GENERAL NOTES: 3a
6000 3350 2650 6000 6000 6000 6000 12215
1. ALL MECHANICAL WORKS HEREUNDER SHALL CONFIRM WITH THE 9400

LATEST EDITION OF THE PHILIPPINE MECHANICAL CODE, PLDT ME A


GENERAL CONDITION AND ME SPECIFICATION, RULES AND
FENCE
REGULATION OF NATIONAL, LOCAL CONCERNED AUTHORITIES, LOCAL
MUNICIPALITY/CITY.
2. THE CONTRACTOR SHALL CONDUCT ACTUAL SITE INSPECTION,
SURVEY, VERIFICATION AND CHECKING BEFORE THE SUBMISSION OF
BID IN ORDER TO FAMILIARIZE WITH THE ACTUAL CONDITION VERSUS
ME PLANS, ANY CONFLICT BETWEEN PLANS AND ACTUAL CONDITION, 26355
ACTUAL CONDITION WILL PREVAIL AND WINNING CONTRACTOR WILL
SUBMIT TO THE PLDT THE SHOP DRAWING FOR EVALUATION AND
APPROVAL. ANY REVISION/CONFLICT HAVE NO COST ADDITION OR NO
CONSTRUCTION BULLETIN TO ISSUE.
FUTURE
3. SUPPLY AND INSTALLATION OF TWO (2) 60,000BTU/HR (5TR) AND FOUR
(4) 120,000BTU/HR (10TR) FLOOR MOUNTED AIR-CONDITIONING UNIT.
EXPANSION
INCLUDING SUPPORTS, REFRIGERANT PIPES, DRAIN PIPES AND ALL
ITEMS REQUIRED FOR THE COMPLETION OF THE PROJECT. B
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT,
ACCESSORIES, SECURE NECESSARY PERMITS FOR INSTALLATION &
FENCE FENCE
PERFORM ALL THE WORK NECESSARY FOR COMMISSIONING AND
TESTING.
5. RESTORATION OF AFFECTED DAMAGE AREAS AND OTHER
MISCELLANEOUS ITEMS NECESSARY FOR THE COMPLETION OF THE
PROJECT. 23400

6. LEGWORK OF PERMITTING AND APPLICATION, TO BE HANDLED BY THE


CONTRACTOR.
7. PAYMENT & LEG WORKS FOR THE APPLICATIONS OF ALL PERMITS
SHALL BE HANDLED BY THE CONTRACTOR.

3RD FLOOR BUILDING LAYOUT


C PACU 208
UPS UPS UPS
PACU NO LABEL
ECB
PACU 212 PACU NO LABEL
ECB

PP 2H
CKT 8
ACCU 204, 5TR
936mm x 336mm x 1250mm
7.5TR 10TR 10TR
ACCU 205, 5TR
936mm x 336mm x 1250mm (DEFECTIVE) (WORKING) (WORKING)
PIIBLE-EL 15 KVA
LOADING

