INDESIGN

TEST PAPER

1. Explain the process of laying CC Pavement for the above Section.

2. Explain the Slope Ratio. Calculate the slope ratio for Carriage way and
Footpath.

3. What is the difference between Water Bond Macadam and Wet Mix
Macadam? What is the max FDD for WMM AND GSB?

4. Suggest any economical method or cost saving in this process.

5. What are Dowel Bars and Tie Bars? Explain the placement of these Bars.
1. Calculate the amount of concrete (In Cu.Mts) and Steel (In Kgs) for
this longitudinal drain length about 2.0 Kms.

2. Process of laying Drainage for CC Roads.

3. What is Road Cross drains.

4. What is Kerb Stone? What is the process for Laying Kerb Stone?