Professional Documents
Culture Documents
00 Drawing Cnt2
00 Drawing Cnt2
Schneider Electric
Gutor Electronic Asia Pacific Sdn Bhd
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
19, Jalan Juruukur U1/19, Hicom-Glenmarie Industrial Park
Seksyen U1, 40150 Shah Alam, Selangor Darul Ehsan, Malaysia
B
Information
Document title 1200334001/00
Document status For Approval
D
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Cover sheet System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAA 1/ 2 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
The instructions specified in the respective operating instructions are to be followed strictly ! The revision status will be elevated at every page modification
It is mandatory that hazard, warning and safety instructions be observed.
2 Page modification date
3 Abbreviation sign of the person who made the modification to the page
4 Project revision description
Plant Labelling System (Reference designator)
B
The creation of a reference designator for an object takes place differently depending on the object type.
Each object can be assigned several reference indicators in various aspects.
Reference identifiers have the following basic structure: 1 2 3 4
Rev. Date Name Project revision description
A = Letter
N = Number
# N........N & AAA == AAAN = AAA ++ AANN + AANN - ANNN
5 Abbreviation sign of the person who has created the page
6 Abbreviation of the person who reviewed the document
C
A1
E
1 3 5
==UPS=UMI+UH01-K001 -K001
1 A2
1 A2
18
Project description
Symbols for electrical drawings according DIN EN 60617 15 17
Gutor technology
Identification of documents according to DIN EN 61355 and Gutor recommendations
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General For Approval == = + 2
0 11.11.20 ZUL For Approval Project description General information System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAA 2/ 2 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Table of contents
Document labeling system Document and page status overview
A
Doc.
Page Page Creation Approved Approved
Document naming Page description Rev. Drawn by Revision description
No. Rev date date by
Status
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
&EAA 1 Cover sheet 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
General
&ELU 1 General arrangement notes 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
General arrangement drawing
2 Nameplates and labels notes 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
7 Frontpanel - Control and monitoring board 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
8 Frontview - Measuring devices and switches 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
E
9 Frontview - Measuring devices and switches 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
10 Frontpanel - Control and monitoring board 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
11 Frontview - Measuring devices and switches 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Table of contents For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Table of contents System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAB 1/ 5 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Table of contents
Document labeling system Document and page status overview
A
Doc.
Page Page Creation Approved Approved
Document naming Page description Rev. Drawn by Revision description
No. Rev date date by
Status
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
&EFA 1 Single line diagram 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
Overview diagram
2 Single line symbol legend 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
B
5 Modbus / Network management card 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
C
7 Modbus / Network management card 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
12 Modbus / Network management card 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
14 Modbus / Network management card 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
E
19 Battery breaker Q005 status 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
20 Battery temperature sensor terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Table of contents For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Table of contents System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAB 2/ 5 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Table of contents
Document labeling system Document and page status overview
A
Doc.
Page Page Creation Approved Approved
Document naming Page description Rev. Drawn by Revision description
No. Rev date date by
Status
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
&EMA 21 RS485 terminal 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
Terminal diagrams
24 Panel heater input terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
25 Panel light input terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
29 Battery breaker Q005 status 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
30 Battery temperature sensor terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
33 Battery MCCB box terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
35 Battery MCCB box terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
37 Battery junction box terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
38 Battery junction box terminals 2 2 01.04.2021 NOS For Approval 19.11.20 WKH
3 12 pulse battery connection before diode 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Table of contents For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Table of contents System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAB 3/ 5 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Table of contents
Document labeling system Document and page status overview
A
Doc.
Page Page Creation Approved Approved
Document naming Page description Rev. Drawn by Revision description
No. Rev date date by
Status
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
&EFS 5 Rectifier output 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
Circuit diagram
22 12 pulse battery connection before diode 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Table of contents For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Table of contents System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAB 4/ 5 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Table of contents
Document labeling system Document and page status overview
A
Doc.
Page Page Creation Approved Approved
Document naming Page description Rev. Drawn by Revision description
No. Rev date date by
Status
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
&EFS 27 Communication 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
Circuit diagram
2 Battery Rack details 1 & 2 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
3 Battery Rack details 1 & 2 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
4 Battery Rack details 1 & 2 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
D
5 Battery Rack details 1 & 2 2 2 01.04.2021 NOS For Approval 11.11.20 WKH
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Table of contents For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Table of contents System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EAB 5/ 5 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Cable entry from bottom Cable entry from top Cable entry from top with rain roof
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
At least 100mm [3.93"]
Recommended 500mm [19.68"]
Cable gland plate
Recommended Recommended
at least 500mm [19.68"] Cable gland plate at least 500mm [19.68"]
Front Front
Clamping rail Side view Side view
Front
Side view
Cable gland plate
The UPS system can be placed with the backside to the wall
(Φ) (Φ)
but a space of at least 100mm [3.93''] must be ensured.
(Y) (Y) (If possible, preferably a distance of 500mm [19.68'']).
(X) Recommended A clearance of at least 500mm [19.68''] is recommended above the top of the UPS system.
At least 1000mm [39.37"]
E
Front To lift the cabinet, the roof has to be taken away first.
Top view After placing the cabinets, remove the lifting eyes and re-install the roofs.
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description General arrangement notes System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 1/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
50[1.97''] 250[9.84'']
4[0.16'']
4[0.16'']
50[1.97'']
Gutor PxW 1 2'' ]
UPS Ø 3[0.1
Gutor XXX xxx-xxx/xxx-xxx 2
Mains input Bypass input ==UPS++UC01+UH01
R
B
3 4 The values on the Rating plate are based on the technical data. 10
xxx A
xxx V AC
xxx A
xxx V AC
[0.39
xx Hz xx Hz 1 System type '']
xxx kVA xxx kVA
xxx kW xxx kW 2 System type designation
Icc: xx kA Icc: xx kA
3 Mains input
Battery Output
4 Bypass input
120 mm[4.72'']
5 6
xxx A
xxx V AC 5 Battery
xx Hz
Nom. xxx A xxx kVA 6 Output
Max. xxx A xxx kW
xxx DC Icc: xx kA 7 Protection degree and
Additional markings
110[4.33'']
GUTOR 8
9 YYYYYYY = Gutor Project number
ZZZ = System serial number
UCxx = Transport separation (Always consecutively numbered from left to right.)
40[1.57'']
YYYYYYYZZZ-UCxx 9 10 Year of manufacturing
Year xxxx Country of origin or Country of manufacturing
Country of origin: xxxxxxxx 10
schneider-electric.com/contact
R
R
1.5
1.8
[0.
[0.
D
06
07
'']
'']
12[0.47'']
12[0.47'']
AC input voltage AC input
This plate is mounted on the first cubicle with a Front panel and R R
5[0 5[0
shows all main electrical interface data. . .
E
2'' 2''
] ]
If an interface is not available in a system (e.g. no Bypass input, no Battery)
this section on the rating plate stays empty
Each transport unit gets a transport unit plate which identify the transport unit, Customize label
but does not shows any technical data. X mm
Y mm
Rating plate must be placed in each transport unit, Customize
Dimension (X) x (Y) mm is customized.
If there any.
on the first door (from left to right) next to the handle as a minimum. Label
R
5[0
F
. 2''
]
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Nameplates and labels notes System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 2/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
1900 1900
1800 Charger 1 Charger 1 Voltage dropper Charger 2 Charger 2 1800
18 18 18 18
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Front
schneider-electric.com/contact
GUTOR
schneider-electric.com/contact
ISO view
A D
B
39
2 2
D
0
A Front view
0
400
1000
1775
2175
2775
B Top view
C Bottom view
Touch-protection and Air outlet
D D Side view
C TS Transport separation
F
Lifting eyes
Touch-protection and Air inlet
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description General arrangement System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 3/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Front view
70
A
A A
125
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
A-A
C
*1 *3 *2 *1
750 750 750
730 730 730
689 689 689
4
Ø1
Ø1
6x
6x
D
61 61 61
20 20 20
0 0 0
85.5
98
98
85.5
98
85.5
85.5
98
98
85.5
0
35
35
0
35
0
35
35
0
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Base socket details System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 4/ 14 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Battery MCCB box 1
++UC03 +UH04
600
562.5
Earthing point M6x17.5
Door lock
Gland plate
Earthing point M6x17.5
37.5
0
250
0
37.5
362.5
400
52
D
40 37
22
130
96
7
Ø9
E
20
345 22
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Battery MCCB box 1 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 5/ 14 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Battery MCCB box 2
++UC04 +UH06
600
562.5
Earthing point M6x17.5
Door lock
Gland plate
Earthing point M6x17.5
37.5
0
250
0
37.5
362.5
400
52
D
40 37
22
130
96
7
Ø9
E
20
345 22
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Battery MCCB box 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 6/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC01+UH01
Charger 1
A
Gutor SDC
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
ON
Display
B
OFF
Common alarm
7 8 9
ON Mains DC
C
V-Aux.
voltage Voltage
OFF
ON 4 5 6
Mains Battery Total DC
current current current
1 2 3
OFF Battery
Temp.
D
ON
OFF
E
Rectifier mains fault DC out of tolerance Battery discharged Control power fault Dropper fan failure Positve earth fault
Rectifier failure DC Fuse blown Battery disconnected Overtemperature Q001 trip Negative earth fault
Rect. Overcurrent DC Earth fault Fan failure Q003 trip Low DC voltage
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Frontpanel - Control and monitoring board System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 7/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC01+UH01
Charger 1
A
Charge
V A V A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
L1,L2
PH1
OFF L2,L3
PH2
-S031 L3,L1
PH3
AC input
D
OFF ON
A -P014 -S014
E
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Frontview - Measuring devices and switches System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 8/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC01+UH02
Voltage dropper
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
V -P022 A -P021
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Frontview - Measuring devices and switches System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 9/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC02+UH03
Charger 2
A
Gutor SDC
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
ON
Display
B
OFF
Common alarm
7 8 9
ON Mains DC
C
V-Aux.
voltage Voltage
OFF
ON 4 5 6
Mains Battery Total DC
current current current
1 2 3
OFF Battery
Temp.
D
ON
OFF
E
Rectifier mains fault DC out of tolerance Battery discharged Control power fault Dropper fan failure Positve earth fault
Rectifier failure DC Fuse blown Battery disconnected Overtemperature Q001 trip Negative earth fault
Rect. Overcurrent DC Earth fault Fan failure Q003 trip Low DC voltage
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Frontpanel - Control and monitoring board System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 10/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC02+UH03
Charger 2
A
Charge
V A V A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
L1,L2
PH1
OFF L2,L3
PH2
-S031 L3,L1
PH3
AC input
D
OFF ON
A -P014 -S014
E
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Frontview - Measuring devices and switches System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 11/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC01+UH01 ==CHA++UC02+UH03
Charger 1 Charger 2
27.0 A 27.0 A
3 x 480 VAC 3 x 480 VAC
60 Hz 60 Hz
22.4 kVA 22.4 kVA
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
18.6 kW 18.6 kW
Icc: 50 kA Icc: 50 kA
125 A 125 A
110 VDC 110 VDC
B
GUTOR GUTOR
schneider-electric.com/contact schneider-electric.com/contact
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description System rating plate System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 12/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC01+UH01 ==CHA++UC01+UH02
Charger 1 Voltage dropper
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Charger 1
B
==CHA++UC02+UH03 ==CHA++UC03+UH04
Charger 2 Battery MCCB box 1
C
Charger 2 Battery 1
D
==CHA++UC04+UH06
Battery MCCB box 2
E
Battery 2
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description System nameplates labels System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 13/ 14 Rev.
