KWIKSTAGE

U S E R G U I D E F O R G E N U I N E K W I K S T AG E
contents
Section 1
Kwikstagecomponents 5

Section 2
Erectionanddismantlingofa 11
basicKwikstagescaffold

Section 3
Safeuseandmaintenance 17

Section 4
Loadingdataandtiepatterns 18

Section 5
Bracingrequirements 52

Section 6
Platformbrackets 53

Section 7
Ladderandstairaccess 54

Section 8
Loadingtower 57

Section 9
Kwikstagesafeanchoragepoints 59

Appendix A -Identificationand 61
useofalternativecomponents

Thisguideisvalidonlyfortheuseof
GenuineKwikstagemanufactured,repaired
andmaintainedwhereappropriatebyInterserve
IndustrialorRMDKwikform.

FirstIssue2010

1 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

userguide
TheDesignationofaGenuineKwikstageScaffoldinaccordancewith
BSEN12810-1:2003is:Scaffold EN 12810-4N-SW12/244-H1-B-LS

The“Kwikstageforaccess”User DISCLAIMER:
Guidehasbeendesignedtoprovide InformationgiveninthisUserGuide
guidanceonhowtosafelyerect, relatessolelytoequipment
useanddismantlebasic manufacturedandsuppliedbyRMD
IndependentAccessScaffolds KwikformandInterserveIndustrial.
formedfromKwikstage. AnumberofKwikstageimitations
areavailable,thequalityofwhich
Requirementscontainedincurrent isunknown.Wherescaffold
CENandBSStandardshavebeen structuresareerectedwholly,orin
implementedtogetherwiththoseit part,fromsuchcopyequipment,
isanticipatedwillbecontainedin instructionsforitsuseshouldbe
Standardscurrentlyunder obtainedfromthemanufacturerof
preparation. thecopyequipment.

Aspartoftheongoingdevelopment
ofKwikstage,andtofacilitate NOTE:
compliancewithchangesin Only trained, competent
legislation,anumberofnew operatives should erect, dismantle
componentshavebeenintroduced, or adapt Kwikstage scaffolds at
somecomponentshavebeen all times.
discontinuedandthedesignand/or
useofothersmodified. Safe systems of work for the
erection, dismantling or
ThisUserGuideisdesignedforsafe adaptation of Kwikstage scaffolds
useofKwikstagecomponentsas should reflect current legislative
currentlymanufactured.Wherethe and industry best practice
designoruseofacomponenthas methodology.
changedsignificantly,information
onthecomponentconcernedis We recommend that as a minimum
giveninAppendixA. the guidelines for working
practices for scaffolders working
Guidanceisprovidedforscaffolds at heights contained in document
ofbothnominal1.2m(5board)and SG4, produced by the National
0.8m(3board)widths. Access and Scaffolding
Confederation (NASC) are applied
For information on Kwikstage to activities taking into
components and applications not consideration the requirements
shown in this User Guide, please for advanced guardrails.
consult your local Branch.

FirstIssue2010

G E N U I N E K W I K S T A G E 2
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

guidetosafe
scaffolding1

Always Ensureallon-siteusersknowforwhatpurposethe
scaffoldisintendedandtheloadsitisdesignedto
take.
Always Preparethegroundforthescaffoldandtheloadsit
willimpose.
Always Ensurethatyouprovideagreedstorageareasfor
scaffoldingonsitetoreducehandlingandprevent
trippinghazards.
Always Keepaccessroutesclear.
Always Inspectthescaffoldeachtimebeforeuse.
Always Inspectyourscaffoldsandissuereports.Itis
requiredbylaw.
Always Giveconsiderationtotheuseofataggingsystem.
Always Preventaccesstoincompleteand/orunsafe
scaffoldsandensurethatyouhave“scaffoldnotto
beused”signsinplace.
Always Tellthescaffoldingcontractorifthescaffoldgets
damaged,repairscanthenbearranged.
Always Protectscaffoldfromdamagebysiteplant.
Always Ensureloadsontheplatformareevenlydistributed.
Always Considertheweightofthematerialsyouare
loadingonthescaffoldandinstructoperativeson
maximumloading.
Always Instructforkliftdriveronmaximumloading.
Always Useproperlydesignedloadingtowers.
Always Instructtheoperativeswhowillbeusingthe
scaffoldnottomakeanyadaptations.
Always Reportscaffolddefectstoscaffoldingcontractor-
youmaybesavingalife.
ALWAYS LOOK AFTER YOUR
SCAFFOLDING. BE SAFE.

