Hazard Identification Risk Assessment and Determine Control (HIRADC)
Hazard Identification Risk Assessment and Determine Control (HIRADC)
Hazard Identification Risk Assessment and Determine Control (HIRADC)
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others - - - - - -
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Dust exposure Breathing difficult 1 2 2 (L) Face Mask (PPE) Site Supervisor
Falling Vehicle/ Injury
Barricade and signage’s on
Open Edge and near miss, 1 2 2 (L) Site Supervisor
Open Edge
property damage
Others - - - - - -
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Dust exposure Breathing difficult 1 2 2 (L) Face Mask (PPE) Site Supervisor
Diesel fume and
Potential Lung Face Mask with cartage/ filter Site Supervisor
carbon monoxide 1 3 3 (M)
infection in long run (PPE) Safety Supervisor
- exposure
Others - - - - - -
Building Uneven floor Safe Work Practice & Site & Logistic
6 Tripping / Body injury 1 2 2 (L)
materials surface Signage Supervisor
Potential Muscular Use of proper method of Site & Logistic
Heavy load 1 3 3 (M)
strain / Back pain lifting and Signage Supervisor
Dust exposure Breathing difficult 1 2 2 (L) Face Mask (PPE) Site Supervisor
Falling objects (bad
Safe Work Practice & Site & Logistic
Unsecure objects stacking) / Body 1 2 2 (L)
Signage Supervisor
injury
1. Safe Work Practice & Site & Logistic
Potential explosion
Signage Supervisor (1)
(Construction
Fire exposure 2 4 6 (M) 2. Fire Extinguisher, Safety Supervisor (2)
Cylinder) / Body
3. Emergency Evacuation Construction
injury
Training Manager (3)
Others - - - - - -
job delayed
Electrical wiring
Safe Work Practice &
exposure / Electrocution / Fatal 1 3 3 (M) Site Supervisor
Signage
Unguarded
Others - - - - - -
8 Tower Crane
8a Installation of:
Project Manager to determine
Using Mobile Falling / Fatal or structure design (floor surface)
Toppling of crane fracture or serious 1 4 4 (M) based on type of mobile crane – Project Manager
Crane injury to workers Update by Subcontractor during
initial approval.
1.Competent talkie-man
2.Regular briefing to talkie-man
and crane operator
3.Lifting apparatus to be
checked daily
4.Use correct lifting apparatus
Site Supervisor (1 to 6)
Struck by falling Falling / serious injury for hoisting
2 2 4 (M)
objects to workers 5.Ensure material stacked
Safety Supervisor (7)
properly
6.Use tag line to stabilize
hoisted materials
7. To carry out Too Box Meeting
before commence of works
Material
8b
Handing
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
8c Dismantling of:
-Mast Section Falling Object Not follow instruction or 1 3 3 (M) 1.Works briefing to workers Site Supervisor (1 to 8)
Telescopic using proper tools / before commence of work Safety Supervisor (9)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
9 Scaffold Falling / body injury 1. Use body harness and Worker & Site
Uneven Ground or fracture (hand / 1 3 3 (M) Supervision, Supervisor (1)
leg) 2. Work Permit, Safety Supervisor (2)
Falling / Fatal or 1. Use body harness and Worker & Site
Work at height fracture or serious 1 3 3 (M) Supervision, Supervisor (1)
injury 2. Work Permit, Safety Supervisor (2)
Unsecure objects Wearing of Safety Helmet Worker
Falling / Head injury 1 3 3 (M)
from above Catch net Safety Supervisor
1. Use body harness and Worker & Site
Lightning Heat / Body injury or
1 3 3 (M) Supervision, Supervisor (1)
exposure burn
2. Work Permit, Safety Supervisor (2)
1. Use body harness and Worker & Site
Rain / storm / Falling / Minor body
1 3 3 (M) Supervision, Supervisor (1)
wind exposure injury
2. Work Permit, Safety Supervisor (2)
Heat stress / Proper clothing and drink
Hot weather 2 1 2 (L) Site Supervisor
Dehydrate sufficient drinking water
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others - - - - - -
Others - - - - - -
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others - - - - - -
14 Generator Noise exposure Long term / Potential 1 3 3 (M) Use of Ear Muff Worker
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others - - - - - -
17 Mobile crane 1. Supervision
Potential Collision / Site Supervisor (1)
Unclear access 1 4 4 (M) 2. Safety Audit PMA from
Fatal or Body injury Safety Supervisor (2)
