OEI - Company Presentation For Vietnam Offshore Wind-Farm EPC Contractor-2021
OEI - Company Presentation For Vietnam Offshore Wind-Farm EPC Contractor-2021
OEI - Company Presentation For Vietnam Offshore Wind-Farm EPC Contractor-2021
www.oei.com.vn
This document is generated by OEI and confidential and the information is intended only for the use of the individual to whom it is addressed.
If you are not the intended recipient, or the employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any use, dissemination, distribution or copying of this document is STRICTLY PROHIBITED.
PART 1 - COMPANY INTRODUCTION
COMPANY GENERAL
1. Company Profile
▪ Tên Công ty tiếng Việt: Công ty Cổ phần Dịch vụ Lắp đặt Công trình Năng lượng Biển
▪ Company name: Offshore Energy Installation JSC.
▪ Brief name: OEI
▪ Capital: 50 Billions VNĐ
▪ Assets: 150 Billions VNĐ
2. Business Registered Office
▪ 89C Nguyen Van Troi Street, Ward. 4, Vung Tau City, Vietnam
3. Company Operating Office:
▪ Level 2, VSP Service Building, No. 44 30/4 Street, Ward. 9, Vung Tau City, Vietnam
4. Contact details:
▪ Tel: +84 (0) 254 6295268 Fax: +84 (0) 254 3526981
▪ Email: info@oei.com.vn Web: www.oei.com.vn
COMPANY GENERAL
1. Company Core Business
▪ Project Management Service;
▪ Marine Fleet Operating and Maintenance Services.
▪ Transportation and Installation (T&I) Services for Wind Farm and Oil & Gas facilities;
▪ Operations and Maintenance (O&M) Services for Wind Farm and Oil & Gas facilities;
▪ Removal and Decommissioning Services for Wind Farm and Oil and Gas facilities.
▪ T&I/O&M Research and Development (R&D) for Wind Farm and Oil & Gas industry.
DIRECTOR
TECHNICAL COMMERCIAL
DIRECTOR DIRECTOR
ENGINEERING PROJECT QUALITY TRAINING FINANCIAL & CONTRACT & SALES TEAM
& DESIGN MANAGEMENT CONTROL & HSE MANAGER ACCOUNT PROCUREMENT BIDS/TENDERS
PART 2
SOLUTIONS FOR NEARSHORE WINDFARM INSTALLATION
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
❑ Site conditions:
▪ Shallow water, depth from 0m up to 10m;
▪ Twice tide change in the day i.e. Mekong Delta coastal areas, water depth
between HAT and LAT is around 2.0 to 3.5m depending on the day/season;
▪ Thick soft/loose sand/clay layers;
❑ Logistic Constraints:
▪ No inland road and infrastructure available for heavy vehicles;
▪ No seaport available nearby the wind farm for marine supply base;
▪ Lack of logistic supports from shore base in Mekong Delta provinces;
▪ Transportation for heavy equipment to site via sea;
❑ Construction Facilities Constraints:
▪ No available construction vessel/barge/jack-up in VN and region for this kind
of specific site conditions.
▪ Productivity of mooring method (using flat top barge and crawler crane) is
low due to weather sensitive (recommended condition Hs < 0.5m).
▪ High risks of using onshore crawler crane due to barge motion and stability
❑ Weather conditions: Only suitable for working during April to October
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
TRIPOD JACKET INSTALLATION
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
WTG INSTALLATION
SOLUTION FOR NEARSHORE WIND FARM INSTALLATION
OEI-TAN CANG 01
GRT/NRT 4,951T/1,486T
GRT/NRT 2,225T/667T
GRT/NRT 1, 408T/442T
LAUNCH BARGE
“VSP – 05”
GENERAL INFORMATION
Type Launch Barge
Classification VR
Gross Tonnage 6,527
Length 109,8m
Breadth 32.0m
Depth 7.0m
Draught 4.7m
Deadweight 12,347.3T
Deck strength 15 Ton/m2
LOCAL PARTNER – PTSC 01
GENERAL INFORMATION
Classification BV/VR
Length 90.0m
Breadth 34.60m
Depth 5.5m
Draught 4.0m
Deadweight 9,515T
GENERAL INFORMATION
Type Flat Top Barge
Classification DNV/VR
Gross Tonnage 2,987
Length 85,34m
Breadth 24.38m
Depth 5.49m
Deadweight 7,085.0T
Deck strength 15 Ton/m2
LOCAL PARTNER – SAI GON TAN CANG 02
GENERAL INFORMATION
Classification ABS
Length 76.20m
Breadth 24.38m
Depth 4.88m
Deadweight 5,400T
GENERAL INFORMATION
Classification DNV/VR
Length 122.40m
Breadth 32.30m
Depth 7.50m
Draught 4.50m
GENERAL INFORMATION
Classification BV/VR
Length 111.56m
Breadth 31.70m
Depth 7.31m
Draught 4.50m