The unit costs and parameters suggested are based on the information available with
NABARD. All Unit costs are indicative in nature and Banks/Govt. agencies may, at
their discretion, arrive at the unit costs for respective activities based on the
conditions prevailing in their area of operation, technical feasibility, financial
viability and bankability of the project. NABARD does not accept any financial
liability to anyone using this report for any purpose.
Contents
S. Unit Cost
Activity Specifications
No. (₹ )
Dugwell in Hardrock Areas-
1 OD-6.9m, ID-6m, Depth: 10m 95300
Model I
Dugwell in Hardrock Areas-
2 OD-6.9m, ID-6m, Depth: 12m 115700
Model II
Dugwell in Hardrock Areas-
3 OD-5.9m, ID-5m, Depth: 14m 101500
Model III
Dugwell in Hardrock Areas-
4 OD-5.9m, ID-5m, Depth: 16m 118800
Model IV
Dugwell in Hardrock Areas-
5 OD-4.9m, ID-4m, Depth: 12m 60600
Model V
Dugwell in Hardrock Areas-
6 OD-3.9m, ID-3m, Depth: 12m 40200
Model VI
Dugwell in Hardrock Areas-
7 OD-3.2m, ID-3m, Depth: 12m 63800
Model VII
8 Borewell Well Depth-100m, Dia-180mm 63300
9 Filter Points Dia-125mm, Depth-20m 25800
10 Tubewell Dia-175mm, Depth-150m 367300
MISCELLANEOUS
Artificial recharge of dried
11 /seasonally functioning 43500
bore-well
Artificial recharge of dried
12 8500
open/dug-well
1
Unit Cost (12 Unit Cost
S. Type of
Crop Spacing mm) ₹ per (16mm) ₹ per
No. Drip
ha ha
5b Mango 6m x 6m Online 30958 34194
6a Mango 6m x 6m Inline 31793 -
6b Mango 6m x 6m Inline 31793 -
7a Mango 5mx5m Online 35101 38803
7b Mango 5mx5m Online 35101 38803
8a Mango 5mx5m Inline 35240 -
8b Mango 5mx5m Inline 35240 -
9a Cashew Nut 7mx7m Online 28481 31285
9b Cashew Nut 7mx7m Online 28481 31285
10a Coconut 8mx8m Online 26669 28372
10b Coconut 8mx8m Online 26669 28372
11 Sapota 10 m x 10 m Online 18712 24218
12a Sapota 8mx8m Online 26669 28372
12b Sapota 8mx8m Online 26669 28372
13a Sweet orange 6mx6m Online 30958 34194
13b Sweet orange 6mx6m Online 30958 34194
14a Acid Lime 6mx6m Online 30958 34194
14b Acid Lime 6mx6m Online 30958 34194
Custard
15a 6mx6m Online 30958 34194
apple
Custard
15b 6mx6m Online 30958 34194
apple
16a Guava 6mx6m Online 30958 34194
16b Guava 6mx6m Online 30958 34194
17a Amla 6mx6m Online 30958 34194
17b Amla 6mx6m Online 30958 34194
18a Ber 6mx6m Online 30958 34194
18b Ber 6mx6m Online 30958 34194
19a Pomegranate 4.5 m x 2.7 m Online 34529 39887
19b Pomegranate 4.5 m x 2.7 m Online 34529 39887
20 Papaya 1.8 m x 1.5 m Online 70540 77931
21 Papaya 1.8 m x 0.6 m Inline 67839 83813
22 Banana 1.8 m x 0.6 m Inline 67839 83813
23a Grapevine 2.7 m x 1.5 m Online 51619 59070
23b Grapevine 2.7 m x 1.5 m Online 51619 59070
24a Grapevine 2.7 m x 1.5 m Inline 52182 64133
24b Grapevine 2.7 m x 1.5 m Inline 52182 64133
25 Vegetables 1.2 m x 0.6 m Inline 98723 112000
26 Rose 1.8 m x 0.6 m Inline 67839 83813
27 Jasmine 1.8 m x 0.6 m Inline 67839 83813
Other
28 1.0 m x 0.60 m Inline 106170 125706
flowers
2
Unit Cost (12 Unit Cost
S. Type of
Crop Spacing mm) ₹ per (16mm) ₹ per
No. Drip
ha ha
