Pipe Ways Loading Calculation PEC-BMS-EN-VSS-L-4795 Rev.

Spread Sheet

Pipe Ways Loading Calculation

Document Number PEC-BMS-EN-VSS-L-4795

Revision A

Applicability Sharjah, Mumbai, Chennai, Jakarta

REVISION / APPROVAL HISTORY

A 5-Oct-2009 Draft in Ratul Avinash Vaidya


development Barkataki
Rev Date Description of Owner Approver
Change
Records of approval are retained in the BMS/Quality Department

SUMMARY
This spreadsheet shall be used for pipe ways vertical load calculation.

__________________________________
____________________________________________________
__________________________
© Petrofac E & C Business Management System 1 of 6
Pipe Ways Loading Calculation PEC-BMS-EN-VSS-L-4795 Rev. A

CONTENTS

1 PURPOSE 3
2 SCOPE 3
3 DESCRIPTION 3
4 REFERENCES 3

ATTACHMENT SHEETS:
1 2. Calculation Sheet 1 Sheet
2 3. Pipe_Thk 1 Sheet
3 4. User Guide 1 Sheet

__________________________________
____________________________________________________
__________________________
© Petrofac E & C Business Management System 2 of 6
Pipe Ways Loading Calculation PEC-BMS-EN-VSS-L-4795 Rev. A

1.0    PURPOSE
The purpose of this spread sheet is to provide user a easy and time effective tool for pipe
ways vertical load calculation.

2.0 SCOPE
This spread sheet describes the procedure to be followed while calculating pipe vertical load.
However this spread sheet is not mean for finding pipe longitudinal &/or lateral loads.

3.0 DESCRIPTION
1. This spread sheet is used for calculating piping vertical load only.
2. The user shall fill data in the cells highlighted yellow only.
3. When piping vertical load is to be calculated for a specific cross section pertaining
to specific pipe rack module (e.g. PR1-M1), copy only "2. Calculation sheet" to the
appropriate folder of the pipe rack load calculation. Rename the Excel file as
"Pipe Rack Loading Calculation (PRX-YY)". E.G. for performing pipe rack loading
calculation for Pipe Rack-1, Module 1 to 5, Pipe Rack Loading Calculation Excel file
needs to be rename as "Pipe Rack Loading Calculation (PR1-M1 to M5). The Tab of
copied sheet "2. Calculation Sheet" needs to be renamed as "Calculation sheet (PR1-M1 to
M5)". Similar Excel file with appropriate name needs to be created for pipe ways other
than Pipe Rack.
4. Copy sheet "3. Pipe_Thk" to the Excel file created as above and rename the sheet Tab
as "Pipe_Thk".
5. Excel sheets created as per Note 3, 4 need to be kept as back-up for devloping pipe
rack loading data to Civil. This need not to be submitted as part of input to Civil.

4.0 REFERENCES
1. ASME B36.10 WELDED AND SEAMLESS WROUGHT STEEL PIPE
2. ASME B36.19 STAINLESS STEEL PIPE

__________________________________
____________________________________________________
__________________________
© Petrofac E & C Business Management System 3 of 6
Project: PQR PLANT REV. A
Client: LMN CORP. PIPE WAYS LOADING CALCULATION
Job No.: JI-XXX Petrofac
Page 1 of 1
Doc. No. AREA AREA - XXX

REFER SKETCH NO:JI-XXX-***-EPI-SKE-*** Minimum Loading Criteria = 170 Kg/m2 Criteria for UDL <=10
Insulation Density = 150 Kg/m3
Pipe Material Density = 7850 Kg/m3

