Competitive crushing

Unified global power

The new
LHD loaders:
The best of
two worlds

GROUND1.09
a magazine from sandvik mining and construction
Safety
is good
business
High-level
construction
in Finland

Cutting-edge
technology in India

Underground
revolution
Balwant Singh
Rathore and
Tushar Kanti
Chakraborty
of Zawar Mines in
Rajasthan, India,
enjoy the return
on investment.
WELCOME

30
High performance:

Saluting successful improved produc-


tivity with new
DTH hammers.
and profitable solutions
Welcome to Solid Ground! This is a magazine from India: Zawar Mines praises
all of us at Sandvik Mining and Construction. In it we
want to profile things important to people who work in the
new technology ......................................................4
mining and construction industry anywhere in the world. News: Delivery with control .........................10
In our magazine you will be able to read about how
other companies – maybe facing the same challenges as The new LHD line – safe and reliable .....12
you do – have found solutions that make them even more
successful. We will show how we can contribute to Arctic construction challenge ...................16
increased productivity through constant product develop-
ment – making your company more profitable. Increase your crushing power ...................22
But we also want to look in depth at issues that concern
all of us in our industry. In this issue we have focused on Close-up:
safety, something that affects us all and something that Testing diamond core drill DE150 ............25
Sandvik Mining and Construction works with constantly.
The business sense of safety ...................26
We work systematically with environmental,
health and safety issues, and we have achieved fantastic News: Efficient continuous mining .........30
results through our efforts: At the end of 2008 the
frequency of lost-time injuries was reduced by 50 percent The Big Picture:
compared to 2005! London gets ready for the Olympics......32
We also continue to invest in leading product develop-
ment, to create the most ergonomically correct and safe Product range:
working environment possible for the operators through
automation and remote control of machines.
Find the right product ......................................34

When we look to the future, towards the latter part of


2009, we realize we are facing a market situation we have
never seen before. No one was really prepared for the SOLID GROUND is a business and technology magazine from Sandvik
Mining and Construction, SE-811 81 Sandviken, Sweden. Phone: +46 (0)26–26 20 00. Solid
power and speed of the downturn that started in the Ground is published three times a year in English, Chinese, Finnish, French, German,
Portuguese, Russian, Spanish and Swedish.
second half of 2008, and this has resulted in drastic The magazine is free to customers of Sandvik Mining and Construction.
measures for many companies around the world. Published by Spoon Publishing in Stockholm, Sweden. ISSN 2000-2874.

Sandvik Mining and Construction has also been Editor-in-chief and responsible under Swedish publishing law: Jeanette Svensson.
Account executive: Anders Ribba. Editorial manager: Peter Wiklund. Art director:
affected by the global situation and has acted in accor- Erik Westin. Sub editor: Michael Miller. Language coordination: Sergio Tenconi. Layout,
dance with the new market conditions. But language editions: Nina Körnung. Prepress: Markus Dahlstedt. Cover photo: Christina
Sjögren.
I want you as our customer to know that
we have done this without losing our focus Please note that unsolicited manuscripts are not accepted. Material in the publication may
only be reproduced with permission. Requests for permission should be sent to the editorial
on you, the customer. On the contrary, we manager, Solid Ground. Editorial material and opinions expressed in Solid Ground do not
are increasing our availability to our necessarily reflect the views of Sandvik Mining and Construction or the publisher.
Correspondence and enquiries regarding the magazine are welcome. Contact: Solid Ground,
customers and are sure that together we Spoon Publishing AB, Kungstensgatan 21B, SE-113 57 Stockholm, Sweden. Phone:
+46 (0)8 442 96 20. Email: solidground@sandvik.com. Distribution enquiries email :
can come out of this downturn stronger solidground@spoon.se Internet: www.miningandconstruction.sandvik.com/solidground.
than before, when the market begins to
AUBEMA, EJC, EXTEC, Fintec, TORO, @YOURSERVICE, AutoMine, iSure and Solo are all
rise. registered trademarks of Sandvik Mining and Construction.

Solid Ground is issued for informational purposes. The information provided is of a general
Lars Josefsson nature and should not be treated as advice or be relied upon for making decisions or for use in
President a specific matter. Any use of the information provided is at the user’s sole risk, and Sandvik
Mining and Construction shall not be liable for any direct, incidental, consequential or indirect
sandvik Mining and Construction damage arising out of the use of the information made available in Solid Ground.

2 solid ground 1-09 sandvik mining and construction


CONTENTS 1.09
Getting ready:
London Olympics 2012. 32 Smiles for new
technology. 4

CHRISTINA SJÖGREN
LHD Line:
streamlined. 12
www.london2012.com

30

26
getty images

Safety builds
bottom line.

22 More power to
your crusher.

16
Esko Räty

Arctic challenge.

solid ground 1-09 sandvik mining and construction 3


sandvik Revolutionizes indian underground mining

Breaking
new ground
Rajasthan, india. The purchase of India’s first electro-hydraulic
long-hole rig has provided a solution to Zawarmala mine’s drill reserve
shortfall and put it at the cutting edge of the country’s underground
mining industry.

Some of the world’s earliest zinc the guy looking after the very first is counts is the return on investment. One
production took place in the area a great feeling.” thing that’s absolutely predictable
around Zawar Mines in the state of Hindustan Zinc’s decision to invest about today’s figures is that we’ll have
Rajasthan in western India. Archaeolo- in the DL310-7 was the result of an a positive return on investment in a
gists believe mining in the region dates urgent need to boost productivity and very short time span – maybe less than
back nearly 2,500 years. efficiency. a year.”
Today the mines are again at Situated just south of the famous
the forefront of mining innovation. “Lake City” of Udaipur, the region is Talks between Sandvik and
Here, 200 metres below the rich in deposits of lead and zinc. But Hindustan Zinc about the DL310-7
surface of the ancient Aravali Hills, Zawarmala mine was struggling to began in 2006. The mine’s management
India’s first electro-hydraulic achieve production targets of 1,000 had been impressed by the rig’s
long-hole drilling rig – the Sandvik tonnes of ore per day because drill performance figures around the world.
DL310-7 (Solo 5-7C) – is poised reserves were not being generated fast “We considered offers from a
to revolutionize its underground enough. number of companies, but after
mining industry. discussions it was agreed that Sandvik
Purchased by Hindustan Zinc Ltd, The DL310-7’s arrival has brought was the one to go with,” says Balwant
the rig was installed in Zawarmala confidence that these targets can be Rathore, Zawarmala mine’s manager.
mine – one of four mines at Zawar sustained and even surpassed. “A major factor in our decision was the
– in September 2008. Overseeing its “Every mine in the entire world quality of their after-sales service.
operation has been Associate Manager wants to enhance its production, and Response time is quick, and they have a
Tushar Chakraborty. once you’ve done your explorations very positive attitude.”
“I learned about the concept of and development, the first thing you Chakraborty explains the compa-
electro-hydraulic machines for need for this is adequate drill re- ny’s thinking: “Technically, we had
underground mining when I was a serves,” Chakraborty says. “This three questions. How can we enhance
student, but at that time no one had any machine takes care of that. our rate of penetration? How can we
idea when they would arrive in India,” “Obviously, the initial investments achieve a greater drilling depth? And
Chakraborty says. “To think that I’m are huge, but at the end of the day what how feasible is it to move the machine

4 solid ground 1-09 sandvik mining and construction


CHRISTINA SJÖGREN
“At the end of the day
what counts is the
return on investment.”
Tushar Chakraborty, associate manager

Balwant Singh Rathore and


Tushar Kanti Chakraborty
of Zawar Mines in Rajas­
than, India.

