000 40,000 167,475,000 121,800,000

J Pipe; 80mmD (Riser) m 870 37,000 97,000 32,190,000 84,390,000

K Pipe; 50mmD m 5,028 20,000 40,000 100,560,000 201,120,000

L Pipe; 32mmD m 5,485 14,000 40,000 76,790,000 219,400,000

Extra Over Pipeworks

M Tee; 100mmD no 1,150 33,000 50,000 37,950,000 57,500,000

N Tee; 80mmD no 300 55,000 50,000 16,500,000 15,000,000

Page: Bill 3 / 5 To Collection Bill 3.1 904,831,000 819,393,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

KITCHEN WASTE SYSTEM

Supply and install kitchen waste pipework; Cast Iron,


branch pipe including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, all fully in accordance with
the technical specification, and or as shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 200mmD (Riser) m 15 1,230,000 245,000 18,450,000 3,675,000

B Pipe; 150mmD (Riser) m 9 802,000 215,000 7,218,000 1,935,000

C Pipe; 100mmD (Riser) m 78 460,000 145,000 35,880,000 11,310,000

D Pipe; 200mmD m 5 1,230,000 285,000 6,150,000 1,425,000

E Pipe; 150mmD m 114 802,000 215,000 91,428,000 24,510,000

F Pipe; 100mmD m 164 460,000 145,000 75,440,000 23,780,000

G Pipe; 50mmD m 106 155,000 85,000 16,430,000 9,010,000

Extra Over Pipeworks

H Bend 90'; 100mmD no 25 535,000 125,000 13,375,000 3,125,000

I Bend 45'; 150mmD no 25 1,900,000 125,000 47,500,000 3,125,000

J Bend 45'; 100mmD no 50 585,000 125,000 29,250,000 6,250,000

K Tee; 200mmD no 10 1,755,000 125,000 17,550,000 1,250,000

L Tee; 150mmD no 28 715,000 125,000 20,020,000 3,500,000

M Tee; 100mmD no 38 835,000 125,000 31,730,000 4,750,000

Valve & Ancillaries

N CCO; 200mmD no 4 670,000 125,000 2,680,000 500,000

O CCO; 150mmD no 12 190,000 125,000 2,280,000 1,500,000

P CCO; 100mmD no 14 110,000 125,000 1,540,000 1,750,000

Q CCO; 50mmD no 2 75,000 87,000 150,000 174,000

UNIT APARTMENT (F.1 ~ F.25)

Pipeworks

R Pipe; 100mmD (Riser) m 2,030 460,000 40,000 933,800,000 81,200,000

S Pipe; 50mmD m 2,638 155,000 40,000 408,890,000 105,520,000

Extra Over Pipeworks

T Tee; 100mmD no 800 835,000 40,000 668,000,000 32,000,000

Valve & Ancillaries

U Portable Grase Trap Cap. 15 Liter/menit no 850 by other by other

Page: Bill 3 / 6 To Collection Bill 3.1 2,427,761,000 320,289,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

RAIN WATER SYSTEM

Supply and install rain water pipework; PVC Pipe (AW


Class), branch pipe including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories, all fully in
accordance with the technical specification, and or as
shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD (Riser) m 17 260,000 127,000 4,420,000 2,159,000

B Pipe; 100mmD (Riser) m 75 116,000 97,000 8,700,000 7,275,000

C Pipe; 65mmD (Riser) m 32 49,000 87,000 1,568,000 2,784,000

D Pipe; 100mmD m 257 116,000 97,000 29,812,000 24,929,000

E Pipe; 65mmD m 51 50,000 87,000 2,550,000 4,437,000

F Pipe; 50mmD m 166 34,000 87,000 5,644,000 14,442,000

Extra Over Pipeworks

G Bend 90'; 100mmD no 17 105,000 87,000 1,785,000 1,479,000

H Bend 90'; 65mmD no 10 35,000 87,000 350,000 870,000

I Bend 45'; 100mmD no 99 105,000 87,000 10,395,000 8,613,000

J Bend 45'; 65mmD no 17 37,000 87,000 629,000 1,479,000

K Tee; 150mmD no 10 345,000 87,000 3,450,000 870,000

L Tee; 100mmD no 35 140,000 87,000 4,900,000 3,045,000

M Tee; 65mmD no 16 50,000 87,000 800,000 1,392,000

Valve & Ancillaries

N Roof Drain; 100mmD no 48 150,000 87,000 7,200,000 4,176,000

O Roof Drain; 50mmD no 22 70,000 87,000 1,540,000 1,914,000

UNIT APARTMENT (F.1 ~ F.25)

Pipeworks

P Pipe; 100mmD (Riser) m 1,160 116,000 40,000 134,560,000 46,400,000

Q Pipe; 65mmD (Riser) m 1,595 49,000 40,000 78,155,000 63,800,000

R Pipe; 50mmD m 610 34,000 87,000 20,740,000 53,070,000

Extra Over Pipeworks

S Tee; 65mmD no 550 50,000 87,000 27,500,000 47,850,000

Valve & Ancillaries

T Floor Drain; 50mmD no 550 by other by other

Page: Bill 3 / 7 To Collection Bill 3.1 344,698,000 290,984,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.1 PLUMBING SYSTEM (Cont'd)

