DRAWING ISSUES

No. DESCRIPTION DRAWN CHECKED APPROVED DATE


1 AS BUILT CM AN KJ 02-05-19

DRAWING AS PER UL LISTED STANDARD


R 1 CORE 2.50 SQ.MM CU. CABLE (BLUE COLOUR) - 105°C
CONTROL SUPPLY (24V AC)
Y
2 2 2 2 2 2
B
AC1
N
CF1, 3P R1 2A
FUSE
+ 10A FUSE CF2 AC2
LINK 10A
Y PHASE - YELLOW COLOR WIRE, 4.0 SQ. MM, 1 CORE

NEUTRAL - BLACK COLOR WIRE, 4.0 SQ. MM, 1 CORE

N FUSE 5 7 9
B PHASE - BLUE COLOR WIRE, 4.0 SQ. MM, 1 CORE

2B
R PHASE - RED COLOR WIRE, 4.0 SQ. MM, 1 CORE

1 1-STAGE 2-STAGE 3-STAGE


AC3
R1 Y1 B1 R1 Y1 B1 R1 Y1 B1 COMMAND FROM COMMAND FROM COMMAND FROM
HVAC CONTROL HVAC CONTROL HVAC CONTROL
2C PANEL PANEL PANEL
230/24V AC
100VA 6 8 10
AC4
TRANSFORMER
K2 K3 K4 3
3P, 25A 3P, 25A 3P, 25A
K1
MAGNETIC MAGNETIC MAGNETIC 8 10 12
AFS
CONTACTOR CONTACTOR CONTACTOR
2
4
7
R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 MC
K1 K1 K1

CONTROL SYSTEM
RUN PERMISSIVE
5

FROM HVAC
2 3
9 11 13
IM 1
3P,25A 9 11 13
4
ISOLATOR 24V AC
+ HANDLE HE HE HE
POWER SUPPLY
STAGE-1 STAGE-2 6
STAGE-3 X1 X1
X1 X1 X1
H1 H2 H3 H4 H5
2 K1 R Y K2 K3 K4
X2 X2 G G G
X2 X2 X2

0 0 0 0 0 0 0 0 0 0

HEATER HEATER TRIP / STAGE-1 STAGE-1 STAGE-2 STAGE-2 STAGE-3 STAGE-3


R Y B N RELAY ON NO AIRFLOW HEATER HEATER HEATER HEATER HEATER HEATER
CONTACTOR ON CONTACTOR ON CONTACTOR ON
INCOMING
415V, 3PH, 50HZ
11 13 15 17 19 21 23
14 16 16 19 19 22 22
HEATER TRIP/ NO AIR STAGE-1 OFF STAGE-1 RUN STAGE-2 OFF STAGE-2 RUN STAGE-3 OFF STAGE-3 RUN
FLOW STATUS K1 STATUS K2 STATUS K2 STATUS K3 STATUS K3 STATUS K4 STATUS K4

12 15 14 17 16 18 18 20 20 21 22 23 24 24

PROJECT TITLE DWG No. MAX-18-DH0172-R2


KW 2.0 KW

MAXELL DUCT SIZE 800 X 600 mm , QTY- 1 KHALIFA SUBSTATION


DUCT HEATER UL
THREE PHASE 3-STAGE
W.O. No.
PO Ref No.
1247
-
PO Box: 18752, Dubai, UAE. CONTROL
CONTRACTOR M/s. GULF STAR COOLING SERVICES
Ph: +971 4 4219900 Fax: +971 4 3603604 - WIRING DIAGRAM, TERMINAL DIAGRAM & BILL OF MATERIALS SHEET 1 of 2