Professional Documents
Culture Documents
171 - 110kV Chu Se
171 - 110kV Chu Se
Contract number
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG F87L PROTECTION PANEL
Chu Se Substation - 171 CRP Panel + A1
Owner Drawing No. Page A1-1
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
3P 3 F87L
0.5 3
171-76
171-7 M V
171-75
U/I
Unauthorized duplication prohibited without written consent
3
5P20 TO F87B PROTECTION
3
CL0.5 P01 M03 Φ 1
SW87L
2
PRS
3 F67/67N,50BF,25/79,50/51
5P20 50/51N,27/59,FR,FL
BCU,25
XG1
3 F21/21N,50/51,50/51N,67/67N
5P20 27/59,FL,FR
ARTECHE ARTECHE ARTECHE ARTECHE ARTECHE ARTECHE
CB P543
171-15
M
171-1 New F87L protection panel
BILL OF MATERIAL
C11
NO. DESCRIPTION FUNCTION Q.TY
CVT11
1 ENCLOSURE INDOOR PANEL 01
3P 3 2 P543 LINE DIFFERENTIAL PROTECTION RELAY 01
3 TSB-14 TEST BLOCK 01 LOT
4 ACCESSORIES TERMINAL, MCB ... 01 LOT
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG CONTROL AND PROTECTION PRINCIPLE Chu Se Substation - 171 CRP Panel + A1
EQUIPMENT LAYOUT Owner Drawing No. Page A1-2
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
BOTTOM VIEW
8-Ø7x20 INDOOR CONTROL & PROTECTION PANEL
FRONT
(W800xH2200xD800)
SPECIFICATION
PG 29 PG 21 PG 21 PG 29
PG 29 PG 21 PG 21 PG 29
PG 29 PG 21 PG 21 PG 29 PG 29 PG 21 PG 21 PG 29
PG 29 PG 21 PG 36 PG 21 PG 29
PG 29 PG 21 PG 21 PG 29 PG 29 PG 21 PG 21 PG 29
PG 29 PG 21 PG 21 PG 29
PG 29
PG 29
PG 29
PG 29
PG 21
PG 21
PG 21
PG 21
PG 21
PG 21
PG 29
PG 29
PG 36
PG 36
PG 29
PG 29
PG 21
PG 21
PG 21
PG 21
PG 21
PG 21
PG 29
PG 29
PG 29
PG 29
* Electrostatic coating
PG 29 PG 21 PG 21 PG 29 PG 29 PG 21 PG 21 PG 29
PG 29 PG 21 PG 21 PG 29 PG 29 PG 21 PG 21 PG 29
REAR
* Protection level: IP41
Unauthorized duplication prohibited without written consent
2200
2200
100
800 800
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG DIMENSION Chu Se Substation - 171 CRP Panel + A1
Owner Drawing No. Page A1-3
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
TC1 TC2 BLOCK 86P 86S 87L 21 OFF 87L Start Input Start DTT POTT OFF 87L
DC1 DC2 NAME FUNCTION
79 50BF
87L
21 ZONE 1 (Z1)
50/51, 50/51N
CRP2
OFF 87L
50BF LEVEL 2
LEGEND
(*): Interal initiate
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TRIP MATRIX Chu Se Substation - 171 CRP Panel + A2
Owner Drawing No. Page A2-1
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
Parts list:
Index Placement Page References Device tag Part number Description Manufacturer
3 CSE_87L+RP =CSE_87L+RP/B-5.1 F87L P54331RL7M0K18M P543 line differential with subcycle distance Schneider/France
4 CSE_87L+RP =CSE_87L+RP/B-2.8 FAC 2CDS272001R0104 Miniature Circuit Breaker - S200M - 2P - C - 10 ampere ABB/China
11 CSE_87L+RP =CSE_87L+RP/B-1.2 KAT1 3RH2122-1BM40 Contactor relay, 2 NO + 2 NC, 220 V DC, Size S00, screw terminal Siemens/Germany
12 CSE_87L+RP =CSE_87L+RP/B-8.8 K_TTRE RF-4R-220VDC Fast Tripping relay (4CO 220VDC) Arteche/Spain
13 CSE_87L+RP =CSE_87L+RP/B-8.8 K_TTRE FN-DE-IP20 OP socket with front screw or faston connections Arteche/Spain
15 CSE_87L+RP =CSE_87L+RP/B-9.7 PRS YW1B-M1E10-G Button with green overview 1NO IDEC/China
19 CSE_87L+RP =CSE_87L+RP/B-9.5 SW87 CA10-A720-600-FS2 Double-throw Switches without „OFF“ with electrically isolated contacts K&N/NewZealand
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG Bill of materials Chu Se Substation - 171 CRP Panel + A3
Owner Drawing No. Page A3-1
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
XDC 1 WSDC1 1 XDC 1 XDC 2
3 2 3 4
5 WSDC2 1 5 6
7 2 7 8
CSE_DC+RP
A1
KAT1
220VDC A2
13 43 21 31
13 14 /B-1.3 KAT1 KAT1
21 22 /B-1.5 /B-1.2 14 44 /B-1.2 22 32
31 32 /B-1.5
43 44 /B-1.3
Unauthorized duplication prohibited without written consent
3 1 12 14 3 1 12 14
FR FS
10A 11 10A 11
440VDC 4 2 440VDC 4 2
/B-1.3
/B-1.5
XR1N
XR1P
XSN
XSP Lắp thêm hàng kẹp XS87:1,2 tại tủ RP1 để giám sát tín hiệu MCB tủ F87L off
Đấu dây XS87:2 với F67-1:R8 (Input spare) để giám sát MCB tủ F87L
B-4.1 /
B-4.1 /
B-3.3 /
B-3.5 /
CSE_171+RP
XP_MCB
B-8.6 /
Đấu mới dây cho mạch mcb
XS 19 WRP 1 XS87 1
12 14 12 14
FR FS
/B-1.3 11 /B-1.5 11
Input spare
XS 20 2 XS87 2 F67-1 R8
CSE_171+RP
Power supply for relay 1 Power supply for trip 1 circuit
Giám sát tại BCU tủ ĐKBV hiện hữu
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG DC DISTRIBUTION Chu Se Substation - 171 CRP Panel + RP
Owner Drawing No. Page B-1
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
CSE_AC+RP
1 3 12 14
FAC
10A 11
230VAC 2 4
/B-2.3
XSP_MCB
/B-3.5
Unauthorized duplication prohibited without written consent
12 14
SKT
FAC
/B-2.8 11 L N
SOCKET PE
230VAC
PE
G1
FAC_F
/B-6.2
L NO
STM C LS1
3 2 COM
E2 x1 E1 x1
x1 X1
R1 H1
x2 X2
x2 x2
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG AC DISTRIBUTION Chu Se Substation - 171 CRP Panel + RP
Owner Drawing No. Page B-2
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
Unauthorized duplication prohibited without written consent
XSP XSN
B-1.5 / B-1.5 /
XS 1 XS 6
XSP_MK XSN_R1
B-6.1 / /B-6.1
XS 2 XS 7
XSP_RP XSN_KTTRE
B-6.1 / /B-8.7
XS 3 XS 8
XSP_MCB
/B-2.4
XS 4 XS 9
XSP_TTRE
/B-6.1
XS 5 XS 10
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG DC DISTRIBUTION Chu Se Substation - 171 CRP Panel + RP
FOR SIGNAL CIRCUIT Owner Drawing No. Page B-3
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021 F87L
XG1 IA
XA 1 WA87L 1 XA 1 21 22
F21:Q2
C03 C02
/B-9.3 IB
XA 2 2 XA 2 23 24
F21:Q4
C06 C05
IC
XA 3 3 XA 3 25 26
F21:Q6
C09 C08
/B-5.9
XA 4 4 XA 4 27 28
F21:Q8
Page F01
XG1 VA
XV 1 WV87L 1 XV 1 1 2
SG1:9
C19
/B-9.3 VB
XV 2 2 XV 2 3 4
SG1:11
C20
VC
XV 3 3 XV 3 5 6
SG1:17
C21
VN
XV 4 4 XV 4
Unauthorized duplication prohibited without written consent
7 8
SG1:19
Page F01 C22
/B-5.9
CSE_171+RP
