RISK ASSESSMENT FOR PERSONAL ROTECTIVE EQUIPMENT

ELEMENT 2.17 – Footwear (Foot Protection)


PROJECT TITLE: 380kV OHTL from JEC-JRP Abha East 380kV BSP
Contract No. : 4400005257
Footwear (Foot Protection) Hazard Identification and Risk Assessment
Any accident Risk Assessment (Optional)
Describe Each
in the past
If Yes, Specify Identified Are there any controls for Severity Exposure and Score
Does this hazard related to this
Exact Location Hazard this hazard? Probability (Severity x
exist in your hazard?
Hazard Potential Exposure and
Hazard Type area or process? (First aid or
Sub-type Hazards (Add as many (Add as many Yes/No (Choose from (Choose from Probability)
recordable
lines as needed lines as 1 to 5 1 to 5 See
Yes / No accumulated
per sub-type) needed per If Yes, please describe according to according to prioritization
in time)
sub-type) rating) rating) action plan
Yes /No
Physical

Workers
intended to
Stringing
Is there any climb the Yes, provision of anti-slip
Activities,
Personnel instance of towers to Safety Shoes.
Erection
falling from slipping during Yes perform No Periodic inspection and 3 4 12
Activities and
height climbing at various task replacement if deem
Splicing
towers? related to necessary.
Activities
their
functions.
Yes, one step surfaces had
Uneven
Office, Store been demarcated to be
surfaces one
Yard, Camps & easily recognized.
Uneven walking step tripping
Project Site (Civil Toolbox talks were
Tripping surfaces or Yes hazards. No 2 3 6
Group, Stringing conducted daily to remind
rough terrain. Sandy terrain
Group & workers of the current
and marl road
Erection Group) terrain condition of the
at site.
workplace.
Is there any
Unsecured
chance that the
Project Site wooden box Yes, housekeeping is
Punctures from worker might be
Yes (Stringing cover with No emphasized before, during 2 3 6
nails punctures from
Group) protruding and after task completion.
any protruding
nails.
objects?
Falling Unsecured Yes Office, Store Hand tools No Yes, area of activity 2 3 6
materials, tools materials, tools Yard, Camps & such as properly barricaded, TBT
and equipment & equipment Project Site (Civil spanners etc., were conducted prior to
falling from Group, Stringing portable the task. Stacking of
height. Group & equipment materials in safe manner
Improper Erection Group) such as and inspection of stacking
Prepared by: Owen Villarino Approved by: M. Ramesh Element 2.17 Page No: Page 1 of 2 Revision No: 00
Reference No:
RISK ASSESSMENT FOR PERSONAL ROTECTIVE EQUIPMENT
ELEMENT 2.17 – Footwear (Foot Protection)
PROJECT TITLE: 380kV OHTL from JEC-JRP Abha East 380kV BSP
Contract No. : 4400005257
hydraulic conducted by stacking
stacking.
press etc. inspector periodically.
Workers may
Yes, safe working distance
experience
Project Site; Civil Existing tower is strictly observed.
Electrical

electric shock
Working near Group, Stringing lines near the Toolbox talks were
due to the Yes No 5 2 10
live lines Group and worker’s conducted prior to the
proximity of live
Erection Group location. activity. Permit system is
electrical lines in
implemented.
the workplace.

TEAM WHO FORMULATED THE RISK ASSESSMENT


Name Designation Signature
Vishvak Raja HSE Officer :Risk Assessment Date 09-09-2017
Owen Villarino HSE Coordinator 08-09-2018
Charles Chua Sr. Electrical Engineer :Risk Assessment Review Date

01-01-2017

01-01-2018

Prepared by: Owen Villarino Approved by: M. Ramesh Element 2.17 Page No: Page 2 of 2 Revision No: 00