TYPE RACK
Design Hydro
Design Empty Design Pipe Weight
Occupied Pipe Density Sp. Empty Design
Width for Space Pipe Pipe Water Gravity Insul. Insul. Total Pipe Factor for Pipe Operating Design Hydro
Nom. Pipe Thickness of Pipe Unequal
Hydro Test ? (Note- Pipe Operating Pipe
Total Lines for Service O.D. Wt. Wt. of Fluid Thk. Wt. Weight Weight Pipe Weight Pipe Weight
Size Material Weight Weight
Width <= 10" NB Future
Line no. Pipe Class
(Note-1) inside
Load (Note-3) (Note 3) 2,Note-3,
Distribution, Note-
Section EL. Pipes Pipe 4)
Design
(or <=12" NB) (Note-1) Growth etc.
(mm)
(mm) (mm) Inch mm Sch. mm Kg/m3 Kg/m Kg/m mm Kg/m Kg/m Y/N Kg/m Kg/m Kg/m Kg Kg Kg
(Note-6)
A-A 6000 5000 460 L 0.75 26.67 80 3.91 7850 2.19 0.28 1.00 30 0.80 3.27 1.10 Y 3.00 3.60 3.60 17.97 21.61 21.61
L 1 33.4 80 4.55 7850 3.24 0.46 1.00 30 0.90 4.60 1.10 Y 4.13 5.06 5.06 24.80 30.34 30.34
L+G 1.5 48.26 80 5.08 7850 5.41 1.14 0.33 30 1.11 6.90 1.10 Y 6.52 7.59 8.42 39.10 45.51 50.53
L 2 60.32 40 3.91 7850 5.44 2.16 1.00 30 1.28 8.88 1.10 Y 6.72 9.77 9.77 40.30 58.61 58.61
L 3 88.9 40 5.49 7850 11.29 4.77 1.00 30 1.68 17.74 1.10 Y 12.97 19.52 19.52 77.84 117.10 117.10
L 4 114.3 40 6.02 7850 16.08 8.21 1.00 40 2.91 27.20 1.10 N 18.98 29.92 20.88 113.90 179.50 125.29
L 6 168.27 40 7.11 7850 28.26 18.64 1.00 50 5.14 52.04 1.10 N 33.40 57.24 36.74 200.41 343.46 220.45
L 8 219.07 20 6.35 7850 33.31 33.45 1.00 50 6.34 73.10 1.10 N 39.65 80.41 43.62 237.91 482.47 261.70
L 10 273.05 20 6.35 7850 41.77 53.24 1.00 60 9.42 104.42 1.10 Y 51.18 114.86 114.86 307.09 689.16 689.16
G 12 323.85 STD 9.53 7850 73.87 72.96 0.00 60 10.85 84.73 1.10 Y 84.73 93.20 173.46 508.36 559.19 1040.73
G 14 355.6 20 7.92 7850 67.91 90.66 0.00 60 11.75 79.66 1.10 Y 79.66 87.63 187.36 477.96 525.75 1124.13
G 16 406.4 20 7.92 7850 77.83 119.80 0.00 60 13.19 91.02 1.10 Y 91.02 100.12 231.90 546.11 600.72 1391.41
L+G 18 457.2 20 7.92 7850 87.75 152.99 0.33 70 17.39 156.14 1.10 Y 105.14 171.76 283.95 630.86 1030.54 1703.71
G 20 508 XS 12.7 7850 155.13 182.92 0.00 70 19.07 174.19 1.10 Y 174.19 191.61 392.83 1045.17 1149.69 2356.97
G 22 658.8 40 15.87 7850 251.63 308.82 0.00 70 24.04 275.67 1.10 Y 275.67 303.24 642.94 1654.02 1819.42 3857.64
G 24 609.6 20 9.53 7850 141.03 273.90 0.00 100 33.44 174.47 1.10 Y 174.47 191.92 493.20 1046.82 1151.50 2959.23
G 26 660.4 20 12.7 7850 202.86 316.69 0.00 100 35.83 238.69 1.10 Y 238.69 262.56 610.92 1432.16 1575.38 3665.54
G 28 711.2 20 12.7 7850 218.77 369.39 0.00 100 38.23 257.00 1.10 Y 257.00 282.70 689.03 1541.99 1696.19 4134.16
G 30 762 20 12.7 7850 234.68 426.14 0.00 100 40.62 275.30 1.10 Y 275.30 302.83 771.59 1651.81 1817.00 4629.53
G 32 812.8 20 12.7 7850 250.59 486.95 0.00 100 43.01 293.61 1.10 Y 293.61 322.97 858.61 1761.64 1937.81 5151.65
G 34 863.6 20 12.7 7850 266.50 551.80 0.00 100 45.41 311.91 1.10 Y 311.91 343.10 950.09 1871.47 2058.62 5700.52
G 36 914.4 20 12.7 7850 282.41 620.72 0.00 100 47.80 330.22 1.10 Y 330.22 363.24 1046.03 1981.30 2179.42 6276.15
G 36 914.4 20 12.7 7850 282.41 620.72 0.00 100 47.80 330.22 1.10 Y 330.22 363.24 1046.03 1981.30 2179.42 6276.15
L+G 40 1016 - 25.4 7850 620.51 731.69 0.33 100 52.59 917.00 1.10 Y 673.10 1008.70 1545.27 4038.63 6052.20 9271.61
G 42 1066.8 - 25.4 7850 652.34 810.73 0.00 100 54.98 707.32 1.10 Y 707.32 778.05 1669.86 4243.92 4668.31 10019.14
L 44 1117.6 - 25.4 7850 684.16 893.83 1.00 100 57.38 1635.37 1.10 Y 741.53 1798.90 1798.90 4449.21 10793.42 10793.42
G 46 1168.4 - 25.4 7850 715.98 980.99 0.00 100 59.77 775.75 1.10 Y 775.75 853.32 1932.41 4654.50 5119.95 11594.45
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24

