LAB FORWARD =
Se
Roller 20PN OPERATOR'S MANUAL
COULTER
Gascon4 - Specimen Processing
Tube Requirements
Tube Dimensions
Tost-ubes 13x75 mm tke 8D Vacutaner® or Greiner Bo-one or wth 13 mm
‘fameter and tm 75 to 83 men high, capineuded Ike fo exam the Sarstedt
tubes that measure 11.8368 mm wot cap),
Tube Volume
‘The semple volume must not exceed 50.60% of he total volume ofthe test tbe,
Tube Caps
‘Optional Terume? cap adapter fr Torume Vonejet I boo
‘Optional Sarstec® cap adaplr fr Sarstedt Monovette® tubes
Sample Mixing
‘Sample misng canbe programmed in thee speeds (60, 22, and 24 RPM) and in
fuer of eats tt 2 4000 eons
‘The system s pre-programmed atthe recorenended setting of 32 RPM at 200,
rotations, about 6 minutes of mixing time.
Roaasatirs Operators Manual 84- Specimen Processing
Internal Sampling
Loading the Samples on the Rotor
“The samples must beloaded onthe Rotor when the folowing measurements are
Selected
intemal
Mandal with veal ming
4. Open the ting dor, ane then insert he tbe the nest avaabe tube
Inder according we the seen depay
Ei)
2. The instrument is equipped with two sensors to detect the presence ofthe
tube’s cap. aa the presonce of gers. ater few seconas te exces!
sensor detects the frger, the instument vl dspay te folowing
message: ‘Ramove hands rm the instrument.
3. After loading the sample, the instrument displays the [ERIN button.
sotsssteyin RevAAwoesss Opera's Manual 46“4. ifmore samples need tobe processed, repeat the procedure forthe next
tube,
5. When all tubs have been loaded on the oor, press the IEEE bution to
‘roceed wit the analysis or the internal mang
0, Wen the arayen scx, te srr’ doplays the sample resus,
‘Based onthe printer setup, the invidul results are printed immediatly or