The document lists 8 purchase requisitions (PRs) with details like PR number, item description, supplier status. It also outlines a schedule from March 2nd to 7th for commissioning various power supply restoration activities like back charging transformers from different voltage sides, completing a connecting transmission line, transformer assembly and testing.
The document lists 8 purchase requisitions (PRs) with details like PR number, item description, supplier status. It also outlines a schedule from March 2nd to 7th for commissioning various power supply restoration activities like back charging transformers from different voltage sides, completing a connecting transmission line, transformer assembly and testing.
The document lists 8 purchase requisitions (PRs) with details like PR number, item description, supplier status. It also outlines a schedule from March 2nd to 7th for commissioning various power supply restoration activities like back charging transformers from different voltage sides, completing a connecting transmission line, transformer assembly and testing.
The document lists 8 purchase requisitions (PRs) with details like PR number, item description, supplier status. It also outlines a schedule from March 2nd to 7th for commissioning various power supply restoration activities like back charging transformers from different voltage sides, completing a connecting transmission line, transformer assembly and testing.
Air relief valve,40Bar,80NB 1 PR6-5059 P.O.5-787 C.R.I.Pumps f/Zambezi waterline Foot valve,CI,200mm f/Zambezi Bridge Procurment a 2 PR6-5067 P.O.5-785 pumps division
Speed control and Governor Fully released, P.O. Centrocar(Mr.Clovis,
3 PR7-3599 control f/Doosan diesel engine not done yet Mussa)
V-Belt A34/A34.5 f/Himoinsa Fully released, P.O.
5 PR6-5212 BMG(Mr. Roberto) lighting tower not done yet Gas R22 and capacitors 40- Fully released, P.O. 6 PR6-5234 60MFD not done yet Fully released, P.O. 7 PR6-5227 Waterline material not done yet Impeller & Housings for 8 PR6-5248 Multistage centrifugal pump, MVS-90/06 C.R.I.Pumps 44MVA HCB transformer A in jindal substation
B 15KM,33kv connecting line matambo-marara
C JSPL 20MVA transformer-2
Target dates of various commsioning activities of power supply restoration 02.03.2021 03.03.2021 04.03.2021
to be connected from 220
KV side and energise on Back charged from 33KV side contiuing back charging for 36 Hours load to be connected and Line construction completed Inspection done by EDM team energise
Vacuum process continue
fixing NEW OLTC Assembly of bushing ,vacuum process started for 36 hours storation 05.03.2021 06.03.202107.03.2021
OIL Final assessment
oil filling in transformer anf filtration filtration and preparation of oil for 48 hours continue Testing for charging