LEMBAGA PELATIHAN KOMPETENSI – TEKNIK DAN MANAJEMEN INDUSTRI

(LPK –TMI)

ADVANCED ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC)


SISTEM PENYEDIAAN AIR MINUM (SPAM)

Online Workshop
25, 27 – 28 May 2021

DETAILED ENGINEERING DESIGN (DED)

BKTI-PII - BKSTI - ISTMI


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Instructor / Facilitator:
Ir. Daru Wiyono, IPU

Received bachelor degree in Chemical Engineering from Engineering Faculty, Gadjah Mada University (UGM). He has
a professional and practice experiences as Senior Process Engineer / Senior Resident Engineer / Engineering
Manager / Commissioning Coordinator more than 35 years in both National and Multinational Company specially Oil
& Gas Onshore , Offshore Industries and Water Treatment Plant (WTP). He works at various engineering company
and operating oil company in Indonesia and overseas: PETRONAS Carigali, PT. ELNUSA, PT. PETROSEA Tbk, CNOOC
(China National Offshore Oil Corporation) SES Ltd, Ranhill Worley Parson Sdn. Bhd., Malaysia, PT. Enerkon, PT
Synergy Engineering and PT. Kelsri. Implementing both International and National best practice of safety.

Email : daru.wiyono@gmail.com
HP : 08121399761
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Online Workshop Agenda


1. Feasibilty Study / Identify & Appraise / Identify & Assess Opportunity
2. Conceptual Design / Pre - Front End Engineering Design (Pre-FEED) / Select & Otimize
/ Generate & Select Alternative.
3. Basic Design / Engineering Design / Front End Engineering Design (FEED) / Develop
Preferred Alternative / Define
4. Detailed Engineering Design (DED)
5. Procurement
6. Construction / Installation
7. Engineering, Procurement & Construction (EPC) / Engineering, Procurement,
Construction & Installation (EPCI) / Engineering, Procurement, Construction &
Commissioning (EPCC).
8. Start Up & Commissioning and Performance Test
9. Operation / Operate & Evaluate.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

AGENDA

Day 1
1. Introduction to ” Sistem Penyediaan Air Minum (SPAM)”
2. Feasibilty Study
3. Feasibilty Study – SPAM Case Study
4. Conceptual Design
Day 2
5. Front End Engineering Design (FEED)
6. Front End Engineering Design (FEED) – SPAM Case Study
7. Detailed Engineering Design (DED)
8. Procurement
Day 3
9. Construction
10. Engineering, Procurement & Construction (EPC)
11. Start Up & Commissioning and Performance Test
12. Operation
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Day 1 : 25 May 2021 Day 3 : 28 May 2021


1. Pembukaan 1. Sesi 1 : Construction
2. Sesi 1 : Introduction to “Sistem Penyediaan Air Minum” 2. Break Pagi
3. Break Pagi 3. Sesi 2 : Engineering, Procurement & Construction (EPC)
4. Sesi 2 : Feasibilty Study 4. Ishoma
5. Ishoma 5. Sesi 3 : Start Up & Commissioning and Performance Test
6. Sesi 3 : Feasibilty Study – SPAM Case Study 6. Break Sore
7. Sesi 4 : Operation
7. Break Sore
8. End Day 3
8. Sesi 4 : Conceptual Design
9. End Day 1

Day 2 : 27 May 2021


1. Sesi 1 : Front End Engineering Design (FEED)
2. Break Pagi
3. Sesi 2 : Front End Engineering Design (FEED) – SPAM Case Study
4. Ishoma
5. Sesi 3 : Detailed Engineering Design
6. Break Sore
7. Sesi 4 : Procurement
8. End Day 2
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Project Phase – From Feasibility Study to Start Up & Commissioning


CASE 3 - MINIMUM FACILITIES ON NEW
Feasibility Study
MIGAS
REMOTE PLATFORM
(CASE 10 FOR WIRELINE ONLY OPTION)
DRILL TYPE WELL LOCATION FACILITIES LOC'N OIL EXPORT GAS EXPORT
Jack-up cantilever MLA - 'shark alley' MLA MLA MLA
Jack-up skidded MLA - existing TRA - bridge linked WTN WTN
Platform rig TRA - bridge linked TRA - remote SNA SNA
TRA - remote WTN

REINJECTION INJECTION
GAS WELLS
GAS
SEPARATOR
NEW
SLUGCATCHER

PROD
WELLS

WEST TUNA
INSTALLATION BARGE REQUIRED

Conceptual Design
TURRUM
PLATFORM
DSV FOR TRUSS INSTALLATION

Power Cable
Fuel Gas?
Glycol
Flowline (insulated)