CKT 2
PP 2H
ASE ASE ASE ASE RECTIFIER RIELLO

ECB
SYSTEM 2 UPS
SYSTEM 2 SYSTEM 2 SYSTEM 1 SYSTEM 1
BANK 4 BANK 3 BANK 2 BANK 1 DOCK PIIBLE-EL

ECB
203
ASE
RECTIFIER

ECB
RECTIFIER 15 KVA
SYSTEM 2

DAECELB00 DAECELB0 DAECELB0 DAECELB0


DAECELB0 RDCL8001 RDCL_701P
6,7,8,9 10,11,12,13
1130mm x 1450mm x 1450mm

1130mm x 1450mm x 1450mm

DCPDB DCPDB
DCPDB DCPDB
SYSTEM 2

PDCL_6084 PDCL_6083
MSAP PH9 LEL01
RIELLO

CALAUAG PASACAO
1,2,3

FACING
DAEHU

1&11
DAECNPS001
FCU
UPS OSF ODF

NO LABEL, 7.5TR
ACCU 203, 10TR

ACU
PIIBLE-EL CU001

206
980.00 980.00

ASE
RECTIFIER RECTIFIER

ECB
SYSTEM 1

DAEHUAG001
SYSTEM 2
PROPOSED TO DISMANTLE

13 & 12
PRISM

FACING

& ATS1
500.00

4,5
ECB
208
PIIBLE-EL
RECTIFIER
ASE
DEFECTIVE PACU

ECB
RECTIFIER
SYSTEM 1

6000
SYSTEM 2

PDCL_80121
PIIBL

15 &14

18
ONFMS

1130mm x 1450mm x 1450mm

1130mm x 1450mm x 1450mm


ODF

ACCU 208, 10TR

NO LABEL, 7.5TR

EXTINGUISHER
BATTERY ROOM

PP 2H

17&16
CKT 3
ASE
RECTIFIER ODF

FIRE
SYSTEM 1

ASE

ACCU
RECTIFIER

201
SYSTEM 1
SMOCK

936mm x 336mm x 1250mm

936mm x 336mm x 1250mm


ASE
PIIBL-EL PIIBL-EL PIIBL-EL PIIBL-EL ROOM RECTIFIER

ACCU 201, 5TR

ACCU 202, 5TR


SYSTEM 1
SYSTEM 2 SYSTEM 2 SYSTEM 1 SYSTEM 1

CKT 10
PP 2H
ACCU BANK 4 BANK 3 BANK 2 BANK 1

D ROOM

2500 EQUIPMENT

E
ROOM

STORAGE

DCPDB

DCPDB
COMFORT 100G
SPARE

ROOM ROOM CONTROL


ROOM RENOVATION ROOM PFE
EXISTING COMFORT 40G
PR1(R)

ROOM TO BE ASE
SPARE
PFE
TTC-1
DEMOLISHED TO ODF PR2

EXTEND THE ACCU ASE PFE

6000 ROOM IN 2ND FLR ODF 100G SMY PM(R)

DLGEN 2
100G

DLGEN 1
DP RECT.
SEA PFE
100G TKO

2018
SW

40G SMY 40G SMY


40G SEA 40G SEA
ELECTRICAL

CIENA 100G

CONCENTRATING

40G TKO 40G TKO


40G SMY 40G SMY
EQUIPMENT

ALARM
SPARE
PFE
TL1
ROOM 236.00

SEA 100G
SMY 100G

CIENA
CIENA
NEC PFE
RFTE
TL2

MDP

UP
F
PACU 203 PACU 211
10TR PACU 204 5TR
10TR PACU 205 5TR

PP2H EDP UPS


(WORKING) (WORKING)
(WORKING) (DEFECTIVE)
LP2H

EXISTING STORAGE
PROPOSED TO DISMANTLE
ROOM TO BE
RENOVATED INTO DEFECTIVE PACU
COMFORT ROOM

4800

9590 1600
MOBILE
GENSET
6200

UP
2390
9000

G GENSET
4029

9410 AND
GUARD 7020

HOUSE
STAFF
11000 11000

HOUSE
1560 8810
14230
PUMP
EXISTING 3-167 KVA ROOM
TRANSFORMER
H
6420
VICINITY MAP
I

PLDT DAET LEGEND:


1 EXISTING SITE DEVELOPMENT PLAN EXISTING
ME-01
PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: 1 :500 .
3RD FLOOR BUILDING LAYOUT RISER DOWN GOING
TO 2ND FLOOR CEILING
HARD DRAWN COPPER TUBE
5
8"Ø LIQUID LINE
1-81"Ø GAS LINE
1305 1305 1305 1305
UPS UPS UPS ECB
PACU NO LABEL PROPOSED PACU 212 PACU NO LABEL

20AT, 230V, 3P
NEMA 1 ECB
CKT 8
PP 2H 300 600 600 900 600 460 10TR 578 STACU 4 578 10TR 578 10TR 578

ACCU 204, 5TR (STANDBY) 10TR ACU (WORKING) (WORKING) 2400


936mm x 336mm x 1250mm 1361 600 1500 3100
ACCU 205, 5TR PIIBLE-EL
936mm x 336mm x 1250mm
ASE ASE ASE ASE LOADING RECTIFIER 600 15 KVA
300

ECB
SYSTEM 2 RIELLO UPS
CKT 2
PP 2H

SYSTEM 2 SYSTEM 2 SYSTEM 1 SYSTEM 1


BANK 4 BANK 3 BANK 2 BANK 1 DOCK PIIBLE-EL
RECTIFIER 600
ASE
600
337
600 1000 600 1200 600 800 600 1200 300 1200 600 1220

