PERENCANAAN DINDING PENAHAN TANAH PASANGAN BATU

TINGGI 9 M

0,30

h H

b
d g4
b +d+g4

II. PENDEKATAN & ASUMSI


H= 9.00 m
h= 8.00 m
D= 1.00 m
b= 3.60 m
B= 6.10 m
d= 1.25 m
g4 = 1.25 m
Lebar atas = 0.3 m
Berat Jenis Pas. batu gb: 2.20 t/m3
III. KOEFISIEN TEKANAN TANAH AKTIF & PASIF
Tanah timbunan :
Ø = 30 derajat
γd = 1.70 t/m3
γsat = 1.80 t/m3
Ca = 10.00 kg/cm2
Tanah dasar dibawah telapak :
Ø = 35 derajat
γsat = 1.80 t/m3
Cb = 10.00 kg/cm2
δ = 20 derajat
Tekanan tanah aktif
2
Ka = Tg (45 - f / 2 )
2
Ka = tan (3.14/4)-(  /180)x(3.14/2)
Ka = 0.333
Sudut geser dalam f =  / 180 x 3.14
f = 0.6109
Tekanan tanah pasif
2
Kp = tan (3.14/4)+(  /180)x(3.14/2)
Kp = 3.690

IV. GAYA-GAYA DINDING LATERAL


Ditinjau per 1.00 m panjang
hg = 7.00 m
Tinggi muka air = 1.00 m Kondisi A :
h2 = 7.00 m Tanah diatas muka air, pada kondisi kering.
Pa1 = 0.5 x h1^2 x gd x Ka
= 0.5 x 1.00 x 1.70 x 0.333 = 0.28
P1
Pa2 = h1 x gd x Ka x h2
= 1.00 x 1.70 x 0.33 x 7.00 = 3.97
Pa3 = 0.5 x h2^2 x g ` = g st- g w x Ka
Pv = 0.5 x 49.00 x 0.80 x 0.333 = 6.53
P2
Tekanan Tanah aktif Total pada dinding permeter :
Pa = Pa1 + Pa2 + Pa3

P3 = 0.283 + 3.967 + 6.533 = 10.8 t


Pw
Ph Kondisi B :
Tekanan Air di muka dan belakang dinding sama, jadi saling meniadakan
pa = 0.5 x H^2 x gsat x ka
= 0.5 x 81.00 x 1.80 x 0.333 = 24.30

Kondisi C
P1 = 0.28 t Tekanan pada dinding per meter
2
P2 = 3.97 t pa = 1/2 x g x H x Ka - 2 x C x √ Ka
P3 = 6.5 t = 12.696 t
Pa = 24.30 t Tekanan air pada dinding arahnya tegak lurus dinding
Pah = 926.456 t Pw = 0.5 x H2 x gsat
Pav = 4.34219 t = 0.5 x 81.00 x 1.80 = 72.9 t
Pp1 = 3.321 t Pah = Pw + Pa x Cos 
Pp2 = 38.420 t = 72.9 + 12.696 x 0.940 = 926.456 t
Pav = Pa x Sin 
= 12.696 x 0.342 = 4.34219

V. KONTROL STABILITAS GULING

G1 = 6.10 x 1.00 x 2.20 = 13.420 t


G2 = 0.30 x 8.00 x 2.20 = 5.280 t
G3 = 3.30 x 8.00 x 2.20 x 0.5 = 29.040 t
G4 = 1.25 x 8.00 x 1.70 = 17.000 t
G5 = 1.00 x 8.00 x 1.70 = 13.600 t
G6 = 1.25 x 7.000 = 8.750 t
87.090 t

Gaya V (t) H (t) Jarak (m) Mv (tm) Mh (tm)


G1 13.420 3.050 40.931
G2 5.280 1.450 7.656
G3 29.040 3.200 92.928
G4 17.000 5.267 89.533
G5 13.600 5.517 75.027 G2
G6 8.750 5.475 47.906 G4
Pa1 0.283 0.333 0.094
G3
Pa2 3.967 3.500 13.883
G5
Pa3 6.533 2.333 15.244
Pa 24.300 2.667 64.800
Pah 2.667
Pav 1.8
Pp1 3.321 0.333 1.107
Pp2 38.420 0.500 19.210 Pp1 G1
Pp2
Jumlah 87.090 76.824 353.981 114.339

Fguling = 3.10 ≥ 1.5 (OK)

V. KONTROL STABILITAS GESER


Gaya penggeser adalah (Pa)
2
Pa = 1/2 x g x H x Ka - 2 x C x √ Ka
= 18.133 t/m2
tahanan geser (GT) = f . ∑VT
= 28.644 ton
Maka keamanan geser :
SF Geser = Gaya penahan (GT) / Gaya geser (Pa)
= 1.580 > 1.5 (OK)
Dimana :
VT = jumlah gaya vertikal seluruhnya (ton).
f = koefisien geser antara pondasi dan tanah dasar 0,6.
2
To = tegangan geser dam utama pada tanah dasar (ton/m /m)
B = lebar dasar pondasi dam utama (m)

VI. KONTROL EKSENTRISITAS

x = 4.06 m
e = 1.01 m
1/6 B = 1.02 m e < 1/6 B (OK)

VII. KONTROL KAPASITAS DAYA DUKUNG TELAPAK

Qmax = 28.52 t/m2 (Kontrol)


Qmin = 0.03 t/m2

Persamaan Hansen (1970) dan Vesic (1975)


Qult = dc. Ic .c. Nc + dq.iq.Df.g.Nq + dy.iy.0.5.B.g.Ni
Dik :
Df = 1 m
D/B = 0.278 m
Kp = 3.69
Nq = 33.29
Nc = 46.11
Ng = 24.01
Faktor kemiringan Beban faktor kedalaman pondasi
1 ic = 0.944 dc = 1.40
2 iq = 0.946 dq = 1.49
3 ig = 0.925 dg = 1

Penyelesaian :
dc. Ic .c. Nc = 1.40 * 0.944 * 0 * 46.11 = 0
dq.iq.Df.g.Nq = 1.49 * 0.946 * 1 * 1.8 * 33.29 = 84.39
dg.ig.0.5.B.g.Ng = 1 * 0.925 * 0.5 * 1.8 * 24.01 = 19.99
Maka :
Qult = dc. Ic .c. Nc + dq.iq.Df.g.Nq+dy.iy.0.5.B.g.Ni
Qult = 0 + 84.391 + 19.991
= 104.382
Daya Dukung ijin
Sf = Qult / 3
2
= 34.79 t/m Qmax ≤ Qijin (OK)

Tekanan Tanah Pada Dasar Pondasi


t 1.2 = ( ∑VT / B) . ( 1 ± ( 6.e / B))
( t1) = ( 87.090 / 6.10 ) * ( 1 ± ( 6 * 1.015/ 6.10 ))
= 28.524 < q all = 34.794 ton/m2 (OK)
( t2 ) = 0.030 > 0 ton/m2 (OK)
Dimana :
t1 = tekanan tanah normal maksimum (ton/m2).
t2 = tekanan tanah normal minimum (ton/m2).
V = jumlah gaya vertikal yang bekerja (ton).
B = lebar dasar pondasi dam utama ( meter )
e = eksentrisitas pembebanan, atau jarak dari pusat sampai titik potong resultant (m)