Professional Documents
Culture Documents
Data Pengamatan Perc. Skala Laju Alir (ML/S) Laju Alir (ML/S) T (°C) T (°C) T (°C) T (°C)
Data Pengamatan Perc. Skala Laju Alir (ML/S) Laju Alir (ML/S) T (°C) T (°C) T (°C) T (°C)
Laju
Laju Alir t1 t2 T1 T2
Perc. Skala aliravg
(ml/s) (°C) (°C) (°C) (°C)
(ml/s)
138.39
123.8
121.67
96.15
124.38 125.04
1 300 38.8 39 46 39.8
128.32 6
133.74
127.90
126.24
129.87
164.53
175.85
162.84
162.45
166.53 167.26
2 400 36 37 47 39.3
167.37 8
165.95
171.61
170.30
165.25
Laju Alir t1 t2
Perc Skala T1(°F) T2(°F)
(lb/hr) (°F) (°F)
1 733.745 101.84 102.2 114.8 103.64
2 981.5 96.8 98.6 116.6 102.74
Perhitungan
Penentuan Data Fisis
Panjang Pipa = 6 m = 19.6848 ft
Data Pipa
Heat Balance:
114.8+103.64
T avg= =109.22℉
2
lb BTU BTU
(
Q= 733.745
hr )
× 1.009
lb ℉
( 114.8−103.64 ) ℉=8262.3
lb
101.84+102.2
t avg= =102.02 ℉
2
8262.3 BTU /lb
W= =22905.023lb/hr
BTU
1.002 ℉ ×(102.2−101.84)℉
lb
LMTD
4 4
De = ¿ ¿) / D1 = (0.0874 −0.072 ¿/0.07=0.039 ft
2
Mass Vel
lb
Ga = W/Aa = 22905.023 ÷ 2.15× 10−3 ft 2
hr
Ga = 10653499.07 (lb)(ft2)/(hr)
Nre
Pada 102.02 °F, µ = 0.7 cP
= 0.7 × 2.42 = 1.694 lb/(ft)(hr)
D e G a 0.039× 10653499.07
Nre = = =245269.4591
μ 1.694
JH
Dari Fig.24 diperoleh jH = 500
Pada 102.02 °F, Cp = 1.002 BTU/(lb) (°F)
k = 0.36611 BTU/hr ft2 (°F/ft)
1
1 1.002× 1.694 3¿ =1.667¿
Cp μ 3¿ ¿( 0.36611
) ¿
( )
k
k Cp μ 13 μ 0.14
h o= j H
De k ( ) ( )
μw
0.36611
.h o=500 × × 1.667× 1.0
0.039
BTU
.h o=7824.43
(hr ) ( ft )2 (℉)
Mass Vel
lb
Gp = w/Ap = 733.745 ÷ 2.1087× 10−3 ft 2
hr
Gp = 347960.8289 (lb)(ft2)/(hr)
JH
Dari Fig.24 diperoleh jH = 325
Pada 109.22 °F, Cp = 1.009 BTU/(lb) (°F)
k = 0.36971 BTU/hr ft2 (°F/ft)
1
1 1.009× 1.573 3 =1.625¿
Cp μ 3¿ ¿( 0.36971 ) ¿ ¿
( )
k
k Cp μ 13 μ 0.14
hi = j H
De k ( ) ( )
μw
0.36971
.hi =325× ×1.625 ×1.0
0.05183
BTU
.hi =3767.18
(hr) ( ft )2 (℉ )
ID
hio =3767.18 ×
OD
0.622
.hio =3767.18 × =2789.5
0.84