Form Number - 102A

Saudi Kayan AF-1319195


Project New Demineralization
INSPECTION AND Package 3rd Train Project
Client OVIVO
TEST REPORT
System/Area SA CATION C SKID / 713
SHUTDOWN VALVE
Report Number 102A-38
Page 1 of 2

Service Tag No. 713-XV-822


Hook-up
Data Sheet
P&ID No Drawing SKE-E05-001
Number
No
Valve Type Supplier

CONFORMED
SL NO INSPECTION ACTIVITY
Yes No N/A
INSTALLATION CHECKS
01 Valve Name Plate Details Confirm To Data Sheet
02 Actuator Name Plate Details Confirm To Data Sheet
03 Positioned Name Plate Details Confirm To Data Sheet
04 I/P/SMART Converter Name Plate Details Confirm To Data Sheet
05 Proximity Switches Name Plate Details Confirm To Data Sheet
06 Solenoid Valve(S) Name Plate Details Confirm To Data Sheet
07 Pilot Valves Name Plate Details Confirm To Data Sheet
08 Air Filter Regulator Name Plate Details Confirm To Data Sheet
09 Tag Number Of Each Items Above Are Correct And Properly Attached
10 Installation Is In Accordance To The Drawing
Valve And Accessories, Tubing And Cables Properly Supported And Vibration
11
Free
12 Flow Direction Is Correct
13 Access Is Adequate And Meets Operational Requirements
14 All Cable Test Completed And Reports Available
15 Instrument Tubing Pressure Test Completed And Reports Available
16 No External Damage
17 Area Classification Correct (As Applicable To Ancillaries)
18 Ensure free Rotation of Stem
19 All Grease Points are Lubricated
Confirm Equipment is Correctly Terminated in Accordance with Termination
20
Drawing and Screen Correctly Isolated from Earth at Field End

SL NO INSPECTION ACTIVITY CONFORMED

COMPLETED BY APPROVED BY VERIFIED & ACCEPTED BY


Tarpon
COMPANY International
Energy Services
SIGNATURE
PRINT NAME Anil Varghese
DATE 07.03.2018
102A-Shutdown Valve
Form Number - 102A
Saudi Kayan AF-1319195
Project New Demineralization
INSPECTION AND Package 3rd Train Project
Client OVIVO
TEST REPORT
System/Area SA CATION C SKID / 713
SHUTDOWN VALVE
Report Number 102A-38
Page 2 of 2

Yes No N/A
OPERATIONAL CHECKS
01 Limit Switches Operated Manually and Functioning properly
02 Solenoid Valves Operations Verified
03 I/P/SMART Converter Calibration is correct
04 Action on Air Failure is correct
05 Action on Power Failure is correct

NOTES:

COMPLETED BY APPROVED BY VERIFIED & ACCEPTED BY


Tarpon
COMPANY International
Energy Services
SIGNATURE
PRINT NAME Anil Varghese
DATE 07.03.2018
102A-Shutdown Valve