PROJECT PROPOSAL

FOR
MBBR BASE EFFLUENT TREATMENT PLANT
(Capacity -0.3 m3/hr.)

CLIENT
FAIR ELECTRONICS (SAMSUNG)

SUBMITTED BY
WATER LINK BANGLADESH

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Date : 13/07/2020
Our Ref. : WLB/FE/ETP/0.3CMPH/2020/01

To : Fair Electronics (Samsung)

Kind Attn. : Md. Akram Hossain


Assistant Manager (Utility and Maintenance)

Subject : Quotation for Design, materials supply, Installation,


commissioning and testing of MBBR base skid mounted
package Effluent Treatment Plant (Capacity 0.3 m 3/hr.)

Dear Sir,

With reference to the gradual technical discussion and site visit for above mention
subject, we are pleased to submit herewith our technical and financial offer of MBBR
base Effluent Treatment Plant of 0.3 cubic meters per hour capacity for your kind
consideration.

Hopping you will find our offer most competitive in terms of technical and financial
aspects.

Please feel free to call us if you need more information.

Sincerely yours,

For WATER LINK BANGLADESH.

Mahatab Hossain
Marketing Executive

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Overall Summery Sheet

Installation of 0.3 m3/hr. Skid mounted package MBBR base effluent treatment plant for
fair electronic limited, Bangladesh.
Item Description Total Amount(TK)
No.
01 Skid mounted package MBBR base ETP for local 1584,000.00
electro-mechanical equipment including design,
erection, commissioning and testing
(Scope of supply by WLB)
Sub total 1584,000.00
Vat 7.5 % 118,800.00
Grand Total 17,02,800.00
In words: Seventeen lac two thousand eight hundred only.

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
WASTEWATER QUALITY

The wastewater (effluent) discharged from different section and plant of the powder
coating floor is considered as bellow.

Parameter Unit Concentration Design


present consideration
PH 4 – 4.5 4.00
TDS mg/l 600-800 1000
TSS mg/l 200 - 450 450
BOD mg/l 180 300
COD mg/l 350-450 450
DO mg/l Unknown 1.25

TREATED WASTEWATER CRITERIA

Capacity of the MBBR base effluent treatment plant will be 0.3 m 3/hr. and treated water
will be capable to meet the specification for discharged set by department of
environment (DOE), Bangladesh.

Parameter Unit Location of final disposal

Inland surface water Public sewer Irrigated land


PH 6-9 6-9 6-9
TDS mg/l 2100 2100 2100
TSS mg/l 150 500 200
BOD mg/l 50 75 75
COD mg/l 200 400 400
DO mg/l 4.5-8 4.5-8 4.5-8

EXPECTED TECHNICAL DATA

After effluent is treated by bellow selected process, the expected water parameter will
be achieved as shown in the following table:

Parameter Unit Range/Max. all allowable value

PH 6.5-9
TDS mg/l ≤2100
TSS mg/l ≤30
BOD mg/l ≤30
COD mg/l ≤150
DO mg/l 4.5-8

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
TOTAL EQUIPMENTS NEEDED FOR THE PROJECT

1.0 Bar screen 02 Units


2.0 Equalization tank 01 Unit
3.0 Manual PH correction unit 01 Set
4.0 Effluent transfer pump 02 Sets
5.0 Chemical dosing system 03 Units
6.0 Reaction tank/Coagulation 01 Unit
7.0 Flocculation tank 01 Unit
8.0 Lamella Clarifier-1 01 Unit
9.0 MBBR tank 01 Unit
10.0 Air blower 02 Units
11.0 Air diffuser 01 lot
12.0 Lamella Clarifier-2 01 Unit
13.0 Clarified water tank 01 Unit
14.0 Sludge sump 01 unit
15.0 Sludge transfer pump 01 unit
16.0 Sludge drying bed 01 unit
17.0 Pressure feed pump 02 Sets
18.0 Multi graded Filter 01 Unit
19.0 Activated Carbon Filter 01 Unit
20.0 Control Panel 01 Unit
21.0 Pipe & Fittings 01 Job