solid ground 1-09 sandvik mining and construction 5


business report “A major factor in our decision was the
quality of their after-sales service.
A need for Response time is quick, and they have
investments a very positive attitude.”
Since privatization in 2002, Hindustan Balwant Rathore, Zawarmala mine’s manager
Zinc’s metal production capacity has
soared from 204,000 tonnes per year
in 2002 to 754,000 tonnes per year in
2008. In the same time span Indian from one place to another? In all these DL310-7 was that an entire sub-level
imports of zinc have dropped from three parameters, the DL310-7 fit can be eliminated. The rig’s capacity
150,000 tonnes per year to 40,000 perfectly.” to drill holes accurately up to 38 metres
tonnes. Previously, two separate rigs – each long means that, on average, one extrac-
The company’s challenge is to requiring two operators – were in use at tion level and one sub-level can take the
continue to increase production and the mine: a conventional pneumatic rig place of one extraction level and two
sustain cost management in the face for upward drilling and a down-the-hole sub-levels.
of falling global metal prices. (DTH) rig to drill downwards. The
Investment in eco-friendly technology
DL310-7’s ability to rotate its boom 360 At Zawarmala, the cost of a
is a key component of its strategy.
Hindustan Zinc’s mission is to
degrees – and thus drill in all directions 100-metre sub-level is around 1.2
produce 1 million tonnes of metal per – enables it to take over the work of both million Indian rupees (18,000 euros),
year by 2010 and thereby become the and requires just one operator. so this will be a huge saving in cost as
world’s largest integrated producer of The Sandvik rig is already achiev- well as time and labour.
zinc-lead. ing consistent top-hole drilling rates, Rathore also points to other
In India consumption of zinc rose and bottom-hole drilling is currently advantages such as reduced noise
from 388 ktpa in 2005 to 492 ktpa in under stabilization. levels and ease of operation. There is
2008 and is predicted to remain the A further decisive factor convincing also an unexpected benefit: a massive
same in 2009. Hindustan Zinc to invest in the boost in staff morale.
CHRISTINA SJÖGREN

Balwant Singh
Rathore prepares
for a visit down the
mine.

6 solid ground 1-09 sandvik mining and construction


CHRISTINA SJÖGREN

Operating 200 metres


below the ancient Aravali
Hills, the new machine
boosts productivity in
the mine.

sandvik solution

Raising targets with confidence


The major challenge for the but targets still could not be met. of four to five times more drilling drilling straightaway.
Zawarmala team was to dramati- Since arriving, the DL310-7 has per shift than we were getting “And with the previous rig, we
cally boost drill reserves. achieved penetration rates of with the previous solution,” says had to change rods manually,
The Sandvik DL310-7 has between 0.9 and 1.1 metres per Zawarmala mine’s Manager whereas with the DL310-7, rod
enabled them to do this as a result minute and is routinely reaching Balwant Rathore. handling is fully mechanized and
of its: 300 metres per day. As a result, “Another major advantage is the they can be changed automati-
>>enhanced drill penetration targets have been raised to ease with which it can be cally.
>>extended drilling reach between 400 and 450 metres per transported. Previously, it took “We’re delighted with what has
>>ease of mobility and operation. day, which Sandvik is confident of three eight-hour shifts to move been accomplished so far, but we
realizing. the rig. First it had to be disman- have greater expectations from
Previously, the mine was achieving The DL310-7’s best perfor- tled, then we had to get a vehicle this machine and want to increase
upward drilling rates of 75 metres mance at Zawarmala to date is to tow it further down the mine, our production still further. We’re
per day – a quarter of the 300 160 metres in an eight-hour shift. and then it had to be reassembled definitely thinking of extending the
metres required to reach In November 2008 a total of 4,239 again. This rig’s integrated carrier advantages to other mines too.
production targets. To increase metres was chalked up. This rose eliminates the need for all that. It “I’m proud that it’s in Zawarmala
drill reserves, the mine’s manage- to 4,343 in December 2008. can easily be driven to the next mine that this rig is being used for
ment regularly outsourced drilling, “We have achieved an average location, and we can get on with the first time in India.”

solid ground 1-09 sandvik mining and construction 7


CHRISTINA SJÖGREN
“It’s a smooth, cool, good-
operating machine that is
going to revolutionize
mining in India.”
Chakanath Tamatat Premnath

Amit Kumar Bhaumik,


general manager,
Zawar Mines,
Rajasthan, India.

DL310-7 operator Chakanath oversee the DL310-7’s startup. The rig of Sandvik as our partners,” he says.
Premnath agrees: “It’s a smooth, cool, has proved so straightforward to handle “We have a lot of new developments
good-operating machine that’s going that three more operators have since coming in – new mines, new expan-
to revolutionize mining in India. been trained in-house. sions. So there’s a great deal of scope
Previously drilling was a big task, but for these machines.”
this machine makes it easy to achieve According to Zawar Mines General Chakraborty adds, “Hindustan Zinc
all our targets. I’m proud that I’m first Manager Amit Kumar Bhaumik, has taken a very big initiative to
man in India to operate it.” the DL310-7’s performance looks modernize its mines. We’re already
Premnath was one of two Zawarmala set to further investments in Sandvik working in a highly mechanized mine,
mine employees to be trained as rigs. and the arrival of this rig is a major
operators by a team of Sandvik “Hindustan Zinc has a very benchmark.”
engineers who came from Finland to ambitious future, and we think jean macfarlane

Prabhat Mittal, sales manager for Sandvik Mining and Construction:

“The DL310-7 has revolutionized the drilling scenario.”


“It’s a privilege for me to have scenario at Zawarmala and is a between Sandvik and Hindustan partnership with Hindustan Zinc
been part of the team that perfect example of the right Zinc Ltd. Sandvik perfectly to make preparatory arrange-
introduced the very first technology in the right place. This understood Hindustan Zinc’s need ments in the stope, and a team of
electro-hydraulic rig is an ideal for more drill reserves, and we Sandvik experts made two visits
long-hole drilling solution for worked closely with the com- from Finland to train operators
rig to India,” says sub-level stoping pany’s planning team for almost a and maintenance staff.
Prabhat Mittal, method in any year on feasibility studies and cost “Thanks to the quality and
Sandvik’s sales mine. comparisons. It was a dream come commitment of everyone
manager in “It has come true when they placed their order involved, the DL310-7 was soon
Udaipur. about as the in mid-2007. giving unbelievable results. It has
“The DL310-7 result of an “Our next challenge was to achieved as many metres drilling
has revolutionized excellent working establish the rig successfully. in just two months as the mine
the drilling partnership Again, we worked in close had previously achieved in six.”

Prabhat Mittal
8 solid ground 1-09 sandvik mining and construction
Hindustan Zinc
has a lot of new
developments
coming in.

zawar mines
Zawar Mines are owned by >>Achieved in the same year >>The company currently supplies In addition to Zawar, Hindustan Zinc
Hindustan Zinc Ltd, India’s only record zinc and lead metal around 82 percent of India’s zinc operates two underground mines
integrated producer of zinc and production of 426,323 demand. (Sindesar Khurd and Rajpura
lead. Formerly an Indian govern- tonnes and 58,247 tonnes >>The company prides itself on its Dariba) and one open-cast mine
ment enterprise, the company was respectively, up 22 percent and growth rate since privatization, (Rampura Agucha).
privatized in April 2002 and is now a 31 percent from the previous and its stated aim is to be a It also has smelter operations
subsidiary of Sterlite Opportunities financial year. world-class zinc company with in Chanderiya, Debari and
& Ventures Ltd and Vedanta >>Total mined metal production a zinc-lead metal capacity of Visakhapatnam. The mines have
Resources Plc. The government of was 629,019 tonnes, up 10 1 million tonnes by 2010. combined lead and zinc ore
India retains a 30 percent stake. percent from the previous year. >>A total staff of 1,160 of whom reserves of 7.18 million tonnes and
>>Net profit 44 billion Indian rupees >>Around 25 percent of the zinc 195 (15 executives and 180 an annual capacity of 1.2 million
(675 million euros) in the production is exported. The labour force) are employed at tonnes of ore. Zinc is grade 4.4
financial year ended March 31, remainder, and all the lead, goes Zawarmala. percent and lead is grade
CHRISTINA SJÖGREN

2008. to the domestic market. 2.3 percent.

solid ground 1-09 sandvik mining and construction 9


news

Crushing makeover
With extensive upgrades on all its systems,
Sandvik Mining and Construction has
relaunched its CH660 cone crusher. The
makeover was designed to meet the demands
of quarrying and mining customers. The
enhancements include a reinforced top shell
prepared for an optional temperature sensor in
the bearing, thus preventing major failure, and a
feed hopper bolted with lock nuts.