ECB
RECTIFIER 15 KVA
ECB
203

SYSTEM 2

DAECELB00 DAECELB0 DAECELB0 DAECELB0


DAECELB0 RDCL8001 RDCL_701P
6,7,8,9 10,11,12,13
300

DCPDB
1130mm x 465mm x 1450mm

1130mm x 465mm x 1450mm

DCPDB DCPDB
SYSTEM 2 RIELLO UPS

PDCL_6084 PDCL_6083
MSAP PH9 LEL01
ACCU

CALAUAG PASACAO
FACING
1,2,3
DAEHU

1&11
DAECNPS001
OSF ODF
NO LABEL, 7.5TR
ACCU 203, 10TR

209

600 600 600 600 600 600


PIIBLE-EL ASE
300 CU001
RISER DOWN GOING TO RECTIFIER 600 RECTIFIER 600
ROOM

ECB
SYSTEM 1

DAEHUAG001
SYSTEM 2

13 & 12 15 &14
2ND FLOOR CEILING

DCPDB
PROP. LOT1

PRISM

& ATS1
FACING
TNT PH2 600

4,5
(CISCO) 600 600 600 600 600
PIIBLE-EL ASE
RECTIFIER
ECB

600 RECTIFIER 600

ECB
208

SYSTEM 1

PDCL_80121
SYSTEM 2 PROP. LOT1
TNT PH2 600 PIIBL

18
600 600 600 600 600 ONFMS
1130mm x 465mm x 1450mm

1130mm x 465mm x 1450mm

(CISCO)

ODF
NO LABEL, 7.5TR

ACCU 208, 10TR

EXTINGUISHER

PROPOSED
PROP. LOT1

17&16
ASE TNT PH2 600
600 600 600 600
ODF

ODF
RECTIFIER (CISCO)

FIRE
SYSTEM 1 900

PROP. DCPDB PROP. DCPDB


210

PROP. DCPDB PROP. DCPDB


PROP. LOT1

10, 11 & 12
(FEED A)

(FEED B)
7, 8 & 9
ASE TNT PH2 600 600 PROP. LOT1
600
BATTERY SMOCK
RECTIFIER
SYSTEM 1
(CISCO)
PROP. LOT1
600 TNT PH2
(CISCO)
ACCU

600
201

TNT PH2
PROP. LOT1
ROOM (CISCO)

(FEED A)
936mm x 336mm x 1250mm

(FEED B)
936mm x 336mm x 1250mm

600

1, 2 & 3
ASE PROP. LOT1

4, 5 & 6
TNT PH2 600
HARD DRAWN COPPER TUBE
ROOM
600 600 TNT PH2
RECTIFIER (CISCO)
PIIBL-EL PIIBL-EL PIIBL-EL PIIBL-EL
ACCU 202, 5TR
ACCU 201, 5TR

5 SYSTEM 1 (CISCO)
8"Ø LIQUID LINE
SYSTEM 2 SYSTEM 2 SYSTEM 1 SYSTEM 1
1-81"Ø GAS LINE BANK 4 BANK 3 BANK 2 BANK 1
300 300
CKT 10
PP 2H

ECB-1 75AT,
230V, 3P

ECB-2 75AT,
230V, 3P
PROP. 10TR
ACCU 1 & 2

1130

EQUIPMENT
465
ROOM
PROP. 10TR
ACCU 3 & 4

1130
ECB-3 75AT,
230V, 3P

ECB-4 75AT,
230V, 3P
HARD DRAWN COPPER TUBE 600 1000 600 1207
3 465
8"Ø LIQUID LINE
COMFORT

DCPDB

DCPDB
3
4"Ø GAS LINE
ACCU 5 & 6

ECB-5 40AT, 100G


PROP. 5TR

230V, 3P 600 600


ROOM SPARE
936
ECB-6 40AT,
230V, 3P CONTROL 300
PROP. PROP. 300 300 1004 600 1000 600 1000

336
PROP. ACU
MAIN PANEL
ROOM 600
6000ADC
RECTIFIER
(SYSTEM A)
6000ADC
RECTIFIER
(SYSTEM B)
FUTURE
EQUIPMENT PFE
600
PR1(R)
PROPOSED PARTITION WALL PROP. PROP.
40G
600
6000ADC 6000ADC FUTURE SPARE
TTC-1
600 RECTIFIER RECTIFIER EQUIPMENT ASE PFE
(SYSTEM A) (SYSTEM B) 600 600
ODF PR2
PROP. PROP.
600
6000ADC 6000ADC FUTURE
600 RECTIFIER RECTIFIER EQUIPMENT ASE PFE
(SYSTEM A) (SYSTEM B) 600
100G SMY 600 600
ODF PM(R)
ELECTRICAL PROP. PROP.
100G

DLGEN 2
DLGEN 1
DP RECT.

6000ADC 6000ADC FUTURE


600 600
RECTIFIER RECTIFIER EQUIPMENT SEA PFE
600
ROOM 100G TKO
(SYSTEM A) (SYSTEM B)
2018

600 600
SW

40G SMY 40G SMY


40G SEA 40G SEA
PROP. PROP.