FirstIssue2010

3 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

guidetosafe
scaffolding2
Never *RemoveTies.
Never *Removeguardrails,toeboards,orbrickguards.
Never Removecomponentsoradaptscaffolding.
Never Creategapsinplatformbyremovingscaffoldboards
fromplatform.
Never Workonorusescaffoldswhicharebeingerectedor
dismantled.
Never Removeladders.
Never Overloadthescaffold.
Never Underminethescaffoldbydiggingtrenchesor
foundationsunderoradjacenttoit.
Never Addsheetingornettingtoscaffoldwithoutthe
approvalofthescaffolddesigner.
Never Forkliftloadsdirectlyontoaccessscaffold
(instead,usealoadingtower).
Never Allowsiteplanttorunoverscaffoldmaterials,
damagedscaffoldboardscauseaccidents.
Never Allowsiteplanttorunintoscaffold,benttubes
couldleadtocollapseofthestructure.

*Exceptwhenusingtrainedcompetentoperatives,workingto
youragreedsiterequirementsandinstructions.

NEVER
TAKE
RISKS –
THEODDSARE
AGAINSTYOU

FirstIssue2010

G E N U I N E K W I K S T A G E 4
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section1components
ThefollowinglistdetailsbasicKwikstagecomponents.Additionalcomponentstocaterfor
specificapplicationsareavailablefromyourlocalRMDKwikformorInterserveIndustrialbranch.
Allcomponentdimensionsarenominal.Weightsofcomponentsrelatetothosecurrentlyin
productionandmaydifferfromearlierdesigns.

UniversalJack Ledger/Guardrails
Designedforlevellingascaffold Thesecomponentshaveawedgefixingdevice
wheregroundorfoundationlevels ateachend.Thesefitintotheupper‘V’
vary.Adjustmentisbymeansofa pressingsontheStandardstolocatethemat
collaronathreadedstem. therequiredlongitudinalspacing.Theyareused
inpairsasLedgersateach‘lift’,andto
Universal Jack formGuardrailsatplatformlevel.
CodeNo.(RMDK) KAX20005
CodeNo.(Interserve) 9001
Weight 6.5kg
Range:closeddimension 140mm
Maximumadjustment 595mm

1.8m Ledger/Guardrail 2.4m Ledger/Guardrail


CodeNo. KAX41829 CodeNo. KAX42438
Standards
CodeNo. 9028 CodeNo. 9014
Thesecomponentsformtheverticalsupports Standardspacing 1.83m Standardspacing 2.44m
andaremadefromstandardscaffoldtube. Weight 7.5kg Weight 9.3kg
Theyhave‘V’pressingsinclustersat
495mmintervalsthatprovideconnection
pointsforLedgers,Transomsetc. Transoms
TheStandardsalsohavespigots Thesecomponentsareintheformofan
atthehead. invertedT-sectionwithwedgefixingdevicesat
eachend.Thesefitintothelower‘V’pressing
(Standardsmanufacturedprior
ontheStandardstolocatethemattherequired
to1994haveaspigotand lateralspacing.FlangesontheT-sectionprovide
wedgeconnection.) aseatingfordeckingcomponents.

