OEI - Company Presentation For Vietnam Offshore Wind-Farm EPC Contractor-2021

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

COMPANY INTRODUCTION AND PRESENTATION

FOR OFFSHORE WINDFARM CONSTRUCTION SERVICES

www.oei.com.vn
This document is generated by OEI and confidential and the information is intended only for the use of the individual to whom it is addressed.
If you are not the intended recipient, or the employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any use, dissemination, distribution or copying of this document is STRICTLY PROHIBITED.
PART 1 - COMPANY INTRODUCTION
COMPANY GENERAL
1. Company Profile
▪ Tên Công ty tiếng Việt: Công ty Cổ phần Dịch vụ Lắp đặt Công trình Năng lượng Biển
▪ Company name: Offshore Energy Installation JSC.
▪ Brief name: OEI
▪ Capital: 50 Billions VNĐ
▪ Assets: 150 Billions VNĐ
2. Business Registered Office
▪ 89C Nguyen Van Troi Street, Ward. 4, Vung Tau City, Vietnam
3. Company Operating Office:
▪ Level 2, VSP Service Building, No. 44 30/4 Street, Ward. 9, Vung Tau City, Vietnam
4. Contact details:
▪ Tel: +84 (0) 254 6295268 Fax: +84 (0) 254 3526981
▪ Email: info@oei.com.vn Web: www.oei.com.vn
COMPANY GENERAL
1. Company Core Business
▪ Project Management Service;
▪ Marine Fleet Operating and Maintenance Services.
▪ Transportation and Installation (T&I) Services for Wind Farm and Oil & Gas facilities;
▪ Operations and Maintenance (O&M) Services for Wind Farm and Oil & Gas facilities;
▪ Removal and Decommissioning Services for Wind Farm and Oil and Gas facilities.
▪ T&I/O&M Research and Development (R&D) for Wind Farm and Oil & Gas industry.

2. Equipment & Facilities


▪ Logistic port facilities including yard, warehouses, maintenance workshops within Vung Tau area;
▪ Heavy-duty installation barges for WTG foundation, tower and turbine installation;
▪ Heavy-duty installation barge for WTG sub-marine cable laying/burial;
▪ Heavy-duty maritime facilities for transportation, installation and Decommissioning of Oil & Gas industry;
▪ Installation aids and equipment for Wind Farm and Oil & gas industry.
COMPANY ORGANISATION
BOARD OF
DIRECTORS

DIRECTOR

TECHNICAL COMMERCIAL
DIRECTOR DIRECTOR

TECHNICAL OPERATIONS QHSE HUMAN RES & ACCOUNTING COMMERCIAL BUSINESS


DEPARTMENT DEPARTMENT DEPARTMENT ADMIN DEPT DEPARTMENT DEPARTMENT DEVELOPMENT

ENGINEERING PROJECT QUALITY TRAINING FINANCIAL & CONTRACT & SALES TEAM
& DESIGN MANAGEMENT CONTROL & HSE MANAGER ACCOUNT PROCUREMENT BIDS/TENDERS
PART 2
SOLUTIONS FOR NEARSHORE WINDFARM INSTALLATION
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
❑ Site conditions:
▪ Shallow water, depth from 0m up to 10m;
▪ Twice tide change in the day i.e. Mekong Delta coastal areas, water depth
between HAT and LAT is around 2.0 to 3.5m depending on the day/season;
▪ Thick soft/loose sand/clay layers;
❑ Logistic Constraints:
▪ No inland road and infrastructure available for heavy vehicles;
▪ No seaport available nearby the wind farm for marine supply base;
▪ Lack of logistic supports from shore base in Mekong Delta provinces;
▪ Transportation for heavy equipment to site via sea;
❑ Construction Facilities Constraints:
▪ No available construction vessel/barge/jack-up in VN and region for this kind
of specific site conditions.
▪ Productivity of mooring method (using flat top barge and crawler crane) is
low due to weather sensitive (recommended condition Hs < 0.5m).
▪ High risks of using onshore crawler crane due to barge motion and stability
❑ Weather conditions: Only suitable for working during April to October
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
TRIPOD JACKET INSTALLATION
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
WTG INSTALLATION
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION

SUBMARINE CABLE LAYING


PART 3 - COMPANY MARINE ASSETS
OEI TAN CANG 01 – SPUD CRANE BARGE

OEI-TAN CANG 01

CONVERTED FROM FLAT TOP BARGE


330FT x 100FT x 20FT

LENGTH O.A. 100.58 meters

BREADTH MLD. 30.48 meters

DRAFT MLD. 6.10 meters

DRAFT (LOADED) 4.514 meters

GRT/NRT 4,951T/1,486T

DEAD WEIGHT DWT Approx. 11,000T

NAVIGATION AREA OCEAN GOING 12


OEI TAN CANG 01 – SPUD CRANE BARGE

Available possibility: From Sept 2021


13
OEI TAN CANG 02 – TRANSPORTATION BARGE

OEI – TAN CANG 02 Available possibility: From Sept 2021

FLAT TOP BARGE


250FT x 80FT x 18FT
LENGTH O.A. 76.20 meters

BREADTH MLD. 24.38 meters

DRAFT MLD. 4.88 meters

DRAFT (LOADED) 3.936 meters

GRT/NRT 2,225T/667T

DEAD WEIGHT DWT Approx 5,400T

NAVIGATION AREA OCEAN GOING 14


OEI TAN CANG 03 - CABLE LAYING BARGE
Available possibility: From Sept 2021
OEI – TAN CANG 03