CONCENTRATING
CIENA 100G

40G TKO 40G TKO


6000ADC 6000ADC

40G SMY 40G SMY


FUTURE

EQUIPMENT

ALARM
600

SPARE
RECTIFIER RECTIFIER EQUIPMENT
(SYSTEM A) (SYSTEM B) 600 600
600 PFE
600 600
TL1
PROP. PROP.

SEA 100G
SMY 100G
6000ADC 6000ADC FUTURE

CIENA
600

CIENA
RECTIFIER RECTIFIER EQUIPMENT NEC PFE
(SYSTEM A) (SYSTEM B) 600 RFTE 600
600 600 600
TL2
PROP. MDP 1000 1000 1000

1600AT

UP

20AT, 230V, 3P

20AT, 230V, 3P

20AT, 230V, 2P

20AT, 230V, 2P

20AT, 230V, 3P
1300
MTS PACU 203 PACU 211

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB
PROPOSED PROPOSED PROPOSED 578
PROPOSED PANEL FOR
590.00

RECTIFIER SYSTEM A STACU 1 578 10TR STACU 2 578


PACU 204 5TR
PROP. 578 10TR PROP. STACU 3
STACU 5 288 STACU 6 288
PP2H EDP UPS 10TR ACU (WORKING) 10TR ACU (WORKING)
5TR (WORKING) 5TR 10TR ACU
LP2H
506 506
1305 1305 1305 1305

HARD DRAWN COPPER TUBE


RISER DOWN GOING RISER DOWN GOING RISER DOWN GOING 5
8"Ø LIQUID LINE
TO 2ND FLOOR CEILING TO 2ND FLOOR CEILING TO 2ND FLOOR CEILING 1-18"Ø GAS LINE
HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE
5 5 3
8"Ø LIQUID LINE 8"Ø LIQUID LINE 3
8"Ø LIQUID LINE
8"Ø LIQUID LINE
1-81"Ø GAS LINE 1-81"Ø GAS LINE 3 3
4"Ø GAS LINE
4"Ø GAS LINE

LEGEND:
PROPOSED FCU EXISTING

PROPOSED ACCU PROPOSED


PLDT DAET

1 PROPOSED REFRIGERANT PIPE LAYOUT PROP. 20AT FCU ECB


REFRIGERANT PIPE:
ME-02 PROP. 40AT ACCU ECB
5
8"Ø LIQUIDLINE (10TR)
1-81"Ø GAS LINE (10TR)
PROP. 75AT ACCU ECB 3
8"Ø LIQUIDLINE (5TR)
3
4"Ø GAS LINE (5TR)
PROP. ACU PANEL
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT PIPE LAYOUT
ME-02
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: 1 :120 .
2ND FLOOR BUILDING LAYOUT
HARD DRAWN COPPER TUBE
RISER UP GOING TO 3RD FLOOR 5
8"Ø LIQUID LINE
EQUIPMENT ROOM 1-81"Ø GAS LINE

UNASSIGNED FIRE LADDER


ACCU ROOM SECURITY CONFERENCE
OFFICE OFFICE
RISER UP GOING TO
OPEN TO BELOW
3RD FLOOR ACCU ROOM

LINE OF CABLE
PULLING ROOM
ACCU BELOW
HARD DRAWN COPPER TUBE
ROOM 5
8"Ø LIQUID LINE
1-81"Ø GAS LINE

HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE
5 5 3 3
8"Ø LIQUID LINE 8"Ø LIQUID LINE 8"Ø LIQUID LINE 8"Ø LIQUID LINE
1-81"Ø GAS LINE 1-81"Ø GAS LINE 3
4"Ø GAS LINE
3
4"Ø GAS LINE

COMMON
JANITOR'S
TOILET
ROOM
SUPERVISOR'S
MAIN LOBBY
OFFICE STORAGE

ELECTRICAL
ROOM

UP
RISER UP GOING TO 3RD FLOOR RISER UP GOING TO 3RD FLOOR
EQUIPMENT ROOM EQUIPMENT ROOM RISER UP GOING TO 3RD FLOOR
EQUIPMENT ROOM

LEGEND:
NOTE: EXISTING
REFRIGERANT & DRAIN PIPES ARE HANGED/ PLACED PROPOSED
ON THE CEILING OF THE 2ND FLOOR
REFRIGERANT PIPE:
PLDT DAET 5
8"Ø LIQUIDLINE (10TR)

1 2ND FLOOR PROPOSED REFRIGERANT / DRAIN PIPE LAYOUT 1-81"Ø GAS LINE (10TR)
3
ME-03 8"Ø LIQUIDLINE (5TR)
3
4"Ø GAS LINE (5TR)

