Location Plan: Equipment Schedule

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CA CB CC CD CE CF DG DH DJ DK

4350 8000 5000 7450 4800 6000 6400 3600 3600

NORTH
PLANT
TRU TH C
L SUPERHEATER 1B, C
L COLD IP EXCHANGER C
L CONVERTER C
L ECONOMISER 3 C
L WASTE HEAT BOILER C
L FURNACE
E
NOR

NORTH
PLANT
SUPERHEATER 4A /
ECONOMISER 4
49
49

20° PLANT CO-ORDINATES

1725 (REF.)
E = 20768422
N = 11693001 14
14 48
48
66
C1
22
D13
31
31
19
D6 THIS DRAWING
5800
9

1800
AREA 6710

475 (REF.)
ACID PLANT 1

4550
D7

2275
C2 C
L D8 D14
10
10
LOCATION PLAN
2500

SUPERHEATER 1B

2225
27
27

3100
C3 C D9
L 3333
CONVERTER 24
24 D15 EQUIPMENT SCHEDULE

2900
45
45
11 TAG No. EQUIP. No. DESCRIPTION

3100
11
D10
1 67-BO-101 WASTE HEAT BOILER
1 1 D16
2 67-DGV-105 JUG VALVE

3300
88
3 67-DU-101 DUCT FROM 67-FL-104 TO 67-FN-101

3400
13000

D11
4 67-DU-102 DUCT FROM 67-FN-101 TO 67-VE-101
D17
17 1313 5 67-DU-103 DUCT FROM 67-VE-101 TO 67-FR-101

3400
17
15
15 12
12
77 6 67-DU-104 DUCT FROM 67-FR-101 TO 67-BO-101

3400
35 3232 D12

785
35 D18 7 67-DU-105 DUCT TO 67-FR-101 SECONDARY INLET
34
34 18
18
8 67-DU-106A DUCT FROM 67-BO-101 TO 67-DGV-105
16
16
9 67-DU-106B DUCT FROM 67-DGV-105 TO 67-VE-102
C4 C D19
L 10 67-DU-107 DUCT FROM 67-VE-102 TO 67-HX-104
SUPERHEATER 4A /
11 67-DU-108 DUCT FROM 67-HX-104 TO 67-VE-102

5565
ECONOMISER 4,
COLD IP EXCHANGER, 39
39
12 67-DU-109 DUCT FROM 67-DU-114 TO 67-VE-102
42
5800

42
ECONOMISER 3
13 67-DU-110 DUCT FROM 67-HX-107 TO 67-VE-102
D20
14 67-DU-111 DUCT FROM 67-VE-102 TO 67-VE-102
C5 15 67-DU-113 DUCT FROM 67-HX-107 TO 67-DU-114
43
43
PLANT CO-ORDINATES 16 67-DU-114 DUCT FROM 67-HX-107 TO 67-VE-102
E = 20768422
N = 11665901 17 67-DU-115 DUCT FROM 67-HX-108 TO 67-VE-102
23
23 55
55 18 67-DU-116 DUCT FROM 67-HX-107 TO 67-HX-105
950 19
19 20
20 21
21 55 19 67-DU-117 DUCT FROM 67-HX-108 TO 67-VE-105
20 67-DU-118 DUCT FROM 67-VE-104 TO 67-HX-107
12550

21 67-DU-119 DUCT FROM 67-HX-105 TO 67-VE-104


22 67-DU-120 DUCT FROM 67-VE-105 TO 67-SK-101
23 67-DU-121 DUCT TO START-UP BURNER M2A/M2B
PLANT CO-ORDINATES 24 67-DU-122 DUCT FROM 67-DU-107 TO 67-DU-108
E = 20767472 25 67-FL-104 A/B/C/D MAIN BLOWER AIR INLET FILTERS
N = 11653351
26 67-FN-101 MAIN BLOWER ACID PLANT 1
E1
27 67-FR-101 SULPHUR BURNER
28 67-HX-101 A/B CIRCULATION ACID COOLERS

2825
37
37
5150

F1 29 67-HX-102 FINAL ACID COOLER


30 67-HX-103 PRODUCT ACID COOLER
E2 31 67-HX-104 SUPERHEATER 1B

5812,5
47
47
46
46 44
44 32 67-HX-105 ECONOMISER 3
22
33 67-HX-106 INTERNAL HOT INTERPASS EXCHANGER
22 54
54
34 67-HX-107 COLD INTERPASS EXCHANGER
44 F2
35 67-HX-108 SUPERHEATER 4A / ECONOMISER 4
36 67-HX-109 DE-SUPERHEATER
11600

