Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Kashif Wakeel

PEC Registration No. Comp/10224.


CNIC: 14203-2529712-5
Date of Birth: Oct 3rd 1991
Father’s Name: Khan Afsar Khan
Phone (Cell): +92 312-8051361
Emai ID: engr.kashifwakeel@gmail.com
Address: House#236, St#13, New Shami Road Defence officer colony Peshawar Cantt Peshawar (PostCode25000).Pak.
OBJECTIVE
Seeking a challenging position in a dynamic organization with the aim to contribute towards
Organizational success by enhancing ethical and competency standards, to perform consistently and meet
the organization’s expectations and being considered for opportunities of professional development and
organizational growth.
EDUCATION
Qualification Institution Year Marks/GPA
BS in (Computer Engineering) BUITEMS Quetta, Pakistan. 2012 2.77
Higher Secondary School Certificate (HSSC)
BISE Kohat. 2008 782
Secondary School Certificate (SSC)
BISE Kohat. 2006 615
EXPERIENCE:
Network: STC & Mobily
Project: 5G1 Aspiration (Ericsson account)
Subcon: China Comm Services.
Position: TI Engineer
Area: KSA
From: 16 Feb, 2019 till Feb, 2020.

RESPONSIBILITIES:
 Responsible for Installation of Complete Technologies(FDD MIMO,TDD,3G sync and 2G
cleanup) on STC-Ericsson 5G Aspiration Project. Follow Ups on installations and Clearance
with site till the sites are declared and handed over to RNI teams.
 New MW link installation of Ericsson new TN (6691-6692-6693) configuration (1+0,2+0
and 4+0).
 Link clearance of MW links and making it available for Cutover.
 Clearing the MW links for Ericsson-Mobily account for PAT.
 Installed 10 MW links for new FTK sites.
 Accepting and making the link clear for PAT and clear the site with zero OIL
Planning and Installation for MW links in Jeddah region.
 Worked at Phase-1 5G-Collocation installation Project, Installed more than 90+ Sites
on Ericsson- STC account.
 50+ sites Installed and proceed for MDT at Rise project. Installed and done MDT for
more than 120+ 5G1 Aspiration Project sites with Zero alarm.
 Installed 30+ sites for TDD in Makkah (Harram) region for Hajj project-2019.
 Mobilizing and Managing teams materials from Warehouse for the installation.
 Able to do work on Mini-Link craft, FileZilla, Element manager, OMT, Putty and Moshell
software.

Experience in hand End to End Managed Operations and Maintenance for Transmission,
.BSS and Power networks
From: 21 September, 2015 to 29 Dec, 2018.
Network: Warid
Project: Operation and Maintenance (O&M)
Vendor: Ericsson.
Position: Service Engineer Assessed.
Area: Islamabad (North Area).

RESPONSIBILITIES:
 End to End Managed Operations and Maintenance for Transmission, BSS and Power
networks.
 TN up-gradation from R3 to R4 to R5 [360 Nodes]
 4G/LTE Integration, Installation and commissioning at Warid Project.
 Testing, verification and quality assurance, RBS 6601 script loading, through Network
Element Scratch through putty.
 PackageR42CZ, L14BCP3, LTE_Basic_Package_DUS41_R27AS install through Filezilla,
 Ericsson DUS, Baseband, DUW and DUG integration, RBS 6102, 6601, 6301, 6201.
 Creating Services (Configuring V lans, WAN, Switch ports, RL-IME)
 TN up gradation, Link up gradation, XPIC link installation and configuration
 Corrective Maintenance & Troubleshooting of Warid Cell Sites and Transmission Links.
 Preventive Maintenance of Warid Cell Sites and Transmission Links.
 Fault Management, Configuration and Maintenance of Ericsson Traffic Node (20P,
6P & 2P), Ericsson Classic Node, Ericsson HiCap Node.
 Commissioning and Software Upgrade of Ericsson Traffic Node (20P, 6P and 2P)
 Managing rectification of Transmission related Alarms and RSL Issues for whole Region.
 Managing Installation of new Battery Banks in whole Region and providing detailed Reports
to customer on Weekly Basis.

From: 15 Jan, 2012 till 14 Sep, 2015


Network: Zong (CMPAK)
Project: Operation and Maintenance (O&M)
Operator: CMPAK.
Position: Cluster Owner
Area: Central

RESPONSIBILITIE:
 Documentation of daily report to present in monthly Meeting.
 OPEX reduction through optimal planning of PM and CM activities fuel checks, Cooling
systems implementation, ID to OD swap candidates, Other Power saving techniques
 Network strengthening fixation of installation issues through vendor most
effected links inclement weather.
 To visit two site for Audit daily, and share their snags with Manager.
 Monitor team members' participation to ensure the Quality of PM for Qualitative
Network, and perform additional work is required.
 Provide Information about Respective area that headquarters is concerned about.
 Listen to and utilizing team members' feedback, if important.
 Communicate clear instructions to Fuel, and PAT team about their respective Duty.
 Manage the flow of day-to-day operations.

Overall Power One, ZTE, Emerson, Ericsson and Huawei:


 Fully Command on rectifier systems.
 Battery SOH test, charge cycle, charge limit, battery capacity and other parameters set.
 Alarms configuration (relays setting).
 During PM, export of all history alarms and charge system of rectifier.
 GEM (smart switch, DC voltage controlled device to start Diesel Generator e.g. on 47V).
 Load balancing of all phase equally to avoid D-fuse faults.
 Battery health check with multi-meter.
 Able to do installation and setting of AGM and Lithium ion Batteries.
 Installation of Solar System.
 Installation of UPS, LC and IC.

Software’s Used Throughout this Job:


 LMT ZTE.
 Web LCT.
 Moshell.
 Filezilla.
 Element Manager.
 Putty.
 Mini Link Craft.
 OMT.

References:
It will provide on demand.

You might also like