HP - HPE0-S22.v2018-11-13.q47: Leave A Reply

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

HP.HPE0-S22.v2018-11-13.

q47
Exam Code: HPE0-S22
Exam Name: Architecting Advanced HPE Server Solutions
Certification Provider: HP
Free Question Number: 47
Version: v2018-11-13
# of views: 861
# of Questions views: 12977
https://www.freecram.com/torrent/HP.HPE0-S22.v2018-11-13.q47.html

NEW QUESTION: 1
A customer is working on a project to enable workplace productivity. The customer needs a solution that
will allow employees to connect to their workplace environment by using a personal mobile phone,
tablet, laptop, or desktop computer. Employees must be able to stop and resume work seamlessly while
travelling between offices.
Which purpose-built hardware can the customer use to help achieve this goal?
A. HPE Apollo 2000 to provide VDI access to mobile users
B. HPE Apollo 2000 to provide hosted physical desktop and application virtualization to mobile users
C. HPE Moonshot to provide hosted physical desktop and application virtualization t mobile users
D. HPE Moonshot to provide VDI access to mobile users
Answer: C (LEAVE A REPLY)

NEW QUESTION: 2
An architect is proposing an HPE Moonshot System, including m710 cartridges, an iLO Chassis
Manager, switch, and uplink modules. The customer needs IT staff to be able to access cartridges over
a Remote console.
What should the architect explain to the customer?
A. IT staff can open a Remote Console to any cartridges linked to an mRCA through the iLO CM.
B. Remote Console access is only supported when a cartridge is part of an HPE Helion CloudSystem
9.x solution.
C. Remote console access is not supported for cartridges; IT staff should use local consoles instead.
D. IT staff can open a Remote Console to any cartridge through the iLO CM.
Answer: A (LEAVE A REPLY)
Explanation/Reference:
Reference: https://h20565.www2.hpe.com/hpsc/doc/public/display?
sp4ts.oid=5365577&docLocale=en_US&docId=emr_na-c04785597

NEW QUESTION: 3
Under which Transformation Area do HPE Moonshot solutions with Citrix fail?
A. Protect your digital enterprise.
B. Enable workplace productivity.
C. Transform to a hybrid infrastructure
D. Empower a data-driven organization.
Answer: (SHOW ANSWER)

NEW QUESTION: 4
A customer needs high performance computing (HPC) and a small-scale solution with up to eight
processors. The solution should also provide storage in a modular form factor. The customer's HPC
application is designed so that some nodes act as compute nodes while others act as storage nodes
that serve data to the compute nodes.
Which HPE Apollo system is most appropriate for this situation?
A. HPE Apollo r2200
B. HPE Apollo r2800
C. HPE Apollo 8000
D. HPE Apollo 6000
Answer: (SHOW ANSWER)

NEW QUESTION: 5
What is one advantage of hard partitioning, or nPartitioning, for HPE Integrity Superdome X as
compared to virtual partitioning?
A. It allows a single blade to support more guest operating systems
B. It provides greater reliability because partitions are electronically isolated
C. It enables HPE Helion CloudSystem to deploy VMs to the Integrity Superdome X System
D. It permits the flexibility to assign different processor cores on the same processors to different
partitions
Answer: B (LEAVE A REPLY)

NEW QUESTION: 6
A customer needs a live transcoding solution that meets the following requirements:
Supports thousands of HD streams
Provides GPU acceleration
Provides a high density of streams per Watt and rack unit
Which solution should the architect recommend?
A. Several HPE Apollo 6000 Systems with HPE ProLiant XL230a server nodes
B. Several HPE Moonshot Systems with m700 cartridges
C. Several HPE Moonshot Systems with m710p cartridges
D. Several HPE Apollo 6000 Systems with HPE ProLiant XL220a server nodes
Answer: (SHOW ANSWER)

NEW QUESTION: 7
An architect is designing a solution, a key element of which is the capability for fast VMware cluster
growth with minimal administrative interaction.
Which HPE solution should the architect recommend?
A. HPE 3PAR in combination with HPE Storage Automation
B. HPE 3PAR in combination with HPE OneView for VMware vCenter
C. HPE StoreVirtual VSA combination with HPE Virtual Connect
D. HPE MSA 2040 in combination with VMware auto deploy
Answer: B (LEAVE A REPLY)