SCOPE OF SUPPLY BY WATER LINK BANGLADESH

1.0 Bar screen


2.0 Equalization tank
3.0 Manual PH correction unit
4.0 Effluent transfer pump
5.0 Chemical dosing system
6.0 Reaction tank/Coagulation
7.0 Flocculation tank
8.0 Lamella Clarifier-1
9.0 MBBR tank
10.0 Air blower
11.0 Air diffuser
12.0 Lamella Clarifier-2
13.0 Clarified water tank
14.0 Sludge sump
15.0 Sludge transfer pump
16.0 Sludge drying bed
17.0 Pressure feed pump
18.0 Multi graded filter
19.0 Activated carbon filter
20.0 Control panel
21.0 Pipe & Fittings

Time Schedule

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Preparation of civil structure drawing : 1 Days
Mechanical & Electrical Installation : 4 weeks
Commissioning : 3 Days

SOURCE OF THE EQUIPMENT

Item name Component Origin


SS frame material Taiwan
Bar screen SS Net sheet Taiwan
Lifting Pump Centrifugal Calpeda/Pedrollo
MBBR PVC China
Tube pack PVC China
MS Sheet Japan
PH correction unit Manual control system Local
Solution tank(PVC) Bangladesh
Chemical dosing Metering dosing pump Seko/Italy.
unit Gear motor & mixing Germany/Japan
equipment’s
PVC tank Bangladesh
Reaction & Gear motor & Mixing Germany/Japan
Flocculation tank Equipment
Shaft & impeller Taiwan
Aeration system Air blower Taiwan
Air diffuser Taiwan
Sludge transfer Non-clog centrifugal pump Calpeda/Pedrollo
pump
Pressure feed pump Calpeda/Pedrollo-Italy
Tertiary treatment Vessel material (FRP) China
equipment’s Media Bangladesh/india
Pipe (MS, PVC) Bangladesh/China
Pipe & fittings Fittings China
Gate Valve China
Electrical Control Board WLB
Panel Accessories Taiwan/korea

TECHNICAL SPECIPICATION

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
1.0 Inlet Screen (Coarse & Fine) : Qty-02 Units

Volume : .05-.06 M3
Dimension : L2’XW1’XH2’
MOC : BRICK/RCC & SS
Screen material : SS (304)
Location : Above & ground
Price = 2X12500=25,000.00
(Twenty five thousand only)

2.0 Equalization Tank : Qty-01 Unit

Capacity : 0.3 m3/hr.


HRT : 10 Hours
Volume : 3 M3
MOC : PVC
Location : Above & ground

Auxiliary

Air diffuser : 01 Lot


Type : coarse diffuser
Size : 250 mm
Price =35,000.00
(Thirty five thousand only)

2.1 Manual PH Correction Unit : Qty-01 Set

One set manual PH correction unit will be used for PH correction of the effluent water.
Chemical flow control will be done by manual ball valve.

Capacity : 0.3 m3/hr.


PVC Tank : 01 Unit
Tank Capacity : 100 ltr
Pipes & Fittings : UPVC
Price =3,000.00
(Three thousand only)

2.2 Effluent Transfer Pump : Qty-02 Sets (1W+1S)

Type : Centrifugal pump


Execution : horizontal
Capacity : 0.3 m3/hr.
Head : 12.3 M
Connection : 25/25 mm
Speed : 2900 rpm
Power rating : 0.37 kW/220V/50Hz
Materials of casing : CI

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Shaft : AISI 303
Materials of impeller : CI
Efficiency : IE2
Protection : IP 54
Insulation : F
Seal : Mechanical seal
Price =2X21000.00=42,000.00
(Forty two thousand only)

3.0 Coagulation Tank : Qty-01 Unit

The inlet water will be conditioned with Lime & PAC (Poly aluminum chloride) that will
act as a coagulant for the reduction of TSS level.
The coagulation tank will be made of concrete and must be considered as excluded
from the scope of supply.

Design hourly flow : 0.3 m3/hr.