29 Sugarcane 2.25 m x 0.60m Inline 58925 71014
30 Sugarcane 2.0 m x 0.60 m Inline 63512 77063
31 Sugarcane 1.5 m x 0.60 m Inline 79331 94945
32 Cotton 1.8 m x 0.6 m Inline 67839 83813
Micro
33a Oil Palm 9mx9m 28625 31719
Sprinkler
33b Oil Palm 9mx9m Microjet 32409 35002
Sprinkler Systems
S. No. Pipe Dia. (mm) Area (ha) Unit Cost (₹ )
1 63 1 17000
2 63 2 20900
3 75 1 19190
4 75 2 23490
5 75 3 30430
6 75 4 37160
7 90 1 22700
8 90 2 27700
9 90 3 35630
10 90 4 43480
11 Rain guns (90mm) - 63500
2. Land Development
Unit Cost
S. No. Activity Specifications
(₹ )
slope 2-10%, area : 1 acre
1 Contour bunding 10000
– 4040 sq.mts
2 Gully plugging with Stone 5m 5200
3 Earthen gully plug with outlet 6m 2750
4 OFD works for 2% slope 1 acre 22550
5 OFD works for 3% slope 1 acre 30800
6 Reclamation of saline/alkaline soils 1 acre 15100
7 Farm Pond – Red soils 15m x 15m x 3m 135500
8 Farm Pond –Black soils 18m x 18m x 3m 196000
9 Mini Farm Pond 10ft. x 10 ft. x 2.5ft. 75500
NADEP compost unit including
10 10 ft. x 6 ft. x 3 ft. 15100
operational cost
11 Tiny Vermicompost 1.8 TPA 25200
12 Mini Vermicompost 20 TPA 281900
13 Vermi hatchery 260 TPA 1230600
14 Barbed wire fencing – rock poles 1 acre 19800
15 Barbed wire fencing – cement poles 1 acre 31000
Biofertilizers & Biopesticides unit
16 200 TPA 21238000
(200 TPA)
3
Unit Cost
S. No. Activity Specifications
(₹ )
Tank silt application (transport &
17 1 acre 21800
application)
3. Farm Mechanisation
S. Specifications Unit Cost (₹
Activity
No. lakh)@
1 Tractor with accessories 15 to 25 HP 2.50-4.50
2 Tractor with accessories 25 to 35 HP 4.50-5.50
3 Tractor with accessories 35 to 45 HP 5.00-7.50
4 Tractor with accessories 45 to 55 HP 6.50-8.50
5 Tractor with accessories 55 to 60 HP 7.50-9.50
6 Trolley – two wheel hydraulic 1.00-1.50
7 Power Tiller 6 to 12 HP 0.60-2.00
8 Seed cum fertilizer Drill 0.35-0.60
9 Paddy Transplanter 4, 6 & 8 rows 1.50-3.00
10 M.B. Plough 2/3 furrows 0.15-0.40
11 Reversible M.B.Plough 2/3 furrows 0.15-1.00
12 Disc Plough 2/3 discs 0.40-0.60
13 Disc Horrow 0.40-0.60
14 Cultivator 0.15-0.30
540 and 1000
15 Rotovator 0.65-1.00
rpm PTO speed
16 Thresher 0.45-2.00
17 Bullock Drawn MB Plough 0.15-0.20
18 Groundnut decorticator hand operated 0.09-0.11
19 Groundnut decorticator 0.50-1.50
20 Combine Harvesters As per make/HP
21 Turmeric cooking machine 4 drums 4.50
22 Laser guided land leveller 3.60
23 Rotary Mulcher with tractor 1.60
24 Mini power weeder) 2 HP 0.20
25 Medium power weeder 4.8 HP 0.72
five line 7 feet
26 Solar fencing 0.60
poles
27 Sugarcane harvester 100-150
@cost may vary based on capacity and make
4
11 Shed and office premises
12 Servicing Tools
Selection of the machinery will depend upon the area, major crops, skilled and
unskilled labour availability, soil type etc.
While financing tractors/power tillers & farm equipment, the banks may ensure
that the respective BIS standards are adhered to.
Banks may finance farm mechanisation activities as per the crops grown,
presence of other CHCs and concentration of farm machinery in the area.