Tại tủ RP1 trạm biến áp 110kV Chư Sê
Tách jump F21-Q2, Q4, Q6, Q8
Lắp thêm hàng kẹp XA:1 đến XA:4, XV:1 đến XV:4
Đấu nối dây dẫn mới từ F21:Q2 - XA:1, F21:Q4 - XA:2, F21:Q6 - XA:3, F21:Q08 - XA:4
Đấu nối dây dẫn mới từ SG1:9 - XV:1, SG1:11 - XV:2, SG1:17 - XV:3, SG1:19 - XV:4 /B-5.6 PORT1
VS
C23
NS
C24
/B-5.10 /B-5.6 PORT2
RL1
/
/B-5.5
XR1P TX RX
B-1.3 / /B-5.4
CHANNEL X PORT E1
XR1N
B-1.3 /
/B-5.5
J1 J2
TX RX
PORT E2
/B-5.10
/B-5.4
CHANNEL Y
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG F87L Chu Se Substation - 171 CRP Panel + RP
CURRENT AND VOLTAGE CIRCUIT CONNECTION Owner Drawing No. Page B-4
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
F87L
FUNCTION FUNCTION FUNCTION
C03
D2 H1 J11 C02
IN1 /B-6.2 FAC MCB FAIL OUT1 /B-8.3 TRIP COIL 1 WD1 /B-8.7 RELAY FAIL
D1 H2 J12 /B-4.4 C06
D4 H3 J13 C05
IN2 /B-6.3 CB CLOSED OUT2 /B-8.4 TRIP TO F86P WD2 RELAY HEALTHY
D3 H4 J14 C09
D6 H5 C08
IN3 /B-6.4 MANUAL CLOSE FOR SOFT OUT3 /B-8.4 START 50BF
D5 H6
D8 H7
IN4 /B-6.5 FVTP MCB OFF
D7 OUT4 H9 SPARE
D10 H8
IN5 /B-6.6 TRIP TO REMOTE END
D9 H10
D12 OUT5 H12 SPARE
IN6 /B-6.7 SW87L ENABLE
D11 H11
D14 H13
IN7 /B-6.8 SW87L OFF
D13 OUT6 H15 SPARE
D16 H14
IN8 /B-6.9 RESET RELAY
D15 H16
F2 OUT7 H18 AR INITIATE
Unauthorized duplication prohibited without written consent
/B-8.5
IN9 /B-7.2 SPARE
F1 H17
F4 G1
IN10 /B-7.3 SPARE OUT8 SPARE
F3 G2
C19 VA
F6 G3
IN11 /B-7.4 SPARE OUT9 SPARE
F5 G4
C20 VB
F8 G5
/B-4.4
IN12 /B-7.5 SPARE OUT10 SPARE
F7 G6
C21 VC
F10 G7
IN13 /B-7.6 SPARE
F9 OUT11 G9 SPARE
C22 VN
F12 G8
IN14 /B-7.7 SPARE
F11 G10
F14 OUT12 G12 SPARE
IN15 /B-7.8 SPARE
F13 G11
F16 G13
IN16 /B-7.9 SPARE
F15 OUT13 G15 SPARE
C23 VS
G14
/B-4.4
G16
C24 NS
OUT14 G18 SPARE
G17
/B-4.7 PORT1
/B-4.7
/B-4.4 J1
P546 /B-4.6
CHANNEL Y
TX RX
/B-4.7
J2
PORT2
PORT E1
/B-4.7
/B-4.6 TX RX
CHANNEL X /B-4.7 PORT3
PORT E2
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG F87L Chu Se Substation - 171 CRP Panel + RP
IO BOARD Owner Drawing No. Page B-5
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
FAC MCB FAIL CB CLOSED MANUAL CLOSE FOR SOFT FVTP MCB OFF TRIP TO REMOTE END SW87L ENABLE SW87L OFF RESET RELAY
F21-1:J1 F21-1:J4
CSE_171+RP
6 10 6 10
2 2
XSP_MK 7 11 7 11
B-3.3 /
3 3
8 12 8 12
WKE 1 WRP 3
4 4
CSE_171+MK
Lắp thêm hàng kẹp XS87:3,4,5,6 tại tủ E03+CRP3 để lấy tín hiệu manual close và MCB mạch áp đường dây off
Unauthorized duplication prohibited without written consent
W0 1
/B-2.4
CSE_171+CB_BOX
Page MK Z01
CSE_171+RP
31 5 1 5 1
K12 K_MCL K_VTP
34 /B-6.8 9 /B-6.9 9
XSP_KTTRE
/B-8.7
3
11 7 1 3
X1 889 XS87 5 XS87 6 K_TTRE SW87 SW87 PRS
/B-8.8 3 /B-9.5 2 /B-9.5 4 /B-9.7
4
W0 2
CSE_171+MK
XCB 2
WKE 2 WRP 4 5
XS 11 XS 12 XS 13
F87L
/B-5.1
D2 D4 D6 D8 D10 D12 D14 D16
XSN_R1 XSN_R1_1
B-3.7 / /B-7.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG F87L Chu Se Substation - 171 CRP Panel + RP