25mmØ PVC BLUE PIPE


DRAIN PIPE
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT/DRAIN PIPE LAYOUT ME-03
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: 1 :120 .
3RD FLOOR EQUIPMENT ROOM RISER DOWN GOING
HARD DRAWN COPPER TUBE
5
8"Ø LIQUID LINE
TO 2ND FLOOR CEILING 1-81"Ø GAS LINE
1305 1305 1305 1305
UPS UPS UPS ECB
PACU NO LABEL PROPOSED PACU 212 PACU NO LABEL

NEMA 1 ECB
20AT, 230V, 3P
300 600 600 900 600 460 10TR 578 STACU 4 578 10TR 578 10TR 578

(STANDBY) 10TR ACU (WORKING) (WORKING) 2400


1361 600 1500 3100
PIIBLE-EL
RECTIFIER 600 15 KVA

ECB
SYSTEM 2 300
RIELLO UPS

337
PIIBLE-EL 600 1000 600 1200 600 800 600 1200 300 1200 600 1220
ASE
RECTIFIER 600 600
RECTIFIER

ECB
15 KVA
SYSTEM 2

DAECELB00 DAECELB0 DAECELB0 DAECELB0


DAECELB0 RDCL8001 RDCL_701P
6,7,8,9 10,11,12,13
300

DCPDB DCPDB
DCPDB DCPDB
SYSTEM 2 RIELLO UPS

PDCL_6084 PDCL_6083
MSAP PH9 LEL01

CALAUAG PASACAO
FACING
1,2,3
DAEHU

1&11
DAECNPS001
600 600 600 600 600 600 OSF ODF
PIIBLE-EL ASE
300 CU001
RECTIFIER 600 RECTIFIER 600

ECB
SYSTEM 1

DAEHUAG001
SYSTEM 2

13 & 12 15 &14
PROP. LOT1

PRISM

& ATS1
FACING
TNT PH2 600

4,5
(CISCO) 600 600 600 600 600
PIIBLE-EL
ASE
RECTIFIER 600 600
RECTIFIER

ECB
SYSTEM 1

PDCL_80121
SYSTEM 2 PROP. LOT1
TNT PH2 600 PIIBL

18
(CISCO) 600 600 600 600 600 ONFMS
ODF

PROPOSED
PROP. LOT1

17&16
ASE TNT PH2 600
600 600 600 600
ODF

ODF
RECTIFIER (CISCO)
SYSTEM 1 900

PROP. DCPDB PROP. DCPDB


PROP. DCPDB PROP. DCPDB
PROP. LOT1

10, 11 & 12
(FEED A)

(FEED B)
7, 8 & 9
ASE TNT PH2 600 600 PROP. LOT1
600 600 TNT PH2
RECTIFIER (CISCO)
(CISCO)

SMOCK
SYSTEM 1 PROP. LOT1
TNT PH2 600
PROP. LOT1 (CISCO)

(FEED A)

(FEED B)
600

1, 2 & 3
ASE PROP. LOT1

4, 5 & 6
TNT PH2 600

ROOM RECTIFIER
SYSTEM 1
600
(CISCO) 600 TNT PH2
(CISCO)

300 300

EQUIPMENT
ROOM

600 1000 600 1207

DCPDB

DCPDB
100G
600 600
SPARE

300
PROP. PROP. 300 300 1004 600 1000 600 1000
6000ADC 6000ADC FUTURE
600 RECTIFIER RECTIFIER EQUIPMENT PFE
(SYSTEM A) (SYSTEM B) 600
PR1(R)
PROP. PROP.
40G
600
6000ADC 6000ADC FUTURE SPARE
600 RECTIFIER RECTIFIER EQUIPMENT ASE PFE
(SYSTEM A) (SYSTEM B) 600 600
ODF PR2
PROP. PROP.
600
6000ADC 6000ADC FUTURE
600 RECTIFIER RECTIFIER EQUIPMENT ASE PFE
(SYSTEM A) (SYSTEM B) 600
100G SMY 600 600
ODF PM(R)
PROP. PROP.
100G

DLGEN 2
DLGEN 1
6000ADC 6000ADC FUTURE
600 600
RECTIFIER RECTIFIER EQUIPMENT SEA PFE
(SYSTEM A) (SYSTEM B) 600 100G TKO 600 600
SW

40G SMY 40G SMY


40G SEA 40G SEA
PROP. PROP.

CONCENTRATING
CIENA 100G

40G TKO 40G TKO

40G SMY 40G SMY


6000ADC 6000ADC FUTURE

EQUIPMENT

ALARM
600

SPARE
RECTIFIER RECTIFIER EQUIPMENT 600 PFE
(SYSTEM A) (SYSTEM B) 600 600 600 600
TL1
PROP. PROP.