The cost of tractor drawn implements, rotovators, plant protection equipment
and post-harvest equipment may vary based on capacity and make.
5. Animal Husbandry
i. Dairy
S. No. Activity Unit Size Unit Cost (₹ )
1 Cross Bred (CB)Cows 1+1 152000
2 Graded Murrah Buffaloes(GMB) 1+1 186000
3 High Yield Variety –CBC 1+1 170800
5
S. No. Activity Unit Size Unit Cost (₹ )
4 High Yield Variety –GMB 1+1 180600
5 Mini Dairy (CB Cows) 3+2 454000
6 Mini Dairy (GMB) 3+2 539600
7 Mini Dairy (CB Cows) 5+5 1011200
8 Mini Dairy (GMB) 5+5 1183200
9 Female Calf Rearing(CB) 1 35400
10 Female Calf Rearing(GMB) 1 45100
11 Fodder Cultivation 1 Acre 33000
ZBNF Unit Non Desript
12 Cows(selling milk, urine and 1+1 82720
dung)
ZBNF Unit Non Desript
Cows(selling part of milk and
13 1+1 92730
preparing different products
from urine and dung)
Indicative Costs for establishing Commercial Dairy Unit of any size
Depending on the size of the unit, indicative costs for various items of
investments are-
a) Cost of Cross Bred Cows: ₹ 4500-5000/litre per day (LPD);
Graded Murrah Buffalo: ₹ 6750-7500/LPD;
Cost of equipment: ₹ 1000/animal
b) Transport can be considered on need basis.
c) Shed space: 20 sq. /calf; 30 sq. /heifer; 40 sq. /adult;
Shed cost: ₹ 200/sq. for Thatched roof; ₹ 300/sq. for Asbestos roof
14 d) Fodder cultivation: 1 acre/1 veterinary aid for animals; ₹ 17000/acre
f) Other investments like feed store, milk shed, chaff cutters, minor
irrigation structures for fodder unit, water supply system, milking
machines, fencing, cost of bulls, feed mixing unit, etc., may be considered
based on need and subject to viability.
iv. Piggery
S. No. Activity Unit Size Unit Cost (₹ )
1 Breeding unit 3+1 144100
2 Breeding unit 10+1 497400
3 Fattening Unit 10 35800
6
v. Plough Bullocks and Bullock Carts
S. No. Activity Unit Size Unit Cost (₹ )
Plough Bullocks-Non Descript
1 1 Pair 39600
(medium size)
Plough Bullocks-Hallikar
2 Bullocks : Rs. 60,000 (incl 1 Pair 66000
insurance)
Bullock Carts-Pneumatic Tyre
3 1 No 47200
carts (3 T)
Bullock Carts-Carts of local
4 1 No 40000
make / wooden
vi. Poultry
S. No. Activity Unit Size Unit Cost (₹ )
Construction - Thatch roof
shed ₹ 95/sq.ft/shed.
Construction - Asbestos
1 Contract Broiler farming Any Size roof and local
material@₹ 160/sq. ft
Equipment (Rs.13-
15/broiler)
Construction -
Asbestos@₹ 190-210/sq.ft
Thatched roof
Equipment @₹ 13-
15/broiler
2 Independent broiler units Large Units
Cost of DOC@₹ 18-20
Cost of Feed@₹ 26-28/kg
Cost of Misc.
Expenses@₹ 10/bird
(₹ 303-335/bird)
Construction - Raised
Platform with asbestos
sheet@₹ 250-270/sq.ft;
Cost of Equipment - (dep.
