Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 160
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

Bidder shall visit the site and study in detail to enumerate the structures,
equipments/panels already available and can be utilized for the proposed FGD
system. Bidder shall ensure that all necessary equipments required for
completion of system for smooth trouble free operation and maintenance after
integrating to the existing system.

5.1 SWITCHYARD EQUIPMENTS

5.1.1 SCOPE
All switchyard equipments to be supplied by the bidder shall be similar rating as
of existing switchyard system.
The ST-FGD equipment bay shall be supplied and installed with all accessories to
make the switchyard complete in all respects. ST-FGD equipment bay shall
consists of but not limited the following:

I. 420kv breakers,isolators,current transformers,and CVTs


II. 360kv lightning arrestor.
III. Busbar Materials& accessories,insulator,assemblies,clampa and
connectors.
IV. Switchyard structures,supports,lightning protection and earthing and
gantry.
V. Trenches ,All foundation and civil works
VI. Switchyard Control and relay panels
VII. Back up Control Panels for control of switch yard equipments
VIII. Scada system for control: All controls and data shall be hooked up to
existing scada system for control and metering and Synchronisation.
IX. Earth switch shall be provided for 400kv system(Earth switch shall be
provided on the isolator itself)
X. Earth mat for switchyard-(If necessary for the proposed bay)
XI. Illumination for transformer yard
XII. DCDB/ACDB: can be extended from existing AC &DCDB cable laying and
termination from existing board is in bidder‘s scope.
XIII. 400kv/11.5kv/11.5 kv transformer.
XIV. Fire fighting system.
All Civil works associated with switchyard equipments, Erection, testing and
commissioning of equipments are in bidder scope.

5.1.2 DESIGN CRITERIA


(a) The 400 kV system has been designed to limit the switching surge over
voltage to 2.3 p.u. and power frequency over voltage to 1.5 p.u.
(b) The following standard insulation values shall be adopted.
400KV
(i) Lightning impulse withstand 1425 kV peak
voltage
(ii) Power frequency withstand 630 kV
voltage
(iii) Switching impulse withstand 1050 kV peak
voltage
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 161
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

(c) Clearances: In line with the recommended insulation levels above, the
following minimum clearances are proposed for 400 kV.
400 kV
(i) Phase to Phase 4100 mm
(ii) Phase to earth 3500 mm
(iii) Live part to ground 8000 mm
(iv) Section clearance 6500 mm
All clearances shall be as per IS / IEC standards.

(d) Creepage Distance


Out of the ‗light‘, ‗heavy‘ and ‗very heavy‘ pollutions categorised in CEA
report, heavy pollution conditions shall be considered for choice of
creepage distance
Considering the location of switchyard, the creepage distance 31 mm /KV
(for heavy polluted area) i.e.,13020 mm shall be provided for the following
equipment

i Circuit breakers,
ii Bus post insulators, isolators and lightning Arresters
iii Insulator strings and transformer bushings
iv Current and voltage Transformers

(e) Current Rating


The buses have been designed for 3000A continuous current for 400 KV
system. Generator transformer, station transformer bay buses shall be
rated at 3000 Amps.
The switchyard has been designed for a fault level of 50KA for 1.0 sec,
and dynamic rating of 125KA peak.

(f) Bus Bars


i Main buses – I & II are of Aluminium for 400 KV systems However, for
drops and stringing in case of 400 KV system twin/quad bersimis
conductors shall be used.
ii The conductor size for buses shall be based on maximum load current
that the conductor can carry with allowable temperature rise within
limits, short circuit conditions and permissible corona / voltage
gradient. The final temperature of the conductor when carrying full
load current shall not exceed 85 deg. C with a design ambient of 50
deg. C. The conductor size and spacing shall be checked to limit the
voltage gradient to 17 kV/cm to reduce corona effect. The short time
rating shall be 50KA for 1.0 sec.
iii The tension in strung bus shall be so as to limit the sag within about
3% of the span. The tension for power conductor shall be 1000 kg /
bus conductor.
(g) Insulators
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 162
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

i Tension and suspension insulator strings shall be anti-fog type


selected based on the voltage, insulation level, pollution level and
electro-mechanical strength. Creepage chosen shall be suitable for
heavy pollution, i.e., 31mm/KV.Electromechanical strength shall be
selected with factor of safety of 2.5 and as per relevant standards.

ii Bus Post Insulators: Bus post shall be solid core/post insulator anti
fog type and shall be selected based on the system voltage, insulation
level, mechanical strength and pollution level requirements and as
per relevant standards.

iii Insulator hardware shall be corona free up to a falling power


frequency visible discharge test voltage of 1.1 times the maximum
system voltage. All steel components shall be hot dip galvanised.

iv Out of the ‗light‘, ‗heavy‘ and ‗very heavy‘ pollutions categorized in


CEA report, heavy pollution conditions has been considered for choice
of creapage distance i.e., 31mm/KV.

(h) The power conductor termination shall not be tapped off directly to the
transformer from the switchyard gantry. The tap-off conductor shall be
routed through a tower and gantry arrangement near the transformer.

(i) For the layout proposed by the CONTRACTOR the adequacy of the
cantilever strength specified shall be checked considering the following
factors of safety:

i Sum of all permanent normal loads (wind load on tubular bus + wind
load on stack + dead weight of the tubes) = 2.5.
ii Combination of all normal loads plus either short circuit or
earthquake load whichever is higher = 1.

(j) The switchyard shall be designed for the seismic coefficient and wind
pressures as indicated elsewhere.
(k) Design criteria for civil works and structures shall be in conformity with
relevant standards.

5.1.3 APPLICABLE STANDARDS:


Sl. Description Requirement
No.
a Circuit Breakers IEC – 62271
b Insulators IS : 2544
c Large Hollow Porcelains IS : 5621
d Electrical Power Connectors IS : 5561
e Hot dip galvanizing IS : 2629 & IS : 2633
f Spec. and Acceptance SF6 IEC : 376.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 163
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

5.1.4 400 kV SWITCHYARD LAYOUT REQUIREMENTS

a. In the switchyard layout, the CONTRACTOR shall maintain the same


dimensions in respect of bay width, phase spacing, clearances, etc.,
b. The CONTRACTOR shall note that the sequence of bays shall be so
arranged that the maximum horizontal angle of deviation of the incoming
power and shielding conductors from transformers do not exceed 30 deg.
C. Similarly, the point of anchoring on building be such that the vertical
angle of deviation is limited to 30 deg. C from horizontal plane.

c. The CONTRACTOR shall adopt bolted type connectors for tubular bus
conductors, fixed type of terminal connectors for isolator terminals,
flexible type of terminal connectors for circuit breakers, current
transformers and power transformers and flexible jumper connectors for
connecting lightning arrestors and voltage transformers.

d. The Contractor shall provide bolted type TEE connectors in the switch
yard to the extent possible. The specific areas for such type of clamps and
connectors are to be used shall be finalised during detailed Engineering.

e. The switchyard shall be provided with access way for movement of crane
for attending to major equipments like current transformers, isolators,
Lightning arrestors, marshalling boxes, CVTs, and circuit breakers etc.

f. The cable trenches for the equipment shall run as close as possible to
their foundations.
g. The switchyard equipment shall be suitable for outdoor installation and
shall have tropical and fungicidal treatment. The design ambient
temperature shall be 50ºC.

h. The design criteria, quantity and type of ODY equipments have to be met
with requirements and in line with the specification.

i. The system and equipments shall have to meet the requirement in respect
of environmental condition, system parameters etc as per specification. All
civil works, obtaining all clearances and licences as per statutory
requirements and TAC / LPA for fire fighting equipments etc are in
contractor‘s scope.

5.1.5 GENERAL TECHNICAL REQUIREMENTS:

A) 400 kV CIRCUIT BREAKERS AND ACCESSORIES

(a) 420 KV, 3150A, 50KA for 1 sec (for 400 KV) SF6 spring operated type
and outdoor circuit breakers shall be provided as per IEC 62271 & other
Relevant standards.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 164
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

(b) Circuit Breakers shall be electrically interlocked with associated


isolators in accordance with switchyard safety interlocking scheme.
(c) Design of circuit breaker shall be such that contacts shall not close
automatically upon loss of gas pressure.
(d) SF6 breakers shall be provided with temperature compensated SF6
density pressure switches for individual poles with separate trip, alarm
and blocking contacts.
(e) DC circuits for two trip coils shall be separate and each shall be
monitored separately.
(f) Local electrical operation of the circuit breaker under the control of local
/ remote switch and interlocked with isolators and earth switches,
associated with the circuit breakers shall be provided.
(g) Breakers shall be Spring- spring operated type only.
(h) SF6 breakers shall be of single pressure type and shall utilise puffer
cylinder for interrupting circuit currents. The breaker shall be so
designed that upon loss of pressure, the gap between open contacts
shall be suitable to withstand at least the rated voltage at zero gauge
pressure of gas.
(i) Suitable pressure switches shall be provided for loss of gas in the circuit
breaker. Suitable protection, to prevent circuit breaker operation under
low gas and / or pneumatic pressure shall be provided.

The switching surge over voltages while re-energising is required to be


limited to 2.3 P.U. The circuit breaker shall be able to meet the duty
given below :

(i) Operating duty O-0.3 Sec-CO-3 Min-CO


(ii) Reclosing against Same as above but with the initial & third
trapped charge closings being on de-energised line and
second closing against trapped charge of
1.2 p.u. of opposite polarity.

(iii) Out of phase One closing operation under phase


closing opposition i.e., with twice the voltage
across terminals.
It is envisaged to have equipments similar to ones already installed. The
GTP/data sheet of installed equipments enclosed for reference.

Technical Requirement
The circuit breakers shall comply with requirements in the following table:
Requirement
Description Unit
1. Make *
2. Type SF6
3. Rated voltage KV 420
4. Rated frequency Hz 50
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 165
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

5. Rated current A 3150


6. Short circuit breaking KA 50kA for 1.0 Sec.
current
7. Making current KAp *
8. Operating duty 0-0.3 sec-CO-3 min-CO
9. Auto Reclosing Required (single pole & 3
pole
10. Execution of poles Three single phase
11. a) Total interrupting time
 Minimum ms *
 Maximum ms *
b) Closing time ms *
12. a) Rated transient KVp
recovery *
voltage for terminal *
faults
b) First pole clear factor
13. Rated transient recovery KVp *
voltage for short-line faults
14. a) Short circuit test Yes *
certificate enclosed / No *
b) Oscillogram enclosed Yes
/ No
15. a) No. of breaks in series 2
per pole
Grading
b) Type of devices, if any, capacitors
used to
obtain uniform voltage
distribution between
breaks
16. Insulation level of the
breaker KV
a) One minute power (rms 630
frequency withstand ) 1425
voltage KVp
b) Impulse withstand 1050
voltage KVp
c) Switching surge
withstand test voltage
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 166
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

17. Corona and visual


discharge
a) Radio interference KV *
voltage V *
i. Test voltage kV *
ii. RI level
b) Visual discharge
voltage for
falling power frequency
voltage
18. Minimum clearances in air
a) Between phases mm 4100
b) Between live parts and mm 3500
earth
c) Centre to centre mm Refer Cl.No.3.2
distance
between phases
19. Whether the breaker is *
fixed trip or trip free
20. Type of operating Spring - spring
mechanism
21. Method of tripping
a) Normal *
b) Emergency *
c) Normal voltage of trip V 220 V DC
coil *
d) No of Trip coils per pole V 70-110%
e) Pick-up range W *
f) Power for tripping
mechanism
22. Method of closing
a) Normal voltage of V 220V DC
closing coils W *
b) Power for closing
mechanism
23 Reference Ambient 50 oC
Temperature
24 Gas Evacuation and filling *
unit
25 SF6 Gas filling Plant *
26. Rated line charging A *
breaking current
27. Rated cable charging A *
breaking
Current
28. Rated (single) capacitor A *
bank
breaking current
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 167
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

29. Critical current (current *


giving the longest arc A
when a break takes place)
30. Maximum over voltage to
earth of the circuit breaker
when breaking
currents of: KVp *
a) Unloaded transformers KVp *
b) Unloaded lines KVp *
c) Capacitor banks kVp *
d) Cable charging
31. When switching off
asynchronous system:
a) Maximum current KA *
b) Maximum recovery
voltage kV *
between contacts of
one pole
32. Number of operations, the
circuit
breaker is capable of
performing
without inspection,
replacement of contacts or *
other main parts/ *
replacement oil at
a) Rated interrupting
capacity
b) Rated continuous
current
33. Overall dimension of *
complete
3-phase circuit breaker
with structure
34. Weight of complete 3- Kg *
phase
circuit breaker
35. Rated low p.f. transformer A *
magnetising breaking
current

Note :‗*‘ during detailed engineering


: Data sheet of equipments existing at sites are enclosed in Annexures

B) 400 kV ISOLATORS

420 kV, 50 kA for 1.0 sec, electrically group operated and also individually
operated, centre break, horizontal upright mounted, isolators with one
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 168
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

earth switch/ with two earth switches as mentioned under technical


requirements below shall be supplied.
A.C motor drive mechanism for main blade and manual operation
mechanism for earth blade shall be provided.
(a) Isolators shall be electrically interlocked with the circuit breakers in
accordance with the switchyard safety interlocking scheme. Required
number of auxiliary contacts shall be provided for interlocks, SCADA &
panel indications.

(b) Isolators and earthing switches shall be provided with padlocking facility
to lock them in fully open or fully closed positions. Padlocks shall be
supplied with the isolators.

(c) Isolator and earthing switch shall be mechanically interlocked such that
it will not be possible to close the earthing switch when the isolator is
closed and vice-versa.

(d) Flexible tinned copper connection between rotating shaft of earth switch
and frame shall have a cross-section to withstand short time withstand
current.

It is envisaged to have equipments similar to ones already installed. The


GTP/data sheet of installed equipments enclosed for reference
Technical Requirement
The isolators shall comply with the requirement indicated in the following
table:

Sl. Details Unit Requirement


No
1.0 RATING 400 KV
1.1 Application Switchyard /
Outdoor
1.2 Quantity *
1.3 Voltage KV 420
1.4 Frequency Hz 50
1.5 No. of phases 3 Phase
1.6 Rated current for site A 3000
conditions
1.7 Short time Current
(a) Rating and duration KA / sec 50kA for 1.0 sec.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 169
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

1.8 Rated peak short circuit current KA(peak) 125


1.9 Capacity to interrupt A *
magnetising current at p.f…
1.10 Capacity to interrupt line A *
charging current at p.f…
2.0 Design Requirements
2.1 Ambient temperature 0C 500C
2.2 Insulation level KV(peak) 1425
2.3 Phase spacing mm 7000

2.4 Type of break Centre break


2.5 Type of mounting Upright
2.6 Operating device
(a) For isolator Motorised( Both
Local & Remote) and
Emergency Manual
(b) For earth switch Manual
3.0 Insulator Data (To be solid core type
only)
3.1 Type Horizontal, Centre
break
3.2 Number of units No. 3
3.3 Height of stack mm 3650
3.4 Cantilever strength – upright KG 800
3.5 Power frequency dry flashover kV 520/610
voltage
3.6 Power frequency wet flashover kV *
voltage
3.7 1.2 / 50 micro sec. Impulse *
flashover : positive wave kV(peak)
3.8 1.2 / 50 micro sec. Impulse 1425/1665
withstand voltage kV(peak)
3.9 Total creepage distance mm 31mm / kV
3.10 Visual discharge voltage for *
complete isolator with fittings KV(rms)
3.11 RIV for complete isolator with V *
fittings
4.0 Miscellaneous
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 170
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

4.1 Auxiliary supply 220 V DC for control


and interlock; 415V
AC, 3 phase for
motor drive
4.2 Interlocks with circuit breakers Bolt interlock
electrically operated
5.0 Whether type tests carried out Yes/ No If yes, type test
on similar isolators reports shall be
furnished . If not,
tests shall be
conducted at no
extra cost.
6.0 Whether all routine / tests as Yes/ No
Yes. All routine/
per latest standards will be
acceptance tests
carried out on each isolator
shall be conducted
in presence of the
corporation‘s
representative.
7.0
Applicable standards
7.1 Insulators
IS : 2544
7.2 Isolators
IS: 9921.

Note: ‗*‘ Details shall be furnished during detailed engineering


: Data sheet of equipments existing at sites are enclosed in Annexures

C) 400 kV CURRENT TRANSFORMERS


(a) 400 kV oil filled hermetically sealed single phase current transformers
shall be provided. Quantity, No of cores and current ratio etc., shall
be decided during detailed engineering.
(b) Multi-ratio CT tapings shall be provided on the secondary side to
obtain different ratios in order to permit different transformation
ratios on each core, as desired. Metering CTs shall have class 0.2s
accuracy.
(c) Secondary terminals of CTs shall be brought out in a whether proof
terminal box. Facility shall be provided for short circuiting and
grounding the CT secondary at the terminal box.

(d) Each CT shall be equipped with an over voltage protective device to


limit the voltage developed across the secondary terminals to a safe
value not exceeding 3 kV.

(e) CONTRACTOR shall furnish the test certificates for all the type tests
conducted as per relevant standards, if the tests have been already
conducted on an identical CT to that offered. In case the tests are not
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 171
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

conducted, the CONTRACTOR shall conduct these tests on the CTs


being supplied.

It is envisaged to have equipments similar to ones already installed.


The GTP/data sheet of installed equipments enclosed for reference.

Technical Requirement
400 kV current transformers shall comply with requirements in the
following table:

Requirement
Sl. Details Unit
No.
1.0 Type Outdoor, oil filled, dead tank
hermetically sealed.
2.0 Nominal system voltage kV 400
3.0 Highest System Voltage kV 420
4.0 Frequency Hz 50
5.0 No. of cores *
6.0 Rated primary current **
for each core
A *
I1
A *
I2
A *
I3
A
I4
A
I5
7.0 Rated secondary current A 1
8.0 Ratio taps for each core
Core 1
*
Core 2
*
Core 3
Core 4
Core 5
9.0 Turns ratio for each core
Core 1
*
Core 2
*
Core 3
*
Core 4
*
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 172
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

Requirement
Sl. Details Unit
No.
Core 5 *

10.0 Application
Core 1 *
Core 2 *
Core 3 *
Core 4 *
Core 5 *
11.0 For relaying cores
(Data shall be furnished
for all ratio taps.)
11.1 Accuracy class shall be 0.2 for metering
cores
11.2 Rated burden VA *
11.3 Accuracy limit factor *
11.4 Minimum knee point V *
voltage Vk
11.5 Maximum excitation mA *
current at Vk/2
11.6 Maximum secondary Ohm *
resistance
s
12.0 For metering cores
(Data shall be furnished
for all ratio taps.)
12.1 Accuracy class *
12.2 Rated burden VA *
12.3 Rated power factor *
12.4 Inst. security factor *
13.0 Short time thermal kA 50kA for 1.0 sec.
rating
14.0 Dynamic rating kAp 125
15.0 Class of Insulation Oil immersed Class A.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 173
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

16.0 Maximum temp. rise of 0C *


winding above ambient
of 500C
17.0 Cantilever strength of Kg 800 Kg
CT at the terminal
18.0 1.2 / 50  sec. Impulse KVp *
– positive & negative
19.0 One min. power kV
frequency withstand *
rms
voltage
20.0 Creepage distance Mm 31 mm / kV
21.0 Partial discharge level 10 pico-coulomb
22.0 Applicable Standards
22.1 Current Transformers IS:2705
22.2 Bushings IS:2099
22.3 Large Hollow Porcelains IS:5621
22.4 Insulators IS: 2544
22.5 Hot dip galvanising IS:2633 & IS: 2629
22.6 Insulating oil IS: 335
Note: ‗*‘ Details shall be furnished during detailed engineering
: Data sheet of equipments existing at sites are enclosed in Annexures

D) 400 kV CAPACITOR VOLTAGE TRANSFORMERS

(a) 400/3 kV/ 110/3 V capacitive voltage transformer shall be


provided for the metering and protection of 400 kV station
transformers. Quantities shall be finalised during detailed
engineering.
(b) Fuses of adequate rating shall be provided in each secondary output
leads of each VT to protect the VT secondary branch circuit from the
abnormal voltage surges that may occur on the VT primary side. The
secondary shall also include suitable number of links for each
secondary as per the requirement of fuse failure detection relays.
(c) The burden of the CVTs shall be finalized during detailed engineering

It is envisaged to have equipments similar to ones already installed. The


GTP/data sheet of installed equipments enclosed for reference
Requirement
Sl. Description Unit
No.
1. Quantity Nos. *
2. Application
Outdoor
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 174
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

3. Nominal / Highest system kV 400 / 420


voltage
4. Power frequency Hz 50
5. System neutral earthing Effectively earthed
type
6. Co-efficient of earthing 0.8
7. Rated primary voltage kV 400 / 3
8. Rated secondary voltage V 110/ 3 V /110/ 3 V
/110/ 3 V
9. No. of secondary windings Three (3)
10. Application Metering / protection
11. Rated burden *
12. Rated power factor *
13. Accuracy class -
Core 1 3P
Core 2 3P
Core 3 0.2
14. Rated voltage factor 1.2 continuous & 1.5
for 30 seconds
15. Class of windings insulation Oil immersed, Class – A
16. Max. Winding temp. at As per Table –II of IEC
110% Excitation & rated 186 considering design
burden ambient of 50 Deg C.
17. Creepage distance (total) mm 31 mm / kV
18. Rated capacitance 8800pF
Tolerance + 10% to –5%
19. High frequency range Hz 40 – 500 kHz
20. 1.2 / 50 micro sec. Impulse kV 1425
voltage withstand (Peak)
21. One minute power frequency kV 630
voltage withstand (rms)
22. High frequency capacitance
- For entire carrier Within 80% to 150% of
frequency range.. rated capacitance
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 175
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

- Equivalent series .Less than 40 Ohms.


resistance over the entire
carrier frequency range
23. Stray capacitance and *
conductance of low voltage
terminal
Stray capacitance of low 300 + 0.05 Cn PF (Cn
voltage terminal over entire is rated capacitance)
carrier frequency range
- Stray conductance of the  50
low voltage terminal over Sieme
entire carrier frequency ns
range
24. One minute power frequency
test
- Withstand voltage kV 4
between low voltage (rms)
terminal and earth
terminal
- Withstand voltage for kV 2
secondary winding (rms)
25. Radio interference voltage at V Not
266 kV rms exceeding
500
26. Corona extinction voltage kV 320
27 Applicable Standards
27.1 Voltage transformers IS : 3156
27.2 Coupling capacitors and capacitor IS : 9348, IEC : 60358
dividers
27.3
Capacitor voltage transformer
27.4 IS :3156,Part IV,IEC:
Bushings 60186
27.5
Large Hollow porcelains IS : 5621
27.6
Insulators IS : 2544
27.7
Hot dip galvanizing IS : 2629

Note: ## Data sheet of equipments existing at sites are enclosed in Annexures

E) 400 kV METERING CURRENT TRANSFORMERS


VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 176
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

(a) 400 kV oil filled hermetically sealed single phase current transformers
shall be provided. Quantity, No of cores etc., shall be as per single line
diagram.

(b) Multi-ratio CT tapings shall be provided on the secondary side to


obtain different ratios in order to permit different transformation
ratios on each core, as desired. Metering CTs shall have class 0.2s
accuracy.

(c) Secondary terminals of CTs shall be brought out in a whether proof


terminal box. Facility shall be provided for short circuiting and
grounding the CT secondary at the terminal box.

(d) Each CT shall be equipped with an over voltage protective device to


limit the voltage developed across the secondary terminals to a safe
value not exceeding 3 kV.

(e) CONTRACTOR shall furnish the test certificates for all the type tests
conducted as per relevant standards, if the tests have been already
conducted on an identical CT to that offered. In case the tests are not
conducted, the CONTRACTOR shall conduct these tests on the CTs
being supplied.
(f) ABT meters shall be provided in compatible to existing meters and
n/w system.

It is envisaged to have equipments similar to ones already installed. The


GTP/data sheet of installed equipments enclosed for reference

Technical Requirement
400 kV current transformers shall comply with requirements in the following
table:
Requirement
Sl. Details Unit
No.
1.0 Type Outdoor, oil filled,
dead tank
hermetically sealed.
2.0 Nominal system voltage kV 400
3.0 Highest System Voltage kV 420
4.0 Frequency Hz 50
5.0 No. of cores *
6.0 Rated primary current **
for each core
A *
I1
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 177
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

Requirement
Sl. Details Unit
No.
I2 A *
I3 A *
I4 A
I5 A
7.0 Rated secondary current A 1
8.0 Ratio taps for each core
Core 1
*
Core 2
*
Core 3
Core 4
Core 5
9.0 Turns ratio for each core
Core 1
*
Core 2
*
Core 3
*
Core 4
*
Core 5
*

10.0 Application
Core 1 *
Core 2 *
Core 3 *
Core 4 *
Core 5 *

11.0 For relaying cores


(Data shall be furnished
for all ratio taps.)
11.1 Accuracy class shall be 0.2 for
metering cores
11.2 Rated burden VA *
11.3 Accuracy limit factor *
11.4 Minimum knee point V *
voltage Vk
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 178
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

11.5 Maximum excitation mA *


current at Vk/2
11.6 Maximum secondary Ohms *
resistance
12.0 For metering cores
(Data shall be furnished
for all ratio taps.)
12.1 Accuracy class *
12.2 Rated burden VA *
12.3 Rated power factor *
12.4 Inst. security factor *
13.0 Short time thermal kA 50kA for 1.0 sec.
rating
14.0 Dynamic rating kAp 125
15.0 Class of Insulation Oil immersed Class
A.
16.0 Maximum temp. rise of 0C *
winding above ambient
of 500C
17.0 Cantilever strength of Kg 800 Kg
CT at the terminal
18.0 1.2 / 50  sec. Impulse KVp *
– positive & negative
19.0 One min. power kV
frequency withstand *
rms
voltage
20.0 Creepage distance Mm 31 mm / kV
21.0 Partial discharge level 10 pico-coulomb
22.0 Applicable Standards
22.1 Current Transformers IS:2705
22.2 Bushings IS:2099
22.3 Large Hollow Porcelains IS:5621
22.4 Insulators IS: 2544
22.5 Hot dip galvanising IS:2633 & IS: 2629
22.6 Insulating oil IS: 335
Note: ‗*‘ Details shall be furnished during detailed engineering
: Data sheet of equipments existing at sites are enclosed in Annexures
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 179
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

F) 400 kV METERING CAPACITOR VOLTAGE TRANSFORMERS


(a) 400/3 kV/ 110/3 V capacitive voltage transformer shall be provided
for the metering of 400 kV LINES as shown in enclosed Single Line
Diagram. Quantities shall be as per single line diagram.

(b) Fuses of adequate rating shall be provided in each secondary output


leads of each VT to protect the VT secondary branch circuit from the
abnormal voltage surges that may occur on the VT primary side. The
secondary shall also include suitable number of links for each
secondary as per the requirement of fuse failure detection relays.

(c) The burden of the CVTs shall be adequate for the loads connected and
shall also consider the requirement of one more future generator
transformer bay.

It is envisaged to have equipments similar to ones already installed. The


GTP/data sheet of installed equipments enclosed for reference

Requirement
Sl. Description Unit
No.
1. Quantity Nos. *
2.
Application Outdoor
3. Nominal / Highest system kV 400 / 420
voltage
4. Power frequency Hz 50
5. System neutral earthing Effectively earthed
type
6. Co-efficient of earthing 0.8
7. Rated primary voltage kV 3
400 /
8. Rated secondary voltage V 110 / 3V / 110 / 3V /110/
3
9. No. of secondary windings Two (2) Three (3)
10. Application Metering
11. Rated burden *
12. Rated power factor *
13. Accuracy class -
Core 1 0.2s
Core 2 0.2s
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 180
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

Core 3 0.2
14. Rated voltage factor 1.2 continuous & 1.5
for 30 seconds
15. Class of windings insulation Oil immersed, Class – A
16. Max. Winding temp. at As per Table –II of IEC
110% Excitation & rated 186 considering design
burden ambient of 50 Deg C.
17. Creepage distance (total) mm 31 mm / kV
18. Rated capacitance 8800pF

Tolerance + 10% to –5%


19. High frequency range Hz 40 – 500 kHz
20. 1.2 / 50 micro sec. Impulse kV 1425
voltage withstand (Peak)
21. One minute power frequency kV 630
voltage withstand (rms)
22. High frequency capacitance
- For entire carrier Within 80% to 150% of
frequency range rated capacitance.

- Equivalent series
Less than 40 Ohms.
resistance over the entire
carrier frequency range
23. Stray capacitance and
conductance of low voltage
terminal
Stray capacitance of low 300 + 0.05 Cn PF (Cn
voltage terminal over entire is rated capacitance)
carrier frequency range
Stray conductance of the  50
low voltage terminal over Sieme
entire carrier frequency ns
range
24. One minute power frequency
test
- Withstand voltage kV 4
between low voltage (rms)
terminal and earth
terminal
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 181
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

- Withstand voltage for kV 2


secondary winding (rms)
25. Radio interference voltage at V Not exceeding 500
266 kV rms
26. Corona extinction voltage kV 320
Note: ‗*‘ Details shall be furnished during detailed engineering
: Data sheet of equipments existing at sites are enclosed in Annexures

G) LIGHTNING ARRESTERS
(a) 360 kV, 20 kA nominal discharge current, discharge Class – IV, metal
oxide gapless lightning arresters shall be provided. Three lightning
arresters shall be used in each of the station transformer.
(b) Surge monitor comprising a digital type counter and a leakage current
detector shall be provided for each arrester and the same shall be
mounted at eye level height to facilitate easy reading of the counter and
leakage current detectors.
(c) The arrester shall be mounted on an insulating base. Surge monitor
shall be inserted between the lightning arrester and earth.
(d) Insulated copper conductor of adequate size and length shall be used
for connecting discharge counter terminal and lightning arrester earth
terminal. Insulation level of .the conductor shall not be less than 5 kV.
(e) Suitably sized bypass copper shunts shall be provided for bypassing
the discharge counter for removal /maintenance of the counter.
It is envisaged to have equipments similar to ones already installed. The
GTP/data sheet of installed equipments enclosed for reference

Technical Requirements
Requirement
Sl. Description Unit
No.
1.0 GENERAL 360kV
1.1 Quantity Nos. -----
1.2 Installation Outdoor
1.3 System Voltage
(a) Nominal kV 400
(b) Highest kV 420
1.4 Type of earthing Effectively earthed
1.5 Type of arrester Metal oxide –
Gapless
2.0 RATING
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 182
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

2.1 Rated arrester voltage kV 360


2.2 Maximum continuous kV 292
operating voltage
2.3 Rated frequency Hz 50
2.4 Nominal Discharge current of 8 kA 20
/ 20 Micro second wave shape
3.0 Performance Data
3.1 Impulse current withstand
a Low current long duration Class IV
discharge class (as per IEC
60099)
b High current short duration kA *
test value (4/10  wave)
c Low current long duration test sec *
value
d Virtual duration of rectangular S *
wave
e
Residual voltage corresponding
to
(i) Steep current kVp 970
Impulse
(ii) Switching impulse kVp 725
f As per IEC 60099-4
Maximum residual voltage at
rated nominal discharge
current
4.0 Arrester Housing
4.1 Withstand Test Voltages
(a) One minute power kV(rms 630
frequency dry & wet )
(b)1.2 / 50 micro second kVp 1425
Impulse
4.2 Minimum total creepage mm 31 mm / kV
distance – mm
5.0 Additional requirements
5.1 Minimum cantilever strength kg 600
of arrester assembly
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 183
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

5.2 Pressure relief class (As per *


IEC – 99)
5.3 Minimum prospective *
symmetrical fault current (as
per IEC – 99)
5.4 Maximum Radio interference V 500
voltage
5.5 No visual discharge up to a kV 320
voltage of
6.0 Applicable Standards
6.1 Lightning arrester IS : 3070
For alternating current IEC – 60099
systems
6.2 Insulators IS – 2544
6.3 Large Hallow Porcelain IS : 5621
Insulators

Note: ‗*‘ Details shall be furnished during detailed engineering

H) INSULATORS & HARDWARE


(a) Bus post insulators, insulator strings with fittings / hardware as
required for the entire system shall be provided.
(b) The hardware shall be corona free up to a falling power frequency
visible discharge test voltage of 320 kV. All hardware components
shall be smooth and as far as possible have round exposed
surface.

Requirement
Sl. No. Description Unit
1.0 Bus Post Insulator
1.1 Type Solid Core
1.2 Voltage class kV 420
1.3 Total creepage distance mm 31 mm / kV
1.4 Cantilever strength kg 800
1.5 Withstand voltages
(a) 1 min. power freq. (Dry) kV *
(b) 1 min. power freq. (wet) kV *
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 184
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

(c) 1.2/50 micro sec. kVp *


Impulse (Dry)
(d) 1.2/50 micro sec. Impulse kVp *
(Wet)
1.6 Puncture voltage 1.3 times corresponding
flash over voltages.
2.0 Disc Insulator
2.1 Voltage class *
2.2 Type *
2.3 Creepage distance mm *
2.4 Electromechanical strength *
2.5 Withstand/ flashover voltages
(a) 1 min. power freq. (Dry) kV *
(b) 1 min. power freq. (wet) kV *
(c) 1.2/50 micro sec. kVp *
Impulse (Dry)
(d) 1.2/50 micro sec. Impulse kVp *
(Wet)
2.6 Power Frequency Puncture *
Voltage
3.0 Insulator String Assembly
Requirement in items 1.1 to 1.3, 1.5 & 1.6 above shall be complied
with.
4.0 Applicable Standards
4.1 Post insulators IS : 2544
4.2 Suspension Insulators IS : 731
4.3 Insulator fittings IS : 2486
4.4 Hot dip galvanising process IS : 2629 & IS : 2633
Note: ‗*‘ Details shall be furnished during detailed engineering

I) BUS CONDUCTORS, CLAMPS & CONNECTORS


The Clamps & connectors shall be aluminium alloy casting conforming to
IS 617 for connection to equipment terminals and conductors of
aluminium. In case terminals are of copper, connectors shall be used with
2 mm thick bi-metallic liner.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 185
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

Applicable Standards
The conductors, clamps and connectors shall comply with the following
standards:
AAC. ACSR conductors: IS : 398
Copper conductors: IS : 282
Galvanisation of steel wires: IS : 4826
Copper tubes: BS : 159
Aluminium / Aluminium Alloys Bars, IS : 5082
Rods, Tubes, Sections for Electrical
Purposes:
Fittings for Aluminium and steel cored IS : 2121
aluminium conductors for overhead lines:
Electric power connectors: IS : 5561
Hot dip galvanised process: IS : 2629 & 2633

J) Bay Marshalling Box (s)


To Marshall Secondaries of current and voltage transformers and also
control and auxiliary supplies to various equipment, and feedback signals
of various equipment such as breakers, isolators etc to control room,
outdoor type marshalling kiosks are considered. Single phase 240V heating
and lighting supply will be provided. The heating and lighting supply will
be sub-distributed in radial way to provide heating and lighting supplies
for all HV equipment marshalling boxes and each bay marshalling box.

Adequate number of Outdoor mounted, free standing type bay marshalling


boxes will be provided. Bay marshalling box will be provided with two
subsections namely: Terminal box and auxiliary supply distribution box.

(a) Terminal box: Providing intermediate termination of all auxiliary


contacts of breaker, isolator and earthing switches (whether used or
not) and preparing interlocking. (CT & PT marshalling boxes will be
provided with respective CTs & PTs.)

(b) Auxiliary supply distribution box from where both AC auxiliary supply,
heating/lighting supplies and DC auxiliary control supply will be
distributed to various motors of all CBs, isolators, earthing switch local
/ marshalling box/equipment marshalling box and heating and
lighting supply to various bay marshalling boxes. The marshalling
boxes will be provided with doors on both sides with key lockable
handle for each door. The key will be removable only in door locked
position.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 186
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

(c) Two 240VAC and 220V DC source will be provided for control supply
for switchyard and control relay panel. Extending supplies to
equipments and panels are in bidder scope.

(d) The scheme for all protections, controls, indications, interlocking,


metering, AC and DC distribution and all other schemes shall be
prepared in such a way that cables will be laid in radial pattern. Loop
formulation of cables will be completely avoided.

Auxiliary contacts of the CBs, isolators and earthing switches will be


terminated in terminal box section of bay marshalling boxes. All
hardwired interlocking will be wired in the above box. All auxiliary
contacts and interlocked scheme contacts will be wired to respective
panels in the control room.

Neutral of all cores of CTs, CVTs will be formed in marshaling of the


respective equipment. Cables with sufficient number of cores are run
from these marshaling boxes to control and relay panels as
appropriate. The Neutral of all cores of CTs & CVTs shall be earthed at
control/relay panel by a disconnecting link.

5.1.6 Test and Test Reports

The CONTRACTOR will conduct all the routine, type and acceptance tests
as per the relevant standards in the presence of the OWNER /
REPRESENTATIVES. The test certificates will be furnished for OWNER‘s /
ENGINEER‘s review / approval.

If, the typetestsin case of circuit breaker, isolators, current transformers,


voltage transformers, lighting arresters insulators strings, bus post
insulators, control & relay panels and other components of all the main
equipment are already conducted within last 5 years on identical
equipment to the one offered and found to be acceptable, such type tests
will be waived.
In case of hardware such as clamps the temperature rise test material
composition test and mechanical test will be conducted on one sample of
each type even if test reports are already available.

5.1.7 DRAWINGS AND DATA SHAEETS : Data to be furnished during detailed


engineering:
(a) Descriptive Pamphlets / literature of the equipment offered.
Complete Technical data sheets of all switchyard equipments as per
KPCL data sheet A1,A2,B &C
(b) Type test report on equipment identical to the one offered for
a) 400kV Circuit breakers, isolators, CVTs & CTs.
b) 360kV Lightning arresters.
(c) Manufacturer‘s Quality approved plan for all switchyard equipments.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 187
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

(d) The following drawings shall be furnished:

 General outline drawing showing front and side elevation of the


equipments with detailed dimensions.
 Drawings as detailed in individual equipment‘s technical
specification.
 Foundation designs and drawings of equipments including weights
of various components, impact and torsional loading's.
 Detailed designs and drawing of the manufacturer's standard
mounting structures for the equipments and switchyard structures.
 Wiring diagrams showing the control scheme of the equipments
including alarms, indicating devices, instruments, space heaters
etc.
 Dimensional drawing of the Line and Earth side terminals
including the clamps and connectors, Line hardwares, Insulators
etc.,
 Name plate details as per standards.
 Detailed bill of Materials for individual equipments and materials
supplied with the respective drawings of the equipment.
 Instruction manuals for operation and maintenance containing the
part list of the equipments and materials supplied along with
complete drawings.
 Detailed civil drawings indicating foundations of various
equipments, etc.
 General arrangement of the equipments and materials showing the
details of overall dimensions.
 Sectional views showing the general construction features of
equipments including operating mechanism, contacts with lifting
dimensions, etc.
 Typical and recommended schematic, wiring diagrams for controls,
etc.
 General arrangements for the foundations.

5.2 400 kV SWITCHYARD RELAY AND CONTROL PANEL

Switch yard control room of YTPS houses control, relay & metering panels of
Generator-1 and 2, 400KV/11KV Station transformer-1 & 2, 400KV lines ,
Busbar protection panels, SCADA panels and PLCC panels along with control
& monitoring work stations. Control panels houses various controls,
metering, indication, annunciation, synchronising, remote control functions,
mimic diagram, etc.,

5.2.1 SCOPE

One complete set of Relay and control panels, Metering panels, SCADA
panels, including marshaling panels and other panels shall be provided for
the proposed ST-FGD. Bidder shall visit the site and study the existing
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 188
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

system and shall design the scheme so that the proposed equipment is
provided with complete set of control panels, relay panels, protection &
metering system, event recorder, disturbance recorder, Transducers etc., as
applicable. Control, relay & metering panel of the equipment bay shall be
placed in switchyard control room and same shall be hooked up to existing
SCADA.
The New Equipment bay Control & Relay Panels shall consist of the
following.
 One complete set of relay panels.
 One complete set of control & metering panels including Energy meters
and/or multifunction meters on either side of Station Transformer.
 All necessary equipment including PCs, software, analysis software and
any and all other accessories as required shall be included in the
contractor‘s scope.
 SCADA panels consisting of I/O modules, relays, Network panels and
interfacing/ marshaling panel.

5.2.2 DESIGN CRITERIA

A. SWITCHYARD CONTROL PHILOSOPHY.


The broad philosophy of control will be as follows. Details of the scheme
shall be as per the existing scheme .
I. Control from Unit control room:

All analogue and status data is also accessible through the CRT and
along with alarm annunciation details. Closing/synchronising of circuit
breaker of the bay is also through CRT with permissivive from check
synchronising relay dead line charging is also envisaged.For
annunciation of faults/abnormality of switchyard equipment/circuits
through facia, group alarm will be built in the annunciation system
envisaged for the units.Data available in the numerical relays will be
accessible through CRT.

II. Control from Switchyard relay room:


All Switchyard equipments except GT HV CB are controlled from
Switchyard control room only. Dead line charging is envisaged from
Switchyard Control room.The SCADA panels are to be located in the
switchyard relay room along with necessary cabling, and interfacing
equipment. The interface panels between SCADA and new bay is in the
scope of contractor. Operation and accessing of analog and status Data
is also possible through CRT and LVS located in the switch yard relay
room. All relay panels along with hardwired panels for control along with
necessary mimics, control switches, indicating meters, alarm
annunciation, synchronising equipment etc as envisaged will be located
in the relay room. Relay panel should consists of LBB protection in
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 189
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

addition to transformer protection. Independent alarm system with


required no. of points will be provided as part of hardwired back up
panel.

III. Time synchronisation:


All numerical relays, DRs, Fault Recorders, controllers, computers,
networking and communication devices, Energy Meters/ MFMs are to be
synchronized with IRIG-B signal available from station master-clock.

B. SWITCHYARD PROTECTION PHILOSOPHY:


The protections envisaged for each 400 kV switchyard bay are listed
below to be finalized during detailed engineering: The functional
requirements and characteristics of the relays specified are the
minimum required. Any additional protection considered necessary by
the CONTRACTOR will also be provided by him.

I. Busbar Protection Relay Panel:


 Static / Numerical Bus bar protection system for 400KV are envisaged.
 Independent lockout relays & other associated relays for each feeder
scope shall be provided as per scheme requirement.
 Any interfacing unit / device for completing the Bus bar scheme shall
be provided

All wiring including CT wiring for main and check zones & other
cabling to complete & achieve the entire busbar protection system
is in the scope of bidder.

II. Transformer relay panel:


The following protections for the transformer are envisaged. The 11kV
side protections shall be housed in the 11kV switchgear.

i) Phase overcurrent (50 & 51) protection


ii) Station Transformer differential protection
iii) Stuck Breaker protection for the bay.
iv) Restricted earth-fault protection.
v) Back-up overcurrent and earth fault protection (50 +51N).
vi) Over fluxing protection.
vii) Supervision and input relays.
viii) Station Transformer thermal protections i.e., protective devices of
station transformer 63X/49 X for multiplying the contacts for
following protections.
1. For trip function (63X1/49X1)
 Buchholz stage II (63TX)
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 190
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

 Winding temperature very high (49 WTX)


 Oil temperature very high (49 OTX)
 Pressure relief device operated (63 PTX)
 OLTC oil surge relay operated (630LTX)
 Fire protection trip (63 RTPX)
 OLTC Buchholz protection.
2. For annunciation function (63x2/49x2)
 Buchholz stage I (63AX)
 Winding temperature high (49 WAX)
 Oil temperature high (490AX)
 Oil level low (OLAX)
 OLTC oil surge relay operated (63 0LAX)
Besides above, other equipment like auxiliary VTs, CTs, timers, auxiliary
relays etc. shall be provided as required. The protection relays shall be
of integrated numerical relays. If any of the protections are not covered
in the numerical relay or a discrete backup relay is required, separate
discrete numerical / microprocessor / static relay shall be provided.

III. Common Items/protections to be included in relay panels


(i) Local breaker back up protection with protection (50 LBB for
each breaker) if the busbar protection is static.
(ii) Pole discrepancy protection (62), Auxiliary relay for pole
discrepancy protection.
(iii) Trip coil supervision relay for each trip coil (98L1 to L6)
(iv) High speed trip relays
(v) Anti pumping device for breaker closing (94). This protection may
be provided in Breaker marshalling box also.
(vi) Supervision relays for tripping relay (98 LT1 to LTX) to supervise
the coil of each trip relay.
(vii) Auxiliary relays and timers in adequate numbers to make the
protection scheme and discrepancy switch scheme complete.
(viii) Auxiliary CTs and auxiliary VTs as required.
C. DC Distribution Philosophy for Controls, protection, Indication,
Annunciation, Fault-Recording and Event Recording Systems.The DC
distribution scheme in various panels will be prepared based on
following DC distribution philosophy for various functions.

I. Protective Functions
(i) Each 400 kV circuit protection panel shall be provided with two (2)
numbers of 220V DC feeders. Each of above feeder will be fed from
separate section of DC board. Manually operated pole, 3 position,
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 191
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

selector switch with positions called source-I, independent, source


II, will be provided to select any one for Main I protection supply for
that panel and other as main II supply. Each incoming supply
before the selector switch and outgoing supply after the selector
switch will be separately fused and supervised by supply
supervision relays having NC contacts with time delayed drop-off.
Loss of supply will be wired for annunciation & DCS. The selector
switch and the fuses will be mounted inside the panel.

(ii) Similarly, Bus bar protection scheme and indications shall be


provided with two (2) no. of 220V DC supplier through three (3)
position selector switch fused and supervised by supply supervision
relays having time delayed drop off type NC contact. Loss of supply
will be wired for annunciation and DCS indication and annunciation
supplies will be separately fused. The selector switch and fuses, etc.
will also be mounted internally inside the panel.

II. Control Functions

(i) Control circuit of each breaker circuit shall be provided with 2


independent 220V DC control supplies. Each of the above feeders
will be fed from separate section of DC board in loop in loop out
fashion. Manually operated pole, 3 position selector switch for
positions called source I, independent and source II will be used to
selector anyone as closing/synchronizing and trip coil I supplies and
other as trip coil II and auxiliary supply for contact
multiplication/follower relay supplies, etc. Each incoming supply
before selector switch and outgoing supply after selector switch will
be separately fused and supervised by supply supervision relay
having time delayed type ―NC‖ contact. Loss of supply will be wired
for annunciation and DCS.

(ii) One separate 220 V DC indication supply in loop in loop out manner
shall be arranged, Contractor shall provided fuses and supervision
relays etc., and use it for all indications in respective control panels.
The indication supply supervision relay will have time delayed drop
off type NC contractors for annunciation and event recording.

(iii) One separate 220V DC annunciation supply for up to half number of


the control panel will be provided. Remaining half will be supplied
by separate but similar 220V DC supply. The CONTRACTOR will
tap annunciation supply through fuses and after supervision relays
use it for all annunciations in respective panels. The supervision
relay will have time delayed drop off type NC contact for
annunciation, failure of annunciation supply will also be combined
and annunciated on 240V AC operated annunciation system. In turn
the failure of AC annunciation supply will be annunciated in normal
DC operated annunciate. It will all be provided with additional
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 192
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

contacts for event recording and remote annunciation.

5.2.3 GENERAL TECHNICAL REQUIREMENTS

I. The control protection and interlocking scheme suitable for one and half
breaker switching scheme shall be provided. All the auxiliary relays,
timers, switches, hardware, etc., required for the scheme are deemed to be
included in the CONTRACTOR scope.
II. Dead line-live bus closing facilities will be provided. Separate numerical
relays shall be provided for each breaker LBB protection, if the busbar
protection is static.
III. It is envisaged to have control/monitor of switchyard breakers and
isolators for the proposed equipment bays in line with existing system viz.,
Transformers, equipment Bays etc., through DCS from CRT located in Unit
&/OR Switch yard Control Rooms & through hardwired control from
switchyard back up control panel. Control Switches for breaker,
indications, metering, transducers and annunciation shall be provided on
the switchyard control panel. The entire annunciation, status indications,
metering shall be displayed on the CRT. The control panels in switchyard
control room shall have the mimic.
IV. Control and indication shall be provided for each of the breaker and
isolator. Separate Status indication LED lamps shall be provided in
addition to discrepancy type control switches. Synchronizing sockets,
Selector switches for DC Source, LBB IN/OUT, Panel/SCADA, semaphore
indicators for earth switches and spring charged indication shall be
provided on the back up panel, if necessary to be in line with existing
system.
V. Each of the abnormal conditions of each circuit breaker (SF6 Pressure
low/lock out, AC/DC Supply trouble etc.,), each protective relay alarm &
trip condition, DC supply failures, each abnormal condition of the isolator
like drive overload, AC & DC supply failure for a group of two isolators,
warning/trip alarms of AC/DC distribution boards, Battery chargers shall
be annunciated and also display on CRT provided in unit/switch yard
control room. All relay panels except bay marshalling boxes will be located
in switchyard relay room under air-conditioning. Bay marshalling boxes
shall be located in the switchyard.
VI. Required number of dual output transducers shall be provided for the 400
kV indications of electrical parameters related to 400 kV switchyard bays.
The dual output transducers shall be either located in the respective
control panels or in a separate transducer panel.
VII. In the event of shortage of contacts in main circuit breakers, isolators,
earth switch, contact multiplying relays will be used. The same will be two
coil, latching type with electrical reset.
VIII. Bidder shall arrange for interfacing all status monitoring, control, relay and
metering system with SCADA in line with existing philosophy. All necessary
hardware, software shall be compatible with existing communication
protocols.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 193
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

IX. Backup control panels:


Backup control panels are provided as backup to the switchyard
automation system. The backup control panels are vertical type with
painted mimic diagram. The alarm annunciator windows are provided on
the backup panel. The measured values will be displayed in 0.5 accuracy
class digital meters or analog meters of highest accuracy which is to be
finalised during detailed engineering. The GT, STs, Lines will have,
measurement of MW (import and export where applicable), MVAR, 3ph
current and 3ph voltages and power factor. The panel will consist of
breaker control switches, isolator control switches, DC Selector switches,
Panel/SCADA selector switches, LBB IN/OUT switches and semaphore
indicators for earth switch along with indicating lamps. Contact multiplier
relays are provided in the interface panels to multiply the status signals for
switchyard automation system and backup control panels. The FGD
transformer bay equipments shall be hooked up to the existing backup
panel. The meters, alarm annunciators, transducers required for the
panels shall be provided. Bidder shall note down all available facilities that
may be spared for and shall complement the same with required facilities
to make the entire scope a complete package in all respects.
X. 400 kV switchyard system (One and half breaker scheme) switchyard
system with all the switchyard equipment, CT cores, protection system etc.,
shall be shown in the single line diagram during detailed engineering
XI. All the protective relays, auxiliary relays, timers, etc., for protection system
of bay shall be housed in simplex type of relay panels meant for
switchyard bay.
XII. Relay setting calculations shall be furnished by the CONTRACTOR to prove
suitability of the offered relays.
XIII. The Numerical relays shall be networked to a PC through their rear ports
with printer facility. It shall be possible to monitor all data, carry out relay
settings, View and record disturbances from the in built disturbance
recorder, trending, alarm etc.,
XIV. The Numerical relay shall have sufficient number of input /output ports for
monitoring and tripping. The numerical relays shall have suitable
communication protocol to match with plant DCS and SCADA system.
These relays are being networked and interfaced with plant DCS using
protocol converters.
XV. All hardware, auxiliary relays, timers etc. required for tripping/interlock
schemes will be provided by the CONTRACTOR.
XVI. Energy meters - Microprocessor based, 0.2s class with optical port with
MRI will be provided for station transformer, (with CT & PT reference on
HV side) and Main & Check bi - directional energy meters for lines ). The
energy meters will be mounted in separate energy meter panel and to be
located in switchyard relay room. Energy meters shall be of 3 phase 4 wire
type. The energy meters shall be ABT compliant. Meters shall be provided
with test terminal blocks and shall be suitable for the measurement of
unbalanced loads. Energy meters provided in the panels are networked
through rear port along with PC, printer with necessary metering software
for monitoring of energy and other electrical data. Energy meters in Unit
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 194
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

control room shall be networked with switch yard energy meters. It is


preferable to provide same model and make of EM as those provided in
switchyard and networked to EMS software. The meter shall be networked
to the existing system.

XVII. The protection system shall comprise pre-engineered modular or discrete


self-contained system comprising protection relays of numerical type. In
addition to the relays/protections mentioned in this contract, any
additional protections/relays considered necessary by the CONTRACTOR
for his system shall be included and offered by the CONTRACTOR and
same is subject to approval by OWNER without commercial / delivery
implications.
XVIII. Two Nos. DC supply shall be arranged for the Panels. These supplies shall
be taken through a selector switch with the positions, viz., Independent,
source-1 & source-2. In the Independent position Group-1 & 2 protection
system will be fed by source 1 & 2 respectively and the common services
from any one of the sources. In case of failure of any one source (say
source 1) switch shall be changed over to the other source (source 2) and
complete DC supply requirement of GRP will be fed from the other source.
DC auxiliary supply shall be supervised by supply supervising relays. The
NC contact of the relays shall be delayed on drop off by approximately 100
to 200 msec. for annunciation in CRT/electrical control panel. The relay
shall be provided with flag indicators wherever required. White colour
supervision lamps of clustered LED type shall be provided.
XIX. The relay panels shall be provided with supervisory system facilities to
indicate the location of the failed component when pre-engineered
protection system is offered. On-line testing facility ‗In-Built‘ in the relay
panel shall be provided.
XX. Either hand reset mechanically operated operation indicator or LED with
reset push button shall be provided for protective relays. They shall be
arranged to operate only when tripping current passes through output
circuit of the relay.
XXI. Fault Disturbance Recorder: 1(one) number microprocessor based fault
disturbance recorder which is designed to analyse the disturbance due to
faults in the switchyard, shall provided for the plant for each circuit. The
equipment shall be complete with disturbance recorder, printer unit,
control / display unit, junction box and accessories like auxiliary CTs and
shunts. All fault recorders shall be mounted on one panel.
XXII. A dual output transducers shall be provided in Transducer Panel as per
scheme requirement.
XXIII. Synchronising Scheme
Each panel shall be provided with plug sockets to connect the
synchronising trolley. The plugs shall have adequate number of heavy duty
pins to cater to all synchronising scheme requirements. All AC circuits, DC
Power supply circuits, synchronising permissive contacts etc., shall be
wired to the socket to enable synchronising once the socket of the trolley is
plugged in.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 195
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

It shall be possible to close the Circuit breaker when all the synchronising
conditions are met.
XXIV. Sequence of events recording System (SER)
The SER system shall be a part of DCS (SCADA) system. All major events
of the proposed scheme at switchyard shall be hooked up to existing event
recorder.
XXV. In addition to the contact required as per schemes, CONTRACTOR shall
wire out to the terminal block atleast one NO & one NC spare contacts of
each of the relays.
XXVI. The protection scheme shall include all the necessary contacts to achieve
the schemes required, alarms in CRT, annunciation windows, sequence
event recorder and for switchyard control panel annunciation wherever
required. Contact multiplication relays for 400 kV circuit breakers and
associated isolators shall be provided for this purpose.
XXVII. The following are the requirements
(a) The panels will have a degree of protection not less than IP-51 and will
be fabricated with 3 mm thick cold rolled sheet steel for front and rear
equipment bearing surfaces and 2.5 mm for sides top and bottom
portions. The doors and removable covers will be gasketted. The panels
will be provided with anti-vibration pads.
(b) The pre-treatment of the sheet steel will involve degreasing rust / scale
removal, phosphating and oven drying. The phosphate coating will be
sealed by the application of two coats of ready mixed, stoving type zinc
chromate primer followed by two coats of synthetic enamel paint.
(c) All the equipment on the front of panel will be flush mounted.
(d) The centre line of switches, push buttons and indicating lamps shall be
not less than 750 mm and centre line of relays, meters shall not be less
than 450 mm from the bottom of the panel. Control switches/push
buttons/selectors and relay resetting knobs shall be located at a height
between 1m and 1.2 m from the bottom of the panel.
(e) No auxiliary relay will be mounted on front of the control panel. They
will be mounted either internally or on the respective relay panel, or on
back panel.
(f) Mimic diagrams of size not less than 7 mm in width will be provided.
The colour of the mimic will be finalised during the detailed engineering
stage and the same is subject to owner‘s approval.
(g) Visual and audible type annunciators will be provided on the unit
control panel.
(h)All the wiring will be carried out with 1100V grade stranded copper
conductor wires with PVC insulation. For CT / PT circuits the wire size
will be 4 mm2 colour coded and other circuits it will be 2.5 mm2. All
wiring meant for power supply to transducers, recorders will be suitably
fused or designed to limit short circuit currents. Means for detection of
blown or open circuited fuses will be provided.
(i) Terminal blocks will be 650V grade, 10 amps rated, stud type terminals
with terminal marking. The insulation between any two terminals and
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 196
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

terminal to framework will withstand 2 kV rms for one minute.


Terminal blocks for CT & VT secondary leads will be disconnectable,
stud type. CT secondary leads will also be provided with short
circulating and earthing facility. A clearance of 250 mm will be
maintained between terminal blocks and gland plate and 150 mm
between two rows of terminal blocks. At least 20% spare terminals will
be provided.
(j) The metering instruments for indication shall have accuracy class 0.5
(k) Instrument selector switches will be of the stay put type. Ammeter
selector switch will have make before-break type contacts.
(n) All indicating lamps will be of clustered LED type.
(o) All the push buttons will be momentary contact type, the colour of PBs
for various functions will be decided later. Push buttons will be suitably
shrouded to prevent inadvertent operation. All PBs will have 2 NO + 2
NC contacts.
(p) Each of the control & relay Panels-controlled space heaters, cubicle
illuminating lamps and a 5A, 3 pin receptacle.
(q) The Panel will be provided with necessary arrangement for receiving,
distributing, isolating and fusing of D.C. and A.C. supplies for various
control, signaling, lighting and space heater circuits.
(r) If miniature circuit breakers (MCBs) are used in VT secondary circuits,
they will have adequate auxiliary contacts for blocking trip circuits of
voltage dependent protection and annunciation. Where high speed
protection is involved, the speed of operation of MCB will be less than 5
milli seconds.
(s) All the panels will be equipped with a continuous earth bus with
connectors and clamps between panels for interpanel connection of the
earth bus. All the metallic cases of relays, instruments and other panel-
mounted equipments will be connected to the earth bus by 2.5 sq.mm
copper wires. CT and PT secondary neutral or common lead will be
earthed at one point only at the terminal block and such earthing will be
made through links. Separate copper earthing flat will be provided in
the panel for cable screens of static equipment.
(t) All PT circuits will be provided with HRC fuses having special holders
such that they cannot be interchanged with other types of fuse holders
and other fuse holders cannot be introduced within them.
(u) Back up control panel shall house various controls, metering, indication
and annunciation, synchronising and mimic diagram. Mimic diagram
on the control panel will be true replica of complete electrical system viz.
Generator transformers, station transformer & Inter connecting
transformer Panels shall be flush mounted type. All energy meters will
be mounted on separate common energy meter panel(s), which will be of
flush mounted type. MW, MVAR meter & required no. of window
annunciator will also be provided on back up control panel. The OLTC
controls unit for inter connecting transformer will be located in
respective control panels.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 197
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

5.2.4 TESTS:The CONTRACTOR shall submit QAP for all the routine tests, which
shall be carried out by him.

(i) Control and relay panels will be subject to the following tests :
 Mechanical operation test
 High voltage test (2000V for 1 minute)
 Megger test
 Verification of wiring as per approved drawings
 Electrical control. Interlock and sequential operation tests

(ii) Type tests and routine tests:


Regarding Type tests and routine tests to be carried out on all
associated components / equipment as per relevant standards, the
same will be decided during detail engineering.
(iii) Acceptance Tests
 The equipment will be demonstrated for proper operation,
including operation of meters, alarms and indications.
 Certified copies of all type and routine test certificate will be
submitted for the owner‘s approval before dispatching the
control / relay panel.

5.2.5 DRAWINGS AND DATA


Data to be furnished during detailed engineering

(a) Detailed description of the relay panel construction


(b) Descriptive literature/pamphlets on each relay, aux. relay timers etc.
giving details of principles of operation.
(c) Main one line diagram, diagram showing CVTs, CTs connected meters,
relays with parameters of equipment
(d) Typical calculation for CT/CVT parameter selection
(e) Technical particulars of the equipment.
(f) Detailed scheme on protection system with complete logic.
(g) Relay settings adopted, criteria for relay range selection and setting
calculations.
(h) Design calculation for CT/PT

5.3 STATION TRANSFORMER


One number of station transformer(ST-FGD) shall be provided and they shall
be sized as described under:
The station transformer shall be 400/11.5-11.5 kV, Four winding, ONAN /
ONAF / OFAF cooled transformer, with each of the two LV windings of ST is
connected to its respective 11kV station switchboard. On load tap changer in
steps of 1.25% shall be provided. 11kV system shall be suitable for medium
resistance earthing with fault current being limited to full load current of 300
amps.

5.3.1 DESIGN CRETERIA


VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 198
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

a) IMPEDANCE
The impedance of the transformers shall be selected keeping in view the
short circuit level of the 11kV switchgear and the voltage dip at motor
terminals not exceeding the limits specified elsewhere in the bid
specification.
b) SIZING
It will be the responsibility of the contractor to adequately size the
transformers to cater for all the auxiliaries of the main equipment,
mechanical systems and loads due to lighting, A/C & ventilation system,
battery charger, cranes, street lighting, plug points and all other loads
and based on the ambient temperature. The basis given below is the
minimum requirement. In case during the operation of plant it is found
that the rating selected is not adequate due to incorrect load
assumptions or due to any other reason, it will be Contractor‘s
responsibility to replace the transformer and associated switchgear and
breakers.
The sizing criteria for Transformers shall be as follows :

(i) The transformer is sized to meet 100% of the unit corresponding to FGD
auxiliaries required for unit1&2 MCR operation and connected to the
11kV bus fed from it. 10% margin is added to this requirement to arrive
at the final rating.

(ii) In addition to the above, MVA rating & impedance of transformers, shall
be chosen such that the largest motor can be started with connected load
under MCR operation.

(iii) Additionally a margin of 10% over the MVA arrived shall be provided for
variations of the loads.
Due consideration shall be given for the reduction in nameplate MVA
capacity due to regulations.

5.3.2 CODES AND STANDARDS


1 Power Transformer IS:2026 IEC:76
2 Fittings and Accessories IS:3639
3 Climate Proofing IS:3202
4 Loading of Oil immersed transformers IS:6600
5 Oil IS:335
6 Bushings >1000V AC IS:2099
7 Degree of Protection IS:2147
8 Tests IS:2026
9 Tolerance on guarantee IS:2026
10 Buchholz Relay IS:3637
11 Electrical insulation classified by thermal IS:1271
stability
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 199
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

12 Distribution Transformer IS:1180


13 Bushings <1000V AC IS:7421

NOTES: Equipment, accessories, components/parts, raw materials and tests shall


in general conform to IS.

5.3.3 GENERAL TECHNICAL REQUIREMENTS


i) The transformer shall be provided with on-line dissolved gas analyser
(hydrogen and water content,H2,C2H2,C2H4,c2H6 etc) to monitor dissolved
gases and water content and the same shall be complete in all respects
including software, hardware etc. including spares and accessories.
ii) 10% extra transformer oil shall be supplied for each transformer in sealed
non-returnable drums.
iii) Cooling equipment
(a) The station transformer shall be provided with 2 nos. 60% detachable
built on radiator banks and if it is not possible to have built on radiator
banks, the same can be separately mounted. Each bank shall be
provided with adequate number of fans, two oil pumps (one in service
and other stand-by). Each radiator bank shall be provided with uni-
directional bypass valve to permit oil to bypass the pump in the event of
pump fail,it shall be possible to completely isolate any one of the radiator
banks for maintenance, while the transformer is in service.

(b) Cooling equipment to include cooler control cabinets - both local and
remote, with all necessary equipment like indicators, annunciators etc.

(c) Flexible expansion joints, one each, on top and bottom pipe connections
for each radiator bank shall be provided.

(d) Each radiator to have top most vent and bottom most drain plugs &
bracings between radiators.
iv)OPERATION/ALARMS IN CONTROL ROOM
a. The transformers shall be provided with top oil and winding temperature
indicators. Repeater for winding temperature of each winding and oil
temperatures with recorders shall be provided in the control desk.
b. All the alarms and trip conditions of the transformers shall be
individually indicated in the CRT and common alarms/trips of
transformer shall be suitably grouped and annunciated in control desk.
c. MOG Magnetic Oil Level Gauge with alarm contacts
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 200
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

v) GAS AND OIL ACTUATED RELAY (BUCHHOLZ RELAY)


A double float type Buchholz relay as per specified standard shall be
provided. All the gas evolved in the transformer shall collect in this relay.
The relay shall be provided with a test cock suitable for a flexible pipe
connection for checking it‘s operation. A 5 mm copper pipe shall be
connected from the relay test cock to a valve located about 1.25M above
ground level to facilitate sampling with the transformer in service. The
device shall be provided with two electrically independent ungrounded
contacts, one for alarm on gas accumulation and the other for tripping on
sudden rise of pressure. The contacts shall be wired upto the
transformer marshalling box. The relay shall be provided with shut-off
valves on the conservator side as well as the tank side.

vi) Tap changers


(a) The station transformers shall be provided with OLTC ± 10% in steps
of 1.25% on HV side. This shall be operable from ground level through
a lockable operating handle. Suitable mechanical tap position
indicator shall also be provided.

(b) The 400/11.5kv/11.5KV transformer shall be provided with on load


tap changers (OLTC).
vii) Neutral earthing
(a) Transformer neutral shall be earthed complying with the requirement
specified under section 5.0
(b) The transformers shall comply with the particulars indicated in the
table below and contractor shall comply and fill the called data in the
respective column.
(c) The type of earthing to be adopted for each transformer winding shall
be as per single line diagrams. The transformers shall be suitably
designed.
viii) Insulating oil
The insulating oil for Transformer shall comply with requirement as
specified
(a) EHV grade mineral transformer oil generally conforming to IEC
60296& in accordance with the specification in non returnable fresh
mild steel barrels of 210 litres capacity made out of 18 SWG MS sheet
coated from inside with Epoxy/phosphate resistant to insulating oil
and sealed perfectly with ISI marks.

(b) The transformer oil to be supplied shall be low viscosity type, pure
hydrocarbon mineral oil, without any additive, clean and free from
moisture or other foreign matter and shall conform generally to the
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 201
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

provisions of IEC 60296 and the specific requirements specified in the


schedule of characteristics indicated below:

Sl. TEST
CHARACTERISTICS SPECIFICATION
No. METHODS
Clear, free from
1 Appearance IEC: 296 sediment &
suspended matter
2 Density @ 200 C Kg/cm3 ISO: 3675 ---
Density @ 29.50C Kg/cm3 --- 0.820 - 0.895
3 Kinematic Viscosity, mm2/s
@400C 11.0 Max
@270C ISO: 3014 16.0 Max
@ -300C 1800Max
4 Flash point (PMCC) 0C ISO: 2719 140 Min.
5 Pour Point 0C ISO: 3016 - 30 Max
Interfacial Tension,
6 ISO: 6295 0.04
N/m @ 250C
Neutralisation Value,
7 IEC: 296 0.03 Max
mg KOH/gm
8 Corrosive Sulphur ISO: 5662 Non corrosive
Electric Strength
9 (Breakdown Voltage) KV
rms
a. As received 30KV rms Min.
(New unfiltered oil) (Before filteration)
IEC: 156
60KV rms Min.
b. After filtration
(After filteration)
10 Resistivity
@270C 2500 x 1012
IEC: 247
@900C 150 x 1012
11 Dielectric dissipation factor
[Tan delta] 900C 0.002 Max
IEC: 247
[Tan delta] 270C 0.0005
12 Antioxidant additives IEC: 666 Not Detectable
13 Water content, ppm IEC: 733 40 Max.
Oxidation stability
14
(164 hours) @ 1000C
a. Neutralisation value, mg
0.15 Max
KOH/gm IEC: 74
b. Sludge content % by 0.03 Max
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 202
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

mass
c. Tan Delta @ 900C 0.1 Max
15 S.K. value % V/V --- 4 Max
16 Aromatic Content FTIR 4-8
Accelerated Ageing Test
17
(Open beaker Method)
a. Sp.Resistance (Resistivity)
IEC: 247 25 x 1012 Min
ohm cm @ 270C
b. Sp.Resistance (Resistivity)
IEC: 247 2 x 1012 Min
ohm cm @ 900C
c. Dielectric Dissipation
IEC: 247 0.1 Max
factor @ 900C
d. Total Acidity mg KOH/gm IEC: 296 0.05 Max
e. Total Sludge weight % --- 0.05 Max
18 Ring Analysis Ca, Cp, Cn FTIR ---

a. TESTS AT SITE
In addition to the test carried out at works, the purchaser will draw samples
from each batch delivered at site and get the same tested in recognized
laboratory like CPRI, Bangalore. The cost of oil testing shall be borne by the
Contractor. The same may be noted by the bidder. In case the test results
of samples collected at site are not conforming to the values specified in the
bid/contract, the entire quantity of the oil supplied will be rejected. It shall
be contractor's responsibility to take back the rejected oil from site at his
cost and to replace the rejected oil free of charges at site with the oil strictly
conforming bid/contract specifications.
b. PACKING
The oil shall be delivered in perfectly clean, fresh, non returnable steel
drums of 210 litres nominal capacity conforming to type-A or type-B of
IS:1783. Minimum 18 guage sheet shall be used for oil drums. The drums
shall be coated from inside with suitable coating (like epoxy lacquere and
phosphate) resistant to insulating oil. The outside surface of the drum shall
be coated with suitable primer and finishing paint or hot dip galvanised
according to IS 4759 for protection against atmospheric corrosion. The
drums shall be effectively sealed immediately after filling the oil to prevent
ingress of moisture.
c. SAMPLING
Sampling of the oil shall be done in accordance with IS: 6855
d. MARKING
Each drum shall be indelibly marked with the following:
i) Manufacturer's name or trade mark
ii) Quantity in litres.
iii) Name of the material
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 203
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

iv) The words `low viscosity type' and


v) Identification in code or otherwise to enable the date and lot of
manufacture to be traced back to the factory records.

ix) ELECTRICAL PERFORMANCE


a Transformers shall operate without injurious heating at the rated MVA
at any voltage within +10 percent of the rated voltage of that particular
tap continuously.
b The transformer shall be capable of remaining in operation without
injurious heating when forced cooling has failed at full load for at least
10 minutes.
c Transformers shall be capable of withstanding the mechanical and
thermal effects of short circuit resulting from different forms of system
faults, including transfer surges, which could be reflected through
capacitor coupling between windings. The ability to withstand dynamic
short circuit shall be shall be provided by the Contractor by calculation
and similar type test reports shall be provided
d Air core reactance of HV winding shall not be less than 20 percent.
e The transformer shall be rated to deliver rated MVA continuously even
at the lowest tap without exceeding specified temperature rise under
site conditions.
f Transformer shall be able to withstand 1.4 times the rated voltage for 5
seconds and 1.25 times for 1 minute at the transformer terminals to
which the generator is to be connected.
g The transformer shall be rated to withstand for 3 seconds the fault
levels indicated.

5.3.4 TECHNICAL PARTICULARS

The transformers shall comply with the particulars indicated below and
CONTRACTOR shall furnish the details in respective column given below :

SL.
CONTRACTOR’S
NO. DESCRIPTION UNIT REQUIREMENTS
DATA

Station Transformer ST ST
400 kV 400
kV
1.0 Type & make As per
drawing
2.0 Applicable standard I IS 2026
3.0 Quantity *
4.0 Full load rating MVA *
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 204
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

5.0 Rating no load voltage kV


*
HV/LV
6.0 Rating of different
cooling methods
*
ONAN / ONAF
7.0 Impedance value % *
8.0 Rated frequency Hz 50
9.0 Winding connection of Ynynyn0d1
different windings and
vector group
10.0 System earthing
(a) HV (400kV side)
Solidly

LV 11kV side)
Medium
Resistance
11.0 Type of tap changer off On load
circuit/on load
12.0 Tapping range and As per specification
number of steps
13.0 Full power tapping Yes/ Required
provided No
14.0 Type of voltage CFVV
variation
(CFVV/VFVV/CbVV)
15.0 Over fluxing capability 110% cont.
125% for 1
minute
140% for 5
second
16.0 Winding insulation
type uniformly or non-
uniformly insulated
16.1 HV Non-
Uniform
16.2 LV Uniform /
Non
Uniform
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 205
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

17.0 Impulse withstand kVp HV(LI/SI)14


voltage of winding 25/1050 /
HV/LV LV1/LV2
(LI) 75*
18.0 Power frequency kV/r HVN-38
withstand voltage of ms
winding HV/LV1/LV2/ PD AT 364
HV neutral kV

19.0 Maximum temperature


rise at full load with
100% coolers : oC 50
(a) Oil oC 55
(b) Winding

20.0 Bushing particulars.


20.1 Applicable standard for IS 2099
bushing
20.2 Clearance in air mm HV-2850 (P-
HV/LV/neutral P)(P-E) LV1-
(between phases and 127 (P-P)(P-
phase to earth) E) LV2-127,
HVN-320

20.3 Quantity of oil in oil litre *


filled bushing
20.4 Creepage distance mm/ 31 for HV
kV and 25 for
balance
21.0 No load loss kW *
22.0 Load loss kW *
23.0 Cooler loss kW *
24.0 Efficiency
(a) At full load % *
(b) At 75% load % *
25.0 No load current A *
26.0 Total estimated weight Kgs *
27.0 OLTC
27.1 Make *
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 206
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

27.2 Rated Voltage Volts *


27.3 Rated Current Amps *
27.4 No. of steps
27.5 Step Voltage Volts *
27.6 Time of operation from Sec.
one step to other for *
Auto / manual mode
28.0 Type of axial and radial
coil supports for *
HV/LV
29.0 No. of cooler banks and
capacity of each cooler
bank
30.0 Guaranteed No load
current
When excited from LV Amps
side at 100% and *
110% rated voltage
31.0 Max. Flux density Wb/
when rated and 110% m2 *
rated voltage

32.0 Vacuum withstand mm


capability main tank, of Hg
*
radiators and
accessories
33.0 Weight
33.1 Core kg *
33.2 Net copper wt. HV/LV kg *
33.3 Oil kg *
33.4 Tank, coolers & kg
*
fittings
33.5 Total kg *
33.6 Untanking weight kg *
34.0 Cooling fans rating kW *
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 207
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

35.0 Capability of minut


transformer to remain es
in operation from hot
*
conditions after failure
of forced cooling with
full load
36.0 Core insulation kV 2

NOTE: ‗*‘ CONTRACTOR shall furnish these details during detailed engineering
5.3.5 FIRE FIGHTING SYSTEM
1. SCOPE:
This Specification covers the requirements of High Velocity Water Spray
System required for Transformer under the Scope as per TAC / BIS
requirement.
2. CODES AND STANDARDS
The design and installation of complete fire protection system shall comply
with regulations of Tariff Advisory Committee (TAC) of India. In the absence
of TAC regulations, NFPA - National Fire Protection Association / VdS shall
be followed

3. DESIGN REQUIREMENTS
The makes/models and technical features offered for various components/
equipment shall comply with the standards of TAC/ BIS/ UL/ Vds and FM
/ NFPA as applicable.

4. HIGH VELOCITY WATER SPRAY SYSTEM (HVWS)


a. Automatic High velocity water spray system (HVWS) shall be provided for
the Transformer. The water required for this system shall be tapped from
the existing header of HVWS system. The required modification shall be
done without affecting the existing system. The bidder shall make site
visits, ascertain the existing system and assess the requirement for the
present scope before submitting the offer.
b. The location of wet pilot type deluge valve shall be kept away from the
equipment to be protected. The water supply to the HVW spray system is
controlled by deluge valve which shall be operated hydraulically and this
valve normally closed by water pressure. The water pipe forms a ring
around the equipment to be protected and frangible bulb type detectors
are mounted on this water line at selected places as per TAC norms.
When the surrounding temperature rises more than the rated
temperature of the detector, the detector quartzoid bulb collapses and
consequently the pressure in water line falls sharply. This fall of pressure
opens the deluge valve and water starts projecting out from the
projectors. Local audible alarm is produced by water motor gong. Remote
/ manual actuation push button units shall also be provided for the
deluge valve.
c. Suitable detectors shall be provided for the transformer for initiation of
HVWS system manually. Fast acting butterfly valves shall be provided at
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 208
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

the downstream of the deluge valve, so that the butterfly valve can be
kept closed and operated manually in the event of fire, if there is any
malfunction of deluge valve., At the upstream of deluge valve, gate valve
shall be provided. Further fast acting butterfly bypass valve to deluge
valve shall also be provided.
d. All the materials used in the manufacture of system shall be of high
grade, design and workmanship so as to ensure satisfactory operation of
the plant in the tropics under humid and dusty condition. The entire
system shall be in accordance with standard practice.
e. The design, manufacture, testing, performance etc., of the various
components of the firefighting system shall comply with all currently
applicable statutory regulations and safety codes in the locality where the
equipment shall be installed.
Compliance for all items hereinafter described with all currently
applicable statutory regulation and safety codes applicable in the locality
where the equipment is to be installed as mandatory. The system as well
as individual items shall in particular comply with regulations of the
Tariff Advisory Committee.
f. All the piping shall be painted/necessary protection given wherever
necessary in accordance with the regulation of TAC.
g. The type of Projectors selected and the piping arrangement around the
equipment shall ensure the discharge of water in the form of an
expanding cone of evenly distributed broken stream which would strike
the burning surface and the transformer /power cable with sufficient
impact to form an emulsion to ensure extinguishing of fire within a few
seconds. . The minimum density of application of water spray shall be
10.20 L.P.M/m2 / of projected area and not less than 6.1 L.P.M/m2 for
the facing ground surface area. The minimum serving water pressure at
any projection/spray nozzle shall not be less than 3.5 kg/m2
h. The number, size, type of projectors, location, design shall be in line with
the requirements of FOC London/TAC /Underwriters Lab/Fire
Manual/TAC regulation etc., The contractor should furnish all technical
characteristics, coverage areas, discharge pattern etc., of the projectors
offered. Detailed design calculations for the entire system shall be
furnished for the information.
i. The impulse for the automatic opening of the control valve (deluge valve)
controlling the water spray and operation of the system should be given
by bulb type thermal detectors rated to fuse at a temperature of 175oF
(71oc) but not later at the occurrence of fire. The detectors shall be of the
type approved by FOC/UL/FM/TAC & shall be mounted on separate pipe
work system around the transformer.
j. The detectors shall also be provided around the base of the inter
connecting Transformer to detect fire at low level. In short, the detectors
shall be distributed all around the interconnecting transformer at all
vulnerable points so that one or more of them will be affected by the heat
from the burning oil irrespective of the direction of wind. The bidder
should indicate the relevant IS or BS or any other approved code of
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 209
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

practice to which they conform to and furnish the necessary certificate in


support of the same.
k. The scope of supply shall include suitable size of FOC/UL/FM/TAC
approved automatically operated control valve assembly (deluge valve).
l. In the event of fire causing one or more of the detectors to operate, the
deluge valve shall come into operation automatically and bring the
connected water spray projectors into operation. The necessary drain
connections for testing the control valves shall be provided. The deluge
valve shall be capable of being operated electrically by a push button for
testing the water spray system periodically.
m. Necessary provision shall be made for automatic operation of water spray
system for transformer in case it is decided to make the system operate
from transformer Bucholz and overall differential protection relays.
n. Manual Operation: The water spray system shall operate both
automatically as well as manually from a point located near the
transformer. For this purpose, required number of solenoid valve with
push buttons etc. shall be provided. The manual operation of the water
spray system shall be possible with 220 + 10% D.C. supply from the
station battery & also by opening a drain valve provided for the purpose
manually.
o. Alarm: Both hydraulically and electrically operated alarm system shall be
provided to work automatically in the event of fire. mulsifyre system
shall be provided with an alarm and gong at suitable location in the
vicinity of the plant protected. The hydraulically operated gong shall be
connected to the installation to give audible alarm in the event of fire in
the protected section of premises.
p. The system should be such that firefighting system can be operated and
the water can be discharged on the live transformer without damage to
the equipment or risk to the personnel.
q. All the required pipes, valves, fittings, pipe supports/projectors,
detectors etc., are included under the scope of this supply and shall be
supplied and installed by the successful bidder

5. LAYOUT REQUIREMENTS
The layout shall be strictly in compliance with TAC especially with regard
to clearances
6. DETAILS TO BE FURNISHED BY THE BIDDER AFTER AWARD OF
CONTRACT
a) Details of HVWS system for transformers.
b) Schematic for Hydrant and High Velocity water spray systems.
FIRE PROTECTION SYSTEM

DATA SHEET – A

SL.NO ITEMS UNITS VALUES


.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 210
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

1.0 HVWS SYSTEM


1.1 Equipment to be transformer
protected
1.2 Design code - TAC / NFPA – 15

1.3 Deluge valve - Wet pilot valve. Limit switches shall


be provided for upstream &
downstream isolation valves.

2.0 PIPES
2.1 Underground piping
a) Material MS
b) Standard (Pipes) IS 3589/ IS 1239 Part – I
c) Standard (Fitting) IS 1239 part II for fittings NB 150 &
below & Fabricated from parent
pipes for NB 200 & above
d) Type of joints Welded
e) Type of protection IS 10221/ IS 15337-2003
f) Class Medium (pipes NB 200 mm & above
shall have thickness of 6.35 mm.
2.2 Above ground piping

a) Material GI for spray system after deluge


valve / MS for other system
b) Standard (Pipes) IS 1239/ IS 3589
c) Standard (Fitting) IS 1239 part II/ TAC
d) Class Medium
Note : pipes NB 200 mm & above
shall have thickness of 6.35 mm.
Note : 1)Pipes shall be hydro tested at 1.5 times the pump shut-off head or
twice the design head, whichever is higher.

5.3.6 TESTS
In addition to all type tests and special test (excluding SC test) as per
IS 2026 (revision as applicable) following tests shall be conducted on
one transformer.
(a) Heat run test, dissolved gas analysis before and after
(b) Vacuum withstand and deflection measurement on tank
(c) Pressure test on tank with deflection measurement
(d) Determination of cooler losses
(e) Partial discharge test
(f) Short circuit impedance of each limb with single phase voltage from
each HV & LV sides.
(g) Auxiliary power measurement.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 211
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019

All routine tests as per IS : 2026 and the tests listed below on each of
the transformer shall be conducted.

(h) No load loss and exciting current at 415V from LV side and at 90%,
100% & 110% of rated voltage before and after dielectric tests.
(i) Oil leakage test – 12 hours
(j) Magnetic balance test
(k) Measurement of tan delta and capacitance of each winding
(l) Impulse on all single phase transformer of HV & LV windings
including chopped wave tests.
(m) Load loss and % impedance at all taps.
(n) FRA test.
(o) Any other routine tests not listed above but required as per IS.

5.3.7 SPARES
One set of spares for each rating of transformers shall be provided as
recommended by OEM.
5.3.8 MAKE OF TRANSFORMERS & COMPONENTS
The bidder shall indicate the proposed makes of various bought out
components in the technical bidding schedule. However, this shall not be
bindings on the purchaser, final make shall be approved by the purchaser/
consultant during detailed engineering to satisfy the specification requirement.

5.3.9 Data to be furnished during detailed engineering


(a) Technical particulars for each of the transformer as per the table indicated
above
(b) Calculations for deciding the transformers MVA rating and the impedance
including calculations and study for fault levels and voltage dips and drops

5.4 11kV SWITCHGEARS


All 11kV switchgears shall meet the following minimum requirements:
a) Incomers from all the switchgear shall be provided with Draw out Type Line
PT in separate draw out cubicle.
b) Each bus section of the 11 kV HT switchgear shall be provided with Draw
out type Bus PT.
c) In each bus section of the 11 kV switchgear at least one spare feeder shall
be provided for highest and lowest rating motors and one spare feeder for
largest rating Service transformer.

5.4.1 Design Criteria:

a) Short Circuit Ratings

The short circuit and short time ratings of HV switchgear including, circuit
breakers, earth switch, bus bars etc. shall not be less than the values
mentioned in Electrical single line diagram. The short circuit & short time
levels shall be calculated by considering short circuit current contribution

You might also like