German high-capacity
provider fully integrated
Last year, Sandvik acquired the German
system technology provider AUBEMA Crushing

getty images
Technology GmbH. Their offering is now
successfully integrated into Sandvik’s already
broad range of mining crushing equipment.
The Sandvik CR series is ideal for a broad
range of high-capacity crushing applications. Sandvik enables electronic management for all companies.
These include coal, overburden and oil sands,
and the crushers may be integrated into
semi-mobile, fully mobile or stationary
materials handling systems.
More power from order to delivery
Full control always available with @YourService
In markets all over the world tools, consumables and spare including price and availabil-
and operations above and parts, Sandvik has introduced ity. Once the order is placed,
below the surface, online @YourService to provide ease the user gets a confirmation
solutions for procurement and and power in electronic order and can subsequently track the
order management are gaining management. @YourService order’s status.
ground. The appeal is the is accessible via a Web portal In addition, @YourService
ability to make informed or with a direct connection to offers a breadth of informa-
product selections, verify a company’s existing tion — catalogues and
prices, confirm deliveries and enterprise resource planning manuals, technical
track orders quickly and system. information, commercial
conveniently. Users get detailed product documents, service bulletins
For mining and construction information immediately, and more.

A tried and tested alternative to trucks


In-pit crushing and conveying — a flexible way to savings

Falling mineral prices and savings ranging from 18 to 82 A completely new, fully
tight credit could force mining US cents a tonne over trucks. mobile crushing advancement
companies to cut back on IPCC can be more flexible for on-face mining applications
production and new project than trucks, with their high is now available. With a
development in a bid to cut operating, maintenance and unique and compact design
Give me a break costs and conserve cash. energy costs. New emission from Sandvik, a true mobile
In response, in-pit crushing standards on diesel engines machine builder, the PF300
A new mid-range hydraulic hammer offers
and conveying (IPCC) points make them more emission- series is expected to effect
customers in demolition, recycling, quarrying
and other areas flexible options. The BR2577
the way to a partial or friendly but less efficient in a big breakthrough as an
features Sandvik’s Fixed Blow Energy System, complete substitute for trucks. terms of energy usage. essential part in the area
which ensures optimum impact energy with In 13 of 14 studies since 2007 IPCC is a proven process of in-pit crushing and
every blow, regardless of hydraulic flow comparing IPCC with that, with a fresh mindset, can conveying and offers signifi-
fluctuations. Its flexible design makes it truck-optimized pit designs, make a significant improve- cant benefits for mining
especially suitable for retrofit applications. IPCC generated operating ment to mining operations. applications.

10 solid ground 1-09 sandvik mining and construction


market outlook

Railroad revival
Adding tracks and expanding tunnels increases business opportunities

Hauling coal and timber Growing US demand for locomotives and bigger and beyond. “This is where
has been US railroads’ main Chinese goods and China’s tunnels to carry the amount we want to put our money,”
task for many decades, but huge appetite for coal of US traffic anticipated by says Sami Alfaraj, president
today they are increasingly causes the same need for a 2035, according to the of the Kuwait Center for
moving finished consumer railway build-out in China. Washington Post. Strategic Studies. “We
goods, often made in Asia. The railroads there carry a A new railway era has want to build railways all
This transition, together quarter of global train cargo also evolved in other the way to China.” The
with rising fuel costs has and passenger traffic on countries around the Chinese plan to spend $248
triggered a call for a railway only 6 percent of the world’s world. Kuwait is preparing billion through 2020 on
build-out. The old infrastruc- track, making its system the a massive build-out, 120,000 kilometres of
ture is plagued with poorly busiest on the planet. investing $132 billion in new track, according to
maintained lines and freight The US railway industry its “Silk City,” which BusinessWeek, although
jams. Many tunnels are too estimates that it needs encompasses an ambitious the profitability of the
low for double-stack railcar to spend $148 billion on rail network from Israel investment is somewhat
containers. new tracks, freight yards, through the Middle East doubtful.
CORBIS

solid ground 1-09 sandvik mining and construction 11


The LHD line will
guarantee more uptime
and less maintenance.

lhd loader line – safe and reliable

streamlined
loading
Merging two product lines resulted in the best of two worlds.
Meet the new streamlined LHD loaders from Sandvik.

12 solid ground 1-09 sandvik mining and construction


“We’ve really paid a lot of
attention to creating a
good working environment
for the operators.”
Olli Koivisto, LHD product line manager.

asd asd a asdasd asd as


dasd asdasd asdsd
fsdfsdf sd s d fs dasd

Sandvik’s new LHD loader line, “We have the most productive
featuring machines with capacities products on the market if you consider
ranging from 1 tonne to 25 tonnes, how many tonnes our customers can get
incorporates new safety and reliability out of the machine per hour,” he says.
features into every product in the range. By maximizing uptime, the LHDs
The result of a merger and streamlining allow underground hard rock mining
of two separate product lines, Toro and customers to boost their productivity.
EJC, the new LHD loaders were The reliability of key systems,
designed with the customer in mind. especially electrics and hydraulics, has
Drawing on key requests identified also been a major focus. Specific
in Sandvik’s Global Customer upgrades include the introduction of the
Roundtable, the product range has advanced Vehicle Control & Manage- Durability
several focus areas: safety, reliability, ment (VCM) System, which enables technology. With only 150 connections, and operator-
friend­liness are
durability and operator- enhanced features and failures are much less likely than with two of the focus
friendliness. Riku Kesäläin- utilizes a simplified system 800 points of connection. areas for the LHD
en, global product line design. “When it comes to the electronically range.
manager, loading and For example, an LHD controlled LHDs, we have introduced a
hauling, says some of the typically has more than 800 CANbus-based control system,” says
tangible effects of the electrical connections. But Olli Koivisto, LHD product line
improvements, based on on the Sandvik LH514, the manager. “In addition, we made
input from customers around number of connections has improvements in the machine electrics.
the world, are more uptime been reduced to about 150 We paid a lot of attention to developing
and less maintenance. Riku Kesäläinen by switching to CANbus a highly reliable electric system for

solid ground 1-09 sandvik mining and construction 13


“There are fewer parts,
which means less stock
and less complicated
ordering practices for
maintenance.”
Riku Kesäläinen, global product line manager,
loading and hauling.

these new upgraded loaders that


complements the electronic control
system.”

The electronic control system has


allowed Sandvik to more easily
introduce safety features, such as
interlocks, into the loaders. “It also
brings the benefit of having only one
display unit in the cabin, so the user
interface is a lot simpler and more
interactive than it used to be,” Koivisto
says. “A single display panel communi-
cates all the necessary information
about the loader to the operator. Any
alert appears as a pop-up window. It
makes it easier for the operator to focus In addition, the same control system identify and locate any potential
on making the tonnes.” software works for all the loaders. “It’s problems. “It saves a lot of time in
Furthermore, using the same parts on easy to upgrade the software,” Koivisto troubleshooting, which translates into
all the machines means improved says. “When we release new patches, productivity improvements and
maintenance. “There are fewer parts, it’s simple to upload those to the control uptime,” he says.
which means less stock and less system of any of these loaders.” Operator comfort, which means
complicated ordering practices for The control system also incorporates improved performance and productiv-
maintenance,” Kesäläinen says. onboard diagnostics, making it easier to ity, has also been a focal point, with

SANDVIK SOLUTION

The entire Sandvik LHD loader line has improved automation of safety features.
been designed with safety as the top “The new electronic control system allows
priority. Features include ground level daily us to more easily introduce safety features
maintenance, three-point mounting and such as interlocks into the machine, and to
dismounting, fall protection systems and better control those features on our
fire prevention. products,” Koivisto says.
In particular, all daily routine mainte- In addition, safety and a better-
nance points are now accessible from ­designed operator cabin go hand in hand.
ground level to reduce the chance of slips With improved lighting both inside
and falls. “You don’t have to climb onto the and outside the cabin, the redesigned
machine anymore to do your daily checkup operator cabin gives better visibility all
and maintenance,” explains Olli Koivisto, around. In addition, a new dash area
LHD product line manager. features ergonomically positioned controls
For monthly preventive maintenance for ease of use. Gauges and meters have
services, engineered access systems been combined into one LCD display.
around the unit allow safe access to the Access to the cabin has also been
top of the machine. Hoods and fenders are improved with wide steps and three-point
flat and free of tripping hazards, and mounting.
fall-arrest systems can be provided where Each unit is also redesigned to reduce
required by regulations. Other optional the risk of fire. Certified fire suppression
features include handrails. systems are available to further protect
The introduction of VCM has also people and property.