upon quotation) - Cage
system@₹ 70/brooder &
grower;₹ 90/layer
Any Size preferably Cost of DOC@₹ 30
3 Layer
over 50000 birds Cost of Feed @₹ 22-
25(brooder)/ ₹ 20-
22(grower mash)/₹ 19-
21(layer mash) per kg
Cost of Misc
expenses@₹ 14 upto point
of lay; ₹ 14 during
lay(₹ 530-570/bird)
6. Sericulture
S. No. Activity Unit Size Unit Cost (₹ )
Mulberry Cultivation One Acre, 1000sq ft. rearing shed,
1 664000
and Silkworm rearing equipment, 2 crops
5000 DFLs per batch -1200 Sq Ft
2 Chawki Rearing Center 1637300
Shed
7
S. No. Activity Unit Size Unit Cost (₹ )
3 Multi end reeling Unit 6 basins 1105000
4 Multi end reeling Unit 10 basins 1405000
5 Twisting Unit 480 spindles 786000
Shrimp culture -
White Shrimp
5 5-6 months 1 ha 800000 1328900 2128900
(Litopenaeus
vannamei)
Renovation of
6 Ponds for Fish 11 months 1 ha 100000 200380 300380
Culture
7 Fish Culture 12 months 1 ha 950000 547000 1497000
Shrimp culture - P 296230
8 12 months 1 ha 1355000 1607300
Vannamei 0
Mudcrab Culture in
9 6 months 1 ha 2675760 1357698 4033458
HDPE boxes
Mudcrab Culture in
10 4-5 months 1 ha 470000 324200 794200
open ponds
11 Crab culture 5 months 1 ha 107000 262000 369000
12 Scampi Culture 4-5 months 1 ha 700000 660500 1360500
GIFT Tilapia 288456
13 4-5 months 1 ha 1000000 1884560
Culture 0
14 Sea Bass culture 12 months 1 ha 700000 1202000 1902000
10-11 234830
15 Pangassius 1 ha 1000000 1348300
months 0
Fresh Water Prawn
16 1 ha 566000
Farming in Ponds
Ornamental Fish
8
S. No. Activity Unit Cost (₹ )
1 Backyard Unit 40000
2 Medium Size Unit 1000000
3 Large Integrated Unit 3000000
Fish Feed
S. No. Activity Specifications Unit Cost (₹ )
Establishment of Small 1 to 5 quintals per day
1 1000000
Capacity Fish Feed Mill
Establishment of Large 6 to 10 quintal per
2 20000000
Capacity Fish Feed Mill day
Transport Vehicles
S. No. Activity Unit Cost per truck (₹ )
Refrigerated Truck/Container of minimum 10
1 ₹ 25 lakh
ton capacity
2 Insulated Truck of a minimum 10 ton capacity ₹ 20 lakh
3 Insulated Truck of a minimum 6 ton capacity ₹ 15 lakh
Marine Boats
Measurements BT Unit
Bulk SD
Type of Boat Lengt Widt Ribs Layer Cost
Depth heads layers
h h s (₹ )
FRP Boat Decked 21 4 2.2 14 - 4 6 69750
FRP Boat Decked 24 5 2.2 16 - 5 7 108900
FRP Boat Decked 32 8 3 18 1 5 8 197100
FRP Boat Decked 36 9 4.5 22 8 5 9 216000
FRP Teppa Decked 24 5 2.2 18 5 7 108900
FRP Teppa Decked 26 7 2.5 18 5 8 114300
FRP Teppa Decked 32 7.5 3.5 19 1 5 8 201600
FRP Teppa Decked 42 5.2 2.2 28 1 7 10 161100
FRP Teppa Decked 33 7.5 3.9 20 1 5 8 206460
FRP Teppa Decked 36 9 4 20 6 5 9 212850
FRP Nava 30 9 4 6 9 6 9 265500
FRP Nava 34 9 4 6 12 6 9 284400
FRP Teppa Chennai
32 6 2.5 14 - 5 9 163166
Model_OBM
FRP Teppa Chennai
34 7.6 2.5 14 5 5 9 187803
Model_OBM
FRP Teppa Chennai
36 7.5 3.5 16 6 5 9 207615
Model_OBM
BLC-IBM 33 9.5 4 11 9 5 9 292950
BLC-IBM 36 11 4.5 11 11 6 9 307350
BLC-IBM 40 12 4.5 14 14 7 10 337050
Inland Boats
Measurements Bulk Unit
Type of Rib BT
heads/ SD layers Cost
Boat Length Width Depth s Layers
Radius (₹ )
FRP Boat 12 2 2 8 4 6 15000
9
FRP Boat 18 3 1.5 13 4 6 37000