Collection

Page: Bill 3 / 1 1,180,785,000 141,790,000

Page: Bill 3 / 2 3,654,318,000 352,765,000

Page: Bill 3 / 3 7,378,750,000 1,421,550,000

Page: Bill 3 / 4 2,038,249,000 598,326,000

Page: Bill 3 / 5 904,831,000 819,393,000

Page: Bill 3 / 6 2,427,761,000 320,289,000

Page: Bill 3 / 7 344,698,000 290,984,000

Page: Bill 3 / 8 To Collection Bill 3 17,929,392,000 3,945,097,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.2 VAC SYSTEM

MAIN EQUIPMENT

AC UNITS

Supply and Install of following AC units including control


panel, supporting frame, connection, fixing, testing,
commissioning and all necessary accessories in
accordance to the technical specification and drawing, all as
described

PUBLIC AREA

IU&OU-LMR 1 & 2 (D1 & D2), Split wall type, Cap. 24.000
A no 4 28,579,000 1,500,000 114,316,000 6,000,000
BTUH, 700 CFM, Power 0.05 Kw, 220V/50Hz/1Ph

IU&OU-LMR 3 (D1 & D2), Split wall type, Cap. 9.000 BTUH,
B no 2 23,400,000 1,500,000 46,800,000 3,000,000
300 CFM, Power 0.03 Kw, 220V/50Hz/1Ph

UNIT APARTMENT (F.1 ~ F.25)

C IU&OU-Unit Apartment, Split wall type, Cap. . . . BTUH no 2,200 By Other By Other

FAN UNITS

Supply and Install of following fan units including control


panel, supporting frame, connection, fixing, testing,
commissioning and all necessary accessories in
accordance to the technical specification and drawing, all as
described

PUBLIC AREA

PAF-RF.1 & 2 (D1 & D2), Axial Fan type, Cap. 30.100 CFM,
D no 4 45,000,000 2,500,000 180,000,000 10,000,000
Stat Press 1.7 In.Wg, Power 16 KW, 380V/50Hz/3Ph

IAF/SEF-RF.1 (D1 & D2), Axial Fan type, Cap. 13.500 CFM,
E no 2 37,000,000 2,500,000 74,000,000 5,000,000
Stat Press 1.2 In.Wg, Power 5 KW, 380V/50Hz/3Ph

UNIT APARTMENT (F.1 ~ F.25)

EF Unit Apartment - Ceiling Sirrocco type


F no 950 982,000 150,000 932,900,000 142,500,000
Tapping power with lighting

G KEF Unit Apartment no 850 By Other By Other

REFRIGERANT PIPES

Supply and Install of copper, seamless copper tube tube


type ACR complete with fittings (tee, elbow, etc.) flanges,
adaptors, hangers, mounting support, and other
miscellaneous Item in accordance to technical and as
shown on drawings

PUBLIC AREA

H Ref Pipe - Li 6.4 + Gas 12.7 m 18 190,000 45,000 3,420,000 810,000

UNIT APARTMENT (F.1 ~ F.25)

I Approved size Refrigerant Pipe m 14,115 330,000 45,000 4,657,950,000 635,175,000

Page: Bill 3 / 9 To Collection Bill 3.2 6,009,386,000 802,485,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.2 VAC SYSTEM (Cont'd)

DRAIN PIPES

Supply and Install of PVC Pipe (AW Class) 10 kg/cm2


complete with fittings and insulations (tee, elbow, etc.),
flanges, adaptors, hangers, mounting supports, and other
miscellaneous items in accordance to technical
specification and as shown on drawings

PUBLIC AREA

A Ref Pipe - Li 6.4 + Gas 12.7 m 18 190,000 3,420,000

UNIT APARTMENT (F.1 ~ F.25)

B Approved size Drain Pipe m 7,460 330,000 2,461,800,000

DUCTWORKS

Supply and Install the following ductworks c/w jointing


material, Insulation, hangers / supporting material and
accessories as described and shown on drawings and
specification

PUBLIC AREA

BJLS without insulation

C BJLS 50 (Smoke Extract Duct) m2 72 205,000 165,000 14,760,000 11,880,000

D BJLS 80 (Smoke Extract Duct) m2 467 310,000 251,000 144,770,000 117,217,000

E BJLS 80 (Press Duct) m2 545 310,000 251,000 168,950,000 136,795,000

F BJLS 120 (Press Duct) m2 1,305 445,000 342,000 580,725,000 446,310,000

UNIT APARTMENT (F.1 ~ F.25)

BJLS without insulation

G Exhaust Pipe class D, from toilet to balcon (Unit Apartment) ls 850 40,700 342,000 34,595,000 290,700,000

DAMPERS , GRILLES, LOUVERES AND DIFFUSERS

Supply and installation of the following Air Register


connections, plenum, hangers / supporting material and
accessories as described and shown on drawings and
specification

PUBLIC AREA

H IAG 200x200 c/w OBD no 100 3,500,000 342,000 350,000,000 34,200,000

I PAR 500x900 c/w OBD no 100 3,500,000 342,000 350,000,000 34,200,000

J SEG 350x250 c/w OBD no 50 3,500,000 342,000 175,000,000 17,100,000

K Bellmouth c/w Wire Guard no 6 3,500,000 342,000 21,000,000 2,052,000

UNIT APARTMENT (F.1 ~ F.25)

L Vent-cup Balcon Arera (Unit Apartment) no 850 220,000 165,000 187,000,000 140,250,000

CONTROL CABLING

M Control Cabling for unit Public Area m 18 125,000 45,000 2,250,000 810,000

N Control Cabling for unit Apartment m 14,115 125,000 45,000 1,764,375,000 635,175,000

Page: Bill 3 / 10 To Collection Bill 3.2 6,258,645,000 1,866,689,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.2 VAC SYSTEM (Cont'd)

Collection

Page: Bill 3 / 9 6,009,386,000 802,485,000

Page: Bill 3 / 10 6,258,645,000 1,866,689,000

Page: Bill 3 / 11 To Collection Bill 3 12,268,031,000 2,669,174,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.3 ELECTRICAL SYSTEM

LV DISTRIBUTION BOARDS

Supply and Installation of low voltage distribution boards


including provision of all interconnecting, control, ancillary
wirings, support bracket vibration isolation and all
necessary accessories in accordance with specification and
as shown on drawings.