3m Standard
CodeNo. KAX32000
CodeNo. 9015
Weight 12.0kg

3m Standard 0.8 Transom 1.2 Transom


CodeNo. KAX33000 CodeNo. KAX50812 CodeNo. KAX51270
CodeNo. 9032 CodeNo. 9529 CodeNo. 9016
Weight 17.0kg Standardspacing 0.81m Standardspacing 1.27m
Weight 4.7kg Weight 6.9kg

FirstIssue2010

5 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

ReturnTransoms TieBars
Thesecomponentsaresimilartonormal TieBarsareformedfromsteelangle,with
Transomsexceptthattheyhaveapressedsteel curvedlugsateachendwhichengageinholes
sectionthathooksoveraLedgertoforma90
o
in2and3BoardPlatformBrackets.TieBarsmust
returninascaffold. alwaysbeusedtopreventthespreadingof 2and
3BoardPlatformBrackets.

1.2m Tie Bar


CodeNo. KAX10027
CodeNo. 9033
Standardspacing 1.27m
Weight 3.8kg
0.8 Return Transom 1.2 Return Transom
1.8m Tie Bar 2.4m Tie Bar
CodeNo. KAX50008 CodeNo. KAX50007
CodeNo. KAX10028 CodeNo. KAX10029
CodeNo. 7807 CodeNo. 9017
CodeNo. 9027 CodeNo. 9020
Standardspacing 0.81m Standardspacing 1.27m
Standardspacing 1.83m Standardspacing 2.44m
Weight 8.5kg Weight 13.1kg
Weight 5.4kg Weight 7.2kg

DiagonalBraces
Thesecomponentsareformedfromtube,with
PlatformBrackets pivotingwedgedevicesateachend.Thesefit
intotheoutside‘V’pressingsontheStandards.
PlatformBracketsareusedtoprovidea
cantileveredplatformontheinnersideofa
scaffold.Theyareformedfromaninverted
T-sectionwithawedgefixingdeviceatone
endwhichfitsintoa‘V’pressingonaStandard. 2.76m Diagonal Brace 3.54m Diagonal Brace
TieBarsmustalwaysbeusedwith2and3
CodeNo. KAX62744 CodeNo. KAX63658
BoardPlatformBrackets.
CodeNo. 9051 CodeNo. 9026
Weight 11.0kg Weight 13.9kg
Forusein1.8mBays Forusein2.4mBays

Steelstage
Steelstageisagalvanisedpressedsteelbatten
withaslipresistantsurface.Thesebattensare
230mmwideand64mmdeepandarethe
1 Board Bracket 2 Board Bracket
preferredtypeforformingtheworking
CodeNo. KAX10003 CodeNo. KAX10004 platformsonKwikstagescaffolds.
CodeNo. 9041 CodeNo. 9019
WidthofPlatform 230mm WidthofPlatform 460mm
Weight 2.3kg Weight 4.9kg 1.2m Steel Stage 1.8m Steel Stage
CodeNo. SGX11219 CodeNo. SGX11829
3 Board Bracket CodeNo. 9515 CodeNo. 9513
CodeNo. KAX10005 Standardspacing 1.27m Standardspacing 1.8m
CodeNo. 9022 Weight 8.5kg Weight 12.3kg
WidthofPlatform 690mm 2.4m Steel Stage
Weight 6.5kg CodeNo. SGX12438
CodeNo. 9514
Standardspacing 2.44m
Weight 16.1kg FirstIssue2010

G E N U I N E K W I K S T A G E 6
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

1components
ToeboardBracket StairwayUnit
ThiscomponentclampsontoaStandardby TheStairwayUnitismadefromaluminiumand
meansofacaptivewedge.Itholdseitherone fitsintoa2.4mx2.0mKwikstagescaffold.Itis
ortwoSteelstage connectedtotheTransomsbymeans
toeboardsinposition. ofaboltedclip(ItemNo.7400).
Theoverallwidthoftheunit
Toeboard Bracket is576mm,enablingtwotobe
CodeNo. KAX10009 fixedinastandard1.27m
widebay.
CodeNo. 9029
Weight 0.8kg Stairway Unit
CodeNo. KAX10023
EndToeboardBracket CodeNo. 9042
Thesecomponentsfitinto‘V’ Weight 31.9kg
pressingsonStandardsattheendof
aplatformandholdtheend
Steelstagetoeboardinposition.
HandrailUnit
End Toeboard Bracket Thisaluminiumcomponentfits
CodeNo. KAX10002 intosocketsintheStairwayUnit
toprovideadoubleguardrail.
CodeNo. 9099
Weight 1.3kg Handrail Unit
CodeNo. KAX10016
Kwikguards CodeNo. 9043
Thesegalvanisedsteel Weight 10.0kg
componentsarecombined
Guardrail,Toeboardand
Brickguardunitsandfit
intothe‘V’pressingson
theStandards.
InternalCornerFiller
1.2m Kwikguard 1.8m Kwikguard
Kwikstageinternalcornerfillerhasbeen
CodeNo. KAX10018 CodeNo. KAX10019 designedforusewithtwoandthree
CodeNo. 9068 CodeNo. 9067 boardstagebracketsatinternalcorners
ofbuildings.
Weight 15.0kg Weight 20.0kg
2.4m Kwikguard Internal Corner Filler
CodeNo. KAX10020 CodeNo. KAX10017
CodeNo. 9066 CodeNo. 9053
Weight 25.0kg Weight 8.9kg

LadderAccessTransom
Thiscomponentisusedinaladder
accesstowertoforman
openinginthe
platform.

Ladder Access Transform


CodeNo. KAX50004
CodeNo. 9055
Weight 10.0kg

7 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

LoadingTowerTransom Guardrail/GateRestraint
ThisTransomisdesignedtoconnecttothe Thiscomponentisformedfromgalvanisedsteel
frontpairofStandardsinaloadingtowerby tubeandisfixedtotheKwikguardoneachside
meansofwedgefixingdevices.Thesefitinto ofaloadingtowerbymeansofahalf-coupler
twopairsofupper‘V’pressingsonthe hinge.Inthe‘open’positionitformsabarrier
Standards.ThetopchordoftheTransomisin betweenthemainscaffoldplatformandthe
theformofaninvertedT-section,theflanges towerdeck.Inthe‘closed’positionitformsa
ofwhichformaseatingfortheSteelstage guardrailatthefrontofthetower
decking. andanattachmentpoint
forthegatelatch.

Loading Tower Transform Guradrail/Gate Restraint


CodeNo. KAX50005 CodeNo. KAX10015
CodeNo. 9010 CodeNo. 9002
Standardspacing 2.44m Weight 22.0kg
Weight 37.0kg

InfillTransom LoadingTowerGates
Thisgateoperatesonafulcrummechanism
Thesegalvanisedcomponentsareusedatthe
attachedtothesidebarrierandsimplyopens
rearofaloadingtowertosupportthe
withanoperatingtubeconnectedbetweenthe
Steelstagedeckingandtofillthegapbetween
arms.Thegatefailssafelytoaclosedposition
itandthemainscaffoldplatform.They
iftheoperatorreleasesholdoftheoperating
connect,bymeansofawedgefixingdevice,to
tube
theStandardsina2.4mscaffoldbayandtoan
additionalstandardatthe
centreofthebay.

1.2m Infill Transom


CodeNo. KAX50003
CodeNo. 9011
Standardspacing 1.22m Loading Tower Gates

Weight 13.0kg CodeNo. KAX10014


CodeNo. 9090&9095
Weight 38.0kg
InfillTie
Thisgalvanisedtieisformedfromsteelbox
section.ItconnectsaroundtheStandardatthe
centreoftherearofthetowerandoverthe LoadingTowerIntermediate
LoadingTowerTransom. StandardRestraint
Thiscomponentprovideslateralrestrainttothe
intermediateStandardattherearofaloading
2.4m Infill Tie tower.
CodeNo. KAX50005
CodeNo. 9012
Weight 13.0kg
CodeNo. KAX10024
CodeNo. 9005
Weight 4.5kg

FirstIssue2010

G E N U I N E K W I K S T A G E 8
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