37 67-SK-101 STACK

5812,5
28
28 28
28 26
26 50
50 38 67-SU-102 AREA DRAINAGE SUMP
39 67-TK-002 CONDENSATE COLLECTION TANK
F3 40 67-TK-101 CIRCULATION ACID TANK
30
30
41
41 40
40
33 53
53
41 67-TK-102 FINAL ACID TANK
E3 C
L 42 67-TK-103 CONTINUOUS BLOW-DOWN DRUM

5812,5
FINAL ACID TANK 43 67-TK-104 INTERMITTENT BLOW-DOWN DRUM
& CIRCULATION
ACID TANK 44 67-VE-101 DRYING TOWER
5800

29
29
F4 45 67-VE-102 CONVERTER
46 67-VE-104 INTERPASS ABSORPTION TOWER
E4
38 5238 52 47 67-VE-105 FINAL TOWER
PLANT CO-ORDINATES 48 67-XX-101 SAMPLING COOLER PACKAGE
E = 20767472
26 216
25
25 51
51 49 67-ZM-102 PHOSPHATE DOSING PLANT
N = 11630801
50 67-FN-201 MAIN BLOWER ACID PLANT 2
51 67-FL-204 A/B/C/D MAIN BLOWER AIR INLET FILTERS
52 67-PU-105 SUMP PUMP
FINAL ACID TANK CIRCULATION ACID TANK
53 67-DU-201 DUCT FROM 67-FL-204 TO 67-FN-201
C
L STACK C
L & FINAL TOWER C
L & INTERPASS TOWER C
L DRYING TOWER C
L ACID COOLER 54 67-DU-202 DUCT FROM 67-FN-201 TO 67-VE-201
55 67-DU-221 DUCT TO START-UP BURNER M2A/M2B
CLIENT: TECHNOLOGY:

4550 8300 9500 9500 6000 4025 11575 11575 4025


DMSA
EA EB EC ED EE EF FA FB FC JF

PLAN VIEW APPROVED BY REG. ENG. APPRVL


NAME -
DATE DATE
DRAWN 13.02.2008
NAME
L.S.L.
DEPT. DATE SIGN
NUMBER - CHKD 25.03.2008 W.H. BATEMAN MINERALS & METALS (PTY)LTD
NORAM ENG. - - acting on behalf of BATEMAN Projects Limited
REG.No. 1984/010584/07
SIGNATURE - S.LDR 12.03.2008 L.S.L.
671013M310005001 ACID AREA - MECHANICAL G.A. - PLAN VIEW
REFERENCE

NORAM ENG. - - SCALE


REVISIONS

671013M310004001 CONVERTER AREA - MECHANICAL G.A. - PLAN VIEW INSTR./ELEC. 20.03.2009 pp W.V. AMBATOVY NICKEL PROJECT NTS
671013M310003001 SULPHUR BURNER AREA - MECHANICAL G.A. - PLAN VIEW 0 02.03.2009 ISSUED FOR CONSTRUCTION LSL GB LSL WV CIVIL/STRUCT. 20.03.2009 pp W.V. SULPHURIC ACID FACILITIES
SHEET
671013M310002001 BLOWER AREA - MECHANICAL G.A. - PLAN VIEW D 21.04.2008 GENERAL UPDATE & RE-ISSUE FOR DESIGN GB LSL LSL WV MECHANICAL 16.03.2009 X.Z. AREA 6710 - ACID PLANT 1
671013M310001002 ACID PLANT 1 - MECHANICAL G.A. - ISOMETRIC VIEW C 29.03.2008 GENERAL UPDATE & RE-ISSUE FOR DESIGN GB LSL LSL WV PIPING - -
MECHANICAL GENERAL ARRANGEMENT - PLAN VIEW 1 OF 2
THIS DRAWING IS THE PROPERTY OF PROJECT No. REV
671013P130101001 ACID PLANT 1 - P&ID
671013P120101001 ACID PLANT 1 - PFD
B
A
12.03.2008 ISSUED FOR DESIGN
13.02.2008 ISSUED FOR INTERNAL APPROVAL
GB WH LSL
LSL LSL LSL
WV
WV
PROCESS
PROJ.ENG.
17.03.2009
17.03.2009
W.V.
W.V.
BATEMAN MINERALS & METALS (PTY)LTD
It is subject to return upon demand, and may not be passed on to
any third party; or used directly or indirectly for any other purpose
A0 M7283 0
than the manufacture or construction of equipment, the design
DRG. NUMBER TITLE No. DATE DESCRIPTION BY CHKD SECLDR ENG PROJ.SECT.LDR 16.03.2009 L.S.L. and installation of plant to the order of BATEMAN PROJECTS LTD DWG No. 671013M310001001

You might also like