Lean Canvas Construction of Housing Society 30-March-2021

Problem Solution Unique Value Unfair Advantage Customer

Proposition Segments

-Lack of materials. -Availability of -We provide energy -Best materials for Target Customers
extra materials. efficient design and construction.
-Delay supply of Families(Buyers)
performance. -Skilled labor that will
equipment. -Accurate
calibrations. provide quality work in
-We provide Houses
-Poor weather. less time
with reduced
-Use AutoCAD for
-Difficult to carry drawings in mobile. greenhouse gas
and handle emissions.
-Use sheet coverings
drawings in the
to cover the site in -Houses with thermal
construction site.
poor weather comfort and
-Incorrect conditions. appropriate humidity Early Adopters
calibration that levels.
results in unstable State Level
-Sustainable designs
structures. with a proper balance
of aesthetics,
accessibility cost
Existing effectiveness safety
and security.
Alternatives Key Metrics Channels
-Own an Equipment. -Time taken for -Letters.
-Work in good construction.
-Whatsapp.
weather.
-Payment of cost
-Gmail.
of construction.
-Colleagues.

Cost Structure Revenue Streams

Materials cost = Area x Cost per sq.ft. 5 years free maintenance.

=Area x 1000 After 5 years payment will be taken according to area of


the house.
Labor Cost per day= 1000