SAFE WORK PROCEDURE

FORM 5.19.3 SWP NO: 01 REV: 01


DEPT/SECTION: Civil Works EMPLOYEE JOB TITLE: Foreman, Labor, Helper
STEP JOB TASK TITLE: Excavation
JOB STEP POTENTIAL HAZARDS CONTROLS OBSERVATION
# Steps in the What could cause injury, loss, Required to minimize/eliminate hazard
process/task damage, interruption or
pollution

1 Mechanical Excavation  Contact with buried UG  Competent person shall conduct inspection Acceptable
use of services, prior to excavation operation to plan and
excavator/backhoe  Collapse of excavation oversees operation and able to recognize any
 dust, weather condition, existing or potential excavation dangers.
fall of  Competent person shall determine the type of
personnel/material to soil and the safety measures to be execute.
the excavation,  "As-built" drawings shall be reviewed prior to
 hit by excavator or tool the start of digging any excavation in order to
used for manual identify the presence, type and location of
excavation buried services.
 Contact with existing  If it is suspected that underground services are
facilities and buried in a radius of 10 meters within the
equipment’s planned location of the excavation, or if a
 Damage to existing doubt exists regarding the accuracy of the as-
underground utilities built drawings, scanning for buried utilities
(water/flooding, power must be performed with appropriate
& or communication equipment operated by a competent person.
outage), respiratory  The exact location of buried services shall be
problem, dehydration, noted on the documents pertaining to the
sunburn, heat stress, excavation (e.g. risk assessment, permit to
fatal injury, damage to work, Point of Work Risk Assessment) and
materials/property marked on the work location in accordance
 Electrocution to with the local standards (flags, painted, etc.)
personnel that caused prior to digging the excavation.
serious injury and even  Hand digging must be considered when
fatality digging an excavation near a known buried
service. Hand digging is mandatory when
excavating near any flammable or explosive
STEP JOB STEP POTENTIAL HAZARDS CONTROLS OBSERVATION
# Steps in the What could cause injury, loss, Required to minimize/eliminate hazard
process/task damage, interruption or
pollution
service.
2 General requirements Acceptable
after Excavation  Falls into trenches or  All exposed cables and pipes shall be
excavations adequately protected and supported when an
 Tripping over excavation is opened.
equipment,
 Debris and spoil  Barricade & safety signs to be in place , proper
 excavated material or PPE's be used , toolbox talks regarding
other objects falling on excavation safety, signal man/banksman
workers availability
 Unstable adjacent
structures  Means of prevention for vehicle and workers
 Mishandled or poorly falling in to the excavation or causing collapse
placed materials (e.g. stop block, hard barrier)
 incidents involving  Slope and step(sloping/benching) to be
vehicles and other maintained to prevent collapse
mobile equipment  Warning signs to be installed; Walling
protection to be made for excavations on a
sandy type soil
3 General Housekeeping Acceptable
and removal waste  Improper handling  Use of proper PPE's
materials generated Contact with sharp  Manual handling techniques & proper
from sites edges ergonomics orientation
 Obstruction on  Waste segregation and proper removal of
passageway waste at site
 Exposed with dust  Provision of waste bins and proper disposal of
 Slip, trip and fall waste generated from the site
 Proper training and awareness in dealing with
waste and hazardous material

Personal Protective Equipment (Check the box for required PPE)


STEP JOB STEP POTENTIAL HAZARDS CONTROLS OBSERVATION
# Steps in the What could cause injury, loss, Required to minimize/eliminate hazard
process/task damage, interruption or
pollution
Type Description Type Description
           
           
           
           
           
           
           
           
           
           
           
           
           
     
     
     
     
     
     

Name & Title Signature Date


Prepared by:
Reviewed and
approved by: