S1 S1 S1 S1 S1 S1 S1 S1 S1: Bottom Bar Reinforcement Plan (FF Slab - 1St Floor)
S1 S1 S1 S1 S1 S1 S1 S1 S1: Bottom Bar Reinforcement Plan (FF Slab - 1St Floor)
#3@6"c/c #3@6"c/c
24'-6"
#3@6"c/c
#3@6"c/c
S1 S1 S1 S1 S1 S1 S1 S1 S1
9'-0"
B
#3@8"c/c
#3@8"c/c
S1 S1 S1 S1 S1 S1 S1 S1 S1
24'-6"
S2 S2
#3@6"c/c
#3@6"c/c
#3@8"c/c
#3@8"c/c
C PARTNERS IN DEVELOPMENT
#3@8"c/c #3@8"c/c (PID) CONSULTING
Stair Reinf. ENGINEERS
ISLAMABAD
9'-0"
S3 S3 S3 S3
D1 S3 S3 S3
Stair Reinf.
D
CLIENT:
L/3
L/3
L/3
L/3
L/3
L/3
L/4
L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3
L/3
24'-6"
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
#3@6"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
L/3
L/3
L/3
#4@8"c/c
B
L/3
L/3
L/3
L/3
L/3 L/3
L/3 L/3
L/4
L/3 L/3 L/3 L/3
L/3 L/3 L/3 L/3
L/3 L/3
24'-6"
L/3
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
L/3 L/3
L/3
L/3
L/3
L/4
L/4
L/4
#4@8"c/c
C L/3
PARTNERS IN DEVELOPMENT
L/4
Stair Reinf.
6'-3"
(PID) CONSULTING
ENGINEERS
\\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
ISLAMABAD
L/3
D1
2'-9"
Stair Reinf.
D
CLIENT:
DOCUMENT TITLE
GENERAL NOTES
1'-4"
1'-4"
1'-4"
1'-0"
9- THERE IS NO WATER TANK AT ROOF TOP SO
CARE MUST BE EXERCISED ACCORDINGLY
X X
24'-6"
#3@6"c/c
#3@6"c/c
S1 S1 S1 S1 S1 S1 S1 S1 S1
9"
49'-0"
1'-4"
B
#3@8"c/c
#3@8"c/c
9"
S1 S1 S1 S1 S1 S1 S1 S1 S1 X X
24'-6"
S2 S2
#3@6"c/c
#3@6"c/c
#3@8"c/c
#3@8"c/c
S3 S3 S3 S3 ENGINEERS
ISLAMABAD
S3 S3
\\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
S3
Stair Reinf.
D
CLIENT:
3"
AT NATIONAL UNIVERSITY OF
BOTTOM BAR REINFORCEMENT PLAN (SF SLAB - 2ND FLOOR) TECHNOLOGY, IJP ROAD, ISLAMABAD
6"
(SLAB THICKNESS-6") REFER TO
RELEVANT BEAM
2'-0"
DETAIL DOCUMENT TITLE
15"
9" SLAB REINFORCEMENT PLAN
AT SECOND FLOOR
6"
(BOTTOM BARS)
L/3
L/4 11- HEAVY LAB EQUIPMENT BE ONLY INSTALLED
AT GROUND FLOOR.
L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3
L/3
24'-6"
#4@5"c/c
#4@5"c/c
#4@5"c/c
X X
#4@5"c/c
#4@5"c/c
#4@5"c/c
#3@6"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
49'-0"
L/3
L/3
L/3
#4@8"c/c
B
L/3
L/3
L/3
L/3
L/3 L/3
L/3 L/3 X X
L/4
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
L/3 L/3
L/3
L/3
L/3
L/4
L/4
#4@8"c/c
L/4
(PID) CONSULTING
L/3 ENGINEERS
Stair Reinf. \\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
ISLAMABAD
CLIENT:
DOCUMENT TITLE
1'-4"
1'-4"
1'-4"
1'-0"
SHED AT THE TOP AS PER MANUFACTURER
SPECS.
9- THERE IS NO WATER TANK AT ROOF TOP SO
#3@6"c/c #3@6"c/c CARE MUST BE EXERCISED ACCORDINGLY
X X
24'-6"
#3@6"c/c
#3@6"c/c
S1 S1 S1 S1 S1 S1 S1 S1 S1
9"
49'-0"
1'-4"
B
#3@8"c/c
#3@8"c/c
9"
S1 S1 S1 S1 S1 S1 S1 S1 S1 X X
24'-6"
S2 S2
#3@6"c/c
#3@6"c/c
#3@8"c/c
#3@8"c/c
C
#3@8"c/c #3@8"c/c
Stair Reinf.
9'-0"
S3 S3 S3 S3
PARTNERS IN DEVELOPMENT
S3 S3 S3 (PID) CONSULTING
Stair Reinf. ENGINEERS
D ISLAMABAD
\\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
CLIENT:
BOTTOM BAR REINFORCEMENT PLAN (TF SLAB - 3RD FLOOR) REFER TO 15" NATIONAL UNIVERSITY OF TECHNOLOGY
PROJECT:
(SLAB THICKNESS-6") SLAB DETAIL DESIGN & CONST OF 4 X STOREY BLOCK
3"
AT NATIONAL UNIVERSITY OF
TECHNOLOGY, IJP ROAD, ISLAMABAD
6"
REFER TO
RELEVANT BEAM
DOCUMENT TITLE
2'-0"
DETAIL
15"
9" SLAB REINFORCEMENT PLAN
AT THIRD FLOOR
(BOTTOM BARS)
6"
DRAWING NO. STAMP & SIGN
N/STR/20/ 23
L/3
BE CONSTRUCTED WITH 6" HOLLOW
L/4
CONCRETE BLOCKS.
#4@6"c/c
7- FOOTING DESIGN HAS BEEN CARRIED OUT
L/3
L/3
L/3
L/4
L/4 FOR 0.75 TSF BEARING CAPACITY AS
RECOMMENDED IN REPORT FOR RAFT.
L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 8- STAIRCASE BE COVERED WITH FIBER GLASS
L/3 SHED AT THE TOP AS PER MANUFACTURER
SPECS.
24'-6"
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
CARE MUST BE EXERCISED ACCORDINGLY
#4@5"c/c
#4@5"c/c
#4@5"c/c
#3@6"c/c
#4@5"c/c
X X
#4@5"c/c
11- HEAVY LAB EQUIPMENT BE ONLY INSTALLED
AT GROUND FLOOR.
49'-0"
#4@8"c/c
L/3
L/3
L/3
B
L/3
L/3
L/3
L/3
L/3 L/3
L/3 L/3
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
L/3
L/3
L/3
L/4
L/4
L/4
#4@8"c/c
C L/3
Stair Reinf. L/4
9'-0"
L/3
Stair Reinf.
D
PARTNERS IN DEVELOPMENT
(PID) CONSULTING
ENGINEERS
\\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
ISLAMABAD
TOP BAR REINFORCEMENT PLAN (TF SLAB - 3RD FLOOR)
(SLAB THICKNESS-6")
CLIENT:
DOCUMENT TITLE
1'-4"
1" 1"
18'-0" X 17'-3" 12'-12 5'-6" 3'-3" 14'-4" 17'-2" 12'-9" 4'-9" 4'-0" 13'-72 17'-3" 18'-0" 5- DRAWING BE READ w.r.t NO'S MENTIONED AT
THE FOOTER OF EACH PLAN / DETAILED.
6- EXTERNAL WALLS HAVE BEEN DESIGNED
A FOR 8" SOLID BLOCKS AND INTERNAL WALLS
1'-0"
1'-4"
1'-4"
1'-0"
BE CONSTRUCTED WITH 6" HOLLOW
X
X CONCRETE BLOCKS.
7- FOOTING DESIGN HAS BEEN CARRIED OUT
#3@6"c/c FOR 0.75 TSF BEARING CAPACITY AS
#3@6"c/c RECOMMENDED IN REPORT FOR RAFT.