JKKP
Potential Collapse /
Uneven Ground 1 4 4 (M) Supervision Site Supervisor
Fatal / Body injury
Falling of carrying 1. Secure of Lifting Chain
Site Supervisor (1)
Unsecure objects objects / Fatal or 1 3 3 (M) Clamp
Safety Supervisor (2)
Head injury 2. Safety Audit
Potential Lightning
Lightning Proper Grounding and
Strike / Body injury or 1 4 4 (M) Site Supervisor
exposure Supervision
2nd degree burn
Falling of carrying 1. Secure of Lifting Chain
Site Supervisor (1)
Heavy load objects / Fatal or 2 3 6 (M) Clamp, Supervision
Safety Supervisor (2)
Head injury 2. Safety Audit
Others - - - - - -
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
PM,
space / Dehydrate Site Supervisor
Supervision,
Falling Object / Third
Heavy load 1 3 3 (M) Supervision Site Supervisor
Party Accident
Flying (Risk to public
Dust exposure safety) / potential 2 4 8 (L) OTP-EHS-MP-003 Supervisor
accident
Potential Electrical Lorry Driver,
Maintenance Inspection and
Fire exposure Spark / Fatal or Body 1 3 3 (M) Contractor & Site
Supervision
injury Supervisor
(Risk to public
Vehicle Speed Signage <20km Driver
safety) / potential 1 4 4 (M)
movement Supervision Site Supervisor
accident
Others - - - - - -
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Dust exposure Breathing difficult 1 2 2 (L) Face Mask (PPE) Site Supervisor
Unguarded water
surface / open Drowning / Fatal 1 3 3 (M) Barricading & Supervision Site Supervisor
pond
Long term
Chemical
Inhalation / Lungs Face Mask, Worker
exposure - carbon 2 3 6 (M)
infection or severe Supervision, Site Supervisor
monoxide
sickness
Not wearing Ear
Noise exposure protection, Potential 1 4 4 (M) Ear plug and Supervision Site Supervisor
Hearing loss
Others - - - - - -
Others
27 Formwork Unsecure timber / Training/Supervision follow
Falling / Body injury 1 3 3 (M) Site Supervisor
metal SOP/ WI
Working at height Fall of person / Fatal 1 3 3 (M) Work permit Site Supervisor
Falling objects / Fatal
Unsecure objects 1 3 3 (M) Netting Site Supervisor
/ Body injury
Uneven floor
Tripping / Body injury 1 3 3 (M) Housekeeping Site Supervisor
surface
Long exposure open Drink more water, Worker
Hot weather 1 2 2 (L)
space / Dehydrate Supervision, Site Supervisor
Wrong Lifting/
Use of proper method of
Heavy load Muscular strain /or 1 2 2 (L) Site Supervisor
lifting
Back pain
Dust exposure Breathing difficult 1 2 2 (L) Face Mask (PPE) Site Supervisor
Not wearing Ear
Noise exposure protection, Potential 1 4 4 (M) Ear plug and Supervision Site Supervisor
Hearing loss
Training/Supervision follow
Fire exposure Fatal / Body injury 2 3 6 (M) Site Supervisor
SOP/ WI
Others - - - - - -
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
surface Supervision
Potential Lightning
Lightning Proper Grounding and
Strike / Body injury or 1 4 4 (M) Site Supervisor
exposure Supervision
2nd degree burn
Rain / storm /
Minor body injury 2 3 6 (M) Supervision and SOP/ WI Site Supervisor
wind exposure
Long exposure open Drink more water, Worker
Hot weather 1 2 2 (L)
space / Dehydrate Supervision, Site Supervisor
Not wearing Ear
Noise exposure protection, Potential 1 4 4 (M) Ear plug and Supervision Site Supervisor
Hearing loss
Long term
Chemical
Inhalation / Lungs Face Mask, Worker
exposure - 2 3 6 (M)
infection or severe Supervision, Site Supervisor
Cement
sickness
Others
difficult
Others
30 Brickwork Collapse / Fatal /
Uneven ground 1 4 4 (M) Supervision/Work permit Site Supervisor
Body injury
Working on height Fall of person / Fatal 1 3 3 (M) Work permit Site Supervisor
Falling objects / Fatal Supervision and Temporary
Unsecure objects 1 3 3 (M) Site Supervisor
/ Body injury barricade
Uneven floor
Tripping / Body injury 1 3 3 (M) Housekeeping Site Supervisor
surface
Wrong Lifting/
Use of proper method of
Heavy load Muscular strain /or 1 2 2 (L) Site Supervisor
lifting
Back pain
Mild Breathing
Dust exposure 1 2 2 (L) Face Mask (PPE) Site Supervisor
difficult
Wet surface Slipping / Body injury 1 3 3 (M) Supervision and Signage’s Site Supervisor
Others
31 Plastering Working at height Fall of person / Fatal 1 3 3 (M) Provide safety harness Site Supervisor
Falling objects / Fatal Supervision and Temporary
Unsecure objects 1 3 3 (M) Site Supervisor