INPUT CARD D CONNECTION Owner Drawing No. Page B-6
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
F87L
/B-5.1
F2 F4 F6 F8 F10 F12 F14 F16
XSN_R1_1
B-6.10 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG F87L Chu Se Substation - 171 CRP Panel + RP
INPUT CARD F CONNECTION Owner Drawing No. Page B-7
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
WRP 11
CSE_171+RP XT87 13
XT87 1 2 3 4 5
WRP 7 8 9 10 6
XT 1 2 3 4 5 XS 14
9 11 13 15
XG1 XG1 XG1 XG1
CSE_171+RP
/B-9.3 /B-9.3 /B-9.3 /B-9.3
10 12 14 16
XP_MCB
F87L H1 F87L H3 F87L H5 F87L H16H17 F87L J11
OUT1 OUT2 OUT3 OUT7 WD1 11 7
/B-5.4 /B-5.4 /B-5.4 /B-5.4 /B-5.6
TRIP COIL 1 H2 TRIP TO F86P H4 START 50BF H6 AR INITIATE H18 RELAY FAIL J12 K_BF
B-1.5 /
/B-8.4 3
XT 6 7 8 9 10 XS 17
WRP 13 14 15 16 12
Đấu mới dây cho mạch mcb
CSE_171+RP
XT87 6 7 XT87 8 9 10 11 12
XT87 14
4
7 3 /B-6.6
4 11
8 4
F6
12
F6 12 8 F67-1 9 5
13
F67-2 K_BF F7
7 3 /B-8.8 10 6
F7 /B-8.4 4 11 14
2 8 4 /B-8.2
12
K_BF 9 5
220VDC 1 13
TRIP 50BF 10 6
X21 7 14
X21 17 X21 18
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG SIGNAL TO EXISTING CRP PANEL Chu Se Substation - 171 CRP Panel + RP
50BF SIGNAL Owner Drawing No. Page B-8
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
GREEN
1 2
1 2 /B-4.3
3 4 /B-4.3 3 4 /B-6.9
5 6 /B-4.3
CONTACT
POSITION
7 8 /B-4.3
9 10 /B-8.3 2 1
15 16 /B-8.5
17 18
19 20
21 22 /B-4.3
23 24 /B-4.3
25 26 /B-4.3
27 28 /B-4.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG ACCESSORIES Chu Se Substation - 171 CRP Panel + RP
Owner Drawing No. Page B-9
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
Terminal diagram
=CSE_87L+RP-WA87L
Strip
Cable name
Cable name
=CSE_87L+RP-XA
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TERMINAL DIAGRAM Chu Se Substation - 171 CRP Panel + TP1
Owner Drawing No. Page 100
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
Terminal diagram
=CSE_87L+RP-WSAC
Strip
Cable name
Cable name
=CSE_87L+RP-XAC
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
2 =CSE_87L+RP/B-2.9
4 =CSE_87L+RP/B-2.9
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TERMINAL DIAGRAM Chu Se Substation - 171 CRP Panel + TP1
Owner Drawing No. Page 101
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
Terminal diagram
=CSE_87L+RP-WSDC1
=CSE_87L+RP-WSDC2
Strip
Cable name
Cable name
=CSE_87L+RP-XDC
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
Đấu dây XS87:2 với F67-1:R8 (Input spare) để giám sát MCB tủ F87L 2 =CSE_87L+RP/B-1.9
Đấu dây XS87:2 với F67-1:R8 (Input spare) để giám sát MCB tủ F87L 4 =CSE_87L+RP/B-1.9
Đấu dây XS87:2 với F67-1:R8 (Input spare) để giám sát MCB tủ F87L 6 =CSE_87L+RP/B-1.9
Đấu dây XS87:2 với F67-1:R8 (Input spare) để giám sát MCB tủ F87L 8 =CSE_87L+RP/B-1.9
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TERMINAL DIAGRAM Chu Se Substation - 171 CRP Panel + TP1
Owner Drawing No. Page 102
