1.0 Any Other Details Pertaining To The Project
1.0 Any Other Details Pertaining To The Project
1.0 Any Other Details Pertaining To The Project
The details of various types of surfaces and quantity of runoff generated due to rainfall are
given below.
The details of all the pits which are being utilized as rainwater harvesting reservoir are given
below:
Sr. Name of Mined out pit Length Width Depth Volume in
No. Cu.M.
1 Settling Pond 1 30 20 5 3000
2 Settling Pond 2 30 20 5 3000
3 Settling Pond 3 30 20 5 3000
4 Settling Pond 4 30 20 5 3000
5 Settling Pond 5 50 40 5 10000
6 Reservoir Pond at Kondkel 300 90 5 135000
Total 157000
The total capacity of existing reservoir pond & settling pond has capacity to hold and harvest
1,57,000 Cu.M of rainwater and seepage water. Further the available run-off of the project
area is 2051021.824 m3/year.
Additional mined out was recharge at the same place in shallow aquifers. water is being
utilized for various mining activities along with the dewatering of water is being passed
through well maintained 5 stage coal fines settling tank/pond. The water is then further
allowed to pass through Lamellae Clarifier after chemical dozing. The primary treated water
is channelized for irrigation purpose to connected villages. Apart from that part of water is
being treated through Reverse Osmosis procedure and prepared for drinking. The treatment
chart and all process photographs are attached in report.
Additional recharge measures shall be taken where small recharge reservoirs shall be made
in dimension of 50 X 50 X 3.0 mts which can at least fulfil the basic requirement of village like
bathing, washing of utensils, bathing of animals etc. For establishing such recharge
structures, consent from individual land owners/ Gram Panchayat will be taken for
successful implementation, after selection of suitable land.