HRT : 10 minutes
Volume : 0.05 M3
Tank materials : MS
Thickness : 5 mm
Location : skid mounted
Paint : Epoxy
Auxiliaries

3.1 Service tank/Chemical tank : 2 Sets

Tank materials : PVC


Tank capacity : 100 liters
Brand : Gazi/Modina
Origin : Bangladesh

3.2 Agitator for service tank/Chemical tank : 2 Sets

Motor : 0.2 kw/220 V/50Hz


Speed : 80-120 rpm
Agitator shaft materials : SS 304
Impeller : SS 304

3.3 Metering dosing pump : 2 Sets (2W+0S)

Type : Diaphragm metering pump


Capacity : 20-25 LPH
Power : 40 watt
Pressure max. : 0.5 Mpa
Connection : 8 & 12 mm

3.4 Agitator for coagulation tank : 1 Set

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Agitator (adjustable)
Quantity : 01 Sets
Motor : 0.2 kw/220 V/50Hz
Speed : 80-120 rpm
Agitator shaft materials : SS 304
Impeller : SS 304
Price (3,0 – 3.4) =175,000.00
(One lac seventy five thousand only)

4.0 Flocculation Tank : Qty-01 Unit

The flocculation tank will be made of concrete and must be considered as excluded
from the scope of supply.

Design hourly flow : 0.3 m3/hr.


HRT : 15 minutes
Volume : 0.075 M3
Tank materials : MS
Thickness : 4 mm
Location : skid mounted
Paint : Epoxy

Auxiliaries

4.1 Service tank /Chemical tank : 1 Set

Tank materials : PVC


Tank capacity : 100 liters
Brand : Gazi/Modina
Origin : Bangladesh

4.2 Agitator for service tank/Chemical tank : 1 Set

Motor : 0.2 kw/220 V/50Hz


Speed : 80-120 rpm
Agitator shaft materials : SS 304
Impeller : SS 304

4.3 Metering dosing pump : 1 Set

Type : Diaphragm metering pump


Capacity : 25 LPH
Power : 40 watt
Pressure max. : 0.5 Mpa
Connection : 8 & 12 mm

4.4 Agitator for Flocculation tank : 1 Set

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Agitator (adjustable)
Quantity : 01 Set
Motor : 0.2 kw/220 V/50Hz
Speed : 80-120 rpm
Agitator shaft materials : SS 304
Impeller : SS 304
Price (4,0 – 4.4) =135,000.00
(One lac thirty five thousand only)

5.0 Sedimentation Tank

A circular/rectangle clarifier is required to determine the precipitation of the


coagulated/flocculated matter

6.0 Lamella Clarifier Tank -01 : Qty-01 Unit

Capacity : 0.3 m3/hr.


HRT : 1.5 Hrs.
SOR : 1.5-2 m/hr.
Volume : 0.45 M3
Construction : MS
Thickness : 5 mm
Location : Above & under ground
Paint : Epoxy

Auxiliary

6.1 V-notch weir : 01 set


Materials : MS
Thickness : 5 mm
Paint : Epoxy
Origin : Bangladesh

6.2 Tube pack : 01 Lot

Materials : PVC
Angle : 55~60 Deg.
Height : 500
Thickness : 1mm
Brand : Benenv/Eqvlt
Origin : China

6.3 MS structure for tube pack


Materials : angle/flat bar
Thickness : 5 mm
Origin : Bangladesh
Paint : Epoxy

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Price (6,0 – 6.3) =115,000.00
(One lac fifteen thousand only)

7.0 MBBR Tank-1 : Qty-01 Unit

Foreword

The injection of ambient air into the waste water is the core of the process. The
dissolved Oxygen feeds the bacteria that transform the complex organic matter into
simple chemical compounds that can be discharged. This aeration tank will be
Concrete made and out of scope.

Design hourly flow : 0.3 m3/hr.


Design operation hour : 24 hours/day
Average daily flow : 7.2 M3
Tank : Rectangle
HRT : 3 hours
Volume : 0.9 M3
Freeboard : 0.5 m
F.M ratio : .3.5-.5
MLSS : 3.5 kg/m3
Construction : MS
Thickness : 5 mm
Location : Above & under ground
Paint : Epoxy
Price = 55,000.00
(Fifty five thousand only)

8.0 MBBR Tank-2 : Qty-01 Unit

Foreword

The injection of ambient air into the waste water is the core of the process. The
dissolved Oxygen feeds the bacteria that transform the complex organic matter into
simple chemical compounds that can be discharged. This aeration tank will be
Concrete made and out of scope.

Design hourly flow : 0.3 m3/hr.