Status
1 2 3 4 5 6 7 8 9 10
==CHA++UC01+UH01 ==CHA++UC02+UH03
Charger 1 Charger 2
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
AC input current AC input current
Battery voltage Ground fault indication Battery voltage Ground fault indication
B
Battery current Ground fault switch Battery current Ground fault switch
C
==CHA++UC01+UH02
Voltage dropper
Output voltage
D
Output current
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO General arrangement drawing For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Measuring devices labels System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &ELU 14/ 14 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
+UH01 +UH02
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
-P021 -P022
-Q040 -F050 A V
3x480 V AC, 60 Hz
-A030 -1X04
110 V DC
-F026 -L011
Output 1
-T001 -V015 -Q003 -V032 -V033 -V034 -1Q10
Mains input 1
+,-
-X001
L1,L2,L3 -Q001
PE
V 64 V
-K032 -K033 -K034
-1CB2 A014
B
110 V DC
-P026
Output 2
A
-2Q10 +,-
-A031 -L012
V A -F027 -P014 A
Earth fault meter PE
-P032 -P031 A
-2CB2
-Q004
V -P027
+,- -X002
C
110 V DC
==BTR1+UH05 ==BBX1+UH04
+UH03
Charger 2
-Q040 -F050
3x480 V AC, 60 Hz
-A030
-T001 -F026 -L011 -V015 -Q003
Mains input 2
-X001
D
L1,L2,L3 -Q001
PE
V 64 V
V/A -1CB2
-S031 VS AS A
-S014 SS
A -P026
-A031 -L012
V A -F027 -P014 A
Earth fault meter PE
-P032 -P031 A
-2CB2
-Q004
E
V -P027
+,- -X002
110 V DC
==BTR2+UH07 ==BBX2+UH06
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Overview diagram For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Single line diagram System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFA 1/ 2 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Analogue meter
Moulded case circuit breaker
A = Ammeter
V = Voltmeter
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
12 pulse Transformer
Hz = Frequency meter A
W = Wattmeter
Miniature circuit breaker cos = Power factor meter
Digital meter
Fuse disconnector switch 6 pulse Transformer
B
A = Ammeter
V = Voltmeter
Hz = Frequency meter A
W = Wattmeter
Load breaking switch cos = Power factor meter
Stabilizer
Measurements to be read
Fuse
on the Display
A = Ammeter
Choke V = Voltmeter V/A/Hz
Hz = Frequency meter
C
Fuse switch
Rectifier / inverter
Power circuit breaker, motor drive Power module block Rectifier
M
X
Surge protective device Blocking Diode Transducer
I
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Overview diagram For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Single line symbol legend System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFA 2/ 2 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal legend
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Bolt terminal ≤ 265A 120mm² AWG 4/0 M10 7/16 in 70 - 120mm² 2/0 - 4/0 AWG 10 - 20 Nm 7 - 15 Ft.Lbs. Feedthrough terminal ≤ 75A 16mm² AWG 6 1.5 - 16mm² 16 - 6 AWG 3.0 - 4.0 Nm 2 - 3 Ft.Lbs.
Bolt terminal ≤ 350A 185mm² 350 MCM M12 1/2 in 120 - 185mm² 4/0 AWG - 350 MCM 14 - 31 Nm 10 - 23 Ft.Lbs. Feedthrough terminal ≤ 115A 35mm² AWG 2 2.5 - 35mm² 14 - 2 AWG 4.0 - 5.0 Nm 3 - 4 Ft.Lbs.
Bolt terminal ≤ 500A 300mm² 600 MCM M16 5/8 in 185 - 300mm² 350 MCM - 600 MCM 40 - 60 Nm 29 - 44 Ft.Lbs. Feedthrough terminal ≤ 192A 70mm² AWG 2/0 10 - 70mm² 8 - 2/0 AWG 6.0 - 10.0 Nm 4 - 8 Ft.Lbs.
Feedthrough terminal ≤ 269A 120mm² AWG 4/0 16 - 120mm² 6 - 4/0 AWG 12.0 - 20.0 Nm 9 - 15 Ft.Lbs.
Size Size Bolt Bolt Cable Cable Torque range Torque range Size Size Cable Cable Torque range Torque range
Type Current [SI] [Imp] [SI] [Imp] [SI] [Imp] [SI] [Imp] Type [SI] [Imp] [SI] [Imp] [SI] [Imp]
Cu-Bar ≤ 440A 40x8mm 1.6x0.3" M12 1/2 in 2x240mm² 2x500 MCM 30 - 40 Nm 22 - 30 Ft.Lbs. Feedthrough terminal 2.5mm² AWG 14 0.5 - 2.5mm² 20 - 14 AWG 0.4 - 0.6 Nm 1 Ft.Lbs.
Cu-Bar ≤ 800A 2x40x8mm 2x1.6x0.3" M12 1/2 in 4x240mm² 4x500 MCM 30 - 40 Nm 22 - 30 Ft.Lbs. Feedthrough terminal 4mm² AWG 12 0.5 - 4mm² 20 - 12 AWG 0.5 - 1.0 Nm 1 Ft.Lbs.
Cu-Bar ≤ 800A 80x8mm 3.1x0.3" М12/16 1/2 ¦ 5/8 4x240/2x300mm² 4x500/2x600 MCM 30-40/40-60 Nm 22-30/29-44 Ft.Lbs.
Cu-Bar ≤ 1200A 2x80x8mm 2x3.1x0.3" M12/16 1/2 ¦ 5/8 8x240/4x300mm² 8x500/4x600 MCM 30-40/40-60 Nm 22-30/29-44 Ft.Lbs. Notes: Information general earth
Cu-Bar ≤ 1600A 2x100x10mm 2x3.9x0.4" M12/16 1/2 ¦ 5/8 8x240/4x300mm² 8x500/4x600 MCM 30-40/40-60 Nm 22-30/29-44 Ft.Lbs. [Imp] = Imperial Units
Cu-Bar ≤ 1600A 180x10mm 7.1x0.4" M12/16 1/2 ¦ 5/8 8x240/4x300mm² 8x500/4x600 MCM 30-40/40-60 Nm 22-30/29-44 Ft.Lbs. [SI] = International System of Units If no individual earth terminal is available
then the PE conductors of the cables
shall be connected to the general earth bar
C
Ø 55"
[0
14 ]
[0
14 ]
.
Ø 70"
[0
18 ]
.
Ø 55"
[0
14 ]
.
D
20 [0.78"]
20 [0.78"]
45 [1.77"]
20
20 [0.78"] 20 [0.78"]
40 [1.57"] 40 [1.57"] 30 20 20 30
90 [3.54"] 100 90 [3.54"]
20 = [0.78"]
30 = [1.18"]
8x500 MCM 1/2 in 22-30 Ft. Lbs. Cable: Bolt: Torque range:
Cable: Bolt: Torque range: 4x300mm² M16 40-60 Nm 8x240mm² M12 30-40 Nm
4x240mm² M12 30-40 Nm 4x600 MCM 5/8 in 29-44 Ft. Lbs. 8x500 MCM 1/2 in 22-30 Ft. Lbs.
4x500 MCM 1/2 in 22-30 Ft. Lbs. Max. 2 cables
per bolt 4x300mm² M16 40-60 Nm
2x300mm² M16 40-60 Nm Max. 2 cables 4x600 MCM 5/8 in 29-44 Ft. Lbs. Max. 2 cables
2x600 MCM 5/8 in 29-44 Ft. Lbs. per bolt per bolt
Ø 70"
Ø 70"
Ø 70"
[0
[0
[0
18 ]
18 ]
18 ]
.
.
Ø 55"
Ø 55"
Ø 55"
[0
[0
[0
14 ]
14 ]
14 ]
.
.
45 [1.77"]
45 [1.77"]
45 [1.77"]
F
20
20
20
20 20 20 20 20 20 20 20 20 60 [2.36"] 20 20
80 [3.14"] 80 [3.14"] 90 [3.54"] 180 [7.08"]
20 = [0.78"]
20 = [0.78"] 20 = [0.78"]
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Terminal legend System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 1/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Battery breaker (GND) -X004:1 ==CHA=CON+UH01 / 10.3C
Battery breaker (OFF) -X004:2 ==CHA=CON+UH01 / 10.3C
Blocking of boost and initial charge (GND) -X004:3 ==CHA=CON+UH01 / 10.4C
Blocking of boost and initial charge (Input signal) -X004:4 ==CHA=CON+UH01 / 10.4C
Connector Controller (Plug) -X005:1-26 ==CHA=CON+UH01 / 10.2C Internal connected
Boost charge (GND) -X006:1 ==CHA=CON+UH01 / 10.4C
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.ZUL Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description External connection board System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 2/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Relay board
-A077
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Boost charge ON (Common) -X002:021 ==CHA=CON+UH01 / 11.3C
Boost charge ON (NC) -X002:022 ==CHA=CON+UH01 / 11.3C
Boost charge ON (NO) -X002:024 ==CHA=CON+UH01 / 11.4C
Rectifier mains failure (Common) -X003:031 ==CHA=CON+UH01 / 11.4C
Rectifier mains failure (NC) -X003:032 ==CHA=CON+UH01 / 11.4C
Rectifier mains failure (NO) -X003:034 ==CHA=CON+UH01 / 11.4C
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Relay board System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 3/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Zone B (NC) B_NC ==CHA=CON+UH01 / 8.5F
Output (COM.) O_COM ==CHA=CON+UH01 / 8.6F
Output (NC) O_NC ==CHA=CON+UH01 / 8.6F
Output (NO) O_NO ==CHA=CON+UH01 / 8.6F
Power (+12V) P_+12 ==CHA=CON+UH01 / 8.6F
Power (GND) P_GND ==CHA=CON+UH01 / 8.5F
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Dry contact I/O System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 4/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Modbus connector RS485 (GND) J3:COM ==CHA=CON+UH01 / 8.5E
Modbus connector RS485 (RXD-) J3:RXD.0 ==CHA=CON+UH01 / 8.4E
Modbus connector RS485 (RXD+) J3:RXD.1 ==CHA=CON+UH01 / 8.5E
Modbus connector RS485 (TXD-) J3:TXD.0 ==CHA=CON+UH01 / 8.4E
Modbus connector RS485 (TXD+) J3:TXD.1 ==CHA=CON+UH01 / 8.4E
Modem (Plug) J4 ==CHA=CON+UH01 / 8.6E
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Modbus / Network management card System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 5/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Zone B (NC) B_NC ==CHA=CON+UH01 / 8.2F
Output (COM.) O_COM ==CHA=CON+UH01 / 8.3F
Output (NC) O_NC ==CHA=CON+UH01 / 8.3F
Output (NO) O_NO ==CHA=CON+UH01 / 8.3F
Power (+12V) P_+12 ==CHA=CON+UH01 / 8.3F
Power (GND) P_GND ==CHA=CON+UH01 / 8.3F
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Dry contact I/O System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 6/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Modbus connector RS485 (GND) J3:COM ==CHA=CON+UH01 / 8.2E
Modbus connector RS485 (RXD-) J3:RXD.0 ==CHA=CON+UH01 / 8.2E
Modbus connector RS485 (RXD+) J3:RXD.1 ==CHA=CON+UH01 / 8.2E
Modbus connector RS485 (TXD-) J3:TXD.0 ==CHA=CON+UH01 / 8.1E
Modbus connector RS485 (TXD+) J3:TXD.1 ==CHA=CON+UH01 / 8.1E
Modem (Plug) J4 ==CHA=CON+UH01 / 8.3E
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Modbus / Network management card System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 7/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
RS232/RS485/RS422 (DTR (TXD1_B)) 4 ==CHA=CON+UH01 / 8.7E
RS232/RS485/RS422 (DSR (TXD0_A)) 5 ==CHA=CON+UH01 / 8.7E
RS232/RS485/RS422 (RTS) 6 ==CHA=CON+UH01 / 8.8E
RS232/RS485/RS422 (DCD) 7 ==CHA=CON+UH01 / 8.8E
RS232/RS485/RS422 (GND (GND_C/C')) 8 ==CHA=CON+UH01 / 8.8E
Power supply 12-48V (+VDC) + ==CHA=CON+UH01 / 8.9D
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Network managment HU250 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 8/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Battery breaker (GND) -X004:1 ==CHA=CON+UH03 / 29.3C
Battery breaker (OFF) -X004:2 ==CHA=CON+UH03 / 29.3C
Blocking of boost and initial charge (GND) -X004:3 ==CHA=CON+UH03 / 29.4C
Blocking of boost and initial charge (Input signal) -X004:4 ==CHA=CON+UH03 / 29.4C
Connector Controller (Plug) -X005:1-26 ==CHA=CON+UH03 / 29.2C Internal connected
Boost charge (GND) -X006:1 ==CHA=CON+UH03 / 29.4C
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description External connection board System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 9/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Relay board
-A077
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Boost charge ON (Common) -X002:021 ==CHA=CON+UH03 / 30.3C
Boost charge ON (NC) -X002:022 ==CHA=CON+UH03 / 30.3C
Boost charge ON (NO) -X002:024 ==CHA=CON+UH03 / 30.4C
Rectifier mains failure (Common) -X003:031 ==CHA=CON+UH03 / 30.4C
Rectifier mains failure (NC) -X003:032 ==CHA=CON+UH03 / 30.4C
Rectifier mains failure (NO) -X003:034 ==CHA=CON+UH03 / 30.4C
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Relay board System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 10/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Zone B (NC) B_NC ==CHA=CON+UH03 / 27.5F
Output (COM.) O_COM ==CHA=CON+UH03 / 27.6F
Output (NC) O_NC ==CHA=CON+UH03 / 27.6F
Output (NO) O_NO ==CHA=CON+UH03 / 27.6F
Power (+12V) P_+12 ==CHA=CON+UH03 / 27.6F
Power (GND) P_GND ==CHA=CON+UH03 / 27.5F
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Dry contact I/O System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 11/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Modbus connector RS485 (GND) J3:COM ==CHA=CON+UH03 / 27.5E
Modbus connector RS485 (RXD-) J3:RXD.0 ==CHA=CON+UH03 / 27.4E
Modbus connector RS485 (RXD+) J3:RXD.1 ==CHA=CON+UH03 / 27.5E
Modbus connector RS485 (TXD-) J3:TXD.0 ==CHA=CON+UH03 / 27.4E
Modbus connector RS485 (TXD+) J3:TXD.1 ==CHA=CON+UH03 / 27.4E
Modem (Plug) J4 ==CHA=CON+UH03 / 27.6E
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Modbus / Network management card System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 12/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Zone B (NC) B_NC ==CHA=CON+UH03 / 27.2F
Output (COM.) O_COM ==CHA=CON+UH03 / 27.3F
Output (NC) O_NC ==CHA=CON+UH03 / 27.3F
Output (NO) O_NO ==CHA=CON+UH03 / 27.3F
Power (+12V) P_+12 ==CHA=CON+UH03 / 27.3F
Power (GND) P_GND ==CHA=CON+UH03 / 27.3F
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Dry contact I/O System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 13/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Modbus connector RS485 (GND) J3:COM ==CHA=CON+UH03 / 27.2E
Modbus connector RS485 (RXD-) J3:RXD.0 ==CHA=CON+UH03 / 27.2E
Modbus connector RS485 (RXD+) J3:RXD.1 ==CHA=CON+UH03 / 27.2E
Modbus connector RS485 (TXD-) J3:TXD.0 ==CHA=CON+UH03 / 27.1E
Modbus connector RS485 (TXD+) J3:TXD.1 ==CHA=CON+UH03 / 27.1E
Modem (Plug) J4 ==CHA=CON+UH03 / 27.3E
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Modbus / Network management card System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 14/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
RS232/RS485/RS422 (DTR (TXD1_B)) 4 ==CHA=CON+UH03 / 27.7E
RS232/RS485/RS422 (DSR (TXD0_A)) 5 ==CHA=CON+UH03 / 27.7E
RS232/RS485/RS422 (RTS) 6 ==CHA=CON+UH03 / 27.8E
RS232/RS485/RS422 (DCD) 7 ==CHA=CON+UH03 / 27.8E
RS232/RS485/RS422 (GND (GND_C/C')) 8 ==CHA=CON+UH03 / 27.8E
Power supply 12-48V (+VDC) + ==CHA=CON+UH03 / 27.9D
B
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Network managment HU250 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 15/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Mains input 1
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M6 Bolt terminal 35 mm² AWG 2 ≤ 115A 3 - 6 Nm 2 - 4 Ft. Lbs. Mains input 1 X001:L1 ==CHA=UMI+UH01 / 1.1F
3x480 V AC, 60 Hz
M6 Bolt terminal 35 mm² AWG 2 ≤ 115A 3 - 6 Nm 2 - 4 Ft. Lbs. X001:L2 ==CHA=UMI+UH01 / 1.1F
M6 Bolt terminal 35 mm² AWG 2 ≤ 115A 3 - 6 Nm 2 - 4 Ft. Lbs. X001:L3 ==CHA=UMI+UH01 / 1.1F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Mains input 1 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 16/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Battery Input 1
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. Battery Input 1 X002:+ ==CHA=BAB+UH01 / 4.4F
110 V DC
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. X002:- ==CHA=BAB+UH01 / 4.4F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Battery Input 1 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 17/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Control terminal
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Boost inhibit (Analog aux) X061:1 ==CHA=CON+UH01 / 10.4A To client
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Boost inhibit (GND) X061:2 ==CHA=CON+UH01 / 10.4A To client
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Control terminal System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 18/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker Q005 On/Off status (GND) X062:1 ==CHA=CON+UH01 / 10.3A
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker Q005 On/Off status (Input alarm) X062:2 ==CHA=CON+UH01 / 10.3A
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Battery breaker Q005 status System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 19/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (-) X125:1 ==CHA=CON+UH01 / 10.5A
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (+) X125:2 ==CHA=CON+UH01 / 10.5A
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Shield (GND) X125:PE ==CHA=CON+UH01 / 10.5A
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Battery temperature sensor terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 20/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
RS485 terminal
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD-) X175:1 ==CHA=CON+UH01 / 8.4F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD+) X175:2 ==CHA=CON+UH01 / 8.4F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD-) X175:3 ==CHA=CON+UH01 / 8.4F
B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD+) X175:4 ==CHA=CON+UH01 / 8.5F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (GND) X175:5 ==CHA=CON+UH01 / 8.5F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (Chassis GND) X175:GND ==CHA=CON+UH01 / 8.5F
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description RS485 terminal System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 21/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
RS485 terminal
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD-) X176:1 ==CHA=CON+UH01 / 8.1F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD+) X176:2 ==CHA=CON+UH01 / 8.1F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD-) X176:3 ==CHA=CON+UH01 / 8.2F
B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD+) X176:4 ==CHA=CON+UH01 / 8.2F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (GND) X176:5 ==CHA=CON+UH01 / 8.2F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (Chassis GND) X176:GND ==CHA=CON+UH01 / 8.2F
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description RS485 terminal System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 22/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Output 1 Output 2
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. Output 1 1X04:+ ==CHA=VDW+UH02 / 16.4F
110 V DC
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. 1X04:- ==CHA=VDW+UH02 / 16.4F
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. Output 2 2X04:+ ==CHA=VDW+UH02 / 16.6F
110 V DC
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. 2X04:- ==CHA=VDW+UH02 / 16.7F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Output 1 Output 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 23/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Panel heater input terminals
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Panel heater input terminals X080:L1 ==CHA=PHW+UH02 / 18.1F
1x220-303 V AC ±10%, 60Hz, 1PH 2W
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. X080:N ==CHA=PHW+UH02 / 18.1F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. X080:PE ==CHA=PHW+UH02 / 18.2F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Panel heater input terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 24/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Panel light input terminals
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Panel light input terminals X081:L1 ==CHA=PLW+UH02 / 19.1F
1x205-264 V AC, 60 Hz, 1PH 2W
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. X081:N ==CHA=PLW+UH02 / 19.1F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. X081:PE ==CHA=PLW+UH02 / 19.2F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Panel light input terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 25/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Mains input 2
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M6 Bolt terminal 35 mm² AWG 2 ≤ 115A 3 - 6 Nm 2 - 4 Ft. Lbs. Mains input 2 X001:L1 ==CHA=UMI+UH03 / 20.1F
3x480 V AC, 60 Hz
M6 Bolt terminal 35 mm² AWG 2 ≤ 115A 3 - 6 Nm 2 - 4 Ft. Lbs. X001:L2 ==CHA=UMI+UH03 / 20.1F
M6 Bolt terminal 35 mm² AWG 2 ≤ 115A 3 - 6 Nm 2 - 4 Ft. Lbs. X001:L3 ==CHA=UMI+UH03 / 20.1F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Mains input 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 26/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Battery Input 2
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. Battery Input 2 X002:+ ==CHA=BAB+UH03 / 23.4F
110 V DC
M10 Bolt terminal 120 mm² AWG 4/0 ≤ 265A 10 - 20 Nm 7 - 15 Ft. Lbs. X002:- ==CHA=BAB+UH03 / 23.4F
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Battery Input 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 27/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Control terminal
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Boost inhibit (Analog aux) X061:1 ==CHA=CON+UH03 / 29.4A To client
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Boost inhibit (GND) X061:2 ==CHA=CON+UH03 / 29.4A To client
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Control terminal System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 28/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker Q005 On/Off status (GND) X062:1 ==CHA=CON+UH03 / 29.3A
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker Q005 On/Off status (Input alarm) X062:2 ==CHA=CON+UH03 / 29.3A
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Battery breaker Q005 status System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 29/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (-) X125:1 ==CHA=CON+UH03 / 29.5A
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (+) X125:2 ==CHA=CON+UH03 / 29.5A
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Shield (GND) X125:PE ==CHA=CON+UH03 / 29.5A
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description Battery temperature sensor terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 30/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
RS485 terminal
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD-) X175:1 ==CHA=CON+UH03 / 27.4F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD+) X175:2 ==CHA=CON+UH03 / 27.4F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD-) X175:3 ==CHA=CON+UH03 / 27.4F
B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD+) X175:4 ==CHA=CON+UH03 / 27.5F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (GND) X175:5 ==CHA=CON+UH03 / 27.5F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (Chassis GND) X175:GND ==CHA=CON+UH03 / 27.5F
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description RS485 terminal System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 31/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
RS485 terminal
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD-) X176:1 ==CHA=CON+UH03 / 27.1F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (TXD+) X176:2 ==CHA=CON+UH03 / 27.1F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD-) X176:3 ==CHA=CON+UH03 / 27.2F
B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (RXD+) X176:4 ==CHA=CON+UH03 / 27.2F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (GND) X176:5 ==CHA=CON+UH03 / 27.2F
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. RS485 (Chassis GND) X176:GND ==CHA=CON+UH03 / 27.2F
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == CHA = + 2
0 11.11.20 ZUL For Approval Project description RS485 terminal System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 32/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Battery MCCB box terminals
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. Battery MCCB box terminals X005:1 ==BBX=BXW+UH04 / 32.3B
110 V DC
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. X005:2 ==BBX=BXW+UH04 / 32.3E
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. X005:5 ==BBX=BXW+UH04 / 32.3B
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. X005:6 ==BBX=BXW+UH04 / 32.3E
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == BBX = + 2
0 11.11.20 ZUL For Approval Project description Battery MCCB box terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 33/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Control terminals
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.1 On/Off status (Common) X010:1 ==BBX=BXW+UH04 / 32.5B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.1 On/Off status (NO) X010:2 ==BBX=BXW+UH04 / 32.5B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.1 On/Off status (NC) X010:3 ==BBX=BXW+UH04 / 32.5B
B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.2 On/Off status (Common) X010:4 ==BBX=BXW+UH04 / 32.6B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.2 On/Off status (NO) X010:5 ==BBX=BXW+UH04 / 32.6B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.2 On/Off status (NC) X010:6 ==BBX=BXW+UH04 / 32.6B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == BBX = + 2
0 11.11.20 ZUL For Approval Project description Control terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 34/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Battery MCCB box terminals
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. Battery MCCB box terminals X005:1 ==BBX=BXW+UH06 / 33.3B
110 V DC
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. X005:2 ==BBX=BXW+UH06 / 33.3E
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. X005:5 ==BBX=BXW+UH06 / 33.3B
M8 Bolt terminal 70 mm² AWG 2/0 ≤ 185A 6 - 12 Nm 4 - 9 Ft. Lbs. X005:6 ==BBX=BXW+UH06 / 33.3E
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == BBX = + 2
0 11.11.20 ZUL For Approval Project description Battery MCCB box terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 35/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
Control terminals
A
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.1 On/Off status (Common) X010:1 ==BBX=BXW+UH06 / 33.5B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.1 On/Off status (NO) X010:2 ==BBX=BXW+UH06 / 33.5B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.1 On/Off status (NC) X010:3 ==BBX=BXW+UH06 / 33.5B
B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.2 On/Off status (Common) X010:4 ==BBX=BXW+UH06 / 33.6B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.2 On/Off status (NO) X010:5 ==BBX=BXW+UH06 / 33.6B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery breaker AUX.2 On/Off status (NC) X010:6 ==BBX=BXW+UH06 / 33.6B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == BBX = + 2
0 11.11.20 ZUL For Approval Project description Control terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 36/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (Brown) X011:1 ==JTB=BJB+UH08 / 32.9B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (Blue) X011:2 ==JTB=BJB+UH08 / 32.10B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery midpoint (Not used) X062:1 ==JTB=BJB+UH08 / 32.9B
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == JTB = + 2
0 11.11.20 ZUL For Approval Project description Battery junction box terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 37/ 38 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (Brown) X011:1 ==JTB=BJB+UH09 / 33.9B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery temp. sensor (Blue) X011:2 ==JTB=BJB+UH09 / 33.10B
Feedthrough terminal 4 mm² AWG 12 ≤ 32A 0.5 - 1.0 Nm 1 Ft. Lbs. Battery midpoint (Not used) X062:1 ==JTB=BJB+UH09 / 33.9B
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 19.11.20
1 04.02.21 NOS For Approval UBSCO Terminal diagrams For Approval == JTB = + 2
0 11.11.20 ZUL For Approval Project description Battery junction box terminals System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EMA 38/ 38 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
-T101
S1 S2 -T102
S1 S2 -T103
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
S1 S2
301
302
303
B
PE
PE
/7.6:A
/7.6:F
1
1 3 5
1
-F063
-F064
-F065
12 14 92 94
-Q001 11 91
2
I>> I>> I>>
2 4 6
A4
A5
A6
A7
A1
A2
A3
121
C
122
123
9 10 14 18 2 4 6
-S031
Selector switch
1 3 5 7
-Q040 11 1 3
A10
A11
A8
A9
2 4 6 8
S1
-P004
/7.4:A
+ +
124
125
126
-P031 A -P032 V
S2
Mains input -
Mains input -
S1
-P005
current voltage
/7.5:A
-F050
L1
L2
L3
S2
-Z001
S1
-P006
/7.5:A
PE
E
S2
PE
PE
-PE PE PE
PE
6
Earth Bar
General Earth
-X001
L1 L2 L3 PE
F
=REC-T001:1U
2.3:A
=REC-T001:1V
2.3:A
=REC-T001:1W
2.3:A
Mains input
3x480 V AC, 60 Hz
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = UMI + UH01 2
0 11.11.20 ZUL For Approval Project description Mains input System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 1/ 33 Rev.
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
=CON-T013:0V K16
1
6.3:A
ZUL
NOS
NOS
Name
=CON-T013:400 K17
6.3:A
-A030
For Approval
For Approval
For Approval
-X009
-A030
-X011
-A030
C1 1 1
X9:1 X11:1
C2 2 4
X9:2 X11:4
C3 3
X9:3
-X010
-A030
1
X10:1
4
1
2
3
X10:4
-X1
-P001
L+
S
(-)
(+)
10 L+
-T001
=INC-F026:1
3.2:A
3
L1 7 3X 1U 4 =UMI-Q001:2
1.9:F
-P001
L2 8 3Y 1V 5 =UMI-Q001:4
1.9:F
L3 9 3Z 1W 6 =UMI-Q001:6
1.9:F
=INC-1CB2:- 15 L- 2X
3.4:A
Gutor technology
=INC-W021:1 17 2Y
3.9:A
-X8
-A030
4
=CON-A070-X002:1-16 A 1-16 2Z
X8 /7.8:A
K19
K18
9.7:B
2
1
UBSCO
PE PE
Θ
PE
PE
PE
Customer name
Project description
13
18
19
5
-A031
-X009
-A031
-X011
-A031
C4 1 1
X9:1 X11:1
C5 2 4
X9:2 X11:4
C6 3
X9:3
X10:1
X10:4
-X1
-P002
6
L+
S
(-)
(+)
=INC-F027:1 20 L+
3.7:A
Page description
L1
-P002
L2
L3
7
=INC-2CB2:- 25 L-
Rectifier 12 pulse
Circuit diagram
3.9:A
=INC-W021:1 27
3.10:A
-X8
-A031
=CON-A070-X001:1-16 B 1-16
X8
9.7:B
PE
PE
PE
System type
8
Document status
For Approval
Drawing number
= REC
=CON-F001:1 304
6.6:A
=CON-F002:1 305
+ UH01
6.7:A
=CON-F003:1 306
ZUL Revi. BAS Appr. WKH Date
6.7:A
10
1200334001/00 &EFS
Page
2/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
-V015
-L011
-F026
-W020
=ROU-Q003:1 38 30 16 2 1 12 2 1 10 =REC-A030:L+
1
1
5.4:A 2.3:F
/7.9:A
PE PE
2
1
1
2
/7.7:A
Θ
PE
/7.8:B
2
1
Θ
=CON-F016:1 312
6.8:A
14
-1R06
3
319
320
Battery current
-P026
1
Gutor technology
324
-1CB2
X1
A
-
+
15 =REC-A030:L-
-
2.4:F
4
325
-R026
X2
2
UBSCO
Customer name
2
Project description
/7.9:A
-P003
=BAB-Q004:1 36
3
5
4.4:A
-W020
=CON-F020:1 314
6.2:A
=CON-F014:1 310
6.7:A
-L012
-F027
Page description
26 2 1 22 2 1 20 =REC-A031:L+
2.6:F
PE PE
1
2
/7.7:B
PE
/7.8:A
2
1
Θ
7
Circuit diagram
12 pulse battery connection before diode
24
-2R06
System type
8
Document status
For Approval
321
322
25 =REC-A031:L-
-
2.7:F
Orig.
== CHA
9
-W021
-W021
=BAB-Q004:3 37 17 =REC-A030:L-
Drawing number
5
1
4
3
2
4.4:A 2.4:F
= INC
=CON-F021:1 315
6.2:A
=CON-F015:1 311
+ UH01
6.7:A
ZUL Revi. BAS Appr. WKH Date
=ROU-Q003:5 39 27 =REC-A031:L-
10
1200334001/00 &EFS
5.4:A 2.7:F
Page
3/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
Battery voltage
-P027
For Approval
For Approval
For Approval
A18
-F034
2 1 328
V
-
+
A19
-F035
2 1 329
=CON-F072:1 356
9.5:B
=CON-F073:1 357
9.5:B
3
-Q004
Gutor technology
-X002
34 36 =INC-W020:5
2
1
+
3.5:F
4
35 37 =INC-W021:5
-
4
3
UBSCO
3.9:F
110 V DC
Customer name
Battery Input 1
Project description
/10.3:A
11
12 14
5
Page description
7
Battery breaker
Circuit diagram
System type
8
Document status
For Approval
Drawing number
= BAB + UH01
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
4/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
-Q003
Gutor technology
=VDW+UH02-XL:+ 40 38 =INC-V015
I>>
2
1
13.5:A 3.2:F
4
I>>
4
3
UBSCO
=VDW+UH02-XL:- 41 39 =INC-W021:2
Customer name
I>>
6
5
Project description
13.6:A 3.10:F
/7.6:A
11
/7.6:F
5
91
12 14 92 94
Page description
7
Rectifier output
Circuit diagram
System type
8
Document status
For Approval
Drawing number
= ROU + UH01
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
5/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-A014
For Approval
For Approval
For Approval
R001 -F020
1 K44 2 1 314 =INC-W020:5
3.5:F
R002
-S014:2 K80 3
9.4:B R003 -F021
2 K45 2 1 315 =INC-W021:4
-A071-X10:1 K46 4 3.9:F
7.4:A
-T013
-A071-X10:3 K47 0V 0V K16 =REC-A030-X011:1
7.4:A 2.1:F
400 K17 =REC-A030-X011:4
440V 2.1:F
480V
525V
3
690V
B2
-F008
2 1
B3
-F009
2 1
Gutor technology
L3
L1
-F012
4
=FAN-T051:480V K24 2 1
12.5:A
-F013
UBSCO
=FAN-T051:0V K25 2 1
12.4:A
Customer name
L2
Project description
K20
-F010
=FAN-T050:480V 2 1
12.2:A
K21
-F011
=FAN-T050:0V 2 1
L1
12.2:A
5
L2
-T012
K12
-F006
-A071-X1:1 0V 0V B4 2 1
7.1:A
-A071-X1:4 K13 400
7.1:A 440V
L3
480V
690V B5 2 1
6
L2
K9
-F001
-A071-X3:1 2 1 304 =REC-T001:1U
7.2:A 2.10:F
Page description
K10
-F002
-A071-X3:3 2 1 305 =REC-T001:1V
7.2:A 2.10:F
K11
-F003
-A071-X3:5 2 1 306 =REC-T001:1W
7.2:A 2.10:F
7
K42
-F014
-A071-X9:1 2 1 310 =INC-1CB2:+
K48
-F016
-A071-X11:1 2 1 312 =INC-V015
7.3:A 3.3:F
System type
-F017
8
-A071-X11:3 K49 2 1
Document status
For Approval
7.3:A
Gutor SDC 110-125-R
-
+
K50
-F018
-A071-X2:1 2 1
7.3:A
K51
-F019
-A071-X2:3 2 1
Orig.
7.4:A
== CHA
9
Drawing number
= CON + UH01
-
+
C27
-F024
-A022:L 2 1
ZUL Revi. BAS Appr. WKH Date
8.2:A
10
1200334001/00 &EFS
C28
-F025
-A022:N 2 1
8.2:A
Page
6/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
-X007
-A071
-X1
-A071
NOS
NOS
/12.1:E
AC Mains
-A071
Name
-A070-X007:1-40 C 1-40 1 K12 -T012:0V
Interface
-X007:1-40 CCU AC 1 -X1:1
9.7:B 2 6.5:F
Not used -X1:2
3
Not used -X1:3
4 K13 -T012:400
AC 2 -X1:4
6.6:F
-X008
-A071
-A070-X008:1-34 D 1-34
For Approval
For Approval
For Approval
Supply
-X3
-A071
-X008:1-34 AC Input voltage
9.8:B 1 K9 -F001:2
L1 -X3:1
2 6.6:F
Not used -X3:2
3 K10 -F002:2
L2 -X3:3
6.7:F
4
Not used -X3:4
5 K11 -F003:2
L3 -X3:5
6.7:F
-X9
-A071
DC Voltage 1 K42 -F014:2
VDC+ -X9:1
2 6.7:F
Not used -X9:2
3 K43 -F015:2
VDC- -X9:3
6.7:F
-X11
-A071
Aux. DC Voltage 1 K48 -F016:2
V Aux+ -X11:1
2 6.8:F
Not used -X11:2
3
3 K49 -F017:2
V Aux- -X11:3
6.8:F
-X2
-A071
Output voltage 1 K50 -F018:2
DC+ -X2:1
2 6.9:F
Not used -X2:2
3 K51 -F019:2
DC- -X2:3
6.9:F
Gutor technology
-X10
-A071
3 K47 -A014:1:2
V Earth- -X10:3
6.3:F
UBSCO
Customer name
Project description
-X4
-A071
-X1
-P004
3 K5 K5 1
L2 -X4:3 X1:1 =UMI-P005
4 K6 K6 2
GND -X4:4 X1:2
5
/1.9:E
3 4
3 4
-X14
-A071
-X1
-P006
-X072 Option 1
=VDW+UH02-K037:14 K150 K150 1 5 K7 K7 1
-X14:1 Control signal L3 -X4:5 X1:1
5
5
15.1:A 6 K8 K8 2
=UMI-P006
GND -X4:6 X1:2 /1.9:E
5 6
5 6
6
6
15.1:A
-Q001 -Q001
-X14
-A071
/1.9:B
-X072 Option 2 /1.9:B
7
7
Mains CB 1 K1 K1
Control input -X5:1
1
1
92 94
12 14
91
11
6
K153 K153 4
-X14:4 GND
8
8
2 K2 K2
GND -X5:2
2
2
-Q003
-Q003 /5.4:B
-X15
-A071
/5.4:B
Option 3 Load CB
C63 1 3 K52 K52
Page description
-X15:1 Control signal Control input -X5:3
3
3
12 14
11
92 94
91
C64 2 4 K53 K53
-X15:2 GND GND -X5:4
4
4
-F027 -F026
-X15
-A071
2
1
2
1
Interface board
17.2:B
Circuit diagram
=VDW+UH02-2Q10:11 C66 4 6 K35
-X15:4 GND GND -X5:6
17.2:B
-T001
-X16
-A071
-X6
-A071
1
1
5
5
System type
8
-L011 -L012
Document status
-X16
-A071
For Approval
3
3
1
1
2
2
3
3
-V015
-X17
-A071
Low DC voltage
Θ
Orig.
(By software) 2
GND GND
6 K41
-X17:2 -X6:6
== CHA
9
Drawing number
-X17
-A071
-X12
-A071
-X1
-P003
Control signal
+ UH01
Internal ON -X13:1
GND -X13:2
ZUL Revi. BAS Appr. WKH Date
1200334001/00 &EFS
GND -X13:4
Page
7/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-J3
-A093
-X176
Modbus connector
E11 1
-A093
J3:TXD.0 RS485 TXD-
E12 2
J3:TXD.1 RS485 TXD+
1 2
3
RS485 terminal
J3:CH:GND Chassis GND
-A091
E13 4
J3:RXD.0 RS485 RXD-
E14 5
-A022
Smart slot
For Approval
For Approval
For Approval
management card
Modbus / Network
-J8
-A091
J3:RXD.1 RS485 RXD+
E15 6 1-9 C27 -F024:2
J3:COM RS485 GND J8:1-9
L
+
PE 6.10:F
PE
-
USB 1 J1:1-14
3 4 5 GND
J101:1
+
-Z076
-GF1
-A093
-J2
-A091
B_COM USB 2
1-20
1-14
Smart slot Power
B
ZE C28 -F025:2
Zone
-
6.10:F
A_COM +24V
J5:2
A
VL -A025-X002:1-25
A_NC Serial configuration 10.2:A
-A093_A
-J3
-A091
P_GND CONFIG.
1-14
Zone Power
P_+12 J3:1-14 J6:1-9
1
1
ZY Connector
O_COM RJ45 RJ45 Not used J1
Output
O_NO
3
Modem
J4
J104
-A093
Modbus/TCP,HTTP,SNMP
1-8
+UH03-A093J104:1-8 ZF1
J104 Network
27.3:F
ZD
B58
B57
Gutor technology
4
-J3
-A092
-X175
RS485 terminal
Modbus connector
E5 1
-A092
J3:TXD.0 RS485 TXD-
UBSCO
E6 2
J3:TXD.1 RS485 TXD+
1 2
3
Customer name
J3:CH:GND Chassis GND
Project description
E7 4
J3:RXD.0 RS485 RXD-
E8 5 management card
Modbus / Network
J3:RXD.1 RS485 RXD+
E9 6
J3:COM RS485 GND
PE
-A092_MKIT M.kit NMS
PE
USB 1
3 4 5 GND
J101:1
5
-Z075
-GF1
-A092
B_COM USB 2
1-20
Smart slot
B
Zone
B_NC J101:2 Connector GF1
A_COM
A
A_NC Serial configuration
-A092_A
P_GND CONFIG.
Zone Power
P_+12
1
1 Connector
ZZ
O_COM RJ45 RJ45 Not used J1
Output
J4
J104
-A092
Modbus/TCP,HTTP,SNMP
1-8
J104 Network
Page description
ZF
RS485
-A094
RS485 port
1-8
RS485
-A094
GPS
7
RS232/RS485
Communication
TXD (RXDO_A')
Circuit diagram
1
2 RXD (RXD1_B')
3 CTS
2G/3G or 3G/4G
4 DTR (TXD1_B)
5 DSR (TXD0_A)
WI-FI (2.4GHz/5GHz)
6 RTS
Network managment HU250
7 DCD
8 GND (GND_C/C')
Digital inputs 1
System type
DI1.1 0V
8
Document status
DI1.2 DI1
For Approval
DI1.3 DI2
DI1.4 DI3
Gutor SDC 110-125-R
DI1.5 DI4
Digital inputs 2 Power supply
DI2.1 0V +VDC +
DI2.2 Voltage presence
12-48V
DI2.5 Local
== CHA
DI2.6 Remote
9
Local communication
Digital outputs Ethernet port
Drawing number
1200334001/00 &EFS
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
Gutor technology
4
-S014
UBSCO
1
K81
Customer name
2
Project description
3
K80 -A014:1:3
3 1
2
-P014
6.2:F
4
Ammeter
5
PE
11
PE
PE
-F072
5
12
A35 2 1 356 =BAB-F034:1
4.3:E
13
A36 -F073
2 1 357 =BAB-F035:1
4.3:E
Page description
-X005
-A070
-X001
-A070
-A070
10.2:A 2.7:F
7
-X006
-A070
-X002
-A070
Circuit diagram
-A077-X017:1-20 G 1-20 1-16 A =REC-A030-X8:1-16
-X006:1-20 Relay board 30° -X002:1-16
1-40 C -A071-X007:1-40
Interface CCU -X007:1-40
7.1:F
-X008
-A070
1-34 D -A071-X008:1-34
Interface Supply -X008:1-34
7.2:F
System type
8
Document status
For Approval
-X007
-A070
-X003
-A070
Orig.
1-16 1-26
-X004:1-16 FP FP -X003:1-26
== CHA
9
Drawing number
= CON
F
E
-A073
Front panel
+ UH01
-Z071
-Z073
1-16 1-26
10
1200334001/00 &EFS
-X002:1-16 -X001:1-26
Page
9/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Remote display
-A025
Name
RS232 -X001:1-25
-X002
-A025
Serial port 1-25 VL -A091-J8:1-9
RS232 -X002:1-25
8.3:A
For Approval
For Approval
For Approval
External connection board
-X003
-A025
Parallel port 1-15 VZ +UH03-A025-X003:1-1
-X003:1-15
29.2:A
-X005
-A025
Connector 1-26 H -A070-X005:1-40
Controller -X005:1-26
9.7:F
=BAB-Q004
/4.4:C
-X062
5
5
1
11
12 14
OFF
K58 K58
-X004:2
6
6
2
-X061
Gutor technology
Input signal
C24
-X004:4
2
Control terminal Control terminal
4
Boost charge
UBSCO
GND -X006:1
Customer name
Project description
Input signal -X006:2
-X125
(+) Brown
F98
-X006:4
5
PE
sensor terminals
PE
PE
Battery temperature
External ON
GND -X007:1
Rectifier failure
-X009:3
Page description
-X008:1
NC
-X009:2 *
-X008:2
NO
-X009:1
GND -X008:3
External OFF
Input signal -X008:4
7
Circuit diagram
Common alarm
-X009:6
Common alarm
8
Document status
NC
-X009:8 * Ext. EPO + -X009:14
Gutor SDC 110-125-R
NO
-X009:7
(* Alarm position)
Orig.
== CHA
9
Drawing number
= CON + UH01
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
10/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-A077
-X017
-A077
1-20 G -A070-X006:1-20
-X017:1-20
9.7:F
Relay board
(* Alarm position)
For Approval
For Approval
For Approval
K009
K001
-X009:092 * * -X001:012
NO NO
-X009:094 -X001:014
3
K010
K002
-X010:102 * * -X002:022
NO NO
-X010:104 -X002:024
Gutor technology
Rectifier overcurrent Rectifier mains failure
4
-X011:111 -X003:031
UBSCO
NC NC
K011
K003
-X011:112 * * -X003:032
Customer name
Project description
NO NO
-X011:114 -X003:034
NC NC
K012
K004
-X012:122 * * -X004:042
NO NO
-X012:124 -X004:044
-X013:132 * * -X005:052
6
NO NO
-X013:134 -X005:054
Page description
Negative earth fault Battery discharged
-X014:141 -X006:061
NC NC
K014
K006
-X014:142 * * -X006:062
NO NO
Relay board
-X014:144 -X006:064
7
Circuit diagram
Low DC voltage DC Fuse blown
-X015:151 -X007:071
NC NC
K015
K007
-X015:152 * * -X007:072
NO NO
-X015:154 -X007:074
System type
8
Document status
For Approval
-X016:161 -X008:081
NC NC
K016
K008
-X016:162 * * -X008:082
NO NO
-X016:164 -X008:084
Orig.
== CHA
9
Drawing number
= CON + UH01
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
11/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-T050
/7.1:C
For Approval
For Approval
For Approval
-X18
-A071
-X002
-A050
-X001
-A050
Fan 1
Fan
-A071
1 K63 1 3 K15 0V 0V K21 =CON-F011:2
Interface
GND -X18:1 -X002:1 -X001:3
-A050
2 K64 2 1 K14 0V 460V 6.5:F
Sense -X18:2 -X002:2 -X001:1
3 K65 3 480V
VCC -X18:3 -X002:3
4 K66 5 500V
VCC -X18:4 -X002:5
5 K67 7 230V 600V
Speed -X18:5 -X002:7
230V 660V
PE 690V
PE
PE K20
PE
PE =CON-F010:2
Fan box
6.5:F
PE
PE
K22
K23
-X19
-A071
-X002
-A051
Fan 2
Fan
1 K68 1
GND -X19:1 -X002:1
-A051
2 K69 2 PE
Sense -X19:2 -X002:2
3 K70 3
PE
5 K72 7
Speed -X19:5 -X002:7
1
2
3
-X055
-A060
Gutor technology
-T051
-X20
-A071
-X002
-A050
-X001
-A050
Fan 3
Fan
1 K75 1 3 K27 0V 0V K25 =CON-F013:2
GND -X20:1 -X002:1 -X001:3
-A050
6.4:F
4
UBSCO
4 K78 5 500V
VCC -X20:4 -X002:5
5 K79 7 230V 600V
Customer name
Speed -X20:5 -X002:7
Project description
230V 660V
690V K24 =CON-F012:2
PE
PE 6.4:F
PE
PE
Fan box
PE
PE
K28
K29
-X21
-A071
-X002
-A051
Fan 4
Fan
1 K80 1
GND -X21:1 -X002:1
-A051
2 K81 2 PE
Sense -X21:2 -X002:2
5
3 K82 3
PE
5 K84 7
Speed -X21:5 -X002:7
1
2
3
-X051
-A061
-X22
-A071
Fan 5
1
GND -X22:1
2
Sense -X22:2
3
Page description
VCC -X22:3
4
VCC -X22:4
5
Speed -X22:5
Fans
7
-X23
-A071
Fan 6
Circuit diagram
1
GND -X23:1
2
Sense -X23:2
3
VCC -X23:3
4
VCC -X23:4
5
Speed -X23:5
System type
8
Document status
For Approval
Fan 7
1
GND -X24:1
2
Sense -X24:2
3
VCC -X24:3
4
VCC -X24:4
5
Speed -X24:5
Orig.
== CHA
9
Drawing number
-X25
-A071
Fan 8
= FAN
1
GND -X25:1
2
Sense -X25:2
3
VCC -X25:3
4
VCC -X25:4
5
+ UH01
Speed -X25:5
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
12/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
Gutor technology
4
/14.7:E
-K034
/14.8:E
-K033
/14.8:E
-K032
UBSCO
2
1
2
1
2
1
Customer name
Project description
4
3
4
3
4
3
-P021:2
17.4:B
6
5
6
5
6
5
-P021:3
17.4:B
8
7
8
7
8
7
5
309
308
58
57
55
54
52
51
-V034
-V033
-V032
X2
X1
-XL
-1Q10:1 60 2 1 X- X+ 56 X- X+ 53 X- X+ 46 40 =ROU+UH01-Q003:2
+
16.4:A 5.4:E
-XL
-R021
-1Q10:5 61 41 =ROU+UH01-Q003:6
-
16.4:A 5.4:E
342
343
Page description
42 =ROU+UH03-Q003:2
24.4:E
-Q035:3
14.9:A
43 =ROU+UH03-Q003:6
7
-Q035:1 24.4:E
Circuit diagram
14.9:A
A16
-F030
-P022:1 2 1
17.6:B
A17
-F031
-P022:4 2 1
17.6:B
System type
8
Document status
For Approval
Drawing number
= VDW + UH02
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
13/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
1 2 3 4 5 6 7 8 9 10
-R021:2
-F130:1
-F131:1
17.5:B
17.5:B
13.7:F
13.7:F
-XL:-
A
PE
352
353
343
342
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
PE
344
PE L N
345
-A036
1 3 1 3
+ - + - -Q035 -Q034
B
D57
D68
D69
D31
D30
D73
D72
D76
D74
D80 D77
C
A1 A2 B1 B2 B3
(+/L) (-/N) COM. (+)
D71
-A039 -K134 -K133 -K132
Output
Transducer /14.4:E 2 /14.3:E 2 /14.2:E 2
+ -
D38
D35
D32
+ -
3 3 3
-K134 -K133 -K132
/14.4:E 4 /14.3:E 4 /14.2:E 4
D70
D39
D36
D33
D
5 5 5
-K134 -K133 -K132
/14.4:E 6 /14.3:E 6 /14.2:E 6
D58
D59
L+
I1
I2
I3
I4
I5
I6
I7
I8
D40
D37
D34
-A034 7 7 7
Q1:1
Q1:2
Q2:1
Q2:2
Q3:1
Q3:2
Q4:1
Q4:2
D81
D78
D75
E
D60
D62
D64
A1 A1 A1 A1 A1 A1
-K132 -K133 -K134 -K034 -K033 -K032
A2 A2 A2 A2 A2 A2
D91
D90
D61 D63 D82 D79
1 2 /14.8:C 1 2 /14.8:C 1 2 /14.7:C 1 2 /13.4:D 1 2 /13.4:D 1 2 /13.4:C
3 4 /14.8:D 3 4 /14.8:D 3 4 /14.7:D 3 4 /13.4:D 3 4 /13.4:D 3 4 /13.4:C
F
-A041:N
15.3:A
-A041:L
15.3:A
5 6 /14.8:D 5 6 /14.8:D 5 6 /14.7:D 5 6 /13.5:D 5 6 /13.5:D 5 6 /13.5:C
7 8 /14.8:E 7 8 /14.8:E 7 8 /14.7:E 7 8 /13.5:D 7 8 /13.5:D 7 8 /13.5:C
13 14 /15.1:E 13 14 /15.1:D 13 14 /15.1:D
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = VDW + UH02 2
0 11.11.20 ZUL For Approval Project description Control voltage dropper System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 14/ 33 Rev.
Status
1 2 3 4 5 6 7 8 9 10
=CON+UH01-X072:5
=CON+UH01-X072:6
=CON+UH03-X072:5
=CON+UH03-X072:6
-Q034:4
-Q034:2
A
14.10:F
14.10:F
26.5:F
26.5:F
7.5:F
7.5:F PE
PE
D90
D91
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
K150
K151
B150
B151
PE L N
-A041
B
+ - + -
D96
D92
12 14 22 24 11
-K036
C
-K037 -K037
/15.1:F
/15.2:F 11 /15.2:F 21 14 12
-FD1
-X041 1
D93 K116 K120 K120 -FD1
D94 2 K117 K121 K121
D50 3 K128
4 K129
D95
PE 5 PE
13 PE
8
-K032 K111 K113
D
/14.8:E 14 9 K112
D51
K118
K119
K122
K123
13 21
-K033 -K036 D105
/14.8:E 14 /15.1:F 24 22
-X003:1
-X003:3
-X013:1
-X007:1
-X003:1
-X003:3
-X013:1
-X007:1
D52
-X001:1
-X001:2
-X001:3
-X001:1
-X001:2
-X001:3
13
-K034
/14.7:E 14
-A151 -A152
E
D99
B
M M
A1 A1
-E151 -E152
-K036 -K037
A2 A2
F
D55
14 11 /15.3:C 14 11 /15.1:C
12 12
24 21 /15.2:D 24 21 /15.2:C
22 22
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = VDW + UH02 2
0 11.11.20 ZUL For Approval Project description Voltage dropper fans System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 15/ 33 Rev.
Status
1 2 3 4 5 6 7 8 9 10
-R021:2
13.5:F
13.6:F
-XL:-
A
60
61
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
161
B
160
/17.2:D
/17.3:D
/17.2:E
/17.3:E
1 3 5 1 3 5
12 14 22 24 12 14 22 24
C
-1Q10 11 21 -2Q10 11 21
I>> I>> I>> I>> I>> I>>
2 4 6 2 4 6
62
63
162
163
D
E
-1X04 -2X04
F
+ - + -
Output Output
110 V DC 110 V DC
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = VDW + UH02 2
0 11.11.20 ZUL For Approval Project description Output System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 16/ 33 Rev.
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
-2Q10 -1Q10
/16.6:C /16.4:C
G1 C65 =CON+UH01-A071-X15:3
12 14
12 14
11
11
7.7:F
C66 =CON+UH01-A071-X15:4
7.7:F
-2Q10 -1Q10
/16.6:C /16.4:C
G2 B65 =CON+UH03-A071-X15:3
22 24
22 24
21
21
26.7:F
3
B66 =CON+UH03-A071-X15:4
26.7:F
Gutor technology
1
4
2
308 -R021:X1
13.5:F
3
UBSCO
-P021
4
309 -R021:X2
Ammeter
13.5:F
Customer name
5
Project description
PE
A30
-F130
2 1 352 -Q034:3
12
14.10:A
remove
A31
-F131
2 1 353 -Q034:1
13
5
14.10:A
355
354
1
A16 -F030:2
13.8:F
2
3
-P022
4
A17 -F031:2
Voltmeter
13.8:F
Page description
5
PE
A32
-F132
2 1
12
Digital meter
7
A33
-F133
2 1
13
Circuit diagram
remove
System type
8
Document status
For Approval
Drawing number
= VDW + UH02
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
17/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
1 3
-Q080
I> I>
2 4
398
399
C
D10 D12
D9 D11
D3
D4
D8 D6
D7 D5
D
2
BU
BN
BU
BN
BU
BN
BU
BN
BU
BN
BK
BK
BK
BK
BK
E
Θ Θ Θ Θ Θ Θ Θ Θ Θ Θ
-PE
PE
Panel heater Panel heater Panel heater Panel heater Panel heater
-E800 -E801 -E802 -E803 -E804
PE
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = PHW + UH02 2
0 11.11.20 ZUL For Approval Project description Panel heater System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 18/ 33 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
1 3
-Q081
I> I>
2 4
396
397
D34 D37
C
D32 D35
D23
D25
D31 D28
D29 D26
D
1 1 1 1 1
-S080 -S081 -S082 -S083 -S084
2 2 2 2 2
E
D30
D27
D24
D33
D36
L L L L L
2 01.04.21 NOS For Approval Customer name Page description Document status Orig.ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = PLW + UH02 2
0 11.11.20 ZUL For Approval Project description Panel light System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 19/ 33 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
-T101
S1 S2 -T102
S1 S2 -T103
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
S1 S2
301
302
303
B
PE
/26.6:A
/26.6:F
PE
1
1 3 5
1
-F063
-F064
-F065
12 14 92 94
-Q001 11 91
2
I>> I>> I>>
2 4 6
A4
A5
A6
A7
A1
A2
A3
121
C
122
123
9 10 14 18 2 4 6
-S031
Selector switch
1 3 5 7
-Q040 11 1 3
A10
A11
A8
A9
2 4 6 8
S1
-P004
/26.4:A
+ +
124
125
126
-P031 A -P032 V
S2
Mains input -
Mains input -
S1
-P005
current voltage
/26.5:A
-F050
L1
L2
L3
S2
-Z001
S1
-P006
/26.5:A
PE
E
S2
PE
PE
-PE PE PE
PE
6
Earth Bar
General Earth
-X001
L1 L2 L3 PE
F
=REC-T001:1U
21.3:A
=REC-T001:1V
21.3:A
=REC-T001:1W
21.3:A
Mains input
3x480 V AC, 60 Hz
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == CHA = UMI + UH03 2
0 11.11.20 ZUL For Approval Project description Mains input System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 20/ 33 Rev.
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
=CON-T013:0V K16
1
25.3:A
ZUL
NOS
NOS
Name
=CON-T013:400 K17
25.3:A
-A030
For Approval
For Approval
For Approval
-X009
-A030
-X011
-A030
C1 1 1
X9:1 X11:1
C2 2 4
X9:2 X11:4
C3 3
X9:3
-X010
-A030
1
X10:1
4
1
2
3
X10:4
-X1
-P001
L+
S
(-)
(+)
10 L+
-T001
=INC-F026:1
22.2:A
3
L1 7 3X 1U 4 =UMI-Q001:2
20.9:F
-P001
L2 8 3Y 1V 5 =UMI-Q001:4
20.9:F
L3 9 3Z 1W 6 =UMI-Q001:6
20.9:F
=INC-1CB2:- 15 L- 2X
22.4:A
Gutor technology
=INC-W021:1 17 2Y
22.9:A
-X8
-A030
4
=CON-A070-X002:1-16 A 1-16 2Z
X8 /26.8:A
K19
K18
28.7:B
2
1
UBSCO
PE PE
Θ
PE
PE
PE
Customer name
Project description
13
18
19
5
-A031
-X009
-A031
-X011
-A031
C4 1 1
X9:1 X11:1
C5 2 4
X9:2 X11:4
C6 3
X9:3
X10:1
X10:4
-X1
-P002
6
L+
S
(-)
(+)
=INC-F027:1 20 L+
22.7:A
Page description
L1
-P002
L2
L3
7
=INC-2CB2:- 25 L-
Rectifier 12 pulse
Circuit diagram
22.9:A
=INC-W021:1 27
22.10:A
-X8
-A031
=CON-A070-X001:1-16 B 1-16
X8
28.7:B
PE
PE
PE
System type
8
Document status
For Approval
Drawing number
= REC
=CON-F001:1 304
25.6:A
=CON-F002:1 305
+ UH03
25.7:A
=CON-F003:1 306
ZUL Revi. BAS Appr. WKH Date
25.7:A
10
1200334001/00 &EFS
Page
21/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
-V015
-L011
-F026
-W020
=ROU-Q003:1 38 30 16 2 1 12 2 1 10 =REC-A030:L+
1
1
24.4:A 21.3:F
/26.9:A
PE PE
2
1
1
2
/26.7:A
Θ
PE
/26.8:B
2
1
Θ
=CON-F016:1 312
25.8:A
14
-1R06
3
319
320
Battery current
-P026
1
Gutor technology
324
-1CB2
X1
A
-
+
15 =REC-A030:L-
-
21.4:F
4
325
-R026
X2
2
UBSCO
Customer name
2
Project description
/26.9:A
-P003
=BAB-Q004:1 36
3
5
23.4:A
-W020
=CON-F020:1 314
25.2:A
=CON-F014:1 310
25.7:A
-L012
-F027
Page description
26 2 1 22 2 1 20 =REC-A031:L+
21.6:F
PE PE
1
2
/26.7:B
PE
/26.8:A
2
1
Θ
7
Circuit diagram
12 pulse battery connection before diode
24
-2R06
System type
8
Document status
For Approval
321
322
25 =REC-A031:L-
-
21.7:F
Orig.
== CHA
9
-W021
-W021
=BAB-Q004:3 37 17 =REC-A030:L-
Drawing number
5
1
4
3
2
23.4:A 21.4:F
= INC
=CON-F021:1 315
25.2:A
=CON-F015:1 311
+ UH03
25.7:A
ZUL Revi. BAS Appr. WKH Date
=ROU-Q003:5 39 27 =REC-A031:L-
10
1200334001/00 &EFS
24.4:A 21.7:F
Page
22/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
Battery voltage
-P027
For Approval
For Approval
For Approval
A18
-F034
2 1 328
V
-
+
A19
-F035
2 1 329
=CON-F072:1 356
28.5:B
=CON-F073:1 357
28.5:B
3
-Q004
Gutor technology
-X002
34 36 =INC-W020:5
2
1
+
22.5:F
4
35 37 =INC-W021:5
-
4
3
UBSCO
22.9:F
110 V DC
Customer name
Battery Input 2
Project description
/29.3:A
11
12 14
5
Page description
7
Battery breaker
Circuit diagram
System type
8
Document status
For Approval
Drawing number
= BAB + UH03
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
23/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
-Q003
Gutor technology
=VDW+UH02-XL:+ 42 38 =INC-V015
I>>
2
1
13.7:A 22.2:F
4
I>>
4
3
UBSCO
=VDW+UH02-XL:- 43 39 =INC-W021:2
Customer name
I>>
6
5
Project description
13.7:A 22.10:F
/26.6:A
11
/26.6:F
5
91
12 14 92 94
Page description
7
Rectifier output
Circuit diagram
System type
8
Document status
For Approval
Drawing number
= ROU + UH03
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
24/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-A014
For Approval
For Approval
For Approval
R001 -F020
1 K44 2 1 314 =INC-W020:5
22.5:F
R002
-S014:2 K80 3
28.4:B R003 -F021
2 K45 2 1 315 =INC-W021:4
-A071-X10:1 K46 4 22.9:F
26.4:A
-T013
-A071-X10:3 K47 0V 0V K16 =REC-A030-X011:1
26.4:A 21.1:F
400 K17 =REC-A030-X011:4
440V 21.1:F
480V
525V
3
690V
B2
-F008
2 1
B3
-F009
2 1
Gutor technology
L3
L1
-F012
4
=FAN-T051:480V K24 2 1
31.5:A
-F013
UBSCO
=FAN-T051:0V K25 2 1
31.4:A
Customer name
L2
Project description
K20
-F010
=FAN-T050:480V 2 1
31.2:A
K21
-F011
=FAN-T050:0V 2 1
L1
31.2:A
5
L2
-T012
K12
-F006
-A071-X1:1 0V 0V B4 2 1
26.1:A
-A071-X1:4 K13 400
26.1:A 440V
L3
480V
690V B5 2 1
6
L2
K9
-F001
-A071-X3:1 2 1 304 =REC-T001:1U
26.2:A 21.10:F
Page description
K10
-F002
-A071-X3:3 2 1 305 =REC-T001:1V
26.2:A 21.10:F
K11
-F003
-A071-X3:5 2 1 306 =REC-T001:1W
26.2:A 21.10:F
7
K42
-F014
-A071-X9:1 2 1 310 =INC-1CB2:+
K48
-F016
-A071-X11:1 2 1 312 =INC-V015
26.3:A 22.3:F
System type
-F017
8
-A071-X11:3 K49 2 1
Document status
For Approval
26.3:A
Gutor SDC 110-125-R
-
+
K50
-F018
-A071-X2:1 2 1
26.3:A
K51
-F019
-A071-X2:3 2 1
Orig.
26.4:A
== CHA
9
Drawing number
= CON + UH03
-
+
C27
-F024
-A022:L 2 1
ZUL Revi. BAS Appr. WKH Date
27.2:A
10
1200334001/00 &EFS
C28
-F025
-A022:N 2 1
27.2:A
Page
25/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
-X007
-A071
-X1
-A071
NOS
NOS
/31.1:E
AC Mains
-A071
Name
-A070-X007:1-40 C 1-40 1 K12 -T012:0V
Interface
-X007:1-40 CCU AC 1 -X1:1
28.7:B 2 25.5:F
Not used -X1:2
3
Not used -X1:3
4 K13 -T012:400
AC 2 -X1:4
25.6:F
-X008
-A071
-A070-X008:1-34 D 1-34
For Approval
For Approval
For Approval
Supply
-X3
-A071
-X008:1-34 AC Input voltage
28.8:B 1 K9 -F001:2
L1 -X3:1
2 25.6:F
Not used -X3:2
3 K10 -F002:2
L2 -X3:3
25.7:F
4
Not used -X3:4
5 K11 -F003:2
L3 -X3:5
25.7:F
-X9
-A071
DC Voltage 1 K42 -F014:2
VDC+ -X9:1
2 25.7:F
Not used -X9:2
3 K43 -F015:2
VDC- -X9:3
25.7:F
-X11
-A071
Aux. DC Voltage 1 K48 -F016:2
V Aux+ -X11:1
2 25.8:F
Not used -X11:2
3
3 K49 -F017:2
V Aux- -X11:3
25.8:F
-X2
-A071
Output voltage 1 K50 -F018:2
DC+ -X2:1
2 25.9:F
Not used -X2:2
3 K51 -F019:2
DC- -X2:3
25.9:F
Gutor technology
-X10
-A071
3 K47 -A014:1:2
V Earth- -X10:3
25.3:F
UBSCO
Customer name
Project description
-X4
-A071
-X1
-P004
3 K5 K5 1
L2 -X4:3 X1:1 =UMI-P005
4 K6 K6 2
GND -X4:4 X1:2
5
/20.9:E
3 4
3 4
-X14
-A071
-X1
-P006
-X072 Option 1
=VDW+UH02-K037:24 B150 B150 1 5 K7 K7 1
-X14:1 Control signal L3 -X4:5 X1:1
5
5
15.2:A 6 K8 K8 2
=UMI-P006
GND -X4:6 X1:2 /20.9:E
5 6
5 6
6
6
15.2:A
-Q001 -Q001
-X14
-A071
/20.9:B
-X072 Option 2 /20.9:B
7
7
Mains CB 1 K1 K1
Control input -X5:1
1
1
92 94
12 14
91
11
6
K153 K153 4
-X14:4 GND
8
8
2 K2 K2
GND -X5:2
2
2
-Q003
-Q003 /24.4:B
-X15
-A071
/24.4:B
Option 3 Load CB
C63 1 3 K52 K52
Page description
-X15:1 Control signal Control input -X5:3
3
3
12 14
11
92 94
91
C64 2 4 K53 K53
-X15:2 GND GND -X5:4
4
4
-F027 -F026
-X15
-A071
2
1
2
1
Interface board
17.3:B
Circuit diagram
=VDW+UH02-2Q10:21 B66 4 6 K35
-X15:4 GND GND -X5:6
17.3:B
-T001
-X16
-A071
-X6
-A071
1
1
5
5
System type
8
-L011 -L012
Document status
-X16
-A071
For Approval
3
3
1
1
2
2
3
3
-V015
-X17
-A071
Low DC voltage
Θ
Orig.
(By software) 2
GND GND
6 K41
-X17:2 -X6:6
== CHA
9
Drawing number
-X17
-A071
-X12
-A071
-X1
-P003
Control signal
+ UH03
Internal ON -X13:1
GND -X13:2
ZUL Revi. BAS Appr. WKH Date
1200334001/00 &EFS
GND -X13:4
Page
26/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-J3
-A093
-X176
Modbus connector
E11 1
-A093
J3:TXD.0 RS485 TXD-
E12 2
J3:TXD.1 RS485 TXD+
1 2
3
RS485 terminal
J3:CH:GND Chassis GND
-A091
E13 4
J3:RXD.0 RS485 RXD-
E14 5
-A022
Smart slot
For Approval
For Approval
For Approval
management card
Modbus / Network
-J8
-A091
J3:RXD.1 RS485 RXD+
E15 6 1-9 C27 -F024:2
J3:COM RS485 GND J8:1-9
L
+
PE 25.10:F
PE
-
USB 1 J1:1-14
3 4 5 GND
J101:1
+
-Z076
-GF1
-A093
-J2
-A091
B_COM USB 2
1-20
1-14
Smart slot Power
B
ZE C28 -F025:2
Zone
-
25.10:F
A_COM +24V
J5:2
A
VL -A025-X002:1-25
A_NC Serial configuration 29.2:A
-A093_A
-J3
-A091
P_GND CONFIG.
1-14
Zone Power
P_+12 J3:1-14 J6:1-9
1
1
ZY Connector
O_COM RJ45 RJ45 Not used J1
Output
O_NO
3
Modem
J4
J104
-A093
Modbus/TCP,HTTP,SNMP
1-8
+UH01-A093J104:1-8 ZF1
J104 Network
8.3:F
ZD
B58
B57
Gutor technology
4
-J3
-A092
-X175
RS485 terminal
Modbus connector
E5 1
-A092
J3:TXD.0 RS485 TXD-
UBSCO
E6 2
J3:TXD.1 RS485 TXD+
1 2
3
Customer name
J3:CH:GND Chassis GND
Project description
E7 4
J3:RXD.0 RS485 RXD-
E8 5 management card
Modbus / Network
J3:RXD.1 RS485 RXD+
E9 6
J3:COM RS485 GND
PE
-A092_MKIT M.kit NMS
PE
USB 1
3 4 5 GND
J101:1
5
-Z075
-GF1
-A092
B_COM USB 2
1-20
Smart slot
B
Zone
B_NC J101:2 Connector GF1
A_COM
A
A_NC Serial configuration
-A092_A
P_GND CONFIG.
Zone Power
P_+12
1
1 Connector
ZZ
O_COM RJ45 RJ45 Not used J1
Output
J4
J104
-A092
Modbus/TCP,HTTP,SNMP
1-8
J104 Network
Page description
ZF
RS485
-A094
RS485 port
1-8
RS485
-A094
GPS
7
RS232/RS485
Communication
TXD (RXDO_A')
Circuit diagram
1
2 RXD (RXD1_B')
3 CTS
2G/3G or 3G/4G
4 DTR (TXD1_B)
5 DSR (TXD0_A)
WI-FI (2.4GHz/5GHz)
6 RTS
Network managment HU250
7 DCD
8 GND (GND_C/C')
Digital inputs 1
System type
DI1.1 0V
8
Document status
DI1.2 DI1
For Approval
DI1.3 DI2
DI1.4 DI3
Gutor SDC 110-125-R
DI1.5 DI4
Digital inputs 2 Power supply
DI2.1 0V +VDC +
DI2.2 Voltage presence
12-48V
DI2.5 Local
== CHA
DI2.6 Remote
9
Local communication
Digital outputs Ethernet port
Drawing number
1200334001/00 &EFS
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
For Approval
For Approval
For Approval
Gutor technology
4
-S014
UBSCO
1
K81
Customer name
2
Project description
3
K80 -A014:1:3
3 1
2
-P014
25.2:F
4
Ammeter
5
PE
11
PE
PE
-F072
5
12
A35 2 1 356 =BAB-F034:1
23.3:E
13
A36 -F073
2 1 357 =BAB-F035:1
23.3:E
Page description
-X005
-A070
-X001
-A070
-A070
29.2:A 21.7:F
7
-X006
-A070
-X002
-A070
Circuit diagram
-A077-X017:1-20 G 1-20 1-16 A =REC-A030-X8:1-16
-X006:1-20 Relay board 30° -X002:1-16
1-40 C -A071-X007:1-40
Interface CCU -X007:1-40
26.1:F
-X008
-A070
1-34 D -A071-X008:1-34
Interface Supply -X008:1-34
26.2:F
System type
8
Document status
For Approval
-X007
-A070
-X003
-A070
Orig.