POTENTIAL WAX PROBLEM


BOTTOM TOW PIPELINE BUNDLE
INSTALLATION

Front End Engineering Design (FEED)

Engineering, Procurement & Constuction (EPC)

Start Up & Commissioning


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Project Phase – From Feasibility Study to Start Up & Commissioning


CASE 3 - MINIMUM FACILITIES ON NEW
Feasibility Study
PUPR
REMOTE PLATFORM
(CASE 10 FOR WIRELINE ONLY OPTION)
DRILL TYPE WELL LOCATION FACILITIES LOC'N OIL EXPORT GAS EXPORT
Jack-up cantilever MLA - 'shark alley' MLA MLA MLA
Jack-up skidded MLA - existing TRA - bridge linked WTN WTN
Platform rig TRA - bridge linked TRA - remote SNA SNA
TRA - remote WTN

REINJECTION INJECTION
GAS WELLS
GAS
SEPARATOR
NEW
SLUGCATCHER

PROD
WELLS

WEST TUNA
INSTALLATION BARGE REQUIRED

Conceptual Design
TURRUM
PLATFORM
DSV FOR TRUSS INSTALLATION

Power Cable
Fuel Gas?
Glycol
Flowline (insulated)

POTENTIAL WAX PROBLEM


BOTTOM TOW PIPELINE BUNDLE
INSTALLATION

Basic Design

Design & Build

Start Up & Commissioning


Advanced EPC Sistem Penyediaan Air Minum (SPAM)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Source : The Oil & Gas Enginering Guide, Herve Baron


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

DETAILED ENGINEERING DESIGN (FEED) -TABLE OF CONTENT

1. Contoh Detailed Engineering Design


2. Process Flow Diagram (PFD)
3. Piping & Instrument Diagram (P&ID)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

RENCANA KEGIATAN
RENCANA TEKNIS TERINCI (DED)
SISTEM TRANSMISI DAN UNIT DISTRIBUSI

Sumber : https://bpsdm.pu.go.id
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

RENCANA TEKNIS TERINCI (DED)


SISTEM PENYEDIAAN AIR MINUM

SISTEM TRANSMISI DISTRIBUSI


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

PERSIAPAN DAN PENGUMPULAN ANALISA DAN


PENGUMPULAN RENCANA
DATA PRIMER EVALUASI DATA TEKNIS TERINCI
DATA SEKUNDER

Pengumpulan Data Survey Wilayah Studi  Kompilasi Data  Laporan Rencana


Sekunder : Dan SPAM Eksisting Sekunder Dan Primer Teknis Terinci Unit
Transmisi Dan Unit
Peta Dasar, Topografi, Survey Topografi  Kebutuhan Sistem
Distribusi
morfologi, tata guna
Penyelidikan Tanah  Perpipaan Transmisi
lahan, foto udara atau  Memo Design
citra satelit Survey Sumber Daya  Reservoir Distribusi
 Gambar Teknis
Energi
Data Kependudukan  Perpipaan Distribusi
 RAB Dan BOQ
Dan Sosial Ekonomi Survey Ketersediaan
 Kebutuhan Pompa
Bahan Konstruksi Dan  Spesifikasi Teknis
Kondisi SPAM
Mekanikal Elektrikal  Zona Dan Blok
Eksisting Termasuk
Pelayanan
Data Pemakaian Air Survey Harga Satuan
Pelanggan
Studi – Studi Terkait
Dan Peraturan Yang
Belaku KRITERIA Sumber : https://bpsdm.pu.go.id
PERENCANAAN
Persiapan Peralatan
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

SISTEM PENYEDIAAN AIR MINUM


PERPIPAAN

TRANSMISI
TRANSMISI
AIR MINUM
AIR BAKU
AIR BAKU

PELAYANAN
IPA R

DISTRIBUSI

UNIT UNIT UNIT DISTRIBUSI UNIT PELAYANAN


AIR BAKU PRODUKSI
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

SPAM REGIONAL
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

CATATAN :
 PADA SPAM REGIONAL ADA TAMBAHAN RESERVOIR OFF TAKE.
 PADA SPAM REGIONAL UNIT DISTRIBUSI DAN UNIT PELAYANAN SPAM PERKOTAAN, MERUPAKAN SATU UNIT
PELAYANAN
UNIT DISTRIBUSI UNIT PELAYANAN
SEBAGAI CONTOH : GAMBAR SKEMATIK SPAM REGIONAL DUROLIS DI BAWAH INI.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

