Dokumen : GSB- Form-255

Revisi : 00
VISUAL INSPECTION REPORT Halaman : 1 dari 1
PT GERBANG SARANABAJA Tanggal : 20 September 2017
Project : Tag No. : Report No. :
Owner : Inspection Date : Procedure No. : QP - 04 -01
Client :

Material Fit Up Check of Completed Weld


No Joint No. Description WPS No. Welder Welding Welding Result Remarks
Root Gap High / Low Stamp Process Date
Reinforcement
Spec./Grade Heat No. Size (mm) TW (mm)
mm mm