14 solid ground 1-09 sandvik mining and construction


Test customers
tech spec LHD Line
directly ordered
several machines.
Improvements introduced with the new LHD line include:
>>Vehicle Control and Management (VCM) systems throughout the line for ease
system: onboard diagnostics and of maintenance.
troubleshooting for reduced downtime >> Improved cooling – higher ambient
based on CANbus technology as well as temperature capabilities, longer compo-
simplified user interface by use of nent life.
interactive display. >> Load-sensing hydraulic system: reliable
>> Advanced electrical system: wiring piston pump delivers power only where
harnesses with Deutsch DT connectors for and when needed — more power but less
increased reliability and ease of service. wear on the entire system.
>> Redesigned operator cabin: easier access, >> Stronger bucket to increase bucket life.
improved visibility, efficient air condition- >> Safety: ground level daily maintenance,
ing, lower noise level. three-point mounting and dismounting,
>>Unified systems: joint electric and hydraulic fall-protection systems, fire prevention.

features such as air conditioning, sound


insulation, vibration reduction and
ergonomic controls. “We’ve really paid
a lot of attention to creating a good
working environment for the opera-
tors,” Koivisto says.
The LHD loader line was put to the
test in the toughest conditions at
Phalaborwa, in South Africa’s Limpopo With improved
province, where the Rio Tinto-owned operator comfort,
the LHD loaders
Palabora Mining Company operates a boost productivity.
massive underground block cave
operation to mine copper and magnetite.
“In the case of Palabora, it’s a block
cave, so their production is dependent
on LHDs,” Kesäläinen says. “The cycle
time and reliability of the LHD are the
Moving more, faster
key factors in their productivity.” The true test of a machine is how this mine,” says mining maintenance
well it functions in the field. Sandvik’s manager Ronald du Toit.
At Palabora, due to improved new LH514 proved itself during a Palabora was so impressed with the
machine control and operator ergonom- four-month trial at Palabora mine in performance of the LH514 during the
ics, the LHD was able to reduce its South Africa in mid-2007. Success at four-month test period that it
normal cycle time, contributing about underground block caves such as purchased the trial model, and
one extra bucket of ore per hour. “That’s Palabora depends upon efficiency at immediately ordered a second
a lot of buckets in a year,” Kesäläinen every step of the way. machine.
“Trackless mining also demands a “The LH514 has proved itself a
says. “It all adds up when you calculate
tight relationship between the mine very reliable machine and a nice
it based on the fleet number.” Ronald du Toit,
and the equipment supplier. There has progression on the Toro 1400,” says mining mainte-
Koivisto adds, “In addition to to be a mutual understanding of each Matthew Gili, Palabora’s general nance manager
improved cycle times, the electric other’s problems and a respect for manager for underground operations. at Palabora mine,
system proved to be very reliable and South Africa.
each other’s knowledge. This is why “It is a robust machine and stands up
the onboard troubleshooting extremely Sandvik is one of the suppliers to to hard use.”
helpful.”
charlotte west

solid ground 1-09 sandvik mining and construction 15


Russia

Finland

Sweden

circle
arctic
the

Ruka, Kuusamo

Challenging
construction
New Hydraulic Hammer AS A Primary Breaker in Lapland

lapland, finland. Construction workers in Lapland face


challenging conditions in beautiful surroundings. Sandvik’s
new hydraulic hammer gets a chance to shine at a luxury
chalet site on top of a mountain.

Helsinki

16 solid ground 1-09 sandvik mining and construction


It is essential to be able
to turn the devices on
in minus 20 degrees
Esko Räty

Celsius.

solid ground 1-09 sandvik mining and construction 17


Snow, ice and temperatures down to cannot be used for primary breaking When Salmivaara heard of the new
minus 30 degrees Celsius – these are the here. The tried and tested answer is a BR2155 hammer, he was ready to make
challenging conditions for construction hydraulic hammer. the purchase decision right away. “Our
work in wintry Lapland. Koillismaan Työkonepalvelu Oy, the company has been eager to acquire the
Lapland is also a place of amazing company in charge of excavation work best possible machinery since the
natural beauty, attracting tourists from at the site, has used hydraulic hammers 1970s”, he says, “and we have been
all over the world with unique opportu- as primary breakers for more than 20 especially interested in new technology.
nities for outdoor life. The most popular years. The company was also the first This is how we maintain our competi-
ski resort in Finland is situated on the in Finland to purchase Sandvik’s new tive advantage and market value.”
Ruka hillside near the Arctic Circle. In a BR2155 hammer. Results have been
spectacular spot on top of the mountain very positive since it acquired the The company has also been eager to
are eight luxury chalets, and a ninth is hammer last autumn. try out new methods. It was the first to
currently under construction. “It’s an excellent, effective hammer,” use a hydraulic hammer as a primary
The location demands special says Teijo Määttä, an excavator breaker at least in the Ruka area, and
requirements for construction work, as operator who has worked at various possibly in all of Finland.
there are other buildings and structures sites in the Ruka area for more than Salmivaara recalls that time in the
in the vicinity, and the chalets are built 10 years. 1980s. “When we first introduced this
into a steep rock slope. Explosives “We had used the old E65 hammer method, others thought it was sheer
for a few years, and our experiences madness,” he says. “Now we have used
were extremely positive,” says Timo hammers as primary breakers for more
Salmivaara of Koillismaan Työkone­ than two decades, and others have
palvelu Oy. followed our example. This method

“Our company has been eager


to acquire the best possible
machinery since the 1970s.”
Timo Salmivaara, Koillismaan Työkonepalvelu Oy
Esko Räty

Site on top
of a mountain
Ten luxury chalets have been
planned at a construction site on
top of the Ruka hillside in Kuusamo,
Finland. Eight of them have been
completed, starting around five
years ago, one is under construc-
tion – it will have three floors, one
of which will be inside rock – and
there is one empty plot left.
Challenges include cold weather,
the site’s location on a steep rock
slope and the fact that there are
other buildings in the vicinity. Timo Salmivaara and Teijo
Esko Räty

Määttä of Koillismaan
Työkonepalvelu Oy.