NEW QUESTION: 8
A customer needs an HPE Apollo 6000 solution and Remote Direct Memory Access (RDMA).
Which network interconnects should the architect recommend for this solution? (Choose two.)
A. FlexFabric
B. 12G SAS
C. Infiniband
D. 16 Gb Fibre Channel
E. 1 GbEthernet
Answer: C,E (LEAVE A REPLY)

NEW QUESTION: 9
A customer needs a server quote for a DL Gen9 server. The requirements are as follows:
- Gen9 technology with internal storage to support 12 drives
- Exchange database capacity of at least 1.2TB
- 512GB of LRDIMM memory
- 10Gbe Ethernet support
The architect is proposing the DL380 Gen9 server to meet this customer's current needs and some near
future expansion.
Which component should the architect add to the quote to meet the customer's requirements?
A. HPE Smart Storage Battery
B. HPE 12Gb SAS Expander Card
C. HPE PCIe Workload Accelerators
D. HPE SAS HBA Controller H244br
Answer: (SHOW ANSWER)

NEW QUESTION: 10
A customer has a large Oracle-based ERP solution that runs on HPUX and multiple rx2800 i2 servers.
The customer plans to move to an open source solution to reduce operating expenses. The customer
needs the ability to deliver incremental capacity and needs to avoid incremental Oracle licensing costs.
Which HPE Server solution will help meet the customer's needs?
A. HPE Apollo 6000 System
B. HPE Superdome X
C. HPE BladeSystem c7000 with BL460G Gen9 Servers
D. HPE Apollo 4500 System
Answer: B (LEAVE A REPLY)
Explanation/Reference:
Reference: https://www.hpe.com/h20195/v2/GetPDF.aspx/4AA6-5294ENN.pdf (page 5)

NEW QUESTION: 11
An architect is designing an HPE Apollo 6000 solution to support a customer application. The architect is
choosing between the HPE ProLiant XL230a and the XL250a compute tray.
What is one reason for choosing the XL250a tray?
A. The application uses high amounts of memory.
B. The application requires GPU acceleration.
C. The application is single-threaded.
D. The application requires high storage capacity.
Answer: D (LEAVE A REPLY)

NEW QUESTION: 12
How does the HPE c7000 BladeSystems use of network infrastructure compare with the HPE Apollo
6000's?
A. The HPE c7000 BladeSystem offers less port variety.
B. The HPE Apollo 6000 offers greater per server connectivity.
C. The HPE Apollo 6000 uses fewer network ports per server.
D. The HPE c7000 BladeSystem offers greater port consolidation.
Answer: A (LEAVE A REPLY)

NEW QUESTION: 13
What is a basic assumption for an architect using the HPE Servers TCO calculator to justify a customer's
migration away from a fully depreciated set of hardware?
A. By analyzing the project's internal rate of return (IRR), it is possible to determine if the lower IRR will
make it more desirable to undertake the project.
B. The Net Present Value (NPV) is the difference between the value of the older systems and the cost of
the new systems.
C. When the customer's older systems are under a support contract, a new system can sometimes pay
for itself simply by not renewing the older support contracts.
D. The opportunity costs of not migrating from a legacy environment to an HPE Converged Infrastructure
Solution, in terms of IT Efficiency and User Productivity, will always justify the purchase.
Answer: B (LEAVE A REPLY)

NEW QUESTION: 14
A customer needs a mission critical SQL database. The customer has an HPE StoreServ and plans to
use this as storage.
The solution must meet the following requirements:
- 240 logical cores (Hyper-Threading enabled)
- support for 6TB Memory
- 16GB FC
- 35TB RAID 1 storage
- the ability for hardware partitioning to build different physical partitions and scale as the need for CPU
and memory resources grows Which solution should the architect recommend?
A. HPE ProLiant 980 Server
B. HPE Apollo 4200 with HPE ProLiant XL170r nodes
C. HPE SL6500 with SL230s nodes
D. HPE Superdome X with BL920s blades
Answer: (SHOW ANSWER)

NEW QUESTION: 15
An architect finds several vulnerabilities with a customer's digital enterprise that could lead to data loss
on a third-party storage system for critical business segments.
Which solution should the architect propose to help the customer to protect their digital enterprise?
A. an HPE StoreVirtual solution configured as a secondary node to replicate the critical data on the third-
party storage
B. an HPE StoreOnce solution configured to take backups of the critical data from the third-party storage
C. an HPE 3PAR StoreServ solution configured to peer persistence with the third-party storage to
protect the critical data
D. an HPE StoreAll solution configured to migrate the critical data to object-based storage
Answer: C (LEAVE A REPLY)

