Air relief valve,40Bar,80NB
1 PR6-5059 P.O.5-787 C.R.I.Pumps
f/Zambezi waterline
Foot valve,CI,200mm f/Zambezi Bridge Procurment a
2 PR6-5067 P.O.5-785
pumps division

Speed control and Governor Fully released, P.O. Centrocar(Mr.Clovis,


3 PR7-3599
control f/Doosan diesel engine not done yet Mussa)

V-Belt A34/A34.5 f/Himoinsa Fully released, P.O.


5 PR6-5212 BMG(Mr. Roberto)
lighting tower not done yet
Gas R22 and capacitors 40- Fully released, P.O.
6 PR6-5234
60MFD not done yet
Fully released, P.O.
7 PR6-5227 Waterline material not done yet
Impeller & Housings for
8 PR6-5248 Multistage centrifugal pump,
MVS-90/06 C.R.I.Pumps
44MVA HCB transformer
A in jindal substation

B 15KM,33kv connecting line matambo-marara

C JSPL 20MVA transformer-2


Target dates of various commsioning activities of power supply restoration
02.03.2021 03.03.2021 04.03.2021

to be connected from 220


KV side and energise on
Back charged from 33KV side contiuing back charging for 36 Hours load
to be connected and
Line construction completed Inspection done by EDM team energise

Vacuum process continue


fixing NEW OLTC Assembly of bushing ,vacuum process started for 36 hours
storation
05.03.2021 06.03.202107.03.2021

OIL Final assessment


oil filling in transformer anf filtration filtration and preparation
of oil for 48 hours continue Testing for charging