18 solid ground 1-09 sandvik mining and construction


Juho Tastula
Timo Salmivaara, Koillismaan Työkonepalvelu

Integrated lubrication device


optimizes the use of grease
One of the optional features “BR2155 has taken a long Other optional features of suppressed, and its bottom
the user can choose for the step forward in maintenance,” BR2155 include a safety valve, plate is replaceable.
Sandvik BR2155 hydraulic says Timo Salmivaara of which protects the hammer from The new hammer boasts a
hammer is an integrated Koillismaan Työkonepalvelu. severe hydraulic installation high power-to-weight ratio:
lubrication device mounted “The lubrication solution is abuse, and a heavy-duty housing Although while its working
inside the hammer. The device ingenious. Lubrication takes with a stone claw, aimed at weight ranges from 1,190 to
optimizes lubrication, providing place automatically, and demanding applications. 1,220 kilograms, the impact rate
maximal effect with the as new grease is inserted with a The basic model provides the is 490 to 760 blows per minute.
smallest possible amount of special filling device, there is user with the latest in breaker The hammer enables the use of
grease. Besides saving money, no longer any need for tubes. design. Its slim body ensures smaller carriers than its
the new solution helps the The integrated lubrication good visibility and accessibility. predecessors. It is designed for
environment by minimizing the system is also less susceptible Its robust housing, made of carriers in the 20- to 22-tonne
use of grease. to vibration.” wear-resistant steel, is sound operating weight class.

saves costs, as there is no need to and then add retrofit options to suit the ing the hammer with a bucket and vice
protect the surroundings against application and the rock. Available versa can be done quickly and efficient-
vibration and flying stones, unlike when options include an integrated lubrica- ly. This is a huge benefit for the
using explosives.” tion device, a safety valve to protect the customer.”
Seppo Pihlajamäki, product line hammer and a heavy-duty housing for Koillismaan Työkonepalvelu has so
manager for Sandvik breakers, agrees. demanding applications. far used the hammer for trenching and
“In regional building the great primary breaking. “It’s an excellent
advantage of hydraulic hammers over The hammer can be used in hammer,” Salmivaara says. “There’s a
explosives is that the required safety demolition, trenching and boulder substantial improvement in the blow
distance is only 10 to 20 metres,” he breaking. “Before, the user had to power. It’s also a bit more compact and
says. “Therefore, work at the site can buy hammers with three different slimmer than the earlier models we
continue normally during primary specifications,” says R.S. Raghavan, have used before. Therefore it fits well
breaking.” general manager for Sandvik Mining in small spaces, which is important in
The BR2155 hammer is a versatile and Construction, product line breakers. trenching.”
and flexible product. A key feature is its “Now this one single hammer can be When working close to other
modular design, which means the user used for many different applications.” buildings, low noise levels are a definite
can choose the inexpensive basic model As Pihlajamäki points out, “Replac- plus. Sandvik aims at minimizing all

solid ground 1-09 sandvik mining and construction 19


Esko Räty
R.S. Raghavan

The hammer offers a


substantial improvement
in blow power.

SANDVIK SOLUTION

Devices for demanding conditions


In Lapland, hydraulic hammers
and other devices have to stand
“Sandvik is well experienced in
designing hammers for hard and
“We understand the
the test of cold. This is no problem
for Sandvik hammers.
difficult working conditions. Our
products are well suited for
importance of performance
“One criterion when developing
new products is that they need to
demanding boulder breaking and
primary breaking. We understand
and reliability in extremely
function in the local conditions,”
says Seppo Pihlajamäki, product
the importance of performance
and reliability in extremely
demanding conditions.”
line manager for Sandvik breakers. demanding conditions.”
“In Lapland it is essential that you and Construction, product line and we are constantly redesigning
can turn the devices on in minus The new hydraulic hammer breakers, emphasizes the our products. Design and
20 degrees. If the temperature has been well received by importance of customer feedback development is a continuous
drops to minus 30 degrees, the customers. So far, BR2155 has when developing products. improvement process.
hammer blade needs pre-heating. been sold in 50 countries around “We are driven by customer “Sandvik is launching several
Sandvik hammers are designed the world. needs and market demand,” he new products in the near future,
to handle both extreme cold and R.S. Raghavan, general says. “Customer feedback is shared and they will all have the same
heat. manager for Sandvik Mining with our engineering department, flexible concept as BR2155.”

20 solid ground 1-09 sandvik mining and construction


kinds of pollution, including noise. Koillismaan Työkonepalvelu Oy
“BR2155 comes standard with a
noise-suppressed housing,” Pihlajamäki
says. “This feature is especially
Invests in new
important in urban environments.”
Sandvik’s commitment to the
devices and training
environment and a green future begins
Based in Kuusamo, Finland, producers about how to get the
long before its products arrive on site. Koillismaan Työkonepalvelu Oy is an products to this country. In this way,
As an environmentally aware company, enterprise that offers excavation, our company maintains its leading
Sandvik has long recognized the need lifting and special transport services. position in technology.”
to reduce the environmental impact of The number of employees varies Besides acquiring new technology,
its products and the processes used to between six and eight. the company invests in training its
manufacture these products. A special feature of the company staff. “We find it important to keep
“The use of the latest model BR2155 is its pioneering spirit. “We have the employees’ skills up-to-date,”
produces fewer engine emissions and actively invested in new products Salmivaara says. “We have also made
and technology, and our company apprenticeship contracts, and many
less accumulated noise,” Raghavan
has been the first user of many of our employees have learned their
says. “The addition of a
products in Finland,” says Maija occupations through working with us.”
patented sealing system Salmivaara of Koillismaan Koillismaan Työkonepalvelu trusts

Esko Räty
ensures that hydraulic oils do Työkonepalvelu. “As we are eager Sandvik as a supplier and developer
not find their way into the to try out novelties, we have also of products. “I’m certain we will use
ground.” worked in cooperation with factories the same supplier in the future when
news-lab oy in the industry.” there’s need for new equipment,”
Salmivaara likes to visit interna- Salmivaara says.
tional fairs. “I often see interesting Sandvik breakers are sold,
new products that have not yet been serviced and supported in Finland
imported to Finland. Then I talk to the by Marakon Oy.

R.S. Raghavan

There will be a total of 10


luxury chalets on the top
of the mountain.
Esko Räty

solid ground 1-09 sandvik mining and construction 21


Duncan McGregor and Kauko Juuri
feel expectant, having a global
presence and improved after­
market support.

increased crushing power

a unified brand
leading the way
Advances in mobile crushing equipment in the past decade
have raised the profile of the contractor segment, and the
acquisition of two UK leaders in the field has opened up a world
of new customers.
22 solid ground 1-09 sandvik mining and construction
The mobile crushers are compact,
stable and low in weight.

In the spring of 2007 Sandvik


acquired two United Kingdom
“What used to be track-mounted chassis designs with
Sandvik’s quality crushing equipment.
manufacturers of mobile crushing and
screening equipment: Extec Screens
impossible to achieve The QH330’s cone plant features a
Sandvik CH430 crusher, developed
and Crushers Ltd, near Derby,
England, and Fintec Crushing and
with mobile equipment with the Sandvik cubical shape crushing
technique.
Screening Ltd, close to Belfast,
Ireland.
is now possible.” In addition, Fintec and Extec have
taken on all Sandvik corporate policies
Duncan McGregor, sales and marketing director
As leaders in the design and and guidelines, such as Fair Play, which
manufacture of mobile crushing and takes into account not only financial
screening equipment, including competitive product line of tracked goals but also environmental and social
consumables and services to the mobile crushers and screens.” responsibility when making business
international construction industry, Extec and Fintec benefit from decisions.
Extec and Fintec have provided a way Sandvik’s global resources and Duncan McGregor, sales and
for Sandvik to add mid-size and light technical know-how. “Sandvik brings marketing director, echoes Juuri’s
equipment to its customer offering, advanced crusher and screen product sentiments that the biggest customer
positioning it to become an even technology combined with excellent advantages of bringing Fintec and Extec
stronger supplier in a rapidly growing process knowledge,” Juuri says. “In together under Sandvik are its global
industry. other words, we are introducing two presence, in particular worldwide
These acquisitions have opened new mobile cone crusher plants distribution, and improved aftermarket
up new customer segments for all equipped with cone technology that support.
parties. “Sandvik will bring its many customers consider to be the best
global network with access to quarry in the world.” Mobile crushing equipment has
and mining customers,” says come a long way in the past 10 years, he
Managing Director Kauko Juuri. For example, the new QH330 says. “What used to be impossible to
“Extec and Fintec bring access (former Fintec 1080) track-mounted achieve with mobile equipment is now
to contractor customers and a cone crusher system combines Fintec’s possible. The contractor segment,

solid ground 1-09 sandvik mining and construction 23


“We have not been shy in saying that we machine colours. “Going to one brand
increases customer awareness of
will be undisputed No. 1 in the mobile Sandvik’s full offering,” Juuri explains.
“Branding and segment strategy helps
crushing and screening business.” Sandvik to improve and broaden services
to a variety of customers by using the
Kauko Juuri, managing director
wider breadth of our organization.”
Although he admits “the economy
will have an effect,” Juuri believes the
Sandvik family is well positioned for
complete with its own special business quick recovery. “Regardless, you will
logic, has become a major part of the see many new Sandvik mobile crushing
materials processing business all over and screening products in 2009,” he
the world, and Sandvik has the right says. “Sandvik has successfully
background to address the needs of this survived various economic situations
particular customer segment.” for almost 150 years. We’ll surely also
According to McGregor, the come out from this recession stronger
traditional business where Sandvik is than before.”
particularly well aligned consists of McGregor concurs with Juuri’s
customers who are not contractors. cautious optimism: “The next couple of
“They own and sell minerals, whether years are going to be very difficult for
for construction materials or for what us. I remain optimistic that our
they are worth in terms of content. This customer business will be among the
is a new area of development for the first to come out of recession as it has
acquired businesses but quite normal done in previous recessions, and we will
for the heavier range from Sandvik, for be in the best shape to respond and
example.” improve our market share.”
Juuri is also confident in stating the
DUE TO Fintec’s and Extec’s company’s goals for the future: “We
extensive product line, Sandvik has have not been shy in saying that we will
chosen to unify its mobile crusher and be undisputed No. 1 in the mobile
Duncan McGregor is optimistic: “Our
customer business will be among the
screen range under a single brand, signi- crushing and screening business.”
first to come out of recession.” fied by new model nomenclature and CHARLOTTE WEST

tech spec mobile crushers

Easily combined units Sandvik offers a wide range configurations to produce a


of mobile crushing for range of fractions. With a high
quarrying, recycling, contract- level of automation and
ing and mining applications. excellent interlocking
Available on crawlers or on characteristics, several units
wheels, they are compact, can be controlled by a single
stable and low in weight. Since operator.
the units are compatible with
one another, it is easy to
Units on wheels
combine two, three or more
Sandvik wheel-mounted
units, depending on the
crushing and screening
fractions required.
units are stable, highly
productive and very flexible.
Units on crawlers They can be linked together
Sandvik track-mounted to produce a range of
crushing units combine high fractions. Certain models
mobility with high productivity on their own can produce
and great flexibility. They can three or four different fractions
be linked together in various plus fines.

24 solid ground 1-09 sandvik mining and construction


close-up DE150 diamond core drill

Drilling deeper and larger holes


Limited supplies, lower ore crystalline rock type in and meet the goal we had, when it came to added
grades and smaller discoveries Forsmark, Sweden, by diamond namely to drill three holes technology resulting from the
demand tools that can reach core and raise drilling according to a set standard,” most recent development at
deeper and more complicated contractor Drillcon. says Mikael Berglund, CEO of Sandvik Nora AB, mainly the
ore bodies. Sandvik is “We had a suitable project, Drillcon. electro-hydraulic power pack,
responding to meet the need an assignment for the As the new prototype is the feed boom and the control
by creating the DE150 Swedish Nuclear Fuel and different from previous panel.
diamond core drill. Waste Management Co., where Sandvik models, Berglund “I am happy with the results.
The diamond core drill we had a chance to see if the says he was in particularly It worked well. We had no
DE150 prototype has recently DE150 could live up to interested in how the machine problem with the new
been tested on the hard our expectations lived up to expectations technology,” Berglund says.

Testing the
Sandvik DE150
on hard
crystalline rock
in Forsmark,
Sweden.

solid ground 1-09 sandvik mining and construction 25


getty images
Fostering
a culture
of safety
After thousands of years of mining and
countless disasters, the industry that provides
many of the materials we use and value in the
world today is undergoing a safety revolution.

26 solid ground 1-09 sandvik mining and construction


SANDVIK RESEARCH

Other Sandvik solutions for improving safety


Sandvik is continuously deve- EJC brands, were designed with which it hopes to spread to regional Like the AutoMine, Tele Remote
loping new solutions to solve all safety as the top priority. All daily competence centres around the Drilling allows the operator to stay
kinds of problems when it comes routine maintenance points are world. In the first phase, training is clear of hazardous areas while at
to safety, ergonomics and tech- now accessible from ground level to available for Sandvik’s surface top the same time increasing
nology in general. reduce the possibility of slips and hammer drilling. productivity.
At the MinExpo 2008 trade fair in falls. For monthly preventive “Simulation is a forgiving training
Las Vegas in September 2008, maintenance, engineered access method,” says Arto Suokas,
attended by 30,000 mining systems around the unit allow safe manager of the Talvivaara mine in
professionals, Sandvik unveiled its access to the top of the machine. Finland. “We can repeat the
new LH 514 loader line. Its design, Hoods and fenders are flat and free exercises as many times as needed
improved serviceability, safety and of tripping hazards, and fall-arrest without any risks to the trainees or
operator-comfort features address systems can be provided where to the machines and tools.”
key customer requests received required by regulations. If simulation increases safety at a
from the company’s Global At the North Karelia Adult Educa- worksite, so do Tele Remote Drilling
Customer Roundtable. tion Centre in Finland, Sandvik systems, which enable a drill
These hard rock mining loaders, launched its first simulator-­aided operator to control a production
which replace the popular Toro and operator-training programme, drill from a remote location.

Automated
mining products
are supplemented
from safety
While mining fatalities periodically safe systems of working and human injuries in American mines. Between research.
capture world headlines, advances in behaviour as it is about engineering,” 2006 and 2007, there were 69 deaths
technology and mining methods says Stuart Evans, global environment, and 11,800 injuries.
together with proactive risk assessment health and safety director at Sandvik Half of the active mines in the United
methods are making mines safer. Taking Mining and Construction. “It is vital to States were completely free of lost-time
a proactive approach means assessing develop a strong safety culture in any injuries in 2007.
risks before anything happens. workplace. Good safety is good While China can claim to have some
“This is a big change for the industry,” business, and it is mines with excellent
says Professor Jim Joy of the Minerals increasingly a key safety records, it had
Industry Safety and Health Centre element in becoming an the world’s deadliest
at the University of Queensland in equipment supplier of mining industry in
Australia. Professor Joy is an expert choice.” 2007, claiming 3,800
consultant for mining industry regula- lives, according to
tors and major mining companies Sandvik Mining and the China’s State
alexander farnsworth

around the world. Construction implement- Administration of


Even though many countries have ed its own environment, Work Safety agency.
declared a policy of zero tolerance of health and safety policy Many people believe
fatalities, serious mining accidents in 2007, and Evans says this number under-
still happen. One of the latest was in the safety systems and states the full figure
November 2008 when an explosion culture within the considerably.
in a coal mine killed 12 miners in company are getting Stuart Evans
Petrila, Romania. stronger day by day. In South Africa,
“In the last 20 years, there have By the end of 2008, the 240,000 miners took
been some dramatic improvements frequency of lost-time injuries at part in a nationwide strike in December
in mining safety around the world,” Sandvik Mining and Construction 2007 to protest poor safety standards.
Professor Joy says. “Much of this is sites around the world had decreased The strike was in response to an
due to new technologies and methods, by 50 percent from 2005. incident in October in which 3,000
like long-wall mining for coal, which According to the US Department of miners were trapped in a gold mine for
ironically save lives but also pose their Labor’s Mine Safety and Health a day. In 2006 there were 199 fatalities.
own risks.” Administration, between 1936 and 1940 “Workers are saying enough is
“Mining safety is as much about there were 1,546 fatalities and 81,342 enough,” Erick Gcilitshana, head of

solid ground 1-09 sandvik mining and construction 27


Sandvik develops
solutions for keeping
workers away from risks.

SANDVIK SOLUTION

Keeping mining workers safe


There is surely no better operated remotely, more The company has been in the mine and the primary
way to improve safety than productively, longer and developing automation crusher.
to get humans away from the with less wear and tear, technology since 1990. Under South African law,
risks entirely. thereby reducing the cost Today AutoMine technology mining equipment with opera-
Enter AutoMine, Sandvik’s per tonne. is present in some major mines tors onboard has a maximum
automated ore-collection “People increasingly want around the world. allowable speed of 16 kilo­
system, a comprehensive safer and more efficient One of the first AutoMine metres per hour. But according
solution for improving safety solutions,” says Taina Heimonen, installations, commissioned to the Engineering and Mining
and efficiencies for underground global product line manager, in 2005, was at the DeBeers Journal, AutoMine allows the
mining operations through mine automation, at Sandvik diamond mine in Finsch, haulers in Finsch to reach
automation technology. Mining and Construction. South Africa. There, autono- speeds of 35 km/hr, driven
With AutoMine, loaders “This is one of the driving mous trucks navigate a haulage from the comfort and safety
in underground mines are forces in mining.” loop between loading points of a remote control room.