SISTEM TRANSMISI DAN UNIT DISTRIBUSI

 Sistem transmisi meliputi sistem perpipaan transmisi air baku dan dan
sistem perpipaan transmisi air minum
 Sistem transmisi air baku berfungsi mengalirkan air dari sumber air ke Unit
Produksi/IPA atau mengalirkan air minum ke reservoir distribusi bila kualitas
air sudah memenuhi persyaratan kualitas air minum.
 Sistem transmisi air minum berfungsi mengalirkan air dari reservoir
produksi ke reservoir distribusi
 Unit distribusi air berfungsi mengalirkan air minum terkirim secara merata
(Kualitas, Kuantitas, Kontinuitas dan Tekanan) dari reservoir distribusi ke
seluruh wilayah pelayanan
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

GAMBAR TYPICAL
JEMBATAN PIPA
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

PERLETAKAN PERLENGKAPAN PERPIPAAN (i)


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Perletakan perlengkapan Sistem Pengaliran Secara Gravitasi


penunjang yang penting
dalam jalur perpipaan
transmisi dan distribusi :

 Katup / Valve
 Katup Udara (Air Valve)
 Katup Penguras (Wash
Out / Blow Off)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

PERLETAKAN PERLENGKAPAN PERPIPAAN (ii)


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Katup / Valve :
Katup berfungsi untuk membuka dan menutup aliran air dalam pipa, dipasang pada :
 Lokasi ujung pipa tempat aliran air masuk atau aliran air keluar;
 Setiap percabangan;
 Pipa outlet pompa;
 Pipa penguras atau wash out
Tipe katup yang dapat dipakai pada jaringan pipa distribusi adalah Katup Gerbang (Gate Valve)
dan Katup kupu-kupu (Butterly Valve).

Katup Udara (Air Valve) :


Dipasang pada titik tertinggi di sepanjang pipa distribusi, di jembatan
pipa dan pada jalur lurus setiap jarak tertentu.

Katup Penguras (Wash Out / Blow Off)


Dipasang pada tempat-tempat yang relatif rendah sepanjang jalur
pipa, ujung jalur pipa yang mendatar dan menurun dan titik awal jembatan.
CONTOH TYPICAL PEMASANGAN GATE/BUTTERFLY VALVE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

CONTOH TYPICAL PEMASANGAN AIR VALVE


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

PIPA TRANSMISI KRITERIA DESIGN PERPIPAAN TRANSMISI


 Hal yang perlu diperhatikan dalam perhitungan perpipaan adalah kaitan antara
kekuatan pipa dengan tekanan pada pada pipa.
 v (kecepatan dalam pipa)
 PVC antara 0.3 – 4.5 meter/detik; HDPE antara 0,3 – 3 meter/detik
 Steel dan DCIP antara 0,3 – 6 meter/detik
(disarankan kecepatan antara 0,3 – 1 meter/detik)
 Tekanan pada pipa antara 10 – 60 meter, pada sistem perpompaan. Sehingga
beban energi tidak terlalu tinggi, tidak memerlukan pipa dengan bahan yang lebih
tebal yang akan mengurangi kapasitas aliran dengan nominal diameter yang sama
 Untuk sistem gravitasi diperlukan BPT (Bak Pelepas Tekan) bila tekanan > 70
meter untuk pipa PVC dan HDPE atau disesuaikan dengan spesifikasi teknis pipa.
Sedangkan untuk pipa Steel dan DCIP diperlukan BPT bila tekanan > 100 meter.
 Perhitungan dimensi pipa transmisi menggunakan QMD :
Qmd= Fmd X Qrata2 Qmd = Qmax day = Qmaksimum harian
 Fmd = ( 1.1 – 1.3 ) ; Fmd = Faktor Max Day = Faktor Maksimum Harian
DEBIT YANG DIGUNAKAN DALAM PERHITUNGAN PIPA

PIPA DISTRIBUSI

PELAYANAN
R

Qjpuncak

Qmd
AIR BAKU

PIPA TRANSMISI
PIPA DISTRIBUSI
AIR BAKU
PELAYANAN
IPA R
Qmd
Qjpuncak

Sumber : https://bpsdm.pu.go.id
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Reservoir Beton Reservoir Menara

Reservoir Tangki

Sumber : https://bpsdm.pu.go.id
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Faktor penentu dalam membuat perencanaan secara keseluruhan


termasuk Unit Transmisi Dan Distribusi adalah Mengetahui
KEBUTUHAN AIR

Apa yang dimaksud dengan Kebutuhan air ?

Kunci untuk penyediaan air adalah mengerti tentang :

 Kebutuhan Pelanggan dan Calon Pelanggan


 Kebutuhan Sistem (Air Baku - Produksi - Transmisi -
Distribusi)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

KEBUTUHAN AIR
KEBUTUHAN PELANGGAN / KONSUMEN
Jumlah Penduduk Yang akan dilayani
Pola Pemakaian Air Yang Terkait Taraf Hidup (Kesejahteraan)
Domestik (non-niaga) : Kebutuhan Perkapita x Jumlah Penduduk
Non-Domestik : tergantung jenis pelanggan (niaga, industri, institusi pendidikan,
perkantoran, dll.
Fasilitas Umum : terutama untuk menyiram taman kota dan Hidran Pemadam Kebakaran
PROYEKSI KEBUTUHAN AIR
 Pertumbuhan Penduduk
 Perubahan Pola Pemakaian Air
 Jumlah Air Terjual
 Jumlah Air Didistribusikan
 Jumlah Air Diproduksi
 Jumlah Air Baku
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Detail Engineering Design – Project Scope of Work

• Review Company supply Specification


• Update and generate specification (if required)
• Project Design Basis (review and updated)
• Calculations
• Study, Report, Procedure, Schedule and index
• Data Sheet
• Deliverable List
• Design Detailed Drawings
• MTO (Material Take Off)
• RFQ (Request For Quotation)
• TBE
• Vendor Document Review (VDR)
• Update document’s based on the Vendor drawing up to AFC
• As Built
• 3D PDMS Modelling
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

DISCIPLINE ENGINEERING
PROCESS ENGINEERING
PROCESS SAFETY ENGINEERING
MECHANICAL ENGINEERING
PIPING ENGINEERING
INSTRUMENTATION & CONTROL ENGINEERING
ELECTRICAL ENGINEERING
CIVIL/STRUCTURAL ENGINEERING
PIPELINE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

1. CONTOH DETAILED ENGINEERING DESIGN


ONSHORE RECEIVING FACILITY (ORF)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

BUKIT TUA DEVELOPMENT PROJECT - ORF

ONSHORE RECEIVING FACILITIES (ORF)

OIL & GAS COMPANY : PC


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

Outline
1.0 Facility Overview

2.0 Facility Layout

3.0 Ground Improvement

4.0 Process Description

4.1 Main Process

4.2 Utilities
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

1.0 Facility Overview


N

Ketapang PSC
Java Sea
Bukit Tua
Facilities
Field JS 2-1 JS 3-1
Garit-1
Payang-1
Bukit Tua-3A

Jenggolo-1 Bukit Tua-4


Bukit Tua-1
Bukit Tua-2

JS 8-1
Bukit Panjang-1
Perawan-1
JS 19-1
JS44A-1

~ 30 km to land
ik ~30km to Madura
es
Gr
to Madura
East
East ~9
0k
m Madura
Gresik
Java
Java
Surabaya
20
20km
km
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

1.0 Facility Overview


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

1.0 Facility Overview


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

1.0 Facility Overview


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

1.0 Facility Overview


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

3.0 Ground Improvement


Currently the land at ORF site is not in ideal condition for construction, hence
a land improvement work is required prior installation of all equipments and
building.
- The ground improvement methods is using pre-fabricated vertical drain.
- Considering the land condition, all civil foundation for equipments and
building will be piled.
- Major structural work is at building works, other structural are for access
platform and pipe sleeper.
- Excavation work will be performed for open drain pond, pit of closed drain
vessel, and fire water pond.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

4.0 Process Description


A. Main Process Equipment: B. Utilities:
• Pig Receiver • Fuel Gas Package (include
• Inlet Separator Instrument Gas Receiver)
• Gas Custody Metering • Oily Water Treatment System
System • Flare System
• Liquid Burner System
• Diesel System
• Power System (PLN as main
source & EDG)
• Fresh Water System
• Fire Water System
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

4.0 Process Description


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

PIG RECEIVER

• Pig Receiver is provided for pigging activity from WHP to ORF in


order to maintain pipeline integrity.
• Pig receiver and related piping system is designed for intelligent
pigging
• Size & Rating
- Major Barrel : 16”
- Minor Barrel : 12”
• Complete with pig signaller, quick opening closure, and interlock
system.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

PIG RECEIVER

44
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

INLET SEPARATOR
Description Requirement

Type Horizontal, 2 Phase

Size (mm) 2850 (ID) x 7200 (T/T)

Design Pressure (barg)/(psig) 46.5 (674.3)

Design Temperature (°C) max./min. 65 / -45

Operating Pressure (barg)/(psig) 38.5 (558) / 24.5 (355)

Operating Temperature (°C) max./min. 23 - 14

Material LTCS + 3mm CA + internal lining (epoxy) at bottom of


vessel
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

INLET SEPARATOR

46
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

GAS METERING SYSTEM

Description Requirement

Type Ultrasonic

Size (mm) 10”, redundant meter run

Design Pressure (barg)/(psig) 46.5 (674.3)

Design Temperature (°C) max./min. 65 / -18

Operating Pressure (barg)/(psig) 38.5 (558) / 24.5 (355)

Operating Temperature (°C) max./min. 22.8 – 13.2

Capacity (MMscfd) 77

Material LTCS + 3mm CA


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

FUEL GAS PACKAGE


Description Requirement

Fuel Gas Scrubber Fuel Gas Filter Separator Fuel Gas Superheater Instrument Gas Receiver
Equipment
(V-6060) (S-6060A/B) (E-6060) (V-6070)
Size (mm) 1800 (ID) x 4500 (T/T) 273 (OD) x 2845 (S/S) - 1950 (ID) x 4900 (T/T)

Design 14 (203) 14 (203) 14 (203) 14 (203)


Pressure
(barg)/(psig)
Design 65 / -15 65 / -15 100 / -15 65 / 0
Temperature
(°C) max./min.
Operating 10.38 (151) 9.7 (141) 9 (131) 9 (131)
Pressure
(barg)/(psig)
Operating 2.8 – 3.8 2.3 – 3.3 2.3 – 3.3 / 52 (IN/OUT) 52
Temperature
(°C) max./min.
Material LTCS + 3mm CA LTCS + 3mm CA LTCS + 3mm CA CS + 3mm CA
Internal: SS316L Sheath: Incoloy 800
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

CLOSED DRAIN/FLARE KO DRUM

Description Requirement

Type Horizontal Vessel, below ground level installation

Size (mm) 3000 (ID) x 7500 (T/T)

Design Pressure (barg)/(psig) 12 (174) / FV

Design Temperature (°C) max./min. 65 / -45

Operating Pressure (barg)/(psig) 0.1 – 6.45

Operating Temperature (°C) max./min. AMB

Material LTCS + 3 mm CA + internal lining (epoxy) at bottom of


vessel
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

CLOSED DRAIN/
FLARE KO DRUM
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

OPEN DRAIN SYSTEM


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

OILY WATER TREATMENT


Description Requirement

Type Corrugated Plate Interceptor (CPI) Tank

Design Pressure (barg)/(psig) ATM + Full of water

Design Temperature (°C) max./min. 65 / 18

Operating Pressure (barg)/(psig) ATM

Operating Temperature (°C) max./min. AMB

Capacity (m3/hr) 11

Oil in water spec at inlet (mg/l) 1000 (normal operation)

Max oil in water spec at inlet (mg/l) 3000 (process upset)

Oil in water spec at outlet (mg/l) 15

Pumps 2x100% recovered oil pumps


2x100% treated water pumps
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

OILY WATER TREATMENT


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

FLARE SYSTEM

Description Requirement

Type of Flare Sonic

Capacity (MMscfd) 133

Seal Velocity

Size of Tip 12”


Material of Tip Inconel 625

Flare Stack Height 32 m, free standing

Number of Pilot 2 ea

Flame Detection Thermocouple

Ignition System High Energy


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

FLARE SYSTEM
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

LIQUID BURNER SYSTEM

Description Requirement

Size of Tip 3”

Capacity (MMscfd) Gas: 602 kg/hr; Liquid: 5998 kg/hr

Inlet Pressure (barg) 7.8

Atomizing Gas Flowrate (scfm) 625

Atomizing Gas Supply Pressure (barg) 9.31

Burner Orientation Horizontal

Burner Nozzle Height (mm) 1219 (above grade)

Shield Height (mm) 4ooo

Shield Material Zincalume G550 (Hi-Ten)

Flame Detection Thermocouple

Ignition System High Energy


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

LIQUID BURNER SYSTEM


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

FRESH WATER SYSTEM


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

DIESEL SYSTEM
Advanced EPC Sistem Penyediaan Air Minum (SPAM)

EMERGENCY DIESEL GENERATOR


Advanced EPC Sistem Penyediaan Air Minum (SPAM)

FIREWATER SYSTEM