TOTAL 6000 5000 460 13243.22 10145.91 14567.54 25938.70 60875.46 87405.23 155632.18
Calculated Rack Loading Kg/m2
35.31 65.59 52.49
for Pipes <=10
SPAN (m) 6.00 6.00 6.00
Calculated
Support
Note : 1059.33 1967.77 1574.81 <=10
Loading Kg for
Pipes

Calculated
Support
1 Value shall be taken as follows 211.87 393.55 314.96 <=10
IF CONDENSATION IS FOUND TO BE LESS Loading Kg/m
THAN 1/3 AFTER DISCUSSION WITH for Pipes
PROCESS, UPDATE ENTRY AT COLUMN "P"
OVERRIDDING FORMULA.
If Service is L+G use 1/3 Assuming 1/3 Condensation
If Service is L use 1 Rack Loading Kg/m2 to Civil
120 170 170
If Service is G 0 for Pipes <=10

2 For Considering Hydro Test Load, participation of 50% of Lines above 16" only need to be considered.
However P&I'D needs to be verified to check that excluded lines don't belong to same hydro test loop. Support Loading Kg/m to Civil
1020 1020 1020
This needs to be verified with any Project Specification. for Pipes <=10

3 Empty weight indicated above doesn't includes design factor for unequal load distribution & design growth etc.
If valve or any other rigid items are located on pipe ways, weight due to the same shall be suitably included.
TOTAL OPERATING
4 Hydro Test load does include insulation weight, as some time insulation is done, leaving only weld joints open, prior to hydro test. RACK LOAD
TOTAL RACK >=400 Kg/m2?
CONSIDERING ALL
LOAD (Kg/m2) PIPES (Kg/m2)
CHECK
5 For sizes and thicknesses, not covered under standard database (in sheet "Pipe_Thk"), the values shall be directly overwritten over the formula in the cell. 2528 Y

6 As a general rule, to calculate occupied width for lines <= 10" NB (or <=12" NB as per project criteria), consider additional 1/2* OD of pipe at extreme end + 50 mm from its C.L.