NEW QUESTION: 16
A customer's business critical application server, which is managed by HPE OneView, recovered from
an automatic ASR reboot. HPE Support requests an Active Health System log.
What should the customer use to access the log while the server is online?
A. UEFI Bios
B. HPE OneView
C. iLO
D. Intelligent Provisioning
Answer: C (LEAVE A REPLY)

Valid HPE0-S22 Dumps shared by PrepAwayExam.com for Helping Passing HPE0-S22 Exam!
PrepAwayExam.com now offer the newest HPE0-S22 exam dumps, the PrepAwayExam.com
HPE0-S22 exam questions have been updated and answers have been corrected get the newest
PrepAwayExam.com HPE0-S22 dumps with Test Engine here:
https://www.prepawayexam.com/HP/braindumps.HPE0-S22.ete.file.html (98 Q&As Dumps, 40%OFF
Special Discount: freecram)

NEW QUESTION: 17
An architect explains a software-defined data center (SDDC) concept and its benefits to a customer. The
customer indicates an interest and so the architect needs to verify whether the customer is ready to
move to the SDDC.
Which additional information should the architect obtain from the customer to verify this?
A. whether they have standardized on a single vendor
B. whether they have a workplace mobility plan implemented
C. whether they already virtualize compute and storage resources
D. whether they have a disaster recovery plan implemented
Answer: (SHOW ANSWER)

NEW QUESTION: 18
An architect has selected the FlexibleLOM option fur HPE XL230a compute trays, which will host an
HPC application.
When should the architect select a FlexibleLOM adapter that supports Fibre Channel over Ethernet
(FCoE)?
A. when the application requires additional bandwidth and needs a solution for load sharing traffic over
multiple links
B. when the application uses parallel computing and relies on Fibre Channel to reduce latency for
communications between compute nodes
C. when the application requires high throughput between processors and disk drives local to the same
compute tray
D. when the application uses a Fibre Channel storage area network (SAN) for its shared storage solution
Answer: (SHOW ANSWER)

NEW QUESTION: 19
A customer has an HPE Integrity Superdome X system with an nPartition that has been provisioned with
a supported OS and application.
What first detects data corruption caused by an installed DIMM module?
A. the Superdome X firmware
B. the XNC2 controller in the internal fabric
C. the OS installed on the nPartition
D. the application using the data
Answer: A (LEAVE A REPLY)

NEW QUESTION: 20
An architect needs to design a solution for a customer that stores all data on third-party NAS storage,
and that does not yet have a database solution. The new HPE-based solution must be optimized for
data mining.
How can the current data stored on the NAS be used for data mining?
A. using the database application import functionality to migrate the data from the NAS to block-level
storage for processing
B. attaching the database directly to the NAS storage by using an iSCSI Host Bus Adapter and by using
the NAS for all DB tables
C. attaching the database directly to the NAS storage by using a Fibre Channel Host Bus Adapter and
by using the NAS for all DB tables
D. connecting the database to the NAS as main storage by using a TOE Host Bus Adapter
Answer: A (LEAVE A REPLY)

NEW QUESTION: 21
During a data center transformation discussion, an architect obtains the following customer information:
core business depends heavily on advanced data modelling techniques that has been developed
internally
infrastructure in use takes anywhere from 10 hours to five days to complete complex data models for
the various development teams that rely on them
has a proud reputation as an "environmentally friendly" Fortune 500 company
increasing productivity of its development team is the highest priority
Which large scale HPC solution should the architect recommend to help the customer achieve its
transformation goals?
A. HPE Apollo 2000
B. HPE Apollo 8000
C. HPE Integrity Superdome X
D. HPE Apollo 6000
Answer: (SHOW ANSWER)

NEW QUESTION: 22
An architect is determining the amount of memory to propose for an HPE XL230a compute tray.
The customer specifies several requirements, properties, and parameter of the application.
Which factor will critically affect the memory amount requirement to prevent a potential memory
bottleneck?
A. Secure Encryption of locally stored data is required.
B. The application requires CPUs with multiple cores to support multiple HPC jobs.
C. The application is single-threaded high performance computing (HPC).
D. The application stores data on local drives.
Answer: B (LEAVE A REPLY)
NEW QUESTION: 23
A customer plans to purchase some c7000 blade enclosures equipped with Virtual Connect FlexFabric
modules to support its development and test team. The customer is concerned about frequent changes
to the server blade connectivity. In the initial proposal, an architect included HPE OneView, and now the
customer wants to learn how HPE OneView will address their concern.
Which HPE OneView functionality should the architect explain to the customer?
A. the customer can use different plugins to visualize network and storage connectivity, and change
them by using the drag and drop method.
B. the customer can create profile templates, deploy server profiles from the template, and, if necessary,
use the same method to update server connectivity.
C. the customer can access HPE Virtual Connect Enterprise Manager and perform connectivity changes
for all servers in the same Virtual Connect Domain Group.
D. all external connectivity changes will be automatically discovered and server profiles will be
automatically updated to reflect the change.
Answer: (SHOW ANSWER)

NEW QUESTION: 24
An architect plans to propose a solution and illustrate how it will reduce the predictable and repeatable
costs for items and services not registered as assets.
Which reporting period information helps the architect achieve this goal?
A. total cost of acquisition (TCA)
B. operating expenditure (OPEX)
C. internal rate of return (IRR)
D. gross profit (GP)
Answer: B (LEAVE A REPLY)

NEW QUESTION: 25
View the Exhibit.
Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support
a customer application virtualization solution. The customer indicated that the maximum acceptable
response time for the solution is three seconds. The architect has implemented a POC and tested a
single cartridge with different numbers of user sessions.
The architect monitored resource utilization throughout the tests. The results of the test with the point at
which the response time exceeded three seconds are shown, marked as the "VSI max." What should the
architect conclude from this test?
A. CPU becomes a limiting factor around 50 sessions, so the architect should propose at least one
cartridge per 45 or 50 users.
B. None of the monitored resources shows signs of being a bottleneck, so the architect should consider
other factors such as the HPE Moonshot switch module.
C. The memory becomes a bottleneck before other resources, so the architect should propose m400
cartridges, which provide a higher memory capacity.
D. The network adapter becomes a bottleneck before other resources, so the architect should propose
m710p cartridges, which provide 10GbE ports.
Answer: D (LEAVE A REPLY)

NEW QUESTION: 26
A customer needs to streamline monitoring to its HPE Apollo 6000 solution.
Which benefit can HPE Advanced Power Management (APM) provide to this customer?
A. It monitors the utilization of resources such as CPU and memory.
B. It audits the firmware on XL servers installed in the HPE Apollo chassis.
C. It enables HPE OneView to automatically discover and map the chassis and its servers.
D. It discovers and inventories XL servers installed in the HPE Apollo chassis.
Answer: (SHOW ANSWER)

NEW QUESTION: 27
A customer needs to integrate an existing incident management application with HPE OneView. The
customer needs to be notified when the physical resource status changes or when a new server is
added to the infrastructure.
Which HPE OneView feature should the architect recommend to the customer?
A. RESTful API and State Change Message Bus concept
B. WBEM Subscription option that will allow data retrieval from HPE OneView
C. additional licensed integration plugins for HPE OneView that will allow required integration
D. HPE Cloud Optimizer for HPE OneView
Answer: A (LEAVE A REPLY)

NEW QUESTION: 28
An architect is proposing a solution that has two HPE Moonshot 1500 chassis, each of which is full of
m700 cartridges. The customer needs the solution to quickly deploy the OS to cartridges, back up a
golden node image. and clone the image.
The customer is concerned about cost and is not interested in managing or monitoring performance of
the solution, Which solution meets these requirements?
A. HPE Insight Cluster Management Utility (CMU)
B. HPE Intelligent Provisioning (IP)
C. HPE OneView 2.0
D. HPE Insight Control server provisioning (ICsp)
Answer: (SHOW ANSWER)
Explanation/Reference:
Reference: https://www.google.com/url?
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwjU36a30sHTAhVJShQKHSt0
BhYQFggnMAA&url=http%3A%2F%2Fwww.hpe.com%2Fsupport%
2Fmoonshot_os_deployment_en&usg=AFQjCNHzc8octr9gtYrHDWIERZNfWTSoEw&sig2=ITJAdGidDUO
SlN-6u7QKeQ

NEW QUESTION: 29
Which of the HPE Transformation Areas should the architect discuss when the customer's concerns
span backup and recovery, high availability, and disaster recovery?
A. Transform to a hybrid infrastructure.
B. Empower the data-driven organization.
C. Protect the digital enterprise.
D. Enable workplace productivity.
Answer: C (LEAVE A REPLY)
Explanation/Reference:
Reference: https://community.hpe.com/t5/OEM-Solutions/Transformation-Areas-for-the-New-Style-of-
Business/ba-p/6830963#.WQA-_Fi6wSw

NEW QUESTION: 30
A customer is deploying HPE Apollo Systems, which the customer hopes will help the organization
achieve its goals for efficient energy operations. In assessing the customer maturity, the architect finds
that IT staff has limited insight into how efficiently servers are operating and limited ability to enforce
energy efficiency policies.
Which solution should the architect recommend to help solve these issues?
A. HPE Advanced Power Manager
B. HPE OneView 2.x
C. HPE Power Advisor
D. HPE Insight Remote Support
Answer: A (LEAVE A REPLY)
Explanation/Reference:
Reference: https://www.hpe.com/h20195/v2/GetPDF.aspx/4AA5-3291ENN.pdf

NEW QUESTION: 31
Which factors must the architect consider to help define an appropriate HPE server solution to meet a
customer's needs?
A. the number of users for the application, the IT resources required by the application, which
applications can be consolidated, and whether there are any Service Level Agreement (SLA)
requirements
B. the legacy hardware and software solutions that the customer is currently running, whether the
customer is standardized on x86 architectures, and which storage and networking protocols the
customer is using
C. the installed base of ProLiant, 3PAR, and ProCurve products, and whether any Cloudline
opportunities exist at the customer site
D. whether the customer is considering solutions for the New Style of IT, for Security, for Big Data, or for
Mobility
Answer: (SHOW ANSWER)

Valid HPE0-S22 Dumps shared by PrepAwayExam.com for Helping Passing HPE0-S22 Exam!
PrepAwayExam.com now offer the newest HPE0-S22 exam dumps, the PrepAwayExam.com
HPE0-S22 exam questions have been updated and answers have been corrected get the newest
PrepAwayExam.com HPE0-S22 dumps with Test Engine here:
https://www.prepawayexam.com/HP/braindumps.HPE0-S22.ete.file.html (98 Q&As Dumps, 40%OFF
Special Discount: freecram)
NEW QUESTION: 32

An architect proposes an HPE Moonshot solution to a customer. The customer informs the architect that
the data center switches can only provide four 40GbE ports per rack.
How should the architect modify the proposed solution so that each rack meets the requirement?
A. Use the iLO Chassis Management (CM) module port to daisy chain the chassis together and let the
chassis in the daisy chain share uplinks
B. Use the iLO Chassis Management (CM) module port to support both iLO and production traffic on
four of the HPE Moonshot chassis
C. Create two Intelligent Resilient Framework (IRF) fabrics, each with four switch modules, and let the
switches in each fabric share uplinks
D. Replace the 45XGc modules with the 180G module to aggregate uplink ports on multiple chassis into
a single port
Answer: A (LEAVE A REPLY)

NEW QUESTION: 33
A customer plans to add a high performance computing system capable of hard partitioning to a data
center that employs HPE StoreServ 7000.
Which solution should the architect include in the design?
A. an HPE SuperdomeX with Fibre Channel connectivity to the HPE 3PAR storage
B. an HPE Apolo6000 with Fibre Channel connectivity to the HPE 3PAR storage
C. an HPE Apollo 2000 system with iSCSI connectivity to the HPE 3PAR system
D. an HPE Moonshot system with iSCSI connectivity to the HPE 3PAR system
Answer: A (LEAVE A REPLY)

NEW QUESTION: 34
When designing a Superdome X configuration for a customer, which storage configuration should the
architect choose?
A. booting from a local direct attached SSD disk and a mezzanine TOE N/W port for user data accessing
an MSA 2040 using iSCSI
B. booting from a local direct attached SSD disk and a mezzanine FC port for user data storage on an
MSA 2040
C. a single mezzanine FC port in each nPar for common access to all volumes on an HPE 3PAR
StoreServ
D. one mezzanine FC port on one nPar dedicated for booting from an MSA 2040 and an additional FC
port for user data
Answer: (SHOW ANSWER)

NEW QUESTION: 35
A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the
architect that the planned purchase of 40GbE switches has been postponed. The customer still intends
to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used.
These switches are HPE network switches located 25 meters from the location of the racks that house
the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth.
Which action should the architect recommend to allow the customer to deploy the solution immediately
and easily take advantage of 40GbE when deployed later?
A. Replace the QSFP+ transceivers with SFP+ transceivers
B. Swap in HPE Moonshot-16SFP+ Uplink Modules
C. Replace the DAC cables with DAC splitter cables
D. Add QSP+/SFP+ adaptor kits to the design
Answer: (SHOW ANSWER)

NEW QUESTION: 36
An architect is designing a data center solution that contains an HPE BladeSystem for the virtual
application, infrastructure, and VDI environment. It also contains an HPE Moonshot for the web servers.
In which parts of the HPE Transformation Area does this solution fit?
A. empower and protect
B. transform and empower
C. enable and empower
D. transform and protect
Answer: B (LEAVE A REPLY)

NEW QUESTION: 37
A customer's Gen9 web server resides behind a firewall.
What is the most secure and efficient method to monitor this server?
A. Create Firewall rules and install WBEM.
B. Use Agentless Management.
C. Create Firewall rules and install System Management Homepage in Protected Mode.
D. Use Intelligent Provisioning.
Answer: (SHOW ANSWER)

NEW QUESTION: 38
An architect is planning an HPE Integrity Superdome X solution with the following nPartitions:
nPar 1= Slots 1, 3, and 5
nPar 2 = Slots 2, 4, and 6
The Superdome X solution must connect to a Fibre Channel SAN solution, which provides boot disks for
the Superdome X solution.
The architect has selected a FlexibleLOM adapter for each blade.
What is a valid plan for additional adapters?
A. one 2-port FC HBA each for slot 2, slot 4, and slot 6
B. one 2-port FC HBA each for slot 1, slot 3, and slot 5
C. one 2-port FC HBA each for slot 1 and slot 2
D. one 2-port FC HBA for slot 1
Answer: A (LEAVE A REPLY)

NEW QUESTION: 39
A customer needs a hosted physical desktop solution. Users will run typical o iceapplications with
limited use of some media-rich applications such as Adobe Photoshop. The customer needs the densest
and most cost-effective solution that can support such users.
Which HPE Moonshot cartridge should the architect recommend?
A. HPE m710
B. HPE m400
C. HPE m700
D. HPE m710p
Answer: D (LEAVE A REPLY)
Explanation/Reference:
Reference: https://www.hpe.com/us/en/product-catalog/servers/moonshot-systems/pip.hpe-proliant-
m710p-server-cartridge.8732043.html
NEW QUESTION: 40
An architect is planning an HPE Apollo 4530 solution to support the Cloudera distribution of Spark and
HDFS. Each HPE ProLiant XL450 in the solution uses the following baseline recommendations:
- 15 8TB HDDs (120TB total)
- 2 10-core 2.3GHz processors
- 128GB memory (64GB on each processor)
- 2-port 10GbE FlexibleLOM
The architect has planned enough servers to meet the customer's requirements for total capacity.
Which two components in this plan are most likely to cause a bottleneck as an increasing number of
Spark applications run?
A. drive type (HDD versus SSD) and drive capacity
B. drive capacity and memory
C. processor and memory
D. adapter bandwidth and processors
Answer: (SHOW ANSWER)

NEW QUESTION: 41
An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application.
The architect originally proposed the following:
m710 cartridges
HPE 45XGc switches
HPE 4-QSFP+ Uplink Modules
The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or
local storage.
Cartridge nodes needs two 10GbE ports each.
What does the architect need to replace in the solution to meet the customer's new requirements?
A. m710 cartridges with m710p cartridges, which support higher capacity local drives
B. 4-QSFP+ Uplink Modules with 16-SFP+ Uplink Modules, which provide 10GbE ports to the cartridges
C. 45XGc switches with 180G switches, which provide the required two 10GbE ports to the cartridges
D. m710 cartridges with m350 Cartridge, which provide more memory
Answer: (SHOW ANSWER)

NEW QUESTION: 42
A customer has a mixed environment based on the G6, G7, Gen8, and Gen9 ProLiant server blades.
The customer is interested in implementing HPE OneView but needs to understand security and
monitoring mechanisms for different server generations.
Which statement most accurately describes different platform support in HPE OneView?
A. WBEM Providers will be used for any server managed by HPE OneView.
B. The customer can select from different management protocols between SNMP V2 and SNMP VS to
match the security requirements.
C. All servers managed by HPE OneView will use WBEM Providers, but collected data must be
translated to the SNMP traps using embedded WMI Mapper.
D. HPE OneView can manage G7, Gen8/Gen9 servers, while G6 servers can only be monitored.
Answer: A (LEAVE A REPLY)

