- Mid span
(L/d) = 30 ; d = (7500/30) = 250 mm
Therefore,
Overall depth, h = 288 + 35 + 8 + (12/2) = 337 mm :- 500 mm
Width, bw = 0.4h = 0.4(500) = 200 mm
Beam size = 200 mm x 500 mm
2) Nominal cover
Cnom = Cmin + C∆dev
:- Cnom = 26 + 10 = 36 mm ≈ 40 mm
1) Design action
7.5 m @ span
Action on Beam
i) Load on slab
53.24 kN/m
- Beam can consider as equal span if the different between shortest and longest
span is not more than 15%.
0.6F 0.6F
0.55F 0.55F 0.55F 0.55F 0.55F
0.45F
0 kN
0.45F
0.55F 0.55F 0.55F 0.55F 0.55F
0.6F 0.6F
0.11FL 0.11FL
0.08FL 0.08FL 0.08FL 0.08FL 0.08FL
kNm
0
Shear Force
Bending Moment
End-span
beff
beff,1 beff,2
b1 b1 bw b2 b2
Mid-span
End-span
ℎ𝑓
𝑀𝑓 = 0.567 𝑓𝑐𝑘 𝑏𝑓 ℎ𝑓 (𝑑 − )
2
110
𝑀𝑓 = 0.567(30)(2750)(110)(446 − )
2
= 2012 kNm
M = 269.53 kNm
𝑀
𝐾=
𝑏𝑓𝑑 2 𝑓𝑐𝑘
269.53𝑥106
𝐾=
(2750)(446)2 (30)
𝐾 = 0.016 < 𝐾𝑏𝑎𝑙
:- compression reinforcement is not required (singly reinforced)
𝐾
𝑧 = 𝑑 {0.5 + √0.25 − } ≤ 0.95𝑑
1.134
0.016
𝑧 = 𝑑 {0.5 + √0.25 − } ≤ 0.95𝑑
1.134
𝑧 = 0.99𝑑 ≥ 0.95𝑑
:- used Z = 0.95d
𝑀
𝐴𝑠 =
0.87 𝑓𝑦𝑘 𝑧
269.53𝑥106
𝐴𝑠 =
0.87 (500)(0.95)(446)
𝐴𝑠 = 1462𝑚𝑚2
:- Asmin (151 mm2) < Asprov (1610 mm2) < Asmax (4000 mm2) - Ok!
𝑀
𝐾=
𝑏𝑓𝑑 2 𝑓𝑐𝑘
209.63𝑥106
𝐾=
(2300)(446)2 (30)
𝐾 = 0.015 < 𝐾𝑏𝑎𝑙
:- compression reinforcement is not required (singly reinforced)
𝑧 = 0.99𝑑 ≥ 0.95𝑑
:- used Z = 0.95d
𝐴𝑠 = 1137𝑚𝑚2
:- Asmin (151 mm2) < Asprov (1260 mm2) < Asmax (4000 mm2) - Ok!
M = 329.42 kNm
𝑀
𝐾=
𝑏𝑤𝑑 2 𝑓𝑐𝑘
329.40𝑥106
𝐾=
(200)(446)2 (30)
𝐾 = 0.276 > 𝐾𝑏𝑎𝑙
:- compression reinforcement is required (doubly reinforced)
𝑧 = 0.58𝑑 ≤ 0.95𝑑
:- used Z = 0.58d
𝐾𝑏𝑎𝑙 𝑓𝑐𝑘 𝑏𝑑 2
𝐴𝑠 = + 𝐴′𝑠
0.87 𝑓𝑦𝑘 𝑧𝑏𝑎𝑙
(0.167)(30)(200)(446)2
𝐴𝑠 = + (763)
0.87 (500)(0.95)(446)
𝐴𝑠 = 1844 𝑚𝑚2
:- provide 4H25 (1960 mm2)
:- Asmin (151 mm2) < Asprov (196 mm2) < Asmax (4000 mm2) - Ok!
M = 239.58 kNm
𝑧 = 0.77𝑑 ≤ 0.95𝑑
:- used Z = 0.77d
:- Asmin (151 mm2) < Asprov (1470 mm2) < Asmax (4000 mm2) - Ok!
3 1
𝑉𝑚𝑖𝑛 = [0.035𝑘 2 𝑓𝑐𝑘 2 ] 𝑏𝑤 𝑑}
3 1
𝑉𝑚𝑖𝑛 = [0.035(1.67)2 (30)2 ] (200)(446)}
= 36.90 kN
𝑓𝑐𝑘
0.36 𝑏𝑤 𝑑 (1 − )𝑓
250 𝑐𝑘
𝑉𝑅𝑑,𝑚𝑎𝑥 = 1.0 ≤ 𝑐𝑜𝑡 𝜃 ≤ 2.5 (22° ≤ 𝜃 ≤ 45°)
(𝑐𝑜𝑡 𝜃 + 𝑡𝑎𝑛 𝜃)
30
0.36 (200)(446) (1 − ) 30
𝑉𝑅𝑑,𝑚𝑎𝑥 = 250
(𝑐𝑜𝑡 22 + 𝑡𝑎𝑛 22)
𝑉𝑅𝑑,𝑚𝑎𝑥 = 294.45 𝑘𝑁
𝐴𝑠𝑤 𝑉𝐸𝑑
=
𝑠 0.78𝑓𝑦𝑘 𝑑 cot 𝜃
𝐴𝑠𝑤 239.58 𝑥 103
=
𝑠 0.78(500)(446) cot 22
𝐴𝑠𝑤
= 0.556
𝑠
:- provide H8 – 175 c/c (0.575)
5) Deflection check
𝑙 𝜌0 1 𝜌′
( ) = 𝐾 [11 + 1.5√𝑓𝑐𝑘 ∙ + √𝑓 ∙ √ ]
𝑑 𝑏𝑎𝑠𝑖𝑐 𝜌 − 𝜌′ 12 𝑐𝑘 𝜌
𝑙 0.0055
( ) = 1.3 [11 + 1.5√30 ∙ + 0]
𝑑 𝑏𝑎𝑠𝑖𝑐 0.018 − 0
= 17.56
𝑙 𝑙
( ) = ( ) 𝑥 𝑀𝐹𝑟𝑒𝑖𝑛𝑓 𝑥 𝑀𝐹𝑠𝑝𝑎𝑛 𝑥 𝑀𝐹𝑓𝑙𝑎𝑛𝑔𝑒
𝑑 𝑎𝑙𝑙 𝑑 𝑏𝑎𝑠𝑖𝑐
𝑙 1610 7
( ) = 17.56 𝑥 ( ) 𝑥 ( ) 𝑥 0.8
𝑑 𝑎𝑙𝑙 1462 7.5
= 14.44
𝑙 𝐿
( ) =( )
𝑑 𝑎𝑐𝑡𝑢𝑎𝑙 𝑑
𝑙 7500
( ) =( )
𝑑 𝑎𝑐𝑡𝑢𝑎𝑙 446
= 16.81
𝑙 𝑙
:- ( ) > ( ) - Deflection check fail!
𝑑 𝑎𝑐𝑡𝑢𝑎𝑙 𝑑 𝑎𝑙𝑙
Solution:
i) Increase the beam depth (h).
ii) Reduce the beam span (L) by adding column in between the beam.
:- redesign the beam after changing the beam configuration and dimension
from beginning.
6) Cracking Check
By interpolation:
2H32
Sall = 229 mm S1
Smin(25 mm) < Sact(40 mm) < Sall(190 mm) :- Deflection check pass!
7) Detailing
2H16 2
3H25 2
3
8H-175 8H-175