28 solid ground 1-09 sandvik mining and construction


An expert’s perspective
health and safety at South Africa’s
National Union of Mineworkers, told
Getting beyond the standards is vital
African Business magazine. “Safety is
needed now. Employers need to take a “One of the major safety earthmoving equipment to
leadership role and invest in safety in challenges in the mining industry suggest safety improvements to
is to better understand the the original equipment
the same way they invest in produc-
human factor,” says Professor manufacturers.
tion.” The underreporting of lost-time Jim Joy of the Minerals Industry A similar roundtable event
injuries has been a problem in the Safety and Health Centre at the will be organized shortly for
industry, in part due to the now largely University of Queensland, underground drilling equipment.
discontinued process of giving bonuses Australia,
for an injury-free record. Today, gross “It is not just about behaviour So what does the future
and willful negligence that leads to a modification,” Professor Joy says. hold?
fatal incident is punishable in many “It is about understanding why “There is definitely a trend
countries by large fines and prison people do what they do and towards mass mining [producing
sentences for senior company manag- managing that.” more ore with less energy],
Another challenge is to increased automation, even
ers. “The trend in the industry, although
design-out risk on mining Jim Joy moving processing plants
it is still new, is to move away from machinery above and beyond underground where the only
lagging indicators [the number what international and local To this end, Professor Joy thing coming out of the mine is
of injuries or fatalities] and look standards stipulate. helped organize the Earth a gold ingot,” says Professor Joy.
at leading indicators [what has been Many standards dictate Moving Equipment Safety Round “There are a lot of major
done to prevent incidents] as a measure thickness, noise and vibration Table in 2006, involving a group innovations out there, but I don’t
of having done a good job,” Professor levels on heavy machinery but of major mining companies. The know how the current financial
Joy says. “It is about rewarding don’t take into account issues result was a nuts-and-bolts crisis will affect this. Either way,
proactivity.” about operating or maintaining analysis of every system, control innovation always poses new
the equipment. and piece of hardware on risks and hazards.”
The winds of safety are blowing
through the industry as mining vehicles
and tools increasingly feature more
ergonomic and safety-related improve-
ments. The new Sandvik LHD line of being presented — everything from technology to use, as antennas and other
loaders, for instance, provides ground new helmets and lighting systems to communication technology are not
level and easy-to-access service and harnesses, boots and simulation tools fail-safe when working underground.
maintenance points on the machine. — to promote safety in mines. Equipping miners with electronic
(See sidebar and pages 12–15.) After a dozen miners were killed in chips in their headlamps is one
alternative that uses a through-the-earth
ultra-low-frequency paging system to
ensure miners can be contacted in the
“The trend in the industry is about event of an emergency.

rewarding proactivity.” While fatality and lost-time injury


rates have improved in recent years,
Professor Jim Joy of the University of Queensland in Australia they differ between countries and
commodities, and the mining industry
as a whole is still underperforming
when it comes to safety.
“We are still a magnitude away from
Advances in computer technology the disaster at the Sago Mine in West what a community would consider safe
are increasingly allowing companies Virginia in the USA in 2006, the US and acceptable,” says Professor Joy,
like Sandvik to develop systems to Congress passed a bill that requires citing social research that defines safety
operate machinery remotely. Sandvik mining companies to improve the as one fatality per 100,000 people
was first on the market with its means of safely rescuing people working in an industry per year. The
AutoMine system where haulage trucks involved in mining incidents, including corresponding figure for a leading
in a mine are operated not only keeping track of where each worker is mining company is one death per
remotely but also automatically (see deep underground. 10,000 people per year.
sidebar). While mining companies have until “As you can see, there is still a lot
Developments are never-ending. 2009 to implement the Miner Act of of work to do,” he says.
New mining products are continuously 2006, there is little consensus on what alexander farnsworth

solid ground 1-09 sandvik mining and construction 29


news

THE QUOTE

“The two roadheaders


The Sandvik MC350
completes the

have never been out


product range for
the coal industry.

of operation since they


were set up back in
November 2005.”
Bernt Olsson, construction manager
at Citytunneln, Malmö, Sweden

How to cut and keep running


Continuous mining with efficiency and safety focus
In response to customer Sandvik is also launching a bolting operations, with an
demand in the coal industry, new range of mobile roof average operation taking only
Sandvik Mining and Construc- bolter. The range comprises, two minutes per bolt and
tion has introduced its first among many others, the providing the capability of
continuous mining machine, DM100, DM200 and DZ700 installing four bolts per metre.
the MC350, for place-change series. The DM100 and The ergonomics of the
room-and-pillar operations. DM200 with their mid-seam bolter design makes it
Sandvik’s decades of operations are designed to be comfortable and safe to
experience in rock-cutting ideal partners for the MC350. work eight-hour shifts. The
applications has been put to The DM100 series features a DM200 comes with arm-feed
good use in the design of the walk-through chassis as a bolters, while the DZ700
new continuous miner. In safety feature. The DM100 is a features longwall recovery
particular, the new machine has track-mounted machine that pan wall bolters. It all adds
been designed to support
reliable operations with high
moves under its own power.
As time is of the essence in
up to state-of-the art solutions
aimed at efficiency and high
Excavation
machine availability.
To complement the MC350,
stabilizing roadways, this
two-man operation speeds
productivity without compro-
mising safety.
quality in focus
Sandvik’s new tunnel planning software
iSure is an efficient tool for managing
tunnelling project information. The iSure
software consists of three modules – iSure
Tunnel, iSure Report and iSure Analysis.
“The iSure software takes underground
excavation planning to a new level,” says
Pertti Koivunen, product manager for
tunnelling at Sandvik. “It supports
high-quality excavation and offers an
efficient way of managing the process. I’m

New DTH hammers raise productivity


convinced that iSure users will find their
tunnelling projects advance faster and with
much better results.”
Three new families lower the cost and facilitate system tailoring A major goal for the software develop-
ment was to make it easy to find optimum
For surface and underground cemented carbide, and a can use drill bits with various parameters for drilling and blasting.
mining, quarrying and comprehensive range of drill open-standard shank designs, “The iSure software supports drill pattern
deep-hole drilling, Sandvik pipes, tools and accessories, and the RH450 series is of a optimization and transfer of approved
parameters into new patterns,” says Martti
Mining and Construction Sandvik vows to raise robust construction that gives
Keskinen, development manager at
launched Sandvik RH550, the productivity and make it high penetration rates in harder Lemminkäinen Infra Oy. “Information on
first of three new families of easier to tailor the drilling rocks. different rock types is continually added to
Down The Hole (DTH) system. The coming RH350 Top of the range is the the library. The use of this information
hammers in late 2008. series are simple, lean, patented Sandvik RH550 reduces the need for empirical research
With the new XT48 button dependable, low-cost hammers series, with advanced design and the time required to calculate the
bits, the world’s toughest based on a proven design that and the highest performance. correct pattern.”

30 solid ground 1-09 sandvik mining and construction


Gerardo Artiaga.
porträtt
“Here we learn
by doing … I’m
developing
myself in a Belenis Olea has
completed the

professional Sandvik Appren-


tice Programme,
enabling him to
sense.” get more advanced
tasks.