SEA 100G
SMY 100G
6000ADC 6000ADC FUTURE

CIENA
600

CIENA
RECTIFIER RECTIFIER EQUIPMENT NEC PFE
(SYSTEM A) (SYSTEM B) 600 RFTE 600 600 600 600
1000 1000 1000 TL2

LEGEND:
20AT, 230V, 3P

20AT, 230V, 3P

20AT, 230V, 2P

20AT, 230V, 2P

20AT, 230V, 3P
1300
PACU 203 PACU 211
NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB
PROPOSED PROPOSED PROPOSED 578
PROPOSED PANEL FOR
RECTIFIER SYSTEM A STACU 1 578 10TR STACU 2 578
PACU 204 5TR
PROP. 578 10TR PROP. STACU 3
STACU 5 288 STACU 6 288
10TR ACU (WORKING) 10TR ACU (WORKING)
5TR (WORKING) 5TR 10TR ACU EXISTING
506 506
1305 1305 1305 1305

HARD DRAWN COPPER TUBE


RISER DOWN GOING RISER DOWN GOING RISER DOWN GOING 5
PROPOSED
8"Ø LIQUID LINE
TO 2ND FLOOR CEILING TO 2ND FLOOR CEILING TO 2ND FLOOR CEILING 1-81"Ø GAS LINE
HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE REFRIGERANT PIPE:
5 5 3
8"Ø LIQUID LINE 8"Ø LIQUID LINE 3
8"Ø LIQUID LINE 5
8"Ø LIQUID LINE
1-81"Ø GAS LINE 1-81"Ø GAS LINE 3 8"Ø LIQUIDLINE (10TR)
4"Ø GAS LINE
3
4"Ø GAS LINE
1-81"Ø GAS LINE (10TR)
3
8"Ø LIQUIDLINE (5TR)
3
PLDT DAET 4"Ø GAS LINE (5TR)

1 PROPOSED EQPT. RM. LAYOUT PROPOSED FCU


ME-04
PROPOSED ACCU

PROP. 20AT FCU ECB

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
PROPOSED EQPT. RM. LAYOUT
ME-04
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: 1 :90 .
3RD FLOOR BUILDING LAYOUT 25mmØ PVC BLUE PIPE;
TAP TO THE NEAREST
EXISTING DRAIN LINE
1305 1305 1305 1305
UPS UPS UPS ECB
PACU NO LABEL PROPOSED PACU 212 PACU NO LABEL

20AT, 230V, 3P
NEMA 1 ECB
300 600 600 900 600 460 10TR 578 STACU 4 578 10TR 578 10TR 578

PP 2H
CKT 8
ACCU 204, 5TR (STANDBY) 10TR ACU (WORKING) (WORKING) 2400
936mm x 336mm x 1250mm 1361 600 1500 3100
ACCU 205, 5TR PIIBLE-EL
936mm x 336mm x 1250mm
ASE ASE ASE ASE LOADING RECTIFIER 600 15 KVA

ECB
SYSTEM 2 300
RIELLO UPS
CKT 2
PP 2H

SYSTEM 2 SYSTEM 2 SYSTEM 1 SYSTEM 1


BANK 4 BANK 3 BANK 2 BANK 1 DOCK PIIBLE-EL
RECTIFIER 600
ASE
RECTIFIER 600
337
600 1000 600 1200 600 800 600 1200 300 1200 600 1220

ECB
15 KVA
ECB
203

DAECELB00 DAECELB0 DAECELB0 DAECELB0


SYSTEM 2

DAECELB0 RDCL8001 RDCL_701P


6,7,8,9 10,11,12,13
300

DCPDB
1130mm x 465mm x 1450mm

1130mm x 465mm x 1450mm

DCPDB DCPDB
SYSTEM 2 RIELLO UPS

MSAP PH9 LEL01

PDCL_6084 PDCL_6083
ACCU

CALAUAG PASACAO
FACING
DAEHU

1,2,3

1&11
DAECNPS001
OSF ODF
NO LABEL, 7.5TR
ACCU 203, 10TR

209

600 600 600 600 600 600


PIIBLE-EL ASE
300 CU001
RECTIFIER 600 RECTIFIER 600
ROOM

ECB
SYSTEM 1

DAEHUAG001
SYSTEM 2

13 & 12 15 &14
DCPDB
PROP. LOT1

PRISM

& ATS1
FACING
TNT PH2 600

4,5
(CISCO) 600 600 600 600 600
PIIBLE-EL ASE
RECTIFIER
ECB

600 RECTIFIER 600

ECB
208

SYSTEM 1

PDCL_80121
SYSTEM 2 PROP. LOT1
TNT PH2 600 PIIBL

18
600 600 600 600 600 ONFMS
1130mm x 465mm x 1450mm

1130mm x 465mm x 1450mm

(CISCO)

ODF
NO LABEL, 7.5TR

ACCU 208, 10TR

EXTINGUISHER

PROPOSED
PROP. LOT1

17&16
ASE TNT PH2 600
600 600 600 600
ODF

ODF
RECTIFIER (CISCO)

FIRE
SYSTEM 1 900

PROP. DCPDB PROP. DCPDB


210

PROP. DCPDB PROP. DCPDB


PROP. LOT1

10, 11 & 12
(FEED A)

(FEED B)
7, 8 & 9
ASE TNT PH2 600 600 PROP. LOT1
600
BATTERY SMOCK
RECTIFIER
SYSTEM 1
(CISCO)
PROP. LOT1
600 TNT PH2
(CISCO)
ACCU

600
201

TNT PH2
PROP. LOT1
ROOM (CISCO)

(FEED A)
936mm x 336mm x 1250mm

(FEED B)
600
936mm x 336mm x 1250mm

1, 2 & 3
ASE PROP. LOT1

4, 5 & 6
TNT PH2 600

ROOM
600 600 TNT PH2
RECTIFIER (CISCO)
PIIBL-EL PIIBL-EL PIIBL-EL PIIBL-EL
ACCU 202, 5TR
ACCU 201, 5TR

SYSTEM 1 (CISCO)
SYSTEM 2 SYSTEM 2 SYSTEM 1 SYSTEM 1 300 300
BANK 4 BANK 3 BANK 2 BANK 1
CKT 10
PP 2H

ECB-1 75AT,
230V, 3P

ECB-2 75AT,
230V, 3P
PROP. 10TR
ACCU 1 & 2

1130

EQUIPMENT
465
ROOM
PROP. 10TR
ACCU 3 & 4

1130
ECB-3 75AT,
230V, 3P

ECB-4 75AT,
230V, 3P

600 1000 600 1207


465

COMFORT

DCPDB

DCPDB
ACCU 5 & 6

ECB-5 40AT,
100G
PROP. 5TR

230V, 3P 600 600


ROOM SPARE
936
ECB-6 40AT,
230V, 3P
CONTROL 300
PROP. PROP. 300 300 1004 600 1000 600 1000

336
PROP. ACU
MAIN PANEL
ROOM 600
6000ADC
RECTIFIER
(SYSTEM A)
6000ADC
RECTIFIER
(SYSTEM B)
FUTURE
EQUIPMENT PFE
600
PR1(R)
PROPOSED PARTITION WALL PROP. PROP.
40G
600
6000ADC 6000ADC FUTURE SPARE
TTC-1
600 RECTIFIER RECTIFIER EQUIPMENT ASE 600
PFE
(SYSTEM A) (SYSTEM B) 600
ODF PR2
PROP. PROP.
600
6000ADC 6000ADC FUTURE
600 RECTIFIER RECTIFIER EQUIPMENT ASE PFE
(SYSTEM A) (SYSTEM B) 600
100G SMY 600 600
ODF PM(R)
ELECTRICAL PROP. PROP.
100G

DLGEN 2
DLGEN 1
DP RECT.

6000ADC 6000ADC FUTURE


600 600
RECTIFIER RECTIFIER EQUIPMENT SEA PFE
600 100G TKO
ROOM
(SYSTEM A) (SYSTEM B)
2018

600 600
SW

40G SMY 40G SMY


40G SEA
PROP. PROP.

CONCENTRATING
CIENA 100G

40G TKO 40G TKO


6000ADC 6000ADC

40G SMY 40G SMY


FUTURE

EQUIPMENT

ALARM
600

SPARE
RECTIFIER RECTIFIER
(SYSTEM A) (SYSTEM B)
EQUIPMENT
600 600
600 PFE
600 600
TL1
PROP. PROP.

SEA 100G
SMY 100G

40G SEA
6000ADC 6000ADC FUTURE

CIENA
600

CIENA
RECTIFIER RECTIFIER EQUIPMENT NEC PFE
(SYSTEM A) (SYSTEM B) 600 RFTE 600 600 600
600
TL2
PROP. MDP 1000 1000 1000

1600AT

UP

20AT, 230V, 3P

20AT, 230V, 3P

20AT, 230V, 2P

20AT, 230V, 2P

20AT, 230V, 3P
1300
MTS PACU 203 PACU 211

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB

NEMA 1 ECB
PROPOSED PROPOSED PROPOSED 578
PROPOSED PANEL FOR
590.00

RECTIFIER SYSTEM A STACU 1 578 10TR STACU 2 578


PACU 204 5TR
PROP. 578 10TR PROP. STACU 3
STACU 5 288 STACU 6 288
PP2H EDP UPS 10TR ACU (WORKING) 10TR ACU (WORKING)
5TR (WORKING) 5TR 10TR ACU
LP2H
506 506
1305 1305 1305 1305

25mmØ PVC BLUE PIPE; 25mmØ PVC BLUE PIPE; 25mmØ PVC BLUE PIPE;
TAP TO THE NEAREST TAP TO THE NEAREST TAP TO THE NEAREST
EXISTING DRAIN LINE EXISTING DRAIN LINE EXISTING DRAIN LINE

LEGEND:
EXISTING

PROPOSED
PLDT DAET
NOTE: 25mmØ PVC BLUE PIPE
1 PROPOSED DRAIN PIPE LAYOUT DRAIN PIPE
EXISTING DRAIN PIPE SHOULD BE DE-CLOGGED PRIOR ME-05
TO TAPPING OF THE PROPOSED DRAIN PIPE. PROPOSED FCU

PROPOSED ACCU
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
PROPOSED DRAIN PIPE LAYOUT
ME-05
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: 1:120 .
ACCU-3 ACCU-1
(10TR) (10TR)

ACCU-5
(5TR) ACCU-4 ACCU-2
(10TR) (10TR)

ACCU-6
(5TR)

NOTE: PLDT DAET


THE ACCU'S ARE FACING THE 1 PROPOSED ACCU LAYOUT
LOUVER WINDOWS ME-06

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
PROPOSED ACCU LAYOUT
ME-06
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: NTS .
CONCRETE CEILING

AR
EB
GL AL
AN ST AR
D E EB
PE GL AL
AN ST
25mmØ DRAIN LINE TAP TO D E
25mmØ DRAIN LINE TAP TO PE

m NEAREST DRAIN CONNECTION


NEAREST DRAIN CONNECTION
6 00m
mm
600

P-TRAP
P-TRAP ±1.75m.

10TR STACU MOUNTING DETAILS 5 TR STACU MOUNTING DETAILS ±2.05m.

ACCU 5TR
ACCU 10TR
936mm x 336mm x 722mm
1130mm x 465mm x 1450mm
FFL ±0.6m.

STACU MOUNTING DETAILS

CONCRETE
PADESTAL
PLDT DAET

1 10TR/5TR MISCELLANEOUS DETAILS


10TR ACCU MOUNTING DETAILS 5TR ACCU MOUNTING DETAILS ME-07

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
10TR/5TR MISCELLANEOUS DETAILS ME-07
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: NTS .
CANVAS CLOTH
(FOR CONCEALED PIPES)

GA. #26 ALUMINUM


SHEET CLADDING
(FOR EXPOSED PIPES OUTDOOR)

PIPE INSULATION
AS PER SPECIFICATIONS

NON-FLAMMABLE
ADHESIVE GLUE

REFRIGERANT SUCTION LINE OR


CHILLED WATER LINE

1 PIPE INSULATION DETAILS 2 PACU DRAIN PIPE DETAIL 3 ACCU SUPPORT DETAIL
ME-08 ME-08 ME-08

WALL
25mm 25mm
CAULK OR
THICKNESS
NON SHRINK GROUT GA 20 PLAIN
G.I. SHEET
REFRIGERANT PIPE PIPE CLAD
INSULATION
INCLUDING
PIPE O.D.

OPENING

8mmØ ROUNDED BAR


40mm MIN. CLEARANCE ANCHOR WELDED TO
ALL AROUND
B.I. PLATE
25mm THK. ANNULAR
ROLLED BI PLATE
RUBBER SEAL
G.A. 16 WELDED
JOINT PIPE SLEEVE

4 TYPICAL PIPE THRU WALL 5 PIPE HANGER DETAIL 6 PIPE SUPPORT DETAIL
ME-08 ME-08 ME-08

PLDT DAET

1 10TR/5TR MISCELLANEOUS DETAILS


ME-08

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: SUPPLY AND INSTALLATION OF 4x10TR ACU PROFESSIONAL ELECTRICAL ENGINEER CHECKED BY:
10TR/5TR MISCELLANEOUS DETAILS
ME-08
CORPORATION
SITE NAME: PLDT DAET PRC No: PTR No: REVIEWED BY:
PUROK 4, BAGASBAS, DAET, CAMARINES
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
NORTE
SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 122°58'51" LATITUDE: 14°08'24" PLACE ISSUE: DATE APPROVED: NTS .