RA Equipment Mobilization
RA Equipment Mobilization
Project Name: 380kV OHTL from JEC-JRP Abha East 380kV BSP Contract No 4400005257 Permit No. Reference No.
RA TEAM (NAMES) DESIGNATION SIGNATURES TASK/ACTIVITY/PROCESS NAME RISK EVALUATION TABLE
1. Mr. Gijo M. Eapen Civil Surveyor ________________ PERSON 2 3 6
2. Mr. Venkatesan Survey Engineer – NCC ________________ RISK FACTOR PROBABILITY
EXPOSED Remote Possible Probable
3. Mr. Vishvak Rajha Safety Officer- NCC ________________
4. Mr. Ismail Tarique Site Engineer ________________ EQUIPMENT MOBILIZATION E – SEC Employee / High RiskEliminate; WSWP to 6
Consultant 25 - 36 Major/Fatal Injury M M H
reduce risk to acceptable level
SEVERITY
5. Mr. Usman Surveyor ________________
6. Mr. Mudassir Supervisor ________________
WORKS FOR OHTL
C – Contractors /
Medium RiskAcceptable 4
7. Mr Owen Villarino HSE Coordinator ________________ 12 - 24 only with full implementation L M M
Sub-contractors Reportable Injury
8. Mr. Sirajudeen Khan Foreman ________________ WORK LOCATION: of all control measures.
O – Others, such as Maintainall basic disciplines 2
Public, visitor 1 - 11 First Aid or Minor L L M
and clients. and controls.
DEPARTMENT/AREA APPROVED BY MANAGER/SUPERVISOR: DATE : August 27, 2017 NEXT REVIEW DATE: February 26, 2018
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk.
RISK ASSESSMENT
HAZARD IDENTIFICATION CONTROL Consequences X Likelihood =
RISK REDUCTION ACTION PLAN
Consequences X Likelihood = Risk Ranking
Risk Ranking
Consequence
Consequence
Implemented
Risk Ranking
Risk Ranking
(Possible incident) Follow up by
Exposed
Likelihood
Likelihood
Workplace/Activity/
Controls
Yes/No
[What can go wrong]
IMPROVED EXISTING CONTROLS Whom (name)
HAZARD EXISTING CONTROLS
No.
Prepared by: Owen Villarino/ HSE Coordinator Approved by: M. Ramesh/ Construction Manager Element Reference No: 2.8 Page No: Revision No:
Signature: Signature SEC EHV FORMS 2.8 G 4 Page 1 of 1 00