Design operation hour : 24 hours/day
Average daily flow : 7.2 M3
Tank : Rectangle
HRT : 2 hours
Volume : 0.6 M3
Freeboard : 0.5 m
F.M ratio : .3.5-.5
MLSS : 3.5 kg/m3
Construction : MS
Thickness : 5 mm

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Location : Above & under ground
Paint : Epoxy
Price =50,000.00
(Fifty thousand only)

Auxiliaries

8.1 MBBR Media

Effective Specific Surface area : 450 m2/m3


Media Height : 15 mm/ 10 mm
Media Diameter : 22 mm
Weight per unit surface area : 0.37 kg/m2
Specific Gravity : 0.90-0.95 g/cm3
Voidage : >98%
Density : 0.93 g/cm3
Media fill rate range : 25-55% of volume
Materials : pp.
Price =32,000.00
(Thirty two thousand only)

8.2 Air blower : Qty-02 Sets (1W+1S)

Air blower : 1 Set (1w + 0s)


Motor : 2 HP/440v/50Hz
Capacity : 60 m3/hr.
Type : Rings blower
Speed : 1440 rpm
Pressure : 7000mmAq

8.3 Air diffuser : 1 lot

Type : Disc
Type pf. bubble : fine;
Material of diffuser body : Polypropylene;
Membrane material : EPDM;
Unit air capacity : 2÷10 Nm³/h;
Air distribution system : pre-assembled in grids
Price (8.2-8.3) =110,000.00
(One lac ten thousand only)

9.0 Lamella Clarifier Tank -02 : Qty-01 Unit

Capacity : 0.3 m3/hr.


HRT : 1.5 Hrs.
SOR : 0.85 m/hr.
Volume : 0.75 M3
Construction : MS

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Thickness : 5 mm
Location : Above & under ground
Paint : Epoxy

Auxiliary

9.1 V-notch weir : 01 set


Materials : MS
Thickness : 5 mm
Paint : Epoxy
Origin : Bangladesh

9.2 Tube pack : 01 Lot

Materials : PVC
Angle : 55~60 Deg.
Height : 500
Thickness : 1mm
Brand : Benenv/Eqvlt
Origin : China

9.3 MS structure for tube pack


Materials : angle/flat bar
Thickness : 5 mm
Origin : Bangladesh
Paint : Epoxy
Price (9.0 – 9.3) =185,000.00
(One lac eighty five thousand only)

10.0 Clarified Water Tank : Qty-01 Unit

Clarified water will be stored by gravity into a storage tank that will also provide water
for filter feed and filter backwash. Concrete made, out of scope.

Design hourly flow : 0.3 m3/hr.


HRT : 1.5 Hour
Volume : 0.45 M3
Construction : MS
Thickness : 5 mm
Paint : Epoxy
Location : Above under ground
Price =15,000.00
(Fifteen thousand only)

10.1 Sludge Sump : Qty-01 Unit

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
The sludge holding tank will be made of concrete and must be considered as excluded
from the scope of supply.

Volume : 200 Liter


MOC : PVC
Price =3,000.00
(Three thousand only)

Auxiliaries

10.2 Sludge Transfer Pump : Qty-01 Set (1W+0S)

Type : Centrifugal pump


Execution : horizontal
Capacity : 0.5 m3/hr.
Head : 12.3 M
Connection : 25/25 mm
Speed : 2900 rpm
Power rating : 0.37 kW/220V/50Hz
Materials of casing : SS 304
Shaft : SS 304
Materials of impeller : PVC
Efficiency : IE2
Protection : IP 55
Insulation : F
Seal : Mechanical seal
Price =12,000.00
(Twelve thousand only)

11.0 Sludge Drying Bed : Qty-01 Unit

Quantity : 01 Unit
MOC : PVC
Location : Above the ground
Media : Gravel &Graded Sand
Price =3,000.00
(Three thousand only)

12.0 Tertiary Treatment (filtering units)

One sand and one activated carbon filters battery will remove the possible turbidity from
clarified water. The filter will be equipped with manual valve and will be operated in full
manual way.