FRP Boat 18 3 1.5 13 4 6 42000
FRP Boat 19.5 4 1.8 - 4 6 45000
FRP Boat 20 5 2 14 4 6 42688
FRP Boat 21 4 2.2 18 4 6 51000
FRP Boat 21 1.5 1 18 4 6 31000
FRP Boat 21 5.5 1.5 18 4 6 60000
FRP Boat 22 5 2 18 4 6 52000
FRP Boat 22 7 3 18 4 6 77000
FRP Boat 28 4 2.2 20 4 6 79000
FRP Putty 1 10 6 15000
FRP Putty 1.4 20 10 6 22000
FRP Putty 2 20 10 6 25500
Material – Specifications
1. Resin ISOPTHALIC RESIN
2. Mat 450 – Emulation Mat
3. Plywood Marine Grade
4. Wood Non-teak
5. Foam Reco Foam ( Chennai Model)
10
Size Price range
0.23/56 mm to 59 mm - 50 md and above 531 to 774
0.23/60 mm and above - 50 md and above 519 to 736
0.28/46 mm to 51 mm - 50 md and above 550 to 765
0.28/52 mm to 55 mm - 50 md and above 531 to 755
0.28/56 mm to 59 mm - 50 md and above 513 to 727
0.28/60 mm and above - 50 md and above 494 to 660
0.32/46 mm to 51 mm - 50 md and above 525 to 698
0.32/52 mm to 55 mm - 50 md and above 501 to 684
0.32/56 mm to 59 mm - 50 md and above 482 to 675
0.32/60 mm and above - 50 md and above 464 to 632
0.40/60 mm and above - 50 md and above 464 to 632
1/4 36 mm to 44 mm - 50 md and above 864 to 903
1/4 46 mm to 78 mm - 50 md and above 861 to 893
1/2 18 mm to 28 mm - 50 md and above 809 to 955
1/2 30 mm to 34 mm - 50 md and above 715 to 910
1/2 36 mm to 44 mm - 50 md and above 701 to 890
1/2 46 mm to 78 mm - 50 md and above 688 to 850
1/2 80 mm & above - 50 md and above 688 to 795
1/3 18 mm to 28 mm - 50 md and above 715 to 895
1/3 30 mm to 34 mm - 50 md and above 648 to 845
1/3 36 mm to 44 mm - 50 md and above 634 to 825
1/3 46 mm to 78 mm - 50 md and above 620 to 795
1/3 80 mm & above - 50 md and above 620 to 760
2/2 18 mm to 28 mm - 50 md and above 688 to 840
2/2 30 mm to 34 mm - 50 md and above 620 to 795
2/2 36 mm to 44 mm - 50 md and above 607 to 775
2/2 46 mm to 78 mm - 50 md and above 594 to 735
2/2 80 mm & above - 50 md and above 594 to 700
2/3 18 mm to 28 mm - 50 md and above 620 to 810
2/3 30 mm to 34 mm - 50 md and above 593 to 775
2/3 36 mm to 44 mm - 50 md and above 587 to 745
2/3 46 mm to 78 mm - 50 md and above 587 to 715
2/3 80 mm & above - 50 md and above 587 to 685
3/3 18 mm to 28 mm - 50 md and above 620 to 810
3/3 30 mm to 34 mm - 50 md and above 594 to 775
3/3 36 mm to 44 mm - 50 md and above 587 to 745
3/3 46 mm to 78 mm - 50 md and above 587 to 715
3/3 80 mm & above - 50 md and above 587 to 680
4/3 18 mm to 28 mm - 50 md and above 620 to 800
4/3 30 mm to 34 mm - 50 md and above 594 to 765
4/3 36 mm to 44 mm - 50 md and above 587 to 735
11
Size Price range
4/3 46 mm to 78 mm - 50 md and above 587 to 710
4/3 80 mm & above - 50 md and above 587 to 675
6/3 30 mm to 34 mm - 50 md and above 565 to 790
6/3 36 mm to 44 mm - 50 md and above 556 to 755
6/3 46 mm to 78 mm - 50 md and above 537 to 735
6/3 80 mm & above - 50 md and above 523 to 698
8/3 to 12/3 80 mm & above- 50 md & above 526 to 555
18/3 46mm to 78mm - 50 md and above 538 to 585
18/3 80 mm & above - 50 md and above 513 to 560
8. Renewable Energy
Note: Unit Costs for wind, small hydro, solar grid connected and cogeneration