8- STAIRCASE BE COVERED WITH FIBER GLASS
SHED AT THE TOP AS PER MANUFACTURER
SPECS.
9- THERE IS NO WATER TANK AT ROOF TOP SO
24'-6"
#3@6"c/c
#3@6"c/c
X X
1'-4"
B
#3@8"c/c
#3@8"c/c
9"
S1 S1 S1 S1 S1 S1 S1 S1 S1 X X
24'-6"
S2 S2
#3@6"c/c
#3@6"c/c
#3@8"c/c
#3@8"c/c
Y Y
C
#3@8"c/c #3@8"c/c
Stair Reinf.
1'-6"
Y Y
9'-0"
S3 S3 S3 S3
S3 S3 S3
Stair Reinf.
D
PARTNERS IN DEVELOPMENT
6" (PID) CONSULTING
ENGINEERS
\\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
ISLAMABAD
17'-4"
BOTTOM BAR REINFORCEMENT PLAN (ROOF SLAB )
(SLAB THICKNESS-6") 3#3
6" Thick.R.c.c Perapit CLIENT:
3'-3"
NATIONAL UNIVERSITY OF TECHNOLOGY
REFER TO PROJECT:
REFER TO
SLAB DETAIL
#3@9"c/c
6"
#3@8"c/c
6"
DOCUMENT TITLE
1'-9"
12"
3#3 SLAB REINFORCEMENT PLAN
9"
15"
AT ROOF/ MUMTY
(BOTTOM BARS)
6"
REFER TO 12" DRAWING NO. STAMP & SIGN
RELEVANT BEAM N/STR/22/ 23
REFER TO
#4@8"c/c 2#3 DETAIL 4" DESIGN BY.
1'-4"
18'-0" 17'-3" 1"
12'-12 5'-6" 3'-3" 14'-4" 17'-2" 12'-9" 4'-9" 4'-0" 1"
13'-72 17'-3" 18'-0" 5- DRAWING BE READ w.r.t NO'S MENTIONED AT
THE FOOTER OF EACH PLAN / DETAILED.
6- EXTERNAL WALLS HAVE BEEN DESIGNED
A FOR 8" SOLID BLOCKS AND INTERNAL WALLS
1'-0"
1'-4"
1'-4"
1'-0"
BE CONSTRUCTED WITH 6" HOLLOW
CONCRETE BLOCKS.
L/3
L/4
L/3
L/3
L/4
L/4 RECOMMENDED IN REPORT FOR RAFT.
8- STAIRCASE BE COVERED WITH FIBER GLASS
L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 L/3 SHED AT THE TOP AS PER MANUFACTURER
SPECS.
L/3
9- THERE IS NO WATER TANK AT ROOF TOP SO
24'-6"
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
9"
#4@5"c/c
#4@5"c/c
#4@5"c/c
#3@6"c/c
#4@5"c/c
#4@5"c/c
11- HEAVY LAB EQUIPMENT BE ONLY INSTALLED
X X AT GROUND FLOOR.
49'-0"
L/3
L/3
L/3
#4@8"c/c
1'-4"
B
L/3
L/3
L/3
L/3
L/3 L/3
L/4 L/3 L/3
9"
X X
24'-6"
#4@5"c/c
#4@5"c/c
#4@5"c/c
#4@5"c/c
L/3
L/3
L/3
L/3
L/3
L/4
#4@8"c/c
C L/3
Stair Reinf. L/4
9'-0"
L/3
Stair Reinf.
D
PARTNERS IN DEVELOPMENT
(PID) CONSULTING
ENGINEERS
\\Server-pc\d\E DRIVE DATA\BAHRIA TOWN EDC COMMERCIAL\VETTING PROJECTS\OTHERS\2-ARSLAN MUSHTAQ\STRUCTURE\PID.jpg
ISLAMABAD
#3@10"c/c
#3@10"c/c
PROJECT:
DESIGN & CONST OF 4 X STOREY BLOCK
AT NATIONAL UNIVERSITY OF
TECHNOLOGY, IJP ROAD, ISLAMABAD
9'-4"
DOCUMENT TITLE