/ Head injury barricade
Uneven floor
Tripping / Body injury 1 3 3 (M) Housekeeping Site Supervisor
surface
Wrong Lifting/
Use of proper method of
Heavy load Muscular strain /or 1 2 2 (L) Site Supervisor
lifting
Back pain
Wet surface Slipping / Body injury 1 3 3 (M) Supervision and Signage’s Site Supervisor
Others
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others Supervisor
34 Painting Working at height Fall of person / Fatal 1 3 3 (M) Work permit Site Supervisor
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others
36 TNB sub- Fire exposure Fatal / Body injury 1 4 4 (M) Training/Supervision Site Supervisor
station
Lightning
Fatal 1 4 4 (M) Tool Box Meeting Site Supervisor
exposure
Electrical wiring Standard Operation
Electrocution / Fatal 1 3 3 (M) Site Supervisor
exposure Procedure
Others
37 Contractor, Netting
Falling objects / Body
Subcontractors Unsecure objects 1 4 4 (M) Safety Helmet & Safety Shoe Site Supervisor
injury
and Visitors (PPE)
having access 1. Safe Work Procedure
Uneven floor Site Supervisor (1)
to the Tripping / Body injury 2 3 6 (M) Monitoring
surface Safety Supervisor (2)
workplace 2. Safety Audit
Collision / Fatal /
Unclear access 2 3 6 (M) Housekeeping Site Supervisor
Body injury
Mild Breathing
Dust exposure 1 2 2 (L) Face Mask (PPE) Site Supervisor
difficult
Fire exposure Fatal / Body injury 1 4 4 (M) Training/Supervision Site Supervisor
Others
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Unguarded water
Potential Drowning / Barricade
surface / open 2 3 6 (M) Site Supervisor
Fatal Safe Work Practice
pond
Unguarded Potential Fatal / Body Signage
2 3 6 (M) Site Supervisor
Opening injury Barricade
Others
Uneven Ground Tripping / Body injury 1 3 3 (M) Safe Work Practice Site Supervisor
Potential Falling
Unsecure objects 1 3 3 (M) Temporary Barricade Site Supervisor
objects / Body injury
Noise exposure Mild noise, no impact 1 2 2 (L) Supervision Site Supervisor
Mild Breathing
Dust exposure 1 2 2 (L) Face Mask (PPE) Site Supervisor
difficult
Long exposure open Drink more water, Worker
Hot weather 1 2 2 (L)
space / Dehydrate Supervision, Site Supervisor
Muscular strain / Safe Work practice &
Heavy load 1 3 3 (M) Site Supervisor
Back pain Supervision
Others
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Others
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Stage 4 & 5 – Unsafe work Potential falling of 1. Safety Harness, Safety Officer/Safety
43b Casting of Lift practice work on workers from height / 2 4 8 (H) 2. Use of proper working Supervisor (1)
of Fin Wall external scaffold Fatal / death platform and access, Site Supervisor (2)
Potential Mold
Collapse/fall,
Unstable Shear 1. Ensure proper fitting of tie
damage most 2 4 8 (H) Site Supervisor
Wall rod
external scaffold and
fatal
Potential collapse of
1. Ensure the proper fitting for
external scaffold /
wall plug, Scaffold Erectors (1
Unstable scaffold serious material 2 4 8 (H)
2. Sufficient Installation of GI & 2)
damage and
Pipes
potential public injury
Potential falling of 1. Safety Harness, Safety Officer/Safety
Unstable scaffold workers from height / 2 4 8 (H) 2. Ensure the proper fitting for Supervisor (1)
Fatal / death wall plug, Scaffold Erectors (2)
Falling of Spilled Spillage of concrete 2 3 6 (M) 1. Installation of catch net, Safety Officer/Safety
of concrete cement, injury to 2. Effective communication Supervisor (1)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)
FAIRWAY TERRACE CONSTRUCTION SDN BHD Form No: AH001
Serial Number: Hazard Identification Risk Assessment And Determine Control (HIRADC) Issue / Revision
2015/01
0 0 0 2 01/01
Workplace: Activity: Activity carried out by: Location:
Construction Site Construction – Building Works Construction team – FTCSB Mercu MK (Menara D & G)
Probability: Severity: Total Risk Rating (TRR): Hierarchy of Control Guiding factor:
Improbable /Highly/Unlikely (1) Negligible (1) Probability x Severity = TRR a) Eliminate
Occasionally /Unlikely (2) Minor (2) Low (<2) b) Substitute
Medium (>3 and <6) c) Isolate
Probable /Likely (3) Major (3) d) Engineering Control
Frequent /Very Likely (4) Fatal (4) High (>8 and <16)
e) Administrative Control
f) Personal Protective Equipment (PPE)