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
Terminal diagram
=CSE_87L+RP-WRP
=CSE_87L+RP-WKE
=CSE_87L+RP-WKE
=CSE_87L+RP-WRP
Strip
Cable name
Cable name
=CSE_87L+RP-XS
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
3 =CSE_171+RP-XS87 3 2 =CSE_87L+RP/B-3.4
3 =CSE_87L+RP/B-3.4
4 =CSE_87L+RP-FAC 12 =CSE_87L+RP/B-3.4
5 =CSE_87L+RP-K_TTRE 7 =CSE_87L+RP/B-3.4
6 =CSE_87L+RP-FS 2 =CSE_87L+RP/B-3.6
7 =CSE_87L+RP-F87L D1 =CSE_87L+RP/B-3.6
8 =CSE_87L+RP-K_TTRE 1 =CSE_87L+RP/B-3.6
9 =CSE_87L+RP/B-3.6
10 =CSE_87L+RP/B-3.6
16 =CSE_87L+RP/B-8.9
Đấu dây XS87:2 với F67-1:R8 (Input spare) để giám sát MCB tủ F87L 1 =CSE_171+RP-XS87 1 19 =CSE_87L+RP/B-1.6
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TERMINAL DIAGRAM Chu Se Substation - 171 CRP Panel + TP1
Owner Drawing No. Page 103
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
10/06/2021
Terminal diagram
=CSE_87L+RP-WRP
=CSE_87L+RP-WRP
Strip
Cable name
Cable name
=CSE_87L+RP-XT
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
5 =CSE_87L+RP/B-8.6
10 =CSE_87L+RP/B-8.6
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TERMINAL DIAGRAM Chu Se Substation - 171 CRP Panel + TP1
Owner Drawing No. Page 104
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
09/06/2021
Terminal diagram
=CSE_87L+RP-WV87L
Strip
Cable name
Cable name
=CSE_87L+RP-XV
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG TERMINAL DIAGRAM Chu Se Substation - 171 CRP Panel + TP1
Owner Drawing No. Page 105
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
3
4
5
6
=CSE_87L+RP-WA87L CAB4x4
Page / column Target designation from Conductor Target designation to Page / column
=CSE_87L+RP-WKE CAB6x1.5
Page / column Target designation from Conductor Target designation to Page / column
3
4
5
6
=CSE_87L+RP-WRP CAB20x1.5
Page / column Target designation from Conductor Target designation to Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG CABLE LIST CONNECTION Chu Se Substation - 171 CRP Panel + XCAB
Owner Drawing No. Page 300
Ia Bang Wind Electricity., JSC IAB_ CSE_87L
DATE STAMP 1 2 3 4 5 6 7 8 9 10
18
19
20
=CSE_87L+RP-WSAC CAB2x2.5
Unauthorized duplication prohibited without written consent
Page / column Target designation from Conductor Target designation to Page / column
=CSE_87L+RP-WSDC1 CAB2x4
Page / column Target designation from Conductor Target designation to Page / column
=CSE_87L+RP-WSDC2 CAB2x4
Page / column Target designation from Conductor Target designation to Page / column
=CSE_87L+RP-WV87L CAB4x4
Page / column Target designation from Conductor Target designation to Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = CSE_87L
A FOR APPROVAL 24.01.21 VU VAN NGA 25.01.21 TRAN DUC DUONG CABLE LIST CONNECTION Chu Se Substation - 171 CRP Panel + XCAB
Owner Drawing No. Page 301
Ia Bang Wind Electricity., JSC IAB_ CSE_87L