Apprentice programme benefits all


Getting future competence assured

Sandvik is convinced that as part CEIM is renowned in the area of operators to manage the depart- taken to the workshops where we
of its long-term development plans, competency development in the ments of mine operations, hydro- apply what we have learned in the
one fundamental strategy must be mining community. metallurgy, concentrate plant, classroom. We learn not only from
personnel development and The apprentices, besides mine maintenance, crushing and books but from practice.
training. The Sandvik Apprentice acquiring knowledge and technical conveyor belts. The programme “Now that I’m working for
Programme develops competent competence through the includes a 240-hour basic training Sandvik, I’m very pleased because
technicians who can add value to programmes, also develop skills cycle and an advanced cycle of 320 I’m developing myself in a
the mining industry. In return, it such as teamwork and leadership, hours where self-care, leadership, professional sense,” he says.
enables apprentices to enhance an integral part of Sandvik’s teamwork and effective communi- “Moreover, we’ve now been offered
their own employment possibilities corporate social responsibility cation are also taught. an English course.”
and quality of life, besides acquiring policies. “There is a great difference Clearly, Sandvik’s strategy is
an education in terms of values and The apprentices combine between any other training centre paying off, and the future of
behaviour that guarantees their studies at CEIM’s premises with and the CEIM/Sandvik scheme, Sandvik — and the industry in
future development. three-month practical application because here we learn by doing,” general — will be assured and
In South America, Sandvik cycles at any of Sandvik’s works says Belenis Olea, who successfully enriched through a steady stream
partners with CEIM, Chile’s mining in Chile. The main objective of the completed the programme. “After of highly skilled and deeply
and industrial training centre. programme is to prepare future the theoretical classes we are motivated individuals.

solid ground 1-09 sandvik mining and construction 31


the big picture

Sandvik makes way for


Olympic Games 2012
Just a few months after the Olympic Games closing ceremony in
Beijing, a construction site for the 2012 games in London was
established. Around 190 buildings have to be removed to make room
for the Aquatics Centre and the rest of the arenas, and Sandvik
Mining and Construction is there.

To prepare the area for London’s foundation materials, helping the of soil are removed to prepare
Olympic Stadium, Olympic Village Olympic organizers to create the for swimming and diving pools.
and Aquatics Centre, Sandvik’s ‘sustainable games,’” says Eugene The piling platforms for the pool
mobile crushers and screeners Lyons, construction segment foundations are formed from
have been used to demolish manager for Sandvik Mining and recycled demolition material
buildings across the Olympic Park Construction in the UK. from the Olympic Park site.
area. In the demolition stages, the The work on the Aquatics The eye-catching Aquatics
machines process waste materials Centre is now under way, creating Centre will host swimming,
such as concrete, dirt and rubble. foundations for the platforms that diving, synchronized swimming,
“We crush and separate the waste will support the sweeping wave-like water polo finals and freestyle
materials that are used to produce roof. Every day nearly 3,000 tonnes swimming.
www.london2012.com
The Aquatics Centre will be
the gateway to the Olympic
Park in London 2012.
product range

The family. Sandvik offers the world’s most comprehensive range of


equipment and tools for customers in mining and construction.
Find the complete family at www.miningandconstruction.sandvik.com

Rock tools and systems


Deep impact. Sandvik offers the world’s most comprehensive
• Cutting tool systems
range of tools for exploration, rock drilling, raise boring, coal • Tophammer drilling tools
cutting, mineral mining, tunnelling, trenching, road grading and • DTH drilling tools
road planing. As world leaders in steel and cemented-carbide • Raise boring tools and systems
technology, our products have revolutionized the rock drilling • Rotary drill bits
industry, while our advanced tool systems for machines such • Exploration tools and systems
as continuous miners, roadheaders and trenchers raise • Rock support tool systems
productivity sharply.

Drill rigs and rock drills • Rotary blasthole drill rigs


King of the pit. Sandvik rock drilling equipment is renowned • Waterwell drill rigs
for its high quality, reliability and productivity. Every machine we • Surface DTH drill rigs
• Surface top hammer drill rigs
make is designed to give the lowest possible cost per metre
• Dimensional stone drill rigs
drilled and a low life-cycle cost. To meet the needs of all
• Underground drill rigs
customers, we offer an extremely wide choice of machines, • Surface exploration drill rigs
ranging from robust and simple drill rigs to semi-automated • Underground exploration drill rigs
units that give extraordinary production rates and low total • Handheld rock drills
cost.

Load and haul machines • Underground loaders (LHDs)


The heavy loaders. Sandvik underground loaders and haul • Underground trucks
trucks are extremely productive and reliable. They are vigorous, • Reef dozer
• Multi-purpose vehicles (MPVs)
highly manoeuvrable, sport enormous capacity for their size
• Coal loaders (LHDs) and trucks
and return a very low cost per tonne.
• Shuttle cars

Mining and tunnelling


machines
• Continuous miners
Keep on going. Sandvik continuous mining and tunnelling • Continuous bolter miners
equipment reflects the unique advantages of total in-house • Continuous hard rock miners
control over machines and cutting tools alike. As a world leader • Continuous reef miners
in this field, our know-how is extensive. Optimized cutting • Roadheaders – tunnel miners
technology and machine design result in high productivity, long • Box hole borers
service life and low total costs.

34 solid ground 1-09 sandvik mining and construction


• Primary gyratory crushers
• Jaw crushers
Crushers and screens • Roll crushers
• Impact crushers
Maximum size-reduction. Sandvik crushing and screening • Hammer mills
equipment is engineered for maximum productivity. We offer • Cone crushers
advanced, rational solutions for any size-reduction challenge, • Screens
stationary or mobile. We can upgrade existing plants, deliver • Feeders
complete solutions and effect turnkey installations. We also • Mobile units
supply individual crushers and screens, as well as key • Crusher automation
components and a wide range of consumables. • Screening media
• Wear protection

Conveyors and conveyor • Conveyor systems


• HC-series standard belt
components conveyors
• HF-series standard belt feeders
Roll it up! Sandvik can design, manufacture and install virtually • Rollers
any kind of conveyor system. From high-speed overland • Idlers
systems to open-cast mine conveyors, flameproof under- • Frames and belt trackers
ground systems, tunnel conveyors and in-plant process • Pulleys and take-up devices
• Belt cleaners
conveyors, we have the know-how and the resources to deliver
• Safety and control devices
complete solutions. We also undertake upgrading and
• Dust suppression and loading
modernization projects and supply a comprehensive range of sections
high-quality components and wear parts. • Wear protection

Bulk materials handling


equipment • Bucket wheel excavators
• Beltwagons
Total transport. Sandvik has the long-term experience to • Spreaders
• Transport crawlers
design, manufacture and install virtually any kind of bulk
• Reclaimers
materials handling system. From continuous open-cast mining
• Stackers
systems to integrated stacking and reclaiming systems for • Stacker/reclaimers
mines, terminals, power plants and port facilities, we offer total • Ship unloaders
solutions and turnkey installations. We also offer a wide range • Shiploaders
of individual equipment and high-quality components for
plants, as well as upgrading and modernization services.

Breakers
and demolition tools • Hydraulic hammers
• Cutter-crushers
Hit harder. Sandvik demolition tools make short work of • Pulverizers
difficult breaking and demolition jobs.They are optimized to • Boom systems
deliver high-impact energy, cutting force or crushing force. With • Accessories
high power-to-weight ratios, easy interfaces and simple • Tools and spare parts
connections, they transform a wide range of excavators into
highly productive demolition machines.

Mine automation
Total control. Sandvik has an in-depth understanding of • AutoMine
modern mining operations, and of how automation of loading
and hauling processes can contribute to safer, more efficient
ore transport.

solid ground 1-09 sandvik mining and construction 35


Ekati, Northwest Territories, Canada

Even when it feels like you’re on another planet,


 we have 4500 service engineers standing by
Every second your operations are at a standstill costs you money. This is why it is so
crucial to have access to expertise where you need it and when you need it. It doesn’t
matter if the location is somewhere barely on the map. Our 4500 service engineers are
never further away than a phone call.

Now that’s what we call world-class service. Add to this that we also offer the market’s
widest range of products within the mining and construction industries and you’ll see
that we can raise your productivity to new heights. Regardless of where you are!
© Sandvik Mining and Construction AB
Print n:o M11-082:1 ENG

www.miningandconstruction.sandvik.com