7 The user shall fill data in the cells highlighted yellow only.

A
REV PPD. CHKD. APPVD. DATE

[ Filename : 528566118.xls , Sheet : 2. Calculation Sheet ] [Print Date : 06/18/2021] Page 4 of 6


Pipe Ways Loading Calculation PEC-BMS-EN-VSS-L-4795 Rev. A

ASA 36.1
SCHEDULE NO
NS OD 5S 10 10S 20 30 STD 40 40S 60 XS 80 80S 100 120 140 160 XXS
1/2 21.34 1.65 2.11 2.41 2.77 2.77 2.77 3.73 3.73 3.73 4.78 7.47
3/4 26.67 1.65 2.11 2.41 2.87 2.87 2.87 3.91 3.91 3.91 5.56 7.82
1 33.4 1.65 2.77 2.9 3.38 3.38 3.38 4.55 4.55 4.55 6.35 9.09
1 1/4 42.16 1.65 2.77 2.97 3.56 3.56 3.56 4.85 4.85 4.85 6.35 9.7
1 1/2 48.26 1.65 2.77 3.18 3.68 3.68 3.68 5.08 5.08 5.08 7.14 10.15
2 60.32 1.65 2.77 3.18 3.91 3.91 3.91 5.54 5.54 5.54 8.74 11.07
2 1/2 73.02 2.11 3.05 4.78 5.16 5.16 5.16 7.01 7.01 7.01 9.53 14.02
3 88.9 2.11 3.05 4.78 5.49 5.49 5.49 7.62 7.62 7.62 11.13 15.24
3 1/2 101.6 2.11 3.05 4.78 5.74 5.74 5.74 8.08 8.08 8.08
4 114.3 2.11 3.05 4.78 6.02 6.02 6.02 8.56 8.56 8.56 11.13 13.49 17.12
5 141.3 2.77 3.4 6.55 6.55 6.55 9.53 9.53 9.53 12.7 15.88 19.05
6 168.27 2.77 3.4 7.11 7.11 7.11 10.97 10.97 10.97 14.27 18.26 21.95
8 219.07 2.77 3.76 6.35 7.04 8.18 8.18 8.18 10.31 12.7 12.7 12.7 15.09 18.26 20.62 23.01 22.23
10 273.05 3.4 4.19 6.35 7.8 9.27 9.27 9.27 12.7 12.7 15.09 12.7 18.26 21.44 25.4 28.58 25.4
12 323.85 3.96 4.57 6.35 8.38 9.53 10.31 9.53 14.27 12.7 17.48 12.7 21.44 25.4 28.58 33.32 25.4
14 355.6 3.96 6.35 4.78 7.92 9.53 9.53 11.13 15.09 12.7 19.05 23.83 27.79 31.75 35.71
16 406.4 4.19 6.35 4.78 7.92 9.53 9.53 12.7 16.66 12.7 21.44 26.19 30.96 36.53 40.49
18 457.2 4.19 6.35 4.78 7.92 11.13 9.53 14.27 19.05 12.7 23.83 29.36 34.93 39.67 45.24
20 508 4.78 6.35 5.54 9.53 12.7 9.53 15.09 20.62 12.7 26.19 32.54 38.1 44.45 50.01
22 658.8 4.78 6.35 5.54 9.53 12.7 9.53 15.87 22.23 12.7 28.58 34.93 41.28 47.63 53.98
24 609.6 5.54 6.35 6.35 9.53 14.27 9.53 17.48 24.61 12.7 30.96 38.89 46.02 52.37 59.54
26 660.4 7.92 12.7 9.53 12.7
28 711.2 7.92 12.7 15.88 9.53 12.7
30 762 6.35 7.92 7.92 12.7 15.88 9.53 12.7
32 812.8 7.92 12.7 15.88 9.53 17.48 12.7
34 863.6 7.92 12.7 15.88 9.53 17.48 12.7
36 914.4 7.92 12.7 15.88 9.53 19.05 12.7

__________________________________
_________________________________________________________________________________
__________________________
© Petrofac E & C Business Management System 5 of 6
Project: PQR PLANT REV. A
Client: LMN CORP. USER TO FILL DATA APPLICABLE PIPE WAYS LOADING CALCULATION USER TO FILL DATA APPLICABLE
TO PROJECT TO PROJECT Petrofac
Job No.: JI-XXX Page 1 of 1
Doc. No. AREA AREA - XXX

USER TO SELECT CRITERIA OF


PIPE SIZE FOR UDL. EITHER
REFER SKETCH NO:JI-XXX-***-EPI-SKE-*** Minimum Loading Criteria = 170 Kg/m2 Criteria for UDL <=10 <=10" OR <=12"
USER TO FILL SKETCH NUMER TO BE REFERED INPUT FOR PIPE MATERIAL DENSITY Insulation Density = 150 Kg/m3 USE PROJECT SPECIFIC VALUE IF MINIMUM LOADING
ALONG WITH THIS SPREAD SHEET. (DEFAULT VALUE 7850 Kg/m3) is COPIED TO EACH Pipe Material Density = 7850 Kg/m3 CRITERIA IS GREATER THAN 170 Kg/m 2
LINE ITEM OF COLUMN "N" IN THE SPREAD SHEET. AS PER CLIENT SPECIFICATION.
IN CASE PIPE MATERIAL DENSITY IS DIFFERENT, USE PROJECT SPECIFIC VALUE , IF INSULATION
TYPE RACK
USER NEEDS TO UPDATE MANUALLY. DENSITY IS GREATER THAN 150 Kg/m3 AS PER
CLIENT SPECIFICATION. Design Hydro
Design Empty Design Pipe Weight
Occupied Pipe Density Sp. Empty Design
Width for Lines Space Pipe Pipe Water Gravity Insul. Insul. Total Pipe Factor for Pipe Operating Design Hydro
Nom. Pipe Thickness of Pipe Unequal
Hydro Test ? (Note- Pipe Operating Pipe
Total <= 10" for Service O.D. Wt. Wt. of Fluid Thk. Wt. Weight Weight Pipe Weight Pipe Weight
Size Material Weight Weight
Width NB Future
Line no. Pipe Class
(Note-1) inside
Load (Note-3) (Note 3) 2,Note-3,
Distribution, Note-
Section (or <=12" EL. Pipes Pipe 4)
Design
NB) (Note-1) Growth etc.
(mm)
(mm) (mm) Inch mm Sch. mm Kg/m3 Kg/m Kg/m mm Kg/m Kg/m Y/N Kg/m Kg/m Kg/m Kg Kg Kg
(Note-6)
A-A 6000 5000 460 L 0.75 26.67 80 3.91 7850 2.19 0.28 1.00 30 0.80 3.27 1.10 Y 3.00 3.60 3.60 17.97 21.61 21.61
L 1 33.4 80 4.55 7850 3.24 0.46 1.00 30 0.90 4.60 1.10 Y 4.13 5.06 5.06 24.80 30.34 30.34
L+G 1.5 48.26 80 5.08 7850 5.41 1.14 0.33 30 1.11 6.90 1.10 Y 6.52 7.59 8.42 39.10 45.51 50.53
L 2 60.32 40 3.91 7850 5.44 2.16 1.00 30 1.28 8.88 1.10 Y 6.72 9.77 9.77 40.30 58.61 58.61
L 3 88.9 40 5.49 7850 11.29 4.77 1.00 30 1.68 17.74 1.10 Y 12.97 19.52 19.52 77.84 117.10 117.10
L 4 114.3 40 6.02 7850 16.08 8.21 1.00 40 2.91 27.20 1.10 N 18.98 29.92 20.88 113.90 179.50 125.29
THIS SPREAD SHEET CAN BE USED FOR USER NEEDS TO FILL DATA IN ALL CELLS MARKED L 6 168.27 40 7.11 7850 28.26 18.64 1.00 50 5.14 52.04 1.10 N 33.40 57.24 36.74 200.41 343.46 220.45
CALCULATING VERTICAL PIPE LOADS ON ANY ONE WITH "YELLOW" AS PER COLUMN L 8 219.07 20 6.35 7850 33.31 33.45 1.00 50 6.34 73.10 1.10 N 39.65 80.41 43.62 237.91 482.47 261.70
OF THE FOLLOWING: HEADING BETWEEN ROW NUMBER 15 TO 46. L 10 273.05 20 6.35 7850 41.77 53.24 1.00 60 9.42 104.42 1.10 Y 51.18 114.86 114.86 307.09 689.16 689.16
a) PIPE RACK THIS SPREAD SHEET HAS PROVISION FOR FOR 32 G 12 323.85 STD 9.53 7850 73.87 72.96 0.00 60 10.85 84.73 1.10 Y 84.73 93.20 173.46 508.36 559.19 1040.73
b) SLEEPER LINE ITEMS. FOR AN ELEVATION OF CROSS
c) GOAL POST SECTION,ANY ADDITION RECORD BETWEEN ROW G 14 355.6 20 7.92 7850 67.91 90.66 0.00 60 11.75 79.66 1.10 Y 79.66 87.63 187.36 477.96 525.75 1124.13
d) TEE POST NUMBER 15 TO 46 NEEDS TO BE DELETED FROM G 16 406.4 20 7.92 7850 77.83 119.80 0.00 60 13.19 91.02 1.10 Y 91.02 100.12 231.90 546.11 600.72 1391.41
THE CALCULATION SHEET. L+G 18 457.2 20 7.92 7850 87.75 152.99 0.33 70 17.39 156.14 1.10 Y 105.14 171.76 283.95 630.86 1030.54 1703.71
USER NEEDS TO SELECT THE REQUIRED INPUT BY G 20 508 XS 12.7 7850 155.13 182.92 0.00 70 19.07 174.19 1.10 Y 174.19 191.61 392.83 1045.17 1149.69 2356.97
USING PULL DOWN MENU. G 22 658.8 40 15.87 7850 251.63 308.82 0.00 70 24.04 275.67 1.10 Y 275.67 303.24 642.94 1654.02 1819.42 3857.64
G 24 609.6 40 17.48 7850 255.25 259.35 0.00 70 22.42 277.67 1.10 Y 277.67 305.44 590.72 1666.02 1832.63 3544.32
G 26 660.4 40 7850 0.00 342.53 0.00 70 24.09 24.09 1.10 Y 24.09 26.50 403.29 144.56 159.02 2419.74
G 28 711.2 40 7850 0.00 397.26 0.00 70 25.77 25.77 1.10 Y 25.77 28.35 465.33 154.62 170.08 2791.98
G 30 762 40 7850 0.00 456.04 0.00 70 27.44 27.44 1.10 Y 27.44 30.19 531.83 164.67 181.14 3190.98
G 32 812.8 40 17.48 7850 342.85 475.19 0.00 70 29.12 371.97 1.10 Y 371.97 409.17 931.88 2231.82 2455.00 5591.28
G 34 863.6 40 17.48 7850 364.75 539.29 0.00 70 30.80 395.54 1.10 Y 395.54 435.10 1028.32 2373.27 2610.59 6169.90
G 36 914.4 40 19.05 7850 420.64 603.11 0.00 70 32.47 453.11 1.10 Y 453.11 498.42 1161.84 2718.65 2990.52 6971.04
G 36 914.4 20 12.7 7850 282.41 620.72 0.00 100 47.80 330.22 1.10 Y 330.22 363.24 1046.03 1981.30 2179.42 6276.15
L+G 40 1016 - 25.4 7850 620.51 731.69 0.33 100 52.59 917.00 1.10 Y 673.10 1008.70 1545.27 4038.63 6052.20 9271.61
G 42 1066.8 - 25.4 7850 652.34 810.73 0.00 100 54.98 707.32 1.10 Y 707.32 778.05 1669.86 4243.92 4668.31 10019.14
L 44 1117.6 - 25.4 7850 684.16 893.83 1.00 100 57.38 1635.37 1.10 Y 741.53 1798.90 1798.90 4449.21 10793.42 10793.42
G 46 1168.4 - 25.4 7850 715.98 980.99 0.00 100 59.77 775.75 1.10 Y 775.75 853.32 1932.41 4654.50 5119.95 11594.45
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24
L+G 48 1219.2 - 25.4 7850 747.80 1072.19 0.33 100 62.17 1167.36 1.10 Y 809.96 1284.10 2070.37 4859.79 7704.59 12422.24

TOTAL 6000 5000 460 12937.62 9840.31 14231.38 25632.44 59041.89 85388.30 153794.63
Calculated Rack Loading Kg/m2
35.31 65.59 52.49
for Pipes <=10
SPAN (m) 6.00 6.00 6.00
Calculated
Support
Note : 1059.33 1967.77 1574.81 <=10
Loading Kg for
Pipes

Calculated
Support
1 Value shall be taken as follows 211.87 393.55 314.96 <=10
IF CONDENSATION IS FOUND TO BE LESS Loading Kg/m
THAN 1/3 AFTER DISCUSSION WITH for Pipes
PROCESS, UPDATE ENTRY AT COLUMN "P"
OVERRIDDING FORMULA.
If Service is L+G use 1/3 Assuming 1/3 Condensation
If Service is L use 1 Rack Loading Kg/m2 to Civil
120 170 170
If Service is G 0 for Pipes <=10

2 For Considering Hydro Test Load, participation of 50% of Lines above 16" only need to be considered.
VERTICAL PIPE LOAD (Kg/m2) AT AN ELEVATION OF A
CROSS SECTION TO BE GIVEN IN SUMMARY SHEET OF
However P&I'D needs to be verified to check that excluded lines don't belong to same hydro test loop. PIPE RACK LOAD INPUT TO CIVIL AS PER THE Support Loading Kg/m to Civil
1020 1020 1020
This needs to be verified with any Project Specification. DESCRIPTION OF COLUMN HEADING. for Pipes <=10

3 Empty weight indicated above doesn't includes design factor for unequal load distribution & design growth etc.
If valve or any other rigid items are located on pipe ways, weight due to the same shall be suitably included. THIS IS TO CHECK & GET APPROVAL
TOTAL OPERATING FOR TOTAL OPERATING VERTICAL
VERTICAL PIPE LOAD (Kg/m) FOR CIVIL SUPPORT LOAD GREATER THAN 400 Kg/m2,
4 Hydro Test load does include insulation weight, as some time insulation is done, leaving only weld joints open, prior to hydro test. OTHER THAN PIPE RACK TO BE GIVEN IN SUMMARY RACK LOAD
TOTAL RACK >=400 Kg/m2? CONSIDERING PIPES OF ALL SIZES
SHEET OF PIPE LOAD INPUT TO CIVIL AS PER THE CONSIDERING ALL
LOAD (Kg/m2) PIPES (Kg/m2) AT A PARTICULAR ELEVATION .
DESCRIPTION OF COLUMN HEADING. CHECK
5 For sizes and thicknesses, not covered under standard database (in sheet "Pipe_Thk"), the values shall be directly overwritten over the formula in the cell. 2472 Y

6 As a general rule, to calculate occupied width for lines <= 10" NB (or <=12" NB as per project criteria), consider additional 1/2* OD of pipe at extreme end + 50 mm from its C.L.

7 The user shall fill data in the cells highlighted yellow only.
REVISION HISTORY
WITH SIGNATURES.
A
REV PPD. CHKD. APPVD. DATE

[ Filename : 528566118.xls , Sheet : 4. User Guide ] [Print Date : 06/18/2021] Page 6 of 6