Bar Bending Schedule

Project Name Bin Lahej Engineer Revision Doc.No:


Ref Dwg. No. NVP-200-Rev-00-(NVP-01) Approver Status Job in Hand Date: 3-Apr-21
Cutting Length of Bar (m)
Spacing
Bar no. Bar Shape L (m) W (m) H (m) Dia (mm) (mm) Length no's
(m) 8 10 12 16 20 25 28 32

Wall Horizental Bar -Wall 11.200 0.300 2.850 16 125 11.80 24 281

Wall Horizental Bar - Wall 11.200 0.300 2.850 16 125 11.80 24 281

Wall Vertical Bar - Wall 2.850 0.300 11.200 16 125 3.45 91 313

Wall Vertical Bar - Wall 2.850 0.300 11.200 16 125 3.45 91 313

Wall Horizental Bar -Wall 2.500 0.300 1.090 16 125 3.10 9.72 30

Wall Horizental Bar - Wall 2.500 0.300 1.090 16 125 3.10 9.72 30

Wall Vertical Bar - Wall 1.090 0.300 2.500 16 125 1.69 21 35

Wall Vertical Bar - Wall 1.090 0.300 2.500 16 125 1.69 21 35

Wall Horizental Bar -Wall 2.000 0.200 1.090 16 125 2.60 9.72 25

Wall Horizental Bar - Wall 2.000 0.200 1.090 16 125 2.60 9.72 25

Wall Vertical Bar - Wall 1.090 0.200 2.000 16 125 1.69 17 29

Wall Vertical Bar - Wall 1.090 0.200 2.000 16 125 1.69 17 29

Base Slab Top Bar - Base Slab 3.400 0.400 2.800 16 125 4.00 23.4 94

Base Slab Top Bar - Base Slab 3.400 0.400 2.800 16 125 4.00 23.4 94

Base Slab Bottom Bar - Base Slab 2.800 0.400 3.400 16 125 3.40 28.2 96

Base Slab Bottom Bar - Base Slab 2.800 0.400 3.400 16 125 3.40 28.2 96

Top Slab Top Bar - Top Slab 3.400 0.400 2.800 16 125 4.00 23.4 94

Top Slab Top Bar - Top Slab 3.400 0.400 2.800 16 125 4.00 23.4 94

Top Slab Bottom Bar - Top Slab 2.800 0.400 3.400 16 125 3.40 28.2 96

Top Slab Bottom Bar - Top Slab 2.800 0.400 3.400 16 125 3.40 28.2 96

Pipe Foundation Vertical Bar 1.050 0.300 0.700 16 100 1.65 8 13

Pipe Foundation Vertical Bar 1.000 0.300 0.700 16 100 1.60 8 13

Pipe Foundation Horizental Bar 1.000 0.300 0.700 16 100 1.60 8 13

Pipe Foundation Horizental Bar 1.000 0.300 0.700 16 100 1.60 8 13

Pipe Foundation Vertical Bar 1.050 0.300 0.700 16 100 1.65 8 13

Pipe Foundation Vertical Bar 1.000 0.300 0.700 16 100 1.60 8 13

Pipe Foundation Horizental Bar 1.000 0.300 0.700 16 100 1.60 8 13

Pipe Foundation Horizental Bar 1.000 0.300 0.700 16 100 1.60 8 13

LinkBar Horizental 0.250 0.300 11.200 10 125 0.25 90.6 22.7

Total Length (m) - 22.65 - 2,287.19 - - - -


Unit weight in kg/m 0.39 0.62 0.89 1.58 2.47 3.85 4.83 6.31
Weight in kg's - 13.96 - 3,609.95 - - - -
Total reinfocement Weight in kg's 3623.9
Concrete Steel/m3 Total Steel Steel/m3 Total Steel Actual Actual Amount
Sl No Description Unit No Rate Quantity Difference Difference
As per Tender As per Actual

1 NVP - 1 Kgs 4 3.00 17.74 125.00 2,217.50 204.22 3,622.90 1,405.40 16,864.78

2 NVP - 2 Kgs 1 3.00 23.93 125.00 2,991.25 204.22 4,887.03 1,895.78 5,687.35

3 NVP - 3 Kgs 2 3.00 19.64 125.00 2,455.00 204.22 4,010.92 1,555.92 9,335.52

4 NVP - 4 Kgs 1 3.00 76.71 125.00 9,588.75 204.22 15,665.87 6,077.12 18,231.36

5 NVP - 5 Kgs 2 3.00 25.07 125.00 3,133.75 204.22 5,119.85 1,986.10 11,916.57

6 NVP - 6 Kgs 1 3.00 50.43 125.00 6,303.75 204.22 10,298.92 3,995.17 11,985.50

Total 16,915.48 74,021.08


For 2 Nos AS PER AVAILABLE DRAWING

Concrete Steel/m3 Total Steel Steel/m3 Total Steel Actual Actual Amount
Sl No Description Unit No Rate
Quantity Difference Difference
As per Tender As per Actual

1 NVP - 1 Kgs 1 3.00 17.74 125.00 2,217.50 204.22 3,622.90 1,405.40 4,216.19

1 NVP - 1 Kgs 1 3.00 17.74 125.00 2,217.50 204.22 3,622.90 1,405.40 4,216.19