1components
AdditionalKwikstage DrilledTransoms
Components SimilartonormalTransomsexceptthatholes
havebeendrilledintheflangetoacceptaTie
Thefollowingtwopagesprovidedetailsof Bar.
additionalcomponentswhichcanbeusedwith
Kwikstagescaffolds. Safe Working Load
MaximumloadonaSteelstageplatform
supportedbyaDrilledTransomisthesameasa
Adescriptionoftheuseandoperationofeach normalTransom.
itemisprovidedtogetherwithaSafeWorking
Loadwhereapplicable.
0.8 Drilled Trandom 1.2 Drilled Trandom
CodeNo. KAX50002 CodeNo. KAX50001
SlidingStageBrackets CodeNo. 9537 CodeNo. 9037
Usedtocreateanaccesswithinrecessesand
Weight 4.6kg Weight 6.8kg
rebateswherefullbaylengthscannotbe
accommodated.Mustbeusedinconjunction
with2&3BoardPlatformBrackets. Always
seek engineering advice prior to use.

Safe Working Load


Maximumloadona
Steelstageplatform
supportedbyaSliding
StageBracketis1.5kN/m2.
0.8mTieBar
TieBarsareformedfromsteelanglewith
2 Board 3 Board curvedlugsateachendwhichengageinholes
CodeNo. KAX10006 CodeNo. KAX10007 inPlatformBracketsand
DrilledTransoms.
CodeNo. 7806 CodeNo. 7808
Weight 7.75kg Weight 9.5kg

3BoardAccessBracket
Usedtocreateanaccessontheoutsideofthe
scaffold,especiallywhereoverhangingeves Safe Working Load
preventaccessalongthemainscaffold.Always
seek engineering advice prior to use. Note:
A0.8mSteelstage(ItemNo.SPU10011orCode
No.9536)maybeusedwiththeTieBartoform
Safe Working Load veryshortcantileverplatformsandbays(using
Engineeringadviceisrequiredat the0.8mTransom-ItemNo.KAX50812orCode
alltimes.MaximumloadonaSteelstage No.9529).
platformsupportedbya3Board
AccessBracketis0.75kN/m2.
0.8m Tie Bar
CodeNo. KAX10001
CodeNo. KAX10026
CodeNo. 9054
CodeNo. 9069
Weight 16.8kg
Weight 2.3kg

FirstIssue2010

9 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

CouplerBrace 16ft(4.877m)
CouplerBraceisusedinallKwikstage
baysthatarecantileveredabovethe
BridgingLedger
lasttie. Providesa4.877mopeningthroughthemain
runofKwikstagescaffold(abridge).Allother
workingplatformsabovethebridgemustbe
producedbysimilarpairsofBridgingLedgers.

Coupler Brace
CodeNo. KAX10013
CodeNo. 9402
Weight 9.0kg

Safe Working Load


Youshouldseekengineeringadvicepriorto
arranginganylayoutbecausetheBridging
8ftInfillTransom, Ledgercanquicklybecomeoverloaded.

SideLoadingTower
16ft Bridging Ledger
TheInfillTransomisinstalledbetweenthe
platformoftheaccessscaffoldandtheside CodeNo. KAX40001
accessloadingtowerplatform. CodeNo. 9044
Weight 28.5kg
Safe Working Load
TheInfillTransomwillsupportasimilarloadto
theloadingtowerplatform. GuardrailPost
8ft Infill Transom Side Loading Tower AGuardrailPostisrequiredtobefitted
atmidspanoftheBridgingLedger.No
CodeNo. 9030
otherKwikstagecomponentshouldbe
Weight 19.4kg fittedatmidspan.

Guardrail Post
CodeNo. KPX10003
CodeNo. 9039
Weight 4.3kg

FirstIssue2010

G E N U I N E K W I K S T A G E 10
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section2
guidefortheerectionand
dismantlingofabasic
kwikstagescaffold
Kwikstageerectedinthefollowingmannerandtotