Bidder shall visit the site and study in detail to enumerate the structures,
equipments/panels already available and can be utilized for the proposed FGD
system. Bidder shall ensure that all necessary equipments required for
completion of system for smooth trouble free operation and maintenance after
integrating to the existing system.
5.1.1 SCOPE
All switchyard equipments to be supplied by the bidder shall be similar rating as
of existing switchyard system.
The ST-FGD equipment bay shall be supplied and installed with all accessories to
make the switchyard complete in all respects. ST-FGD equipment bay shall
consists of but not limited the following:
(c) Clearances: In line with the recommended insulation levels above, the
following minimum clearances are proposed for 400 kV.
400 kV
(i) Phase to Phase 4100 mm
(ii) Phase to earth 3500 mm
(iii) Live part to ground 8000 mm
(iv) Section clearance 6500 mm
All clearances shall be as per IS / IEC standards.
i Circuit breakers,
ii Bus post insulators, isolators and lightning Arresters
iii Insulator strings and transformer bushings
iv Current and voltage Transformers
ii Bus Post Insulators: Bus post shall be solid core/post insulator anti
fog type and shall be selected based on the system voltage, insulation
level, mechanical strength and pollution level requirements and as
per relevant standards.
(h) The power conductor termination shall not be tapped off directly to the
transformer from the switchyard gantry. The tap-off conductor shall be
routed through a tower and gantry arrangement near the transformer.
(i) For the layout proposed by the CONTRACTOR the adequacy of the
cantilever strength specified shall be checked considering the following
factors of safety:
i Sum of all permanent normal loads (wind load on tubular bus + wind
load on stack + dead weight of the tubes) = 2.5.
ii Combination of all normal loads plus either short circuit or
earthquake load whichever is higher = 1.
(j) The switchyard shall be designed for the seismic coefficient and wind
pressures as indicated elsewhere.
(k) Design criteria for civil works and structures shall be in conformity with
relevant standards.
c. The CONTRACTOR shall adopt bolted type connectors for tubular bus
conductors, fixed type of terminal connectors for isolator terminals,
flexible type of terminal connectors for circuit breakers, current
transformers and power transformers and flexible jumper connectors for
connecting lightning arrestors and voltage transformers.
d. The Contractor shall provide bolted type TEE connectors in the switch
yard to the extent possible. The specific areas for such type of clamps and
connectors are to be used shall be finalised during detailed Engineering.
e. The switchyard shall be provided with access way for movement of crane
for attending to major equipments like current transformers, isolators,
Lightning arrestors, marshalling boxes, CVTs, and circuit breakers etc.
f. The cable trenches for the equipment shall run as close as possible to
their foundations.
g. The switchyard equipment shall be suitable for outdoor installation and
shall have tropical and fungicidal treatment. The design ambient
temperature shall be 50ºC.
h. The design criteria, quantity and type of ODY equipments have to be met
with requirements and in line with the specification.
i. The system and equipments shall have to meet the requirement in respect
of environmental condition, system parameters etc as per specification. All
civil works, obtaining all clearances and licences as per statutory
requirements and TAC / LPA for fire fighting equipments etc are in
contractor‘s scope.
(a) 420 KV, 3150A, 50KA for 1 sec (for 400 KV) SF6 spring operated type
and outdoor circuit breakers shall be provided as per IEC 62271 & other
Relevant standards.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 164
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Technical Requirement
The circuit breakers shall comply with requirements in the following table:
Requirement
Description Unit
1. Make *
2. Type SF6
3. Rated voltage KV 420
4. Rated frequency Hz 50
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 165
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
B) 400 kV ISOLATORS
420 kV, 50 kA for 1.0 sec, electrically group operated and also individually
operated, centre break, horizontal upright mounted, isolators with one
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 168
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
(b) Isolators and earthing switches shall be provided with padlocking facility
to lock them in fully open or fully closed positions. Padlocks shall be
supplied with the isolators.
(c) Isolator and earthing switch shall be mechanically interlocked such that
it will not be possible to close the earthing switch when the isolator is
closed and vice-versa.
(d) Flexible tinned copper connection between rotating shaft of earth switch
and frame shall have a cross-section to withstand short time withstand
current.
(e) CONTRACTOR shall furnish the test certificates for all the type tests
conducted as per relevant standards, if the tests have been already
conducted on an identical CT to that offered. In case the tests are not
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 171
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Technical Requirement
400 kV current transformers shall comply with requirements in the
following table:
Requirement
Sl. Details Unit
No.
1.0 Type Outdoor, oil filled, dead tank
hermetically sealed.
2.0 Nominal system voltage kV 400
3.0 Highest System Voltage kV 420
4.0 Frequency Hz 50
5.0 No. of cores *
6.0 Rated primary current **
for each core
A *
I1
A *
I2
A *
I3
A
I4
A
I5
7.0 Rated secondary current A 1
8.0 Ratio taps for each core
Core 1
*
Core 2
*
Core 3
Core 4
Core 5
9.0 Turns ratio for each core
Core 1
*
Core 2
*
Core 3
*
Core 4
*
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 172
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Requirement
Sl. Details Unit
No.
Core 5 *
10.0 Application
Core 1 *
Core 2 *
Core 3 *
Core 4 *
Core 5 *
11.0 For relaying cores
(Data shall be furnished
for all ratio taps.)
11.1 Accuracy class shall be 0.2 for metering
cores
11.2 Rated burden VA *
11.3 Accuracy limit factor *
11.4 Minimum knee point V *
voltage Vk
11.5 Maximum excitation mA *
current at Vk/2
11.6 Maximum secondary Ohm *
resistance
s
12.0 For metering cores
(Data shall be furnished
for all ratio taps.)
12.1 Accuracy class *
12.2 Rated burden VA *
12.3 Rated power factor *
12.4 Inst. security factor *
13.0 Short time thermal kA 50kA for 1.0 sec.
rating
14.0 Dynamic rating kAp 125
15.0 Class of Insulation Oil immersed Class A.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 173
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
(a) 400 kV oil filled hermetically sealed single phase current transformers
shall be provided. Quantity, No of cores etc., shall be as per single line
diagram.
(e) CONTRACTOR shall furnish the test certificates for all the type tests
conducted as per relevant standards, if the tests have been already
conducted on an identical CT to that offered. In case the tests are not
conducted, the CONTRACTOR shall conduct these tests on the CTs
being supplied.
(f) ABT meters shall be provided in compatible to existing meters and
n/w system.
Technical Requirement
400 kV current transformers shall comply with requirements in the following
table:
Requirement
Sl. Details Unit
No.
1.0 Type Outdoor, oil filled,
dead tank
hermetically sealed.
2.0 Nominal system voltage kV 400
3.0 Highest System Voltage kV 420
4.0 Frequency Hz 50
5.0 No. of cores *
6.0 Rated primary current **
for each core
A *
I1
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 177
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Requirement
Sl. Details Unit
No.
I2 A *
I3 A *
I4 A
I5 A
7.0 Rated secondary current A 1
8.0 Ratio taps for each core
Core 1
*
Core 2
*
Core 3
Core 4
Core 5
9.0 Turns ratio for each core
Core 1
*
Core 2
*
Core 3
*
Core 4
*
Core 5
*
10.0 Application
Core 1 *
Core 2 *
Core 3 *
Core 4 *
Core 5 *
(c) The burden of the CVTs shall be adequate for the loads connected and
shall also consider the requirement of one more future generator
transformer bay.
Requirement
Sl. Description Unit
No.
1. Quantity Nos. *
2.
Application Outdoor
3. Nominal / Highest system kV 400 / 420
voltage
4. Power frequency Hz 50
5. System neutral earthing Effectively earthed
type
6. Co-efficient of earthing 0.8
7. Rated primary voltage kV 3
400 /
8. Rated secondary voltage V 110 / 3V / 110 / 3V /110/
3
9. No. of secondary windings Two (2) Three (3)
10. Application Metering
11. Rated burden *
12. Rated power factor *
13. Accuracy class -
Core 1 0.2s
Core 2 0.2s
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 180
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Core 3 0.2
14. Rated voltage factor 1.2 continuous & 1.5
for 30 seconds
15. Class of windings insulation Oil immersed, Class – A
16. Max. Winding temp. at As per Table –II of IEC
110% Excitation & rated 186 considering design
burden ambient of 50 Deg C.
17. Creepage distance (total) mm 31 mm / kV
18. Rated capacitance 8800pF
- Equivalent series
Less than 40 Ohms.
resistance over the entire
carrier frequency range
23. Stray capacitance and
conductance of low voltage
terminal
Stray capacitance of low 300 + 0.05 Cn PF (Cn
voltage terminal over entire is rated capacitance)
carrier frequency range
Stray conductance of the 50
low voltage terminal over Sieme
entire carrier frequency ns
range
24. One minute power frequency
test
- Withstand voltage kV 4
between low voltage (rms)
terminal and earth
terminal
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 181
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
G) LIGHTNING ARRESTERS
(a) 360 kV, 20 kA nominal discharge current, discharge Class – IV, metal
oxide gapless lightning arresters shall be provided. Three lightning
arresters shall be used in each of the station transformer.
(b) Surge monitor comprising a digital type counter and a leakage current
detector shall be provided for each arrester and the same shall be
mounted at eye level height to facilitate easy reading of the counter and
leakage current detectors.
(c) The arrester shall be mounted on an insulating base. Surge monitor
shall be inserted between the lightning arrester and earth.
(d) Insulated copper conductor of adequate size and length shall be used
for connecting discharge counter terminal and lightning arrester earth
terminal. Insulation level of .the conductor shall not be less than 5 kV.
(e) Suitably sized bypass copper shunts shall be provided for bypassing
the discharge counter for removal /maintenance of the counter.
It is envisaged to have equipments similar to ones already installed. The
GTP/data sheet of installed equipments enclosed for reference
Technical Requirements
Requirement
Sl. Description Unit
No.
1.0 GENERAL 360kV
1.1 Quantity Nos. -----
1.2 Installation Outdoor
1.3 System Voltage
(a) Nominal kV 400
(b) Highest kV 420
1.4 Type of earthing Effectively earthed
1.5 Type of arrester Metal oxide –
Gapless
2.0 RATING
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 182
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Requirement
Sl. No. Description Unit
1.0 Bus Post Insulator
1.1 Type Solid Core
1.2 Voltage class kV 420
1.3 Total creepage distance mm 31 mm / kV
1.4 Cantilever strength kg 800
1.5 Withstand voltages
(a) 1 min. power freq. (Dry) kV *
(b) 1 min. power freq. (wet) kV *
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 184
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Applicable Standards
The conductors, clamps and connectors shall comply with the following
standards:
AAC. ACSR conductors: IS : 398
Copper conductors: IS : 282
Galvanisation of steel wires: IS : 4826
Copper tubes: BS : 159
Aluminium / Aluminium Alloys Bars, IS : 5082
Rods, Tubes, Sections for Electrical
Purposes:
Fittings for Aluminium and steel cored IS : 2121
aluminium conductors for overhead lines:
Electric power connectors: IS : 5561
Hot dip galvanised process: IS : 2629 & 2633
(b) Auxiliary supply distribution box from where both AC auxiliary supply,
heating/lighting supplies and DC auxiliary control supply will be
distributed to various motors of all CBs, isolators, earthing switch local
/ marshalling box/equipment marshalling box and heating and
lighting supply to various bay marshalling boxes. The marshalling
boxes will be provided with doors on both sides with key lockable
handle for each door. The key will be removable only in door locked
position.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 186
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
(c) Two 240VAC and 220V DC source will be provided for control supply
for switchyard and control relay panel. Extending supplies to
equipments and panels are in bidder scope.
The CONTRACTOR will conduct all the routine, type and acceptance tests
as per the relevant standards in the presence of the OWNER /
REPRESENTATIVES. The test certificates will be furnished for OWNER‘s /
ENGINEER‘s review / approval.
Switch yard control room of YTPS houses control, relay & metering panels of
Generator-1 and 2, 400KV/11KV Station transformer-1 & 2, 400KV lines ,
Busbar protection panels, SCADA panels and PLCC panels along with control
& monitoring work stations. Control panels houses various controls,
metering, indication, annunciation, synchronising, remote control functions,
mimic diagram, etc.,
5.2.1 SCOPE
One complete set of Relay and control panels, Metering panels, SCADA
panels, including marshaling panels and other panels shall be provided for
the proposed ST-FGD. Bidder shall visit the site and study the existing
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 188
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
system and shall design the scheme so that the proposed equipment is
provided with complete set of control panels, relay panels, protection &
metering system, event recorder, disturbance recorder, Transducers etc., as
applicable. Control, relay & metering panel of the equipment bay shall be
placed in switchyard control room and same shall be hooked up to existing
SCADA.
The New Equipment bay Control & Relay Panels shall consist of the
following.
One complete set of relay panels.
One complete set of control & metering panels including Energy meters
and/or multifunction meters on either side of Station Transformer.
All necessary equipment including PCs, software, analysis software and
any and all other accessories as required shall be included in the
contractor‘s scope.
SCADA panels consisting of I/O modules, relays, Network panels and
interfacing/ marshaling panel.
All analogue and status data is also accessible through the CRT and
along with alarm annunciation details. Closing/synchronising of circuit
breaker of the bay is also through CRT with permissivive from check
synchronising relay dead line charging is also envisaged.For
annunciation of faults/abnormality of switchyard equipment/circuits
through facia, group alarm will be built in the annunciation system
envisaged for the units.Data available in the numerical relays will be
accessible through CRT.
All wiring including CT wiring for main and check zones & other
cabling to complete & achieve the entire busbar protection system
is in the scope of bidder.
I. Protective Functions
(i) Each 400 kV circuit protection panel shall be provided with two (2)
numbers of 220V DC feeders. Each of above feeder will be fed from
separate section of DC board. Manually operated pole, 3 position,
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 191
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
(ii) One separate 220 V DC indication supply in loop in loop out manner
shall be arranged, Contractor shall provided fuses and supervision
relays etc., and use it for all indications in respective control panels.
The indication supply supervision relay will have time delayed drop
off type NC contractors for annunciation and event recording.
I. The control protection and interlocking scheme suitable for one and half
breaker switching scheme shall be provided. All the auxiliary relays,
timers, switches, hardware, etc., required for the scheme are deemed to be
included in the CONTRACTOR scope.
II. Dead line-live bus closing facilities will be provided. Separate numerical
relays shall be provided for each breaker LBB protection, if the busbar
protection is static.
III. It is envisaged to have control/monitor of switchyard breakers and
isolators for the proposed equipment bays in line with existing system viz.,
Transformers, equipment Bays etc., through DCS from CRT located in Unit
&/OR Switch yard Control Rooms & through hardwired control from
switchyard back up control panel. Control Switches for breaker,
indications, metering, transducers and annunciation shall be provided on
the switchyard control panel. The entire annunciation, status indications,
metering shall be displayed on the CRT. The control panels in switchyard
control room shall have the mimic.
IV. Control and indication shall be provided for each of the breaker and
isolator. Separate Status indication LED lamps shall be provided in
addition to discrepancy type control switches. Synchronizing sockets,
Selector switches for DC Source, LBB IN/OUT, Panel/SCADA, semaphore
indicators for earth switches and spring charged indication shall be
provided on the back up panel, if necessary to be in line with existing
system.
V. Each of the abnormal conditions of each circuit breaker (SF6 Pressure
low/lock out, AC/DC Supply trouble etc.,), each protective relay alarm &
trip condition, DC supply failures, each abnormal condition of the isolator
like drive overload, AC & DC supply failure for a group of two isolators,
warning/trip alarms of AC/DC distribution boards, Battery chargers shall
be annunciated and also display on CRT provided in unit/switch yard
control room. All relay panels except bay marshalling boxes will be located
in switchyard relay room under air-conditioning. Bay marshalling boxes
shall be located in the switchyard.
VI. Required number of dual output transducers shall be provided for the 400
kV indications of electrical parameters related to 400 kV switchyard bays.
The dual output transducers shall be either located in the respective
control panels or in a separate transducer panel.
VII. In the event of shortage of contacts in main circuit breakers, isolators,
earth switch, contact multiplying relays will be used. The same will be two
coil, latching type with electrical reset.
VIII. Bidder shall arrange for interfacing all status monitoring, control, relay and
metering system with SCADA in line with existing philosophy. All necessary
hardware, software shall be compatible with existing communication
protocols.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 193
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
It shall be possible to close the Circuit breaker when all the synchronising
conditions are met.
XXIV. Sequence of events recording System (SER)
The SER system shall be a part of DCS (SCADA) system. All major events
of the proposed scheme at switchyard shall be hooked up to existing event
recorder.
XXV. In addition to the contact required as per schemes, CONTRACTOR shall
wire out to the terminal block atleast one NO & one NC spare contacts of
each of the relays.
XXVI. The protection scheme shall include all the necessary contacts to achieve
the schemes required, alarms in CRT, annunciation windows, sequence
event recorder and for switchyard control panel annunciation wherever
required. Contact multiplication relays for 400 kV circuit breakers and
associated isolators shall be provided for this purpose.
XXVII. The following are the requirements
(a) The panels will have a degree of protection not less than IP-51 and will
be fabricated with 3 mm thick cold rolled sheet steel for front and rear
equipment bearing surfaces and 2.5 mm for sides top and bottom
portions. The doors and removable covers will be gasketted. The panels
will be provided with anti-vibration pads.
(b) The pre-treatment of the sheet steel will involve degreasing rust / scale
removal, phosphating and oven drying. The phosphate coating will be
sealed by the application of two coats of ready mixed, stoving type zinc
chromate primer followed by two coats of synthetic enamel paint.
(c) All the equipment on the front of panel will be flush mounted.
(d) The centre line of switches, push buttons and indicating lamps shall be
not less than 750 mm and centre line of relays, meters shall not be less
than 450 mm from the bottom of the panel. Control switches/push
buttons/selectors and relay resetting knobs shall be located at a height
between 1m and 1.2 m from the bottom of the panel.
(e) No auxiliary relay will be mounted on front of the control panel. They
will be mounted either internally or on the respective relay panel, or on
back panel.
(f) Mimic diagrams of size not less than 7 mm in width will be provided.
The colour of the mimic will be finalised during the detailed engineering
stage and the same is subject to owner‘s approval.
(g) Visual and audible type annunciators will be provided on the unit
control panel.
(h)All the wiring will be carried out with 1100V grade stranded copper
conductor wires with PVC insulation. For CT / PT circuits the wire size
will be 4 mm2 colour coded and other circuits it will be 2.5 mm2. All
wiring meant for power supply to transducers, recorders will be suitably
fused or designed to limit short circuit currents. Means for detection of
blown or open circuited fuses will be provided.
(i) Terminal blocks will be 650V grade, 10 amps rated, stud type terminals
with terminal marking. The insulation between any two terminals and
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 196
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
5.2.4 TESTS:The CONTRACTOR shall submit QAP for all the routine tests, which
shall be carried out by him.
(i) Control and relay panels will be subject to the following tests :
Mechanical operation test
High voltage test (2000V for 1 minute)
Megger test
Verification of wiring as per approved drawings
Electrical control. Interlock and sequential operation tests
a) IMPEDANCE
The impedance of the transformers shall be selected keeping in view the
short circuit level of the 11kV switchgear and the voltage dip at motor
terminals not exceeding the limits specified elsewhere in the bid
specification.
b) SIZING
It will be the responsibility of the contractor to adequately size the
transformers to cater for all the auxiliaries of the main equipment,
mechanical systems and loads due to lighting, A/C & ventilation system,
battery charger, cranes, street lighting, plug points and all other loads
and based on the ambient temperature. The basis given below is the
minimum requirement. In case during the operation of plant it is found
that the rating selected is not adequate due to incorrect load
assumptions or due to any other reason, it will be Contractor‘s
responsibility to replace the transformer and associated switchgear and
breakers.
The sizing criteria for Transformers shall be as follows :
(i) The transformer is sized to meet 100% of the unit corresponding to FGD
auxiliaries required for unit1&2 MCR operation and connected to the
11kV bus fed from it. 10% margin is added to this requirement to arrive
at the final rating.
(ii) In addition to the above, MVA rating & impedance of transformers, shall
be chosen such that the largest motor can be started with connected load
under MCR operation.
(iii) Additionally a margin of 10% over the MVA arrived shall be provided for
variations of the loads.
Due consideration shall be given for the reduction in nameplate MVA
capacity due to regulations.
(b) Cooling equipment to include cooler control cabinets - both local and
remote, with all necessary equipment like indicators, annunciators etc.
(c) Flexible expansion joints, one each, on top and bottom pipe connections
for each radiator bank shall be provided.
(d) Each radiator to have top most vent and bottom most drain plugs &
bracings between radiators.
iv)OPERATION/ALARMS IN CONTROL ROOM
a. The transformers shall be provided with top oil and winding temperature
indicators. Repeater for winding temperature of each winding and oil
temperatures with recorders shall be provided in the control desk.
b. All the alarms and trip conditions of the transformers shall be
individually indicated in the CRT and common alarms/trips of
transformer shall be suitably grouped and annunciated in control desk.
c. MOG Magnetic Oil Level Gauge with alarm contacts
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 200
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
(b) The transformer oil to be supplied shall be low viscosity type, pure
hydrocarbon mineral oil, without any additive, clean and free from
moisture or other foreign matter and shall conform generally to the
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 201
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
Sl. TEST
CHARACTERISTICS SPECIFICATION
No. METHODS
Clear, free from
1 Appearance IEC: 296 sediment &
suspended matter
2 Density @ 200 C Kg/cm3 ISO: 3675 ---
Density @ 29.50C Kg/cm3 --- 0.820 - 0.895
3 Kinematic Viscosity, mm2/s
@400C 11.0 Max
@270C ISO: 3014 16.0 Max
@ -300C 1800Max
4 Flash point (PMCC) 0C ISO: 2719 140 Min.
5 Pour Point 0C ISO: 3016 - 30 Max
Interfacial Tension,
6 ISO: 6295 0.04
N/m @ 250C
Neutralisation Value,
7 IEC: 296 0.03 Max
mg KOH/gm
8 Corrosive Sulphur ISO: 5662 Non corrosive
Electric Strength
9 (Breakdown Voltage) KV
rms
a. As received 30KV rms Min.
(New unfiltered oil) (Before filteration)
IEC: 156
60KV rms Min.
b. After filtration
(After filteration)
10 Resistivity
@270C 2500 x 1012
IEC: 247
@900C 150 x 1012
11 Dielectric dissipation factor
[Tan delta] 900C 0.002 Max
IEC: 247
[Tan delta] 270C 0.0005
12 Antioxidant additives IEC: 666 Not Detectable
13 Water content, ppm IEC: 733 40 Max.
Oxidation stability
14
(164 hours) @ 1000C
a. Neutralisation value, mg
0.15 Max
KOH/gm IEC: 74
b. Sludge content % by 0.03 Max
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 202
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
mass
c. Tan Delta @ 900C 0.1 Max
15 S.K. value % V/V --- 4 Max
16 Aromatic Content FTIR 4-8
Accelerated Ageing Test
17
(Open beaker Method)
a. Sp.Resistance (Resistivity)
IEC: 247 25 x 1012 Min
ohm cm @ 270C
b. Sp.Resistance (Resistivity)
IEC: 247 2 x 1012 Min
ohm cm @ 900C
c. Dielectric Dissipation
IEC: 247 0.1 Max
factor @ 900C
d. Total Acidity mg KOH/gm IEC: 296 0.05 Max
e. Total Sludge weight % --- 0.05 Max
18 Ring Analysis Ca, Cp, Cn FTIR ---
a. TESTS AT SITE
In addition to the test carried out at works, the purchaser will draw samples
from each batch delivered at site and get the same tested in recognized
laboratory like CPRI, Bangalore. The cost of oil testing shall be borne by the
Contractor. The same may be noted by the bidder. In case the test results
of samples collected at site are not conforming to the values specified in the
bid/contract, the entire quantity of the oil supplied will be rejected. It shall
be contractor's responsibility to take back the rejected oil from site at his
cost and to replace the rejected oil free of charges at site with the oil strictly
conforming bid/contract specifications.
b. PACKING
The oil shall be delivered in perfectly clean, fresh, non returnable steel
drums of 210 litres nominal capacity conforming to type-A or type-B of
IS:1783. Minimum 18 guage sheet shall be used for oil drums. The drums
shall be coated from inside with suitable coating (like epoxy lacquere and
phosphate) resistant to insulating oil. The outside surface of the drum shall
be coated with suitable primer and finishing paint or hot dip galvanised
according to IS 4759 for protection against atmospheric corrosion. The
drums shall be effectively sealed immediately after filling the oil to prevent
ingress of moisture.
c. SAMPLING
Sampling of the oil shall be done in accordance with IS: 6855
d. MARKING
Each drum shall be indelibly marked with the following:
i) Manufacturer's name or trade mark
ii) Quantity in litres.
iii) Name of the material
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 203
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
The transformers shall comply with the particulars indicated below and
CONTRACTOR shall furnish the details in respective column given below :
SL.
CONTRACTOR’S
NO. DESCRIPTION UNIT REQUIREMENTS
DATA
Station Transformer ST ST
400 kV 400
kV
1.0 Type & make As per
drawing
2.0 Applicable standard I IS 2026
3.0 Quantity *
4.0 Full load rating MVA *
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 204
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
LV 11kV side)
Medium
Resistance
11.0 Type of tap changer off On load
circuit/on load
12.0 Tapping range and As per specification
number of steps
13.0 Full power tapping Yes/ Required
provided No
14.0 Type of voltage CFVV
variation
(CFVV/VFVV/CbVV)
15.0 Over fluxing capability 110% cont.
125% for 1
minute
140% for 5
second
16.0 Winding insulation
type uniformly or non-
uniformly insulated
16.1 HV Non-
Uniform
16.2 LV Uniform /
Non
Uniform
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 205
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
NOTE: ‗*‘ CONTRACTOR shall furnish these details during detailed engineering
5.3.5 FIRE FIGHTING SYSTEM
1. SCOPE:
This Specification covers the requirements of High Velocity Water Spray
System required for Transformer under the Scope as per TAC / BIS
requirement.
2. CODES AND STANDARDS
The design and installation of complete fire protection system shall comply
with regulations of Tariff Advisory Committee (TAC) of India. In the absence
of TAC regulations, NFPA - National Fire Protection Association / VdS shall
be followed
3. DESIGN REQUIREMENTS
The makes/models and technical features offered for various components/
equipment shall comply with the standards of TAC/ BIS/ UL/ Vds and FM
/ NFPA as applicable.
the downstream of the deluge valve, so that the butterfly valve can be
kept closed and operated manually in the event of fire, if there is any
malfunction of deluge valve., At the upstream of deluge valve, gate valve
shall be provided. Further fast acting butterfly bypass valve to deluge
valve shall also be provided.
d. All the materials used in the manufacture of system shall be of high
grade, design and workmanship so as to ensure satisfactory operation of
the plant in the tropics under humid and dusty condition. The entire
system shall be in accordance with standard practice.
e. The design, manufacture, testing, performance etc., of the various
components of the firefighting system shall comply with all currently
applicable statutory regulations and safety codes in the locality where the
equipment shall be installed.
Compliance for all items hereinafter described with all currently
applicable statutory regulation and safety codes applicable in the locality
where the equipment is to be installed as mandatory. The system as well
as individual items shall in particular comply with regulations of the
Tariff Advisory Committee.
f. All the piping shall be painted/necessary protection given wherever
necessary in accordance with the regulation of TAC.
g. The type of Projectors selected and the piping arrangement around the
equipment shall ensure the discharge of water in the form of an
expanding cone of evenly distributed broken stream which would strike
the burning surface and the transformer /power cable with sufficient
impact to form an emulsion to ensure extinguishing of fire within a few
seconds. . The minimum density of application of water spray shall be
10.20 L.P.M/m2 / of projected area and not less than 6.1 L.P.M/m2 for
the facing ground surface area. The minimum serving water pressure at
any projection/spray nozzle shall not be less than 3.5 kg/m2
h. The number, size, type of projectors, location, design shall be in line with
the requirements of FOC London/TAC /Underwriters Lab/Fire
Manual/TAC regulation etc., The contractor should furnish all technical
characteristics, coverage areas, discharge pattern etc., of the projectors
offered. Detailed design calculations for the entire system shall be
furnished for the information.
i. The impulse for the automatic opening of the control valve (deluge valve)
controlling the water spray and operation of the system should be given
by bulb type thermal detectors rated to fuse at a temperature of 175oF
(71oc) but not later at the occurrence of fire. The detectors shall be of the
type approved by FOC/UL/FM/TAC & shall be mounted on separate pipe
work system around the transformer.
j. The detectors shall also be provided around the base of the inter
connecting Transformer to detect fire at low level. In short, the detectors
shall be distributed all around the interconnecting transformer at all
vulnerable points so that one or more of them will be affected by the heat
from the burning oil irrespective of the direction of wind. The bidder
should indicate the relevant IS or BS or any other approved code of
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 209
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
5. LAYOUT REQUIREMENTS
The layout shall be strictly in compliance with TAC especially with regard
to clearances
6. DETAILS TO BE FURNISHED BY THE BIDDER AFTER AWARD OF
CONTRACT
a) Details of HVWS system for transformers.
b) Schematic for Hydrant and High Velocity water spray systems.
FIRE PROTECTION SYSTEM
DATA SHEET – A
2.0 PIPES
2.1 Underground piping
a) Material MS
b) Standard (Pipes) IS 3589/ IS 1239 Part – I
c) Standard (Fitting) IS 1239 part II for fittings NB 150 &
below & Fabricated from parent
pipes for NB 200 & above
d) Type of joints Welded
e) Type of protection IS 10221/ IS 15337-2003
f) Class Medium (pipes NB 200 mm & above
shall have thickness of 6.35 mm.
2.2 Above ground piping
5.3.6 TESTS
In addition to all type tests and special test (excluding SC test) as per
IS 2026 (revision as applicable) following tests shall be conducted on
one transformer.
(a) Heat run test, dissolved gas analysis before and after
(b) Vacuum withstand and deflection measurement on tank
(c) Pressure test on tank with deflection measurement
(d) Determination of cooler losses
(e) Partial discharge test
(f) Short circuit impedance of each limb with single phase voltage from
each HV & LV sides.
(g) Auxiliary power measurement.
VOLUME-I
RAICHUR POWER CORPORATION LIMITED
(A Joint Venture Company of KPCL, BHEL & IFCIL) PART-III
YERAMARUS THERMAL POWER STATION (2X800 MW)
Notification No: WET LIME STONE FLUE GAS DESULPHURIZATION PLANT
KPCL/2018- FOR 2 X 800MW YTPS SHEET 211
19/PS/WORK
INDENT 8463
TECHNICAL SPECIFICATION of 652
Dated:09.03.2019
All routine tests as per IS : 2026 and the tests listed below on each of
the transformer shall be conducted.
(h) No load loss and exciting current at 415V from LV side and at 90%,
100% & 110% of rated voltage before and after dielectric tests.
(i) Oil leakage test – 12 hours
(j) Magnetic balance test
(k) Measurement of tan delta and capacitance of each winding
(l) Impulse on all single phase transformer of HV & LV windings
including chopped wave tests.
(m) Load loss and % impedance at all taps.
(n) FRA test.
(o) Any other routine tests not listed above but required as per IS.
5.3.7 SPARES
One set of spares for each rating of transformers shall be provided as
recommended by OEM.
5.3.8 MAKE OF TRANSFORMERS & COMPONENTS
The bidder shall indicate the proposed makes of various bought out
components in the technical bidding schedule. However, this shall not be
bindings on the purchaser, final make shall be approved by the purchaser/
consultant during detailed engineering to satisfy the specification requirement.
The short circuit and short time ratings of HV switchgear including, circuit
breakers, earth switch, bus bars etc. shall not be less than the values
mentioned in Electrical single line diagram. The short circuit & short time
levels shall be calculated by considering short circuit current contribution