L-HMD-S-JYC_SHM-0619_Annexe-2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES:
1. CE PLAN DOIT ENTRE CONSULTE AVEC D-230-1323-241.
2. LE NIVEAU ACTUEL VARIE ENTRE 100.00 ET 99.850.

A F2 (REQD = 1) F3 (REQD = 1) REPORTEZ-VOUS AU PLAN DE PAVAGE POUR UN NIVEAU DE FINITION PRECIS


A

Annexe-2 (1/4) 1.
2.
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH D-230-1323-241.
ACTUAL LEVEL WILL BE VARIED BETWEEN 100.00 TO 99.850.
REFER TO PAVING PLAN FOR ACCURATE FINISHING LEVEL.

A
-

-
B B
4500

675 3150 675

450 450 2700 450 450

4700

C 600 3500 600


450 C
200 800 2700 800 200 A 160 130 160

525
-

750
160 240 240 160 160 240 240 160
A. BOLT 4-M24-S

450

160
A. BOLT 2 x 6-M30-S P1 P1

2500

1000

550
A
160
500

450
130
900

450
P1 P1 -
1800

750
800

480

D D

525

160
900

P1 P1 REFERENCE DRAWINGS
500

160

CONTRACTOR'S DOCUMENT No. DOCUMENT TITLE

D-200-1310-002 ABBREVIATIONS AND SYMBOLS FOR CIVIL WORK


D-200-1320-001-01/02 GENERAL NOTES FOR CONCRETE WORK

PLAN PIEDESTAL, P1 D-200-1320-002 STANDARD DRAWING FOR ANCHOR BOLT

PLAN PLAN PEDESTAL, P1


D-200-1320-003 STANDARD DRAWING FOR REBAR ARRANGEMENT

E E
PLAN SCALE 1:30

TETE/TOP 19-T12
FOND/BOTTOM 19-T16

TETE/TOP 20-T12
F FOND/BOTTOM 20-T16 F

16 - T16

FOND/BOTTOM 11-T16
8-T20

TETE/TOP 11-T12
FOND/BOTTOM 10-T16
TETE/TOP 10-T16

6-T10

2
G 5-T10
5-T10
G
3 x 6 - T10

APPROVED PAR CTC


SEMELLE PIEDESTAL, P1 SEMELLE PIEDESTAL, P1 SIGNATURE :
FOOTING PEDESTAL, P1 FOOTING PEDESTAL, P1
SCALE 1:30
SCALE 1:30
H H
FERRAILLAGE FERRAILLAGE
For Inf For Review For Const As Built

RE-BAR ARRANGEMENT RE-BAR ARRANGEMENT

2 01-SEP-17
1 07-JUL-17 FOR CONSTRUCTION
0 21-APR-17 FOR INFORMATION
I I
REV. DATE ISSUE PURPOSE PREP'D CHK'D APP'D
PJ=130 PJ=115

EL+100.200 TOG EL+100.200 TOG


CADRES ET EPINGLES/

CADRES ET EPINGLES/
HOOPS AND TIES

HOOPS AND TIES


FGL FGL FGL
(NOTE 2)

5-T10
(NOTE 2)

25 MORTIER/GROUT
6-T10

HMD SOUTH SATELLITE REVAMPING


1000

950

25 MORTIER/GROUT
750
800
1350

1350

P1 P1 P1
PROJECT- ALGERIA
400
350

EL+98.850 EL+98.850
J J
2
50

50

100 100
1-T10
(TYP) (TYP)
CADRE/HOOP
BETON DE PROPRETE TITLE: TITRE:
D-230-1323-242

BETON DE PROPRETE 1-T10


1-T10 BLINDING CONCRETE
BLINDING CONCRETE CADRE/HOOP
CADRE/HOOP FOUNDATION DRAWING FOR PLAN DE FONDATION POUR
C41M851 (2/2) C41M851 (2/2)
COUPE A COUPE A
AREA W1C/UNIT 230 REGION W1C/UNITE 230
SECTION - SECTION -
K JOB CODE CONTRACTOR'S DOCUMENT No. SIZE K
0-7382-20 D-230-1323-242
PCWBS CONTRACT No. SCALE
C410 E/029/HMD/2015 1/50

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D R
IN P- 7
2 0 1
01-SE
1/1
L-HMD-S-JYC_SHM-0619_Annexe-2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES:
85°
85 ° 24.
24.

EE D
1. CE PLAN DOIT ENTRE CONSULTE AVEC D-250-1323-201~203.

R OR
EE D

L
R OR

N
L
N
2. SI, EN CAS DE CAST IN-SITU , LA TUYAUTERIE PVC N'EST PAS REQUISE.
A F13 (REQD=2) F14 (REQD=4) F15 (REQD=2) EMPLACEMENT DU TUYAU EN PVC A REGLER AU SITE . A

N
T

O
N
N

TI
O
O L

T A
N EE

C
N IN

TI
D

NOMENCLATURE :

U
R

C
V OM
Annexe-2 (2/4)
R

R
O D
U

ST
C OR
R
O D
D
E

ST
8 CHAQUE 50 DIA PVC MANCON DE TUYAU

C OR

N
N
N
N
1150 L=650MM (REMARQUE 2)
N
85°

4 CHAQUE 50 DIA PVC MANCON DE TUYAU


O
TI
24.

185 150 150


C

142.5 380 142.5 L=800MM (REMARQUE 2)


U
D R
R T

4 CHAQUE PLAQUE INTEGREE H5 TYPE


O S
N ON

T
AN
C

2 CHAQUE PLAQUE INTEGREE (650MMx650MM)

T
AN

O T
IN
D EN
O T

M
IN
D EN

V
M
V
145
135
B B

650

380

360
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH D-250-1323-201~203.

135

145
2. IF IN CASE OF CAST IN-SITU, PVC PIPE IS NOT REQUIRED. LOCATION OF PVC
PIPE TO BE ADJUSTED AT SITE.
A. BOLT 10-M24-S
BILL OF MATERIAL :
PIEDESTAL, P1 8 EACH 50 DIA PVC PIPE SLEEVE L=650MM (NOTE 2)

PEDESTAL, P1 4
4
EACH
EACH
50 DIA PVC PIPE SLEEVE L=800MM (NOTE 2)
EMBEDDED PLATE H5 TYPE
C SCALE 1:30
1900 1900
2 EACH EMBEDDED PLATE (650MMx650MM) C
650
950 950 950 950
100 450 100 15 200
650 625 650 625 550 800 550
150
175 150 175

225 100
A. BOLT 6-M24-S

REFERENCE DRAWINGS
145

650
EMB PL H5 EMB PL

550
CONTRACTOR'S DOCUMENT No. DOCUMENT TITLE

625

100 225
650

360
D D

950

950
D-200-1310-002 ABBREVIATIONS AND SYMBOLS FOR CIVIL WORK
145

1900

1900
650

800
D-200-1320-001-01/02 GENERAL NOTES FOR CONCRETE WORK
Ø10 AIR ESCAPE HOLE (TYP) 3-Ø16 D-200-1320-002 STANDARD DRAWING FOR ANCHOR BOLT

950

950
PIEDESTAL, P2

625

550
4100 D-200-1320-003 STANDARD DRAWING FOR REBAR ARRANGEMENT

15
D-200-1320-005 STANDARD DRAWING FOR EMBEDDED PLATE
692.5 2957.5 450
PEDESTAL, P2

200
117.5 1150 2057.5 650 125 SCALE 1:30

75 75
E PLAN PLAN E
PLAN PLAN
175

DETAIL DE PLAQUE ENCASTREE


A
500

EMBEDDED PL DETAIL
1000

650

- DETAILS SUPPLEMENTAIRES, VOIR D-200-1320-005.


500

P1 P2 FURTHER DETAIL, SEE D-200-1320-005


SCALE 1:20
175

18-T16

F PLAN F
PLAN
5-T10
TETE/TOP 9-T12 TETE/TOP 9-T12
FOND/BOTTOM 9-T16 FOND/BOTTOM 9-T16
7x5-T10 16-T16
12-T16
FOND/BOTTOM 9-T16

FOND/BOTTOM 9-T16
TETE/TOP 9-T12

PIEDESTAL, P1

TETE/TOP 9-T12
G PEDESTAL, P1 5-T10
G
TETE/TOP 18-T12 SCALE 1:30
5-T10
FOND/BOTTOM 18-T16
12-T16 4x5-T10
6x5-T10
APPROVED PAR CTC
2
2
FOND/BOTTOM 6-T20
TETE/TOP 6-T16

5-T10
SEMELLE PIEDESTAL SEMELLE PIEDESTAL SIGNATURE :

FOOTING PEDESTAL FOOTING PEDESTAL


H 4x5-T10
SCALE 1:30 SCALE 1:30
H
For Inf For Review For Const As Built

SEMELLE PIEDESTAL, P2
FOOTING PEDESTAL, P2
SCALE 1:30

FERRAILLAGE FERRAILLAGE FERRAILLAGE 2 04-SEP-17 FOR CONSTRUCTION S.MITO Y.YAMAKI H.KONO

RE-BAR ARRANGEMENT RE-BAR ARRANGEMENT RE-BAR ARRANGEMENT 1


0
28-JUL-17
29-JUN-17
FOR CONSTRUCTION
FOR INFORMATION
S.MITO Y.YAMAKI H.KONO
S.MITO T.SUGIHARA H.KONO
I I
REV. DATE ISSUE PURPOSE PREP'D CHK'D APP'D

2-LE MANCHON DU TVYAU PVC DIAMETRE 50 2-LE MANCHON DU TVYAU PVC DIAMETRE 50
2-50 DIA PVC PIPE SLEEVE 2-50 DIA PVC PIPE SLEEVE
130 130 (NOTE 2) 90 90 (NOTE 2)
PJ=115
HMD SOUTH SATELLITE REVAMPING
200

200
EL +99.800 TO EMB EL +99.800 TO EMB
SIZE

CADRES ET EPINGLES/

CADRES/HOOPS

CADRES/HOOPS
EL +99.905 TOG
300

300
HOOPS AND TIES

FGL FGL
PROJECT- ALGERIA
300

FGL
5-T10

5-T10
950

950

J J
5-T10

1300

1300

25 MORTIER/GROUT
855
1305

P1 P2
350

350

EL +98.500 EL +98.500
450

EL +98.600 TITLE: TITRE:


D-250-1323-211

50
50

100 100
50

100 (TYP) 1-T10 (TYP) 1-T10 FOUNDATION DRAWING FOR PLAN DE FONDATION POUR
(TYP) BETON DE PROPRETE 1-T10 CADRE/HOOP CADRE/HOOP
CONTRACTOR'S DOCUMENT NUMBER

BLINDING CONCRETE CADRE/HOOP A11M101 & A11T101 (11/17) A11M101 ET A11T101 (11/17)
1-T10 BETON DE PROPRETE BETON DE PROPRETE
CADRE/HOOP BLINDING CONCRETE BLINDING CONCRETE AREA E1C/UNIT 250 REGION E1C/UNITE 250
K K
COUPE A ELEVATION COUPE ELEVATION COUPE JOB CODE CONTRACTOR'S DOCUMENT No. SIZE

SECTION - ELEVATION SECTION ELEVATION SECTION


0-7382-20
PCWBS
D-250-1323-211
CONTRACT No. SCALE
A110 E/029/HMD/2015 1/50

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D R
IN P- 7
2 0 1
04-SE
1/1
L-HMD-S-JYC_SHM-0619_Annexe-2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES:
1. CE PLAN DOIT ENTRE CONSULTE AVEC D-250-1323-201~203.

NORD

NORD
REEL
REEL
2. SI, EN CAS DE CAST IN-SITU , LA TUYAUTERIE PVC N'EST PAS REQUISE.
A EMPLACEMENT DU TUYAU EN PVC A REGLER AU SITE . A
24.85°

24.85°
F16 (REQD=14) F17 (REQD=2) NOMENCLATURE :

CONSTRUCTION

CONSTRUCTION
52 CHAQUE 50 DIA PVC MANCON DE TUYAU
L=650MM (REMARQUE 2)

Annexe-2 (3/4)
F16a (REQD=10)

DOMINANT

DOMINANT
NORD

NORD
VENT

VENT
F16b (REQD=2) 1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH D-250-1323-201~203.

2. IF IN CASE OF CAST IN-SITU, PVC PIPE IS NOT REQUIRED. LOCATION OF PVC


FOR (F16) PIPE TO BE ADJUSTED AT SITE.
B 3600
BILL OF MATERIAL :
B
24.85°
450 2700 450 52 EACH 50 DIA PVC PIPE SLEEVE L=650MM (NOTE 2)
NORD
CONSTRUCTION NORD 225 450 2250 450 225
REEL

225
A

450
C C

450
VENT
DOMINANT
P1 P1 -

FOR (F16a, F16b) 450

2700

2250
3600
160 130 160 REFERENCE DRAWINGS
A. BOLT 4-M24-S CONTRACTOR'S DOCUMENT No. DOCUMENT TITLE
1350

160
D-200-1310-002 ABBREVIATIONS AND SYMBOLS FOR CIVIL WORK
675 675

D A D-200-1320-001-01/02 GENERAL NOTES FOR CONCRETE WORK


D

450
130
350 650 350

450
D-200-1320-002 STANDARD DRAWING FOR ANCHOR BOLT
-

450
145 145 P1 P1
360 D-200-1320-003 STANDARD DRAWING FOR REBAR ARRANGEMENT
A. BOLT 6-M24-S

160
225
175 150 150 175
350
675

PLAN PIEDESTAL, P1
1350

650

PLAN PEDESTAL, P1
675

350

E SCALE 1:30
E

PLAN
PLAN TETE/TOP 15-T12
FOND/BOTTOM 15-T16

F F
TETE/TOP 6-T12

FOND/BOTTOM 15-T16
FOND/BOTTOM 6-T16

TETE/TOP 15-T12
12-T16
FOND/BOTTOM 6-T16

8-T16
TETE/TOP 6-T12

5-T10
G 5-T10
G
4x5-T10 2x5-T10
2

APPROVED PAR CTC


SIGNATURE :

SEMELLE PIEDESTAL SEMELLE PIEDESTAL, P1


H FOOTING PEDESTAL FOOTING PEDESTAL, P1 H
SCALE 1:30 SCALE 1:30 For Inf For Review For Const As Built

FERRAILLAGE FERRAILLAGE
RE-BAR ARRANGEMENT RE-BAR ARRANGEMENT
2 04-SEP-17 FOR CONSTRUCTION S.MITO Y.YAMAKI H.KONO

2-LE MANCHON DU TVYAU PVC DIAMETRE 50 1 28-JUL-17 FOR CONSTRUCTION S.MITO Y.YAMAKI H.KONO
PJ=115 2-50 DIA PVC PIPE SLEEVE PJ=115 0 29-JUN-17 FOR INFORMATION S.MITO T.SUGIHARA H.KONO
I 130 130
(NOTE 2) I
EL +99.800 TOG REV. DATE ISSUE PURPOSE PREP'D CHK'D APP'D

CADRES ET EPINGLES/
CADRES ET EPINGLES/

EL + a TOG

HOOPS AND TIES


HOOPS AND TIES

300

FGL
300

FGL
650

ELEVATIONS 25 MORTIER/GROUT

5-T10
25 MORTIER/GROUT
950
5-T10
950

FDN ID
1300
1300

P1 P1
EL + a EL + b
350

EL +98.500
HMD SOUTH SATELLITE REVAMPING
350

EL + b F16 99.800 98.500


SIZE

50
50

100
(TYP)
F16a 99.800 98.500
100
1-T10
PROJECT- ALGERIA
J BETON DE PROPRETE
F16b 99.900 98.600 (TYP) BETON DE PROPRETE
BLINDING CONCRETE
CADRE/HOOP J
BLINDING CONCRETE

1-T10
TITLE: TITRE:
D-250-1323-212

CADRE/HOOP
FOUNDATION DRAWING FOR PLAN DE FONDATION POUR
CONTRACTOR'S DOCUMENT NUMBER

A11M101 & A11T101 (12/17) A11M101 ET A11T101 (12/17)


ELEVATION COUPE COUPE A AREA E1C/UNIT 250 REGION E1C/UNITE 250
K ELEVATION SECTION SECTION - JOB CODE CONTRACTOR'S DOCUMENT No. SIZE K
0-7382-20 D-250-1323-212
PCWBS CONTRACT No. SCALE
A110 E/029/HMD/2015 1/50

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D R
IN P- 7
2 0 1
04-SE
1/1
L-HMD-S-JYC_SHM-0619_Annexe-2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES:

NORD
REEL
1. CE PLAN DOIT ENTRE CONSULTE AVEC D-250-1323-201~203.

NORD
REEL

24.85°
A A
24.85°

CONSTRUCTION
F17a (REQD=1) F18 (REQD=4)
CONSTRUCTION

DOMINANT
F18a

NORD
(REQD=1)

DOMINANT

VENT
NORD

VENT
(FOR F18, F18a) F18b (REQD=2)
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH D-250-1323-201~203.

Annexe-2 (4/4)

A
B B

-
3600
24.85°

450 2700 450


NORD
NORD
225 450 2250 450 225 CONSTRUCTION
REEL
225

A 1050
450

C C
450

P1 P1 - VENT
DOMINANT
525 525

175 700 175

100
450 (FOR F18b)
2700

2250
3600

450
160 130 160 700 REFERENCE DRAWINGS

700
A. BOLT 4-M24-S CONTRACTOR'S DOCUMENT No. DOCUMENT TITLE
135 430 135

160
P1 D-200-1310-002 ABBREVIATIONS AND SYMBOLS FOR CIVIL WORK

D A D-200-1320-001-01/02 GENERAL NOTES FOR CONCRETE WORK

135 215 215 135


D

450
130
450

D-200-1320-002 STANDARD DRAWING FOR ANCHOR BOLT


-

2700

2000
3600
450

700
P1 P1
D-200-1320-003 STANDARD DRAWING FOR REBAR ARRANGEMENT

160
225

P1
A. BOLT 6-M24-S

700
PLAN PIEDESTAL, P1

450
E PLAN PEDESTAL, P1 E

100
SCALE 1:30

PLAN PIEDESTAL, P1
TETE/TOP 15-T12 PLAN PEDESTAL, P1
SCALE 1:30
FOND/BOTTOM 15-T16

TETE/TOP 6-T16
FOND/BOTTOM 6-T16
F F
FOND/BOTTOM 15-T16
TETE/TOP 15-T12

FOND/BOTTOM 15-T16
TETE/TOP 15-T12
8-T16
12-T16

G 5-T10
G
2x5-T10 5-T10
2

4x5-T10 APPROVED PAR CTC


SIGNATURE :

SEMELLE PIEDESTAL, P1 SEMELLE PIEDESTAL, P1


H FOOTING PEDESTAL, P1 FOOTING PEDESTAL, P1 H
SCALE 1:30 SCALE 1:30 For Inf For Review For Const As Built

FERRAILLAGE FERRAILLAGE
RE-BAR ARRANGEMENT RE-BAR ARRANGEMENT
2 04-SEP-17 FOR CONSTRUCTION S.MITO Y.YAMAKI H.KONO
1 28-JUL-17 FOR CONSTRUCTION S.MITO Y.YAMAKI H.KONO
0 29-JUN-17 FOR INFORMATION S.MITO T.SUGIHARA H.KONO
I PJ=115 PJ=115
I
REV. DATE ISSUE PURPOSE PREP'D CHK'D APP'D

CADRES ET EPINGLES/
EL +99.800 TOG EL + a TOG
CADRES ET EPINGLES/

HOOPS AND TIES


HOOPS AND TIES
300

300

FGL FGL
ELEVATIONS
25 MORTIER/GROUT 25 MORTIER/GROUT
5-T10

5-T10
950

950

FDN ID
1300

1300

P1 P1 P1 P1 EL + a EL + b
HMD SOUTH SATELLITE REVAMPING
SIZE

350

350

EL +98.500 EL + b F18 99.800 98.500


PROJECT- ALGERIA
50

F18a 99.900 98.600


J J
50

100 100
F18b 99.800 98.500
(TYP) (TYP) 1-T10
1-T10
BETON DE PROPRETE CADRE/HOOP
CADRE/HOOP 1-T10
BLINDING CONCRETE CADRE/HOOP BETON DE PROPRETE TITLE: TITRE:
D-250-1323-213

BLINDING CONCRETE

COUPE A COUPE A FOUNDATION DRAWING FOR PLAN DE FONDATION POUR


SECTION - SECTION -
CONTRACTOR'S DOCUMENT NUMBER

A11M101 & A11T101 (13/17) A11M101 ET A11T101 (13/17)


AREA E1C/UNIT 250 REGION E1C/UNITE 250
K JOB CODE CONTRACTOR'S DOCUMENT No. SIZE K
0-7382-20 D-250-1323-213
PCWBS CONTRACT No. SCALE
A110 E/029/HMD/2015 1/50

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D R
IN P- 7
2 0 1
04-SE
1/1