NEW QUESTION: 43
Which network infrastructure components should an architect consider when recommending 40GbE in a
server solution?
A. OM2 cables can be reused for runs of 50 meters or less
B. OM4 cables can be reused for all runs out to the maximum of 300 meters
C. Cables will need to be replaced by multi strand MPO cables
D. Multimode cables will all need to be replaced by single mode cables
Answer: (SHOW ANSWER)
Explanation/Reference:

NEW QUESTION: 44
An architect is planning an HPE Moonshot solution with m710p cartridges. The customer's application
requires cartridge nodes to connect to a NAS. The customer's current infrastructure supports 10GbE. In
the future, the customer plans to upgrade the fabric between the HPE Moonshot and the NAS solution to
support 40GbE.
Which switch modules and uplink modules should the architect recommend to meet both the current and
future needs?
A. HPE Moonshot 45XGc Switch Modules and HPE Moonshot 4-QSFP+ Uplink Modules
B. HPE Moonshot 45XG Switch Modules and HPE Moonshot 16-SPF+ Uplink Modules
C. HPE Moonshot 180G Switch Modules and HPE Moonshot 16-SFP+ Uplink Modules
D. HPE Moonshot 180G Switch Modules and HPE Moonshot 4-QPPF+ Uplink Modules
Answer: A (LEAVE A REPLY)

NEW QUESTION: 45
A customer requires a server infrastructure update for its Hadoop HBase solution. The HBase maximum
dataset size will be 120TB.
To host HBase, the architect is planning three HPE Moonshot 1500 chassis fully populated with
cartridges.
The populated chassis provide the following in total:
- 135 processors with four 2.9GHz cores each
- 4.23TB RAM
- 64.8TB local storage on SSDs
An aspect of the design is under provisioned and is likely to cause performance to degrade to one-tenth
or even one-hundredth of its potential.
How can the architect resolve this problem?
A. Scale the SSD capacity by adding cartridges or selecting higher capacity SSDs
B. Select different cartridges that provide more processor cores
C. Scale the memory capacity by selecting higher capacity DIMM's for the cartridges
D. Select different cartridges that provide more nodes per cartridge
Answer: A (LEAVE A REPLY)

NEW QUESTION: 46
An architect is writing a response to a Request for Proposal (RFP). The customer has requested
financial information on the monetary amount by which assets are valued in business records.
Which value does the architect need to consider?
A. total cost of acquisition (TCA)
B. net investment value (NIV)
C. net book value (NBV)
D. fair market value (FMV)
Answer: C (LEAVE A REPLY)
Explanation/Reference:
Reference: https://www.seslisozluk.net/book-value-nedir-ne-demek/

Valid HPE0-S22 Dumps shared by PrepAwayExam.com for Helping Passing HPE0-S22 Exam!
PrepAwayExam.com now offer the newest HPE0-S22 exam dumps, the PrepAwayExam.com
HPE0-S22 exam questions have been updated and answers have been corrected get the newest
PrepAwayExam.com HPE0-S22 dumps with Test Engine here:
https://www.prepawayexam.com/HP/braindumps.HPE0-S22.ete.file.html (98 Q&As Dumps, 40%OFF
Special Discount: freecram)

NEW QUESTION: 47
An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO
connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set
up as individual switches connected to a single core.
Which configuration change should the architect recommend to ensure a loop free management
topology?
A. Replace the top-of-rack switches with HPE Advanced Power Management Kits.
B. Configure MAD between the top-of-rack switches.
C. Configure IRF between the top-of-rack switches.
D. Remove one iLO connection from each HPE Apollo 6000 chassis.
Answer: C (LEAVE A REPLY)
Valid HPE0-S22 Dumps shared by PrepAwayExam.com for Helping Passing HPE0-S22 Exam!
PrepAwayExam.com now offer the newest HPE0-S22 exam dumps, the PrepAwayExam.com
HPE0-S22 exam questions have been updated and answers have been corrected get the newest
PrepAwayExam.com HPE0-S22 dumps with Test Engine here:
https://www.prepawayexam.com/HP/braindumps.HPE0-S22.ete.file.html (98 Q&As Dumps, 40%OFF
Special Discount: freecram)

You might also like