CONVERTED FROM FLAT TOP BARGE


230FT x 64FT x 14FT

LENGTH O.A. 70.104 meters

BREADTH MLD. 19.510 meters

DRAFT MLD. 4.270 meters

DRAFT (LOADED) 3.600 meters

GRT/NRT 1, 408T/442T

DECK LOADING 10T/m2


15
NAVIGATION AREA OCEAN GOING
PART 4 - LOCAL PARTNERS – MARINE ASSETS
LOCAL PARTNER – VSP 05

LAUNCH BARGE
“VSP – 05”

GENERAL INFORMATION
Type Launch Barge
Classification VR
Gross Tonnage 6,527
Length 109,8m
Breadth 32.0m
Depth 7.0m
Draught 4.7m
Deadweight 12,347.3T
Deck strength 15 Ton/m2
LOCAL PARTNER – PTSC 01

FLAT TOP BARGE – 290FT


“PTSC 01”

GENERAL INFORMATION

Type Flat Top Barge

Classification BV/VR

Gross Tonnage 4,424

Length 90.0m

Breadth 34.60m

Depth 5.5m

Draught 4.0m

Deadweight 9,515T

Deck strength 12 Ton/m2


LOCAL PARTNER – SAI GON TAN CANG 01

Flat Top Barge – 280FT


SG TAN CANG 01

GENERAL INFORMATION
Type Flat Top Barge
Classification DNV/VR
Gross Tonnage 2,987
Length 85,34m
Breadth 24.38m
Depth 5.49m
Deadweight 7,085.0T
Deck strength 15 Ton/m2
LOCAL PARTNER – SAI GON TAN CANG 02

Flat Top Barge – 250FT


SG TAN CANG 02

GENERAL INFORMATION

Type Flat Top Barge

Classification ABS

Length 76.20m

Breadth 24.38m

Depth 4.88m

Deadweight 5,400T

Deck strength 15 Ton/m2


LOCAL PARTNER – VSP 06 (MOORING BARGE)

WORK BARGE - 150Men


VSP 06

GENERAL INFORMATION

Type Flat Top Barge

Classification DNV/VR

Length 122.40m

Breadth 32.30m

Depth 7.50m

Draught 4.50m

Deck strength 12 Ton/m2


LOCAL PARTNER – POS1 (MOORING BARGE)

Work Barge – 300Men


POS1

GENERAL INFORMATION

Type Work Barge

Classification BV/VR

Length 111.56m

Breadth 31.70m

Depth 7.31m

Draught 4.50m

Deck strength 12.50 Ton/m2


PART 5 – ONGOING PROJECTS
50MW VIEN AN NEARSHORE WINDFARM PROJECT
Project name : 50MW Vien An Nearshore Windfarm Project
Location : Viên An Commune, Ngoc Hien District, Ca
Mau
Project Owner : Tai Tam Company Limited
EPC Contractor : JV of CHEC and CEEC Company
Foundation type : PHC
Turbine Model : MingYang MySe3.2-156WTG
Cable Installation : Subsea Cables
Type
Scope of work : Transportation and installation of 16 WTGs
Installation schedule : June to October 2021
75MW TAN THUAN NEARSHORE WINDFARM PROJECT

Project name : 75MW Tan Thuan Wind Power Plant


Project
Location : Tan Thuan Commune, Dam Doi District,
Ca Mau
Project Owner : PECC2
EPC Contractor : CEEC
Foundation type : PHC
Turbine Model : Gamesa Siemens
Cable Installation : Subsea Cables
Type
Scope of work : Transportation and installation of 25km
of Subsea Cables
Installation schedule : July to September 2021
30MW BEN TRE VPL NEARSHORE WINDFARM PROJECT

Project name : Ben Tre VPL Wind Farm Project


Location : Thua Duc Commune, Binh Dai District,
Ben Tre
Project Owner : GEC
EPC Contractor : Vestas Vietnam
Foundation type : PHC
Turbine Model : Vestas
Cable Installation : Subsea Cables
Type
Scope of work : Work barge for Installation of 7 WTGs
Installation : July to September 2021
schedule
CHERVON THAILAND - DSV 2021 CAMPAIGN

Project name : DSV 2021 CAMPAIGN


Location : Thailand Gulf
Project Owner : Chervon Thailand
Main Contractor : PTSC Offshore Services
Scope of work : Project Management and Engineering
Support
Schedule : April to April 2022
PART 6 – FOCUS OWF PROJECTS
(Partnership with APMC for Offshore Installation)
POTENTIAL OFFSHORE WIND FARM PROJECTS
POTENTIAL OFFSHORE OIL & GAS PROJECT
❑ Vietnam
▪ Block B Omon Project (still waiting for final approval by Government)
▪ LNG Projects (Bac Lieu, Ca Mau, Long An, Ca Na…)
❑ SEA
▪ Chevron EPCIR
▪ CPOC WHP/PLs EPCI
▪ WHP/PL EPCI in GoT
▪ PTTEP M3, Myanmar
PART 7 – PARTNERS
DOMESTIC PARTNERS
OVERSEAS PARTNERS
THANK YOU!

Offshore Energy Installation Joint Stock Company (OEI)


Level 2, No. 89C Nguyen Van Troi Street, Ward 4, Vung Tau City, Vietnam
Tel: +84 (0) 254 6295268 | Fax: +84 (0) 254 3526981 | www.oei.com.vn

You might also like