1-16 1-26
-X004:1-16 FP FP -X003:1-26
== CHA
9
Drawing number
= CON
F
E
-A073
Front panel
+ UH03
-Z071
-Z073
1-16 1-26
10
1200334001/00 &EFS
-X002:1-16 -X001:1-26
Page
28/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Remote display
-A025
Name
RS232 -X001:1-25
-X002
-A025
Serial port 1-25 VL -A091-J8:1-9
RS232 -X002:1-25
27.3:A
For Approval
For Approval
For Approval
External connection board
-X003
-A025
Parallel port 1-15 VZ +UH01-A025-X003:1-1
-X003:1-15
10.2:A
-X005
-A025
Connector 1-26 H -A070-X005:1-40
Controller -X005:1-26
28.7:F
=BAB-Q004
/23.4:C
-X062
5
5
1
11
12 14
OFF
K58 K58
-X004:2
6
6
2
-X061
Gutor technology
Input signal
C24
-X004:4
2
Control terminal Control terminal
4
Boost charge
UBSCO
GND -X006:1
Customer name
Project description
Input signal -X006:2
-X125
(+) Brown
F98
-X006:4
5
PE
sensor terminals
PE
PE
Battery temperature
External ON
GND -X007:1
Rectifier failure
-X009:3
Page description
-X008:1
NC
-X009:2 *
-X008:2
NO
-X009:1
GND -X008:3
External OFF
Input signal -X008:4
7
Circuit diagram
Common alarm
-X009:6
Common alarm
8
Document status
NC
-X009:8 * Ext. EPO + -X009:14
Gutor SDC 110-125-R
NO
-X009:7
(* Alarm position)
Orig.
== CHA
9
Drawing number
= CON + UH03
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
29/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-A077
-X017
-A077
1-20 G -A070-X006:1-20
-X017:1-20
28.7:F
Relay board
(* Alarm position)
For Approval
For Approval
For Approval
K009
K001
-X009:092 * * -X001:012
NO NO
-X009:094 -X001:014
3
K010
K002
-X010:102 * * -X002:022
NO NO
-X010:104 -X002:024
Gutor technology
Rectifier overcurrent Rectifier mains failure
4
-X011:111 -X003:031
UBSCO
NC NC
K011
K003
-X011:112 * * -X003:032
Customer name
Project description
NO NO
-X011:114 -X003:034
NC NC
K012
K004
-X012:122 * * -X004:042
NO NO
-X012:124 -X004:044
-X013:132 * * -X005:052
6
NO NO
-X013:134 -X005:054
Page description
Negative earth fault Battery discharged
-X014:141 -X006:061
NC NC
K014
K006
-X014:142 * * -X006:062
NO NO
Relay board
-X014:144 -X006:064
7
Circuit diagram
Low DC voltage DC Fuse blown
-X015:151 -X007:071
NC NC
K015
K007
-X015:152 * * -X007:072
NO NO
-X015:154 -X007:074
System type
8
Document status
For Approval
-X016:161 -X008:081
NC NC
K016
K008
-X016:162 * * -X008:082
NO NO
-X016:164 -X008:084
Orig.
== CHA
9
Drawing number
= CON + UH03
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
30/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
0
1
2
F E D C B A
Rev. Date
11.11.20
04.02.21
01.04.21
1
ZUL
NOS
NOS
Name
-T050
For Approval
For Approval
For Approval
-X18
-A071
-X002
-A050
-X001
-A050
Fan 1
Fan
/26.1:C
-A071
1 K63 1 3 K15 0V 0V K21 =CON-F011:2
Interface
GND -X18:1 -X002:1 -X001:3
-A050
2 K64 2 1 K14 0V 460V 25.5:F
Sense -X18:2 -X002:2 -X001:1
3 K65 3 480V
VCC -X18:3 -X002:3
4 K66 5 500V
VCC -X18:4 -X002:5
5 K67 7 230V 600V
Speed -X18:5 -X002:7
230V 660V
PE 690V
PE
PE K20
PE
PE =CON-F010:2
Fan box
25.5:F
PE
PE
K22
K23
-X19
-A071
-X002
-A051
Fan 2
Fan
1 K68 1
GND -X19:1 -X002:1
-A051
2 K69 2 PE
Sense -X19:2 -X002:2
3 K70 3
PE
5 K72 7
Speed -X19:5 -X002:7
1
2
3
-X055
-A060
Gutor technology
-T051
-X20
-A071
-X002
-A050
-X001
-A050
Fan 3
Fan
1 K75 1 3 K27 0V 0V K25 =CON-F013:2
GND -X20:1 -X002:1 -X001:3
-A050
25.4:F
4
UBSCO
4 K78 5 500V
VCC -X20:4 -X002:5
5 K79 7 230V 600V
Customer name
Speed -X20:5 -X002:7
Project description
230V 660V
690V K24 =CON-F012:2
PE
PE 25.4:F
PE
PE
Fan box
PE
PE
K28
K29
-X21
-A071
-X002
-A051
Fan 4
Fan
1 K80 1
GND -X21:1 -X002:1
-A051
2 K81 2 PE
Sense -X21:2 -X002:2
5
3 K82 3
PE
5 K84 7
Speed -X21:5 -X002:7
1
2
3
-X051
-A061
-X22
-A071
Fan 5
1
GND -X22:1
2
Sense -X22:2
3
Page description
VCC -X22:3
4
VCC -X22:4
5
Speed -X22:5
Fans
7
-X23
-A071
Fan 6
Circuit diagram
1
GND -X23:1
2
Sense -X23:2
3
VCC -X23:3
4
VCC -X23:4
5
Speed -X23:5
System type
8
Document status
For Approval
Fan 7
1
GND -X24:1
2
Sense -X24:2
3
VCC -X24:3
4
VCC -X24:4
5
Speed -X24:5
Orig.
== CHA
9
Drawing number
-X25
-A071
Fan 8
= FAN
1
GND -X25:1
2
Sense -X25:2
3
VCC -X25:3
4
VCC -X25:4
5
+ UH03
Speed -X25:5
ZUL Revi. BAS Appr. WKH Date
10
1200334001/00 &EFS
Page
31/ 33
11.11.20
2
Rev.
Doc.
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
==BBX=BXW+UH04
1 1 2
Battery MCCB box 1 -X010 -X062 -X011
1 2 3 4 5 6
Control terminals
-X005
1 5
Brown
Battery MCCB box terminals
Blue
110 V DC
Junction box 1
B
==JTB=BJB+UH08
C71
C72
C73
C74
C75
C76
/32.5:C
/32.6:C
1 3 5
12 14 22 24 11 21
-Q005 -Q005
C
2 4 6
D
-X005
2 6
110 V DC
E
==BTR=BAT+UH05
Battery 1
-B026
Battery temp. sensor
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == BBX = BXW + UH04 2
0 11.11.20 ZUL For Approval Project description Battery MCCB box System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 32/ 33 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
==BBX=BXW+UH06
1 1 2
Battery MCCB box 2 -X010 -X062 -X011
1 2 3 4 5 6
Control terminals
-X005
1 5
Brown
Battery MCCB box terminals
Blue
110 V DC
JUnction box 2
B
==JTB=BJB+UH09
C71
C72
C73
C74
C75
C76
/33.5:C
/33.6:C
1 3 5
12 14 22 24 11 21
-Q005 -Q005
C
2 4 6
D
-X005
2 6
110 V DC
E
==BTR=BAT+UH07
Battery 2
-B026
Battery temp. sensor
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. ZUL Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == BBX = BXW + UH06 2
0 11.11.20 ZUL For Approval Project description Battery MCCB box System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS 33/ 33 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
Schneider Electric
Gutor Electronic Asia Pacific Sdn Bhd
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
19, Jalan Juruukur U1/19, Hicom-Glenmarie Industrial Park
Seksyen U1, 40150 Shah Alam, Selangor Darul Ehsan, Malaysia
B
Information
Document title 1200334001/00
Document status For Approval
D
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Cover sheet System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS_BAT
1/ 5 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Battery Rack details 1 & 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS_BAT
2/ 5 Rev.
Status
1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
CellRange
StepNo
RackNo
TierNo
1 2 4 29-44
B
Flexible inter-row
connector 310536509
1 2 5 28-13
Flexible inter-row
connector 310536509
1 2 6 1-12 +
C
Cable:2
1 1 3 60-45 Cable:1
Flexible inter-row
connector 310536509
1 1 2 61-76
Flexible inter-row
D
connector 310536509
1 1 1 92-77 -
Solid inter-cell
connector310042921
E
Front
DRAWN DATE
AutoJob 2021-02-26
CHECKED DATE Ni-Cd Battery
APPROVED DATE Wiring Diagram
INVENTOR-ORG / A3
CUSTOMER REF.1
4500128002_1200334 92 cells LBE 415 P SCALE
CUSTOMER REF.2
Cable matrix SYS_00001 1 x ESGL3-3150 STD FORMAT
A3
Connect from Connect to ARTICLE GROUP
F
PAGE
Cable no Rack no Tier no Row no Designation PN Dimension Rack no Tier no Row no REPLACES 2 /4
1 1 1 3 Cable between tiers 310536529 L=1200 mm M10x70mm2 1 2 4 DRAWING NUMBER REV
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Battery Rack details 1 & 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS_BAT
3/ 5 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
Rack footprint
B
715
675
1013 1050 1013
3136
C
255
349
1801
1000
D
100
651
3150 715
150
50
Front view Left side view
E
CUSTOMER REF.1
Total system weight: Approx. 2000 kg LENGTH: 3120 mm / 122,8 in Material: Sheet steel s235, powder coated 4500128002_1200334 92 cells LBE 415 P
Supports RAL 9010 SCALE
Electrolyte per system: Approx. 430 liters WIDTH: 195 mm / 7,7 in CUSTOMER REF.2
Beams and uprights: RAL 9005 SYS_00001 1 x ESGL3-3150 STD FORMAT
HEIGHT: 410 mm / 16,1 in A3
F
ARTICLE GROUP
PAGE
REPLACES 3 /4
DRAWING NUMBER REV
REPLACED BY
00013792 0
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Battery Rack details 1 & 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS_BAT
4/ 5 Rev.
Status
A 1 2 3 4 5 6 7 8 9 10
The technical information contained in this document is the exclusive property of Schneider Electric and can not be used or disclosed to third parties of any kind without its written consent. Only those drawings and diagrams remitted after order booking are binding for execution. All devices shown in this diagrams are in open position, drawn out with operating mechanisms discharged and all power sources off
B
C
D
E
F
2 01.04.21 NOS For Approval Customer name Page description Document status Orig. NOS Revi. BAS Appr. WKH Date 11.11.20
1 04.02.21 NOS For Approval UBSCO Circuit diagram For Approval == = + 2
0 11.11.20 ZUL For Approval Project description Battery Rack details 1 & 2 System type Drawing number Page
Doc.
Rev. Date Name Project revision description Gutor technology 110V Battery and Battery Charger at IBB-230 kV Main Gutor SDC 110-125-R 1200334001/00 &EFS_BAT
5/ 5 Rev.
Status