PUBLIC AREA

A P-F(1~25).D1 & D2 no 50 99,000,000 14,500,000 4,950,000,000 725,000,000

B End Feed Box c/w MCCB 800A no 2 145,000,000 3,500,000 290,000,000 7,000,000

C P-BP no 1 45,000,000 3,500,000 45,000,000 3,500,000

D P-LF.SV/F.1 & 2 no 2 125,000,000 14,500,000 250,000,000 29,000,000

E P-Roof.D1 & D2 no 2 125,000,000 14,500,000 250,000,000 29,000,000

F P-Fire RF.D1 & D2 no 2 45,000,000 3,500,000 90,000,000 7,000,000

G P-Balcon no 2 45,000,000 3,500,000 90,000,000 7,000,000

H P-GDL no 2 80,000,000 6,000,000 160,000,000 12,000,000

I LCP-SEF.RF.1.1 no 2 60,000,000 4,000,000 120,000,000 8,000,000

J LCP-PAF.RF.1.1~2 no 4 60,000,000 4,000,000 240,000,000 16,000,000

K CP-LF.P.1~6 no 6 80,000,000 6,000,000 480,000,000 36,000,000

L P-Façade no 2 60,000,000 4,000,000 120,000,000 8,000,000

UNIT APARTMENT (F.1 ~ F.25)

M MB-3BR no 150 4,500,000 500,000 675,000,000 75,000,000

N MB-2BR no 450 3,500,000 500,000 1,575,000,000 225,000,000

O MB-ST no 250 2,500,000 500,000 625,000,000 125,000,000

BUSDUCT

Supply and installation of Busduct including fixing, bends,


tees, supporting brackets, connecting, termination and all
necessary accessories in accordance with specification and
as shown on drawings

P 800A (AL) m 145 6,000,000 1,750,000 870,000,000 253,750,000

Q Plug / In Box MCCB 80A no 50 15,000,000 1,750,000 750,000,000 87,500,000

R Plug / In Box MCCB 200A no 2 35,000,000 1,750,000 70,000,000 3,500,000

LOW VOLTAGE CABLES

Supply and Installation the following Low Voltage Cables


run and fixed on cable ladders including end cable,
connecting, termination, protection system andall necessary
accessories in accordance with specification and as shown
on drawing.

From P-F(1~25).D1 to:

S MB-(A ~ Z).D1; NYY 3x4mm m 9,550 28,500 10,000 272,175,000 95,500,000

T Plug / In Box MCCB 80; NYY 4x25mm + NYA 16mm m 23 336,000 25,000 7,728,000 575,000

Page: Bill 3 / 12 To Collection Bill 3.3 11,929,903,000 1,753,325,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.3 ELECTRICAL SYSTEM (Cont'd)

LOW VOLTAGE CABLES (Cont'd)

Supply and Installation the following Low Voltage Cables


run and fixed on cable ladders including end cable,
connecting, termination, protection system andall necessary
accessories in accordance with specification and as shown
on drawing.

From P-F(1~25).D2 to:

A MB-(A ~ Z).D2; NYY 3x4mm m 9,550 28,500 10,000 272,175,000 95,500,000

B Plug / In Box MCCB 80; NYY 4x25mm + NYA 16mm m 23 336,000 25,000 7,728,000 575,000

From P-Roof.D1 to:

C Plug / In Box MCCB 200A; NYY 4x95mm + NYA 50mm m 27 965,000 40,000 26,055,000 1,080,000

D IU/OU-LMR.1 ~ 3; NYY 3x4mm m 26 28,500 10,000 741,000 260,000

E P-BP; NYY 4x10mm + NYA 10mm m 30 137,000 25,000 4,110,000 750,000

F P-GDL; NYY 4x4mm + NYA 4mm (Prov. QTY) m 30 55,000 25,000 1,650,000 750,000

G CP-LF.P1 ~ 3; NYY 4x25mm + NYA 16mm m 34 336,000 25,000 11,424,000 850,000

H P-Balcon D1; NYY 4x4mm + NYA 4mm (Prov. QTY) m 30 55,000 25,000 1,650,000 750,000

I P-Façade D1; NYY 4x4mm + NYA 4mm (Prov. QTY) m 30 55,000 25,000 1,650,000 750,000

From P-Roof.D2 to:

J Plug / In Box MCCB 200A; NYY 4x95mm + NYA 50mm m 24 965,000 40,000 23,160,000 960,000

K IU/OU-LMR.1 ~ 3; NYY 3x4mm m 25 28,500 10,000 712,500 250,000


f
L P-BP; NYY 4x10mm + NYA 10mm (DELETE) m

M P-GDL; NYY 4x4mm + NYA 4mm (Prov. QTY) m 30 55,000 25,000 1,650,000 750,000

N CP-LF.P4 ~ 6; NYY 4x25mm + NYA 16mm m 33 336,000 25,000 11,088,000 825,000

O P-Balcon D2; NYY 4x4mm + NYA 4mm (Prov. QTY) m 30 55,000 25,000 1,650,000 750,000