12.1 Pressure Feed Pump : Qty-02 Sets (1W+1S)

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Pressure feed pump will be used to transfer the clarified water through Multimedia Filter
and Carbon Filter

Type : Centrifugal pump


Execution : horizontal
Capacity : 0.3 m3/hr.
Head : 12.3 M
Connection : 25/25 mm
Speed : 2900 rpm
Power rating : 0.37 kW/220V/50Hz
Materials of casing : CI
Shaft : AISI 303
Materials of impeller : CI
Efficiency : IE2
Protection : IP 54
Insulation : F
Seal : Mechanical seal
Price =2X21,000.00=42,000.00
(Forty two thousand only)

13.0 Multi grade Sand Filter : Qty-01 Unit

No. of unit : 01 Nos.


Design production flow capacity : 0.3 m3/hr.
Diameter of the filter vessel : 250 mm
Height on straight : 875 mm
Bed depth : 500 mm
Free board : 70 % of bed depth
Vessel Material : FRP
Backwash interval : Once in day
Backwash flow rate : 0.45 m3/hr.
Backwash duration : 15 minutes
Media used : Stone, Graded Sand
Accessories
Interception valves on inlet and outlet
Including manual control butterfly valves
Price =12,000.00
(Twelve thousand only)

14.0 Activated Carbon Filter : Qty-01 Unit

No. of unit : 01 Nos.


Design production flow capacity : 0.3 m3/hr.
Diameter of the filter vessel : 250 mm
Height on straight : 875 mm
Bed depth : 500 mm
Free board : 70 % of bed depth

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
Vessel Material : FRP
Backwash interval : Once in day
Backwash flow rate : 0.45 m3/hr.
Backwash duration : 15 minutes
Media used : Stone, Activated carbon

Accessories
Interception valves on inlet and outlet
Including manual control butterfly valves
Price =15,000.00
(Fifteen thousand only)

15.0 Electrical Control Unit : 01 Job

A MS, PVC made panel board with necessary electrical equipment’s will be supplied
For the smooth operation of the plant
Price =115,000.00
(One lac fifteen thousand only)

16.0 Pipe & Fittings : 01 Lot

A lot of MS& PVC, All MS pipe epoxy painting, pipes & fittings will be supplied for
interconnecting the equipment supplied by WATER LINK BANGLADESH.
Price = 85,000.00
(Eighty five thousand only)

17.0 Erection & Commissioning Of Effluent Treatment Plant

Price = 150,000.00
(On lac fifty thousand only)
18.0 Worker feeding, engineering feeding, engineering design drawing,
Safety Purpose, Accommodation for worker & Engineer & All transportation for effluent
treatment plant
Price = 25,000.00
(Twenty five thousand only)

19.0 Painting of whole project

Price = 95,000.00
(Ninety five thousand only)

20.0 Skid mounted frame for MBBR base Effluent Treatment Plant

Price = 50,000.00
(Fifty thousand only)

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.
OTHER TERMS
Customer has to supply the following items free of cost and free from any
Obligation.

■ Electrical Power
■ Water and sanitation for worker
■ Sufficient illumination at work site.
■ Accommodation for our Expert, Stuff and Worker

Note:
WLB reserved the rights to change the specification of any equipment
based on test analysis of waste water & site condition of the project.

COMMERCIAL TERMS & CONDITIONS

Electro-mechanical portion & : Tk.1584, 000.00


Consultancy and others
In words (total) : Fifteen lac eighty four thousand only.
Mode of Payment : 50% advance payment at the time of
work order.
40% at the time of Delivery
10% after successful commissioning &
hand over the plant

Warranty : One year service warranty.


Delivery : Within 30 days from the date of civil
work completion or hand over the site from
civil contractor.

For Water Link Bangladesh

Engr. U Swi Ching Marma (Uchhas)


Managing Partner
Water Link Bangladesh.
01937295699

Dhaka Office: Rupayan Millennium Square (3rd Floor ,C-3, Plot 69,70,71.progoti Sarani, North Badda Dhaka-1212.
Tel: +88 02 9889291, Cell: 01998-701900-02, Chattogram Office: 135, Dewan Square (5th Floor) Dewanhat Moor Double Mooring
Chattogram. E-mail: waterlinkbang@gmail.com, www.waterlinkbd.com, Factory: South Badda, Dhaka-1212.

You might also like