900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: N/A Issued on: 18.07.2020


Contactor: hanlei@china-hei.com Stage: N/A Completion Date: 27.07.2020

Reviewer KE Document Control TEG Document Control NESPAK Document Control RE2 Document Control
Contact: Amir.ipbal@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: E113S-KTPS-Z0103-03

Drawing/Document Title: Section drawing of concrete block walkway

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 3
Besides the information discussed in the following, it is assumed that
2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 KE NIL Instead of concrete block walkway, HEI to provide pavers
with design patterns for walkway. For pattern HEI to
provide the drawing.

2. 0 KE NIL Top level of all walkways shall be at least 200mm raised


from adjacent road level, HEI to modify.

Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

One behalf ofthe Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

Page 2 of 2