P P-Façade D2; NYY 4x4mm + NYA 4mm (Prov. QTY) m 30 55,000 25,000 1,650,000 750,000

From P-Fire RF.D1 & P-Fire RF.D2 to:

Q P-LF.S/F.1 & 2; FRC 4x25mm + NYA 16mm m 14 395,000 25,000 5,530,000 350,000

R LCP-IAF/SEF.RF.1.1 & 1.2; FRC 4x2.5mm + NYA 2.5mm m 10 60,000 25,000 600,000 250,000

S LCP-PAF.RF.1.1, 1.2, 2.1 & 2.2;; FRC 4x6mm + NYA 6mm m 20 135,000 25,000 2,700,000 500,000

From LCP-IAF/SEF.RF.1 & LCP-IAF/SEF.RF.1 to:

U IAF/SEF.RF.1 & 2; FRC 3x2.5mm + FRC 4x2.5mm m 44 95,000 25,000 4,180,000 1,100,000

From LCP-PAF.RF.1.1 & LCP-PAF.RF.1.2 to:

V PAF.RF.1 & 2; FRC 3x6mm + FRC 4x6mm m 47 195,000 25,000 9,165,000 1,175,000

From LCP-PAF.RF.2.1 & LCP-PAF.RF.2.2 to:

W PAF.RF.3 & 4; FRC 3x6mm + FRC 4x6mm m 47 195,000 25,000 9,165,000 1,175,000

From P-LF.SV/F.1 & P-LF.SV/F.2 to:

X LF-S/F1 & 2; FRC 4x16mm + NYA 16mm m 20 275,000 25,000 5,500,000 500,000

Page: Bill 3 / 13 To Collection Bill 3.3 403,933,500 110,600,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.3 ELECTRICAL SYSTEM (Cont'd)

CABLE CONTAIMENT

Supply and install cable cage above/under ceiling


galvanized mild steel, including bends, tees, elbows and all
necessary accessories in accordance with specification and
as shown on drawings

A 400mm x 100mm; Cable Tray m 515 293,000 175,000 150,895,000 90,125,000

B 300mm x 100mm; Cable Tray m 665 245,000 175,000 162,925,000 116,375,000

C 200mm x 100mm; Cable Tray m 1,010 197,000 175,000 198,970,000 176,750,000

D 200mm x 100mm; Cable Tray C/W Cover m 19 305,000 175,000 5,795,000 3,325,000

E 100mm x 100mm; Cable Tray C/W Cover m 39 209,000 175,000 8,151,000 6,825,000

LIGHTING

Supply and installation of following lighting fixtures


including supporting bracket, connection, fixing, testing,
commissioning and all necessary accessories

PUBLIC AREA

F Down Light, LED 9 W no 1,175 85,000 75,000 99,875,000 88,125,000

G Down Light, LED 9 W + Niccad Battery no 225 885,000 75,000 199,125,000 16,875,000

H Exit Lamp FL 1 x 10 W, c/w Battery no 200 715,000 75,000 143,000,000 15,000,000

I Light Motion Sensor no 100 550,000 125,000 55,000,000 12,500,000

J Stair Lamp T5 1 x 16 W, c/w Battery no 204 1,244,000 75,000 253,776,000 15,300,000

K Spotlight 50 W no 4 935,000 75,000 3,740,000 300,000

L TL LED 1 x 16 W, Tipe BALK no 4 117,000 75,000 468,000 300,000

M TL LED 1 x 16 W, Tipe BALK c/w Battery no 156 917,000 75,000 143,052,000 11,700,000

UNIT APARTMENT (F.1 ~ F.25)

N Lighting (Down Light, LED 9 W) no 4,650 105,000 75,000 488,250,000 348,750,000

Final circuits comprising PVC insulated copper cables,


drawing into cable containment systems, including trunking,
conduits and/or flexible conduits and fittings, and earth
continuity conductors

NYM 3 x 2.5 mm2 in PVC Conduit Ø 20 mm from distribution


board ; Lighting point

O Lighting Point For Public Area no 2,068 45,000 15,000 93,060,000 31,020,000

P Lighting Point For Unit Loft no 4,650 45,000 15,000 209,250,000 69,750,000

Page: Bill 3 / 14 To Collection Bill 3.3 2,215,332,000 1,003,020,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.3 ELECTRICAL SYSTEM (Cont'd)

POWER

Supply and installation of following power accessories


including supporting bracket, connection, fixing, testing,
commissioning and all necessary accessories

PUBLIC AREA

A Single Switch, 10A no 6 90,000 40,000 540,000 240,000

B Grid Switch no 50 142,000 40,000 7,100,000 2,000,000

C Socket Outlet 1Phase, 16A, 200W no 204 90,000 40,000 18,360,000 8,160,000

UNIT APARTMENT (F.1 ~ F.25)

D Double Switch, 10A no 900 90,000 40,000 81,000,000 36,000,000

E Single Switch, 10A no 2,750 90,000 40,000 247,500,000 110,000,000

F Socket Outlet no 6,450 90,000 40,000 580,500,000 258,000,000

G Socket Outlet for AC no 2,150 115,000 40,000 247,250,000 86,000,000

H Socket Outlet WP no 950 90,000 40,000 85,500,000 38,000,000

Final circuits comprising PVC insulated copper cables,


drawing into cable containment systems, including trunking,
conduits and/or flexible conduits and fittings, and earth
continuity conductors

NYM 3 x 2.5 mm2 in PVC Conduit Ø 20 mm from distribution


board ; Electric Socket Point

J Electric Socket Outlet Point for Public Area no 204 45,000 15,000 9,180,000 3,060,000

K Electric Socket Outlet Point for Unit Loft no 9,550 45,000 15,000 429,750,000 143,250,000

LIGHTNING PROTECTION

Supply and Installation of Earthing cable including fixing,


connection, testing and commissioning as per specification
and drawings necessary accessories:

Complete Lightning Protection System Comprising The


Following :

L LP non Radio Aktif Type R.70mm (T=5m c/w BASP Dia.80mm) no 1 16,500,000 2,500,000 16,500,000 2,500,000

Control Box 400x400x400 (Grounding Resistant for LP Max 5


M no 2 5,000,000 1,500,000 10,000,000 3,000,000
Ohm)

N Obstraction Lamp no 5 1,644,000 125,000 8,220,000 625,000

O NYA 70mm2 + PVC Dia.50mm m 131 202,000 35,000 26,462,000 4,585,000

Page: Bill 3 / 15 To Collection Bill 3.3 1,767,862,000 695,420,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.3 ELECTRICAL SYSTEM (Cont'd)

Collection

Page: Bill 3 / 12 11,929,903,000 1,753,325,000

Page: Bill 3 / 13 403,933,500 110,600,000

Page: Bill 3 / 14 2,215,332,000 1,003,020,000

Page: Bill 3 / 15 1,767,862,000 695,420,000

Page: Bill 3 / 16 To Collection Bill 3 16,317,030,500 3,562,365,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.4 FIRE FIGHTING SYSTEM

HYDRANT SYSTEM INSTALLATIONS

Supply and install hydrant pipe; Black steel pipe Sch.40


ASTM A53 including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories, in accordance with the
technical specification, and or as shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD m 498 655,000 190,000 326,190,000 94,620,000

B Pipe; 65mmD m 315 205,000 135,000 64,575,000 42,525,000

C Pipe; 40mmD m 736 95,000 100,000 69,920,000 73,600,000

Extra Over Pipeworks

D Bend; 65mmD no 292 475,000 100,000 138,700,000 29,200,000

E Tee; 150mmD no 102 530,000 190,000 54,060,000 19,380,000

F Tee; 65mmD no 50 440,000 100,000 22,000,000 5,000,000

Valve & Ancillaries

G FE Dry Powder 3 Kg + Box standart no 112 3,187,000 100,000 356,944,000 11,200,000

H Gate Valve; 65mmD no 50 3,585,000 190,000 179,250,000 9,500,000

I Indoor Hydrant Box no 104 3,151,000 135,000 327,704,000 14,040,000

J Landing Valve; 65mmD no 102 915,000 190,000 93,330,000 19,380,000

K AAV Set c/w PG no 16 2,860,000 190,000 45,760,000 3,040,000

L PRV Set; 150mmD set 8 48,700,000 5,000,000 389,600,000 40,000,000

Page: Bill 3 / 17 To Collection Bill 3.4 2,068,033,000 361,485,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.4 FIRE FIGHTING SYSTEM (Cont'd)

SPRINKLER SYSTEM INSTALLATIONS

Supply and install sprinkler pipe; Black steel pipe Sch.40


ASTM A53 for Vertical Pipeworks and Black steel pipe
medium after BCV, including all fitting for 2 inch (50mm)
inside diameter run in pipe or less, supports, hangers,
jointing materials and fixing accessories fully in accordance
with the technical specification, and or as shown in the
drawings.

PUBLIC AREA

Pipeworks

A Pipe; 150mmD (Riser) (BSP Sch.40) m 256 655,000 190,000 167,680,000 48,640,000

B Pipe; 100mmD (BSP Sch.40) m 134 375,000 150,000 50,250,000 20,100,000

C Pipe; 100mmD (BSP Medium) m 103 375,000 150,000 38,625,000 15,450,000

D Pipe; 80mmD (BSP Medium) m 283 265,000 140,000 74,995,000 39,620,000

E Pipe; 65mmD (BSP Medium) m 1,480 205,000 50,000 303,400,000 74,000,000

F Pipe; 50mmD (BSP Medium) m 594 127,000 125,000 75,438,000 74,250,000

G Pipe; 40mmD (BSP Medium) m 216 95,000 75,000 20,520,000 16,200,000

H Pipe; 25mmD (BSP Medium) m 1,181 60,000 50,000 70,860,000 59,050,000

I Pipe; 25mmD (Dropper) (BSP Medium) m 425 60,000 50,000 25,500,000 21,250,000

Extra Over Pipeworks

J Bend; 100mmD no 100 225,000 87,000 22,500,000 8,700,000

K Bend; 65mmD no 100 127,000 87,000 12,700,000 8,700,000

L Tee; 150mmD no 54 511,000 87,000 27,594,000 4,698,000

M Tee; 100mmD no 150 225,000 87,000 33,750,000 13,050,000

N Tee; 80mmD no 125 205,000 87,000 25,625,000 10,875,000

O Tee; 65mmD no 575 127,000 87,000 73,025,000 50,025,000

Valve & Ancillaries

P BCV; 100mmD set 50 7,300,000 500,000 365,000,000 25,000,000

Q SP Head Pendant Type (standard respond) no 850 295,000 40,000 250,750,000 34,000,000

R AAV Set c/w PG set 8 2,860,000 250,000 22,880,000 2,000,000

S PRV Set + MCV Set; 150mmD set 6 98,333,000 2,500,000 589,998,000 15,000,000

UNIT APARTMENT (F.1 ~ F.25)

Pipeworks

T Pipe; 50mmD m 190 127,000 125,000 24,130,000 23,750,000

U Pipe; 40mmD m 1,490 95,000 75,000 141,550,000 111,750,000

V Pipe; 32mmD m 705 85,000 65,000 59,925,000 45,825,000

W Pipe; 25mmD m 5,230 60,000 50,000 313,800,000 261,500,000

X Pipe; 25mmD (Dropper) m 300 60,000 50,000 18,000,000 15,000,000

Valve & Ancillaries

Y SP Head Pendant Type (quick respond) no 600 117,372 40,000 70,423,200 24,000,000

Z SP Head Side Wall Type (quick respond) no 2,600 145,500 40,000 378,300,000 104,000,000

Page: Bill 3 / 18 To Collection Bill 3.4 3,257,218,200 1,126,433,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.4 FIRE FIGHTING SYSTEM (Cont'd)

DRAIN SPRINKLER SYSTEM INSTALLATIONS

Supply and install drain sprinkler pipe; Black steel pipe


Medium, including all fitting for 2 inch (50mm) inside
diameter run in pipe or less, supports, hangers, jointing
materials and fixing accessories fully in accordance with the
technical specification, and or as shown in the drawings.

PUBLIC AREA

Pipeworks

A Pipe; 50mmD (Riser) (BSP Medium) m 157 155,000 85,000 24,335,000 13,345,000

B Pipe; 25mmD (BSP Medium) m 850 85,000 85,000 72,250,000 72,250,000

Valve & Ancillaries

C Gate Valve; 25mmD no 50 199,000 85,000 9,950,000 4,250,000

D Orifice; 25mmD no 50 3,000,000 400,000 150,000,000 20,000,000

E Vent Cup no 2 209,000 100,000 418,000 200,000

Page: Bill 3 / 19 To Collection Bill 3.4 256,953,000 110,045,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.4 FIRE FIGHTING SYSTEM (Cont'd)

Collection

Page: Bill 3 / 17 2,068,033,000 361,485,000

Page: Bill 3 / 18 3,257,218,200 1,126,433,000

Page: Bill 3 / 19 256,953,000 110,045,000

Page: Bill 3 / 20 To Collection Bill 3 5,582,204,200 1,597,963,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.5 ELECTRONIC SYSTEM

ACCESS CONTROL SYSTEM

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as shown
on drawings

PUBLIC AREA

A Junction Box c/w Access Module no 10 250,000 75,000 2,500,000 750,000

B Emergency Door Release no 2 350,000 75,000 700,000 150,000

C Magnetic Lock c/w Door Contact no 2 75,000 75,000 150,000 150,000

D Reader no 4 150,000 75,000 600,000 300,000

Cable STP #18 AWG 4 pair + FRC 2x1.5 mm2 + UTP CAT.6 in
PVC high impact conduit 20mm diameter;

E Junction Box c/w Access Module Point no 10 500,000 75,000 5,000,000 750,000

Cable NYYHY 2 x 1.5mm in PVC high impact conduit 20mm


diameter;

F Emergency Door Release Point no 2 500,000 75,000 1,000,000 150,000

G Magnetic Lock c/w Door Contact Point no 2 500,000 75,000 1,000,000 150,000

Cable STP #18 AWG 2 pair in PVC high impact conduit


20mm diameter;

H Reader Point no 4 500,000 75,000 2,000,000 300,000

FIRE ALARM SYSTEM

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as shown
on drawings

PUBLIC AREA

I JB-FA no 50 8,250,000 1,500,000 412,500,000 75,000,000

J Smoke Detector (Photo Electric) no 404 950,000 100,000 383,800,000 40,400,000

K Manual Alarm Push Button no 100 400,000 100,000 40,000,000 10,000,000

L Horn & Strobe Light (Addressable) no 100 850,000 100,000 85,000,000 10,000,000

M Fire Intercom Jack no 100 450,000 100,000 45,000,000 10,000,000

N Flow Switch no 50 By Fire Fighting

O Tamper Switch no 50 By Fire Fighting

P End Of Line no 52

UNIT APARTMENT (F.1 ~ F.25)

Q Smoke Detector (Photo Electric) no 2,200 850,000 100,000 1,870,000,000 220,000,000

R Remote LED Lamp no 850 250,000 100,000 212,500,000 85,000,000

S End Of Line no 150 750,000 100,000 112,500,000 15,000,000

Page: Bill 3 / 21 To Collection Bill 3.5 3,174,250,000 468,100,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.5 ELECTRONIC SYSTEM (Cont'd)

FIRE ALARM SYSTEM (Cont'd)

Cable FRC STP #18 AWG 2 pair (Data) + FRC STP #16 AWG
1 pair (Intercom) + FRC 3x2.5 mm2 (Power Module) + NYA
25mm (Grounding) in PVC high impact conduit 20mm
diameter;

A JB-FA w/ Module Point no 50 2,500,000 500,000 125,000,000 25,000,000

Cable NYA 2x1.5 mm2 in PVC high impact conduit 20mm


diameter;

PUBLIC AREA

B Smoke Detector (Photo Electric) Point no 404 250,000 100,000 101,000,000 40,400,000

UNIT APARTMENT (F.1 ~ F.25)

C Smoke Detector (Photo Electric) Point no 2,200 250,000 100,000 550,000,000 220,000,000

Cable ITC 2x2x0.6 mm2 in PVC high impact conduit 20mm


diameter;

PUBLIC AREA

D Fire Intercom Jack Point no 100 250,000 100,000 25,000,000 10,000,000

UNIT APARTMENT (F.1 ~ F.25)

E Remote LED Lamp Point no 850 250,000 50,000 212,500,000 42,500,000

Cable FRC 2x1.5 mm2 in PVC high impact conduit 20mm


diameter;

F Manual Alarm Push Button Point no 100 400,000 150,000 40,000,000 15,000,000

G Horn & Strobe Light (Addressable) Point no 100 400,000 150,000 40,000,000 15,000,000

H Flow Switch Point no 50 400,000 150,000 20,000,000 7,500,000

I Tamper Switch Point no 50 400,000 150,000 20,000,000 7,500,000

GPON SYSTEM

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as shown
on drawings

PUBLIC AREA

J ODP-(16-Port SC-APC) no 50 1,500,000 150,000 75,000,000 7,500,000

UNIT APARTMENT (F.1 ~ F.25)

K FO Outlet SC Port 1 Core (1-Gang) no 850 350,000 40,000 297,500,000 34,000,000

Cable FO (ADSS G 652 D Single) 24 Core;

L ODP-(16-Port SC-APC) point no 50 1,500,000 150,000 75,000,000 7,500,000

Cable FO Drop Wire (2 Core) in PVC high impact conduit


20mm diameter;

"White wire with hook" in PVC high impact conduit 20mm


diameter;
M FO Outlet SC Port 1 Core (1-Gang) point no 850 250,000 40,000 212,500,000 34,000,000

Page: Bill 3 / 22 To Collection Bill 3.5 1,793,500,000 465,900,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.5 ELECTRONIC SYSTEM (Cont'd)

CCTV SYSTEM

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as shown
on drawings

A Rack Switch no 18 4,500,000 150,000 81,000,000 2,700,000

B IP-Dome Camera 2MP PoE no 50 6,500,000 150,000 325,000,000 7,500,000

C IP-Bullet IR Camera 2MP PoE no 6 7,500,000 150,000 45,000,000 900,000

D Module Control CCTV no 8 8,500,000 150,000 68,000,000 1,200,000

Cable Backbone FO Single Mode 4 Core in PVC high impact


conduit 20mm diameter;

Rack Switch point no 18 4,500,000 150,000 81,000,000 2,700,000

Cable UTP CAT.6 in PVC high impact conduit 20mm


diameter;

E IP-Dome Camera 2MP PoE point no 50 6,500,000 150,000 325,000,000 7,500,000

F IP-Bullet IR Camera 2MP PoE point no 6 7,500,000 150,000 45,000,000 900,000

G Module Control CCTV point no 8 6,500,000 150,000 52,000,000 1,200,000

SOUND SYSTEM

FIELD EQUIPMENT & CABLE INSTALATION DEVICES

Supply and installation of field equipment and devices


including brackets, supports, fixing and all necessary
accessories in accordance with specification and as shown
on drawings

PUBLIC AREA

H JBSS no 50 1,150,000 50,000 57,500,000 2,500,000

I Ceiling Speaker 3 W no 400 150,000 50,000 60,000,000 20,000,000

J Horn Speaker 15 W no 2 450,000 50,000 900,000 100,000

K Wall Speaker 6 W no 4 450,000 50,000 1,800,000 200,000

L Wall Speaker Emergency 6 W no 50 450,000 50,000 22,500,000 2,500,000

UNIT APARTMENT (F.1 ~ F.25)

M Ceiling Speaker Emergency 6 W no 850 150,000 50,000 127,500,000 42,500,000

Cable NYMHY 3x2.5 mm2 in PVC high impact conduit 20mm


diameter;

N JBSS point no 50 500,000 50,000 25,000,000 2,500,000

Page: Bill 3 / 23 To Collection Bill 3.5 1,317,200,000 94,900,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.5 ELECTRONIC SYSTEM (Cont'd)

SOUND SYSTEM (Cont'd)

FIELD EQUIPMENT & CABLE INSTALATION DEVICES (Cont'd)

Cable NYMHY 2x1.5 mm2 in PVC high impact conduit 20mm


diameter;

PUBLIC AREA

A Ceiling Speaker 3 W point no 400 150,000 50,000 60,000,000 20,000,000

B Horn Speaker 15 W point no 2 350,000 50,000 700,000 100,000

C Wall Speaker 6 W point no 4 350,000 50,000 1,400,000 200,000

UNIT APARTMENT (F.1 ~ F.25)

D Ceiling Speaker Emergency 6 W point no 850 150,000 50,000 127,500,000 42,500,000

Cable FRC 2x2.5 mm2 in PVC high impact conduit 20mm


diameter;

E Wall Speaker Emergency 6 W point no 50 350,000 50,000 17,500,000 2,500,000

CABLE CONTAIMENT

Supply and install cable tray and cable ladder class A


electro galvanized mild steel, hot dip galvanized including
bends, tees, elbows and all necessary accessories in
accordance with specification and as shown on drawings

PUBLIC AREA; (F.7)

F 500mm x 100mm (Shaft); Tray m 150 341,000 175,000 51,150,000 26,250,000

G 300mm x 100mm; Cable Cage m 2,050 245,000 125,000 502,250,000 256,250,000

Page: Bill 3 / 24 To Collection Bill 3.5 760,500,000 347,800,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.5 ELECTRONIC SYSTEM (Cont'd)

Sub Collection

Page: Bill 3 / 21 3,174,250,000 468,100,000

Page: Bill 3 / 22 1,793,500,000 465,900,000

Page: Bill 3 / 23 1,317,200,000 94,900,000

Page: Bill 3 / 24 760,500,000 347,800,000

Page: Bill 3 / 25 To Collection Bill 3 7,045,450,000 1,376,700,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

3.6 OTHERS WORKS

Allow hereunder for any other work not mentioned but are
considered necessary for the full and satisfactory
completion of Works. The Contractor is to list out the items
below and indicate the cost breakdown against each Item

A a)________________________________________ Item

B b)________________________________________ Item

C c)________________________________________ Item

D d)________________________________________ Item

E e)________________________________________ Item

Page: Bill 3 / 26 To Collection Bill 3


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 3 - APARTMENT (F1 ~ ROOF)

Material Rate Installation Material Amount Installation


Ref Description Unit QTY
(IDR) Rate (IDR) (IDR) Amount (IDR)

BILL 3 - APARTMENT (F1 ~ ROOF)

Collection

3.1 PLUMBING SYSTEM 17,929,392,000 3,945,097,000

3.2 VAC SYSTEM 12,268,031,000 2,669,174,000

3.3 ELECTRICAL SYSTEM 16,317,030,500 3,562,365,000

3.4 FIRE FIGHTING SYSTEM 5,582,204,200 1,597,963,000

3.5 ELECTRONIC SYSTEM 7,045,450,000 1,376,700,000

3.6 OTHERS WORKS

Page: Bill 3 / 27 To Summary 59,142,107,700 13,151,299,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

GENERAL

A The General Notes contained in Bill 2 shall apply to this Bill.


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

Page: BILL 4 / 1 To Collection


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

MISCELLANEOUS, TESTING AND COMMISSIONING

Allow for 1 years full servicing and maintenance upon completion and
A Item 1 25,000,000 25,000,000
handover to Client (Include Scope But No Price - Include in Prelim)

B Allow for Fire Stop as described on drawing and specification Item 1 15,000,000 15,000,000

C Allow for Obtaining all necessary Permit and Licenses Item 1 5,500,000 5,500,000

Allow for additional cost incurred in preparing all the testing and
D commissioning procedures for the Engineer's approval (Include Scope Item 1 13,500,000 13,500,000
But No Pricing)

Allow for all necessary protection of the system to ensure no


E Item 1 12,500,000 12,500,000
deterioration arises prior to commissioning and acceptance tests

F Allow for holes, motices, penetrations and chases in non structural works Item 1 4,500,000 4,500,000

Allow for labelling and identification of plant and equipment including


G Item 1 5,500,000 5,500,000
specification plates and manufacturer's name plates

Allow for painting to plant, pipework and fittings including


H Item 1 5,500,000 5,500,000
identification of pipework with colour coded bands as described

Allow for preparing and submitting shop drawings prior to


I commencement of installation including schematics and schedule, plans Item 1 35,000,000 35,000,000
section and elevations, details etc.

Allow for providing all necessary guard and railing to all moving and
J Item 1 30,000,000 30,000,000
rotating parts of equipment

Allow for providing all necessary record documents including drawings,


K operation, maintenance manual and other information necessary for the Item 1 10,000,000 10,000,000
satisfactory execution of the works

Allow for providing all necessary submissions, making applications to


relevant authorities and utility companies for tests, inspections and
L connections, and obtaining all necessary licenses, certificates and Item 1 15,000,000 15,000,000
approvals, including the completion of al forms and payment of all fees
charges.

Allow for providing instruction and training to Employer's staff in


M operation and maintenance of the Mechanical, Electrical & Plumbing Item 1 15,000,000 15,000,000
System Installation

Allow for submission of samples, catalogues, calculations and


N Item 1 12,500,000 12,500,000
information regarding the materials and equipment prior to ordering
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

Page: BILL 4 / 2 To Collection 204,500,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

MISCELLANEOUS, TESTING AND COMMISSIONING


(Cont'd)

Allow for testing and commissioning the whole system including all
necessary tests at maker's works, site tests during construction,
acceptance tests, etc. and provision of all necessary tools, facilities and
A Item 1 25,000,000 25,000,000
consumable stores for carrying out the tests all as directed by and to the
satisfaction of the Engineer to leave the whole in sound and perfect
working order on completion

Allow for the supply and installation of entire earthing and equipotential
B Item 1 12,500,000 12,500,000
bonding system.

C Allow providing sleeves for the main contractor to cast or built in Item 1 7,500,000 7,500,000
3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

Page: BILL 4 / 3 To Collection 45,000,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

MISCELLANEOUS, TESTING AND COMMISSIONING


(Cont'd)

Collection

Page: BILL 4 / 1

Page: BILL 4 / 2 204,500,000

Page: BILL 4 / 3 45,000,000


3003 MEIKARTA DISTRICT 2 - BLOCK 60007
MECHANICAL, ELECTRICAL & PLUMBING
BILL 4 - MISCELLANEOUS, TESTING AND COMMISSIONING

Ref Description Unit Qty Rate (IDR) Amount (IDR)

Page: BILL 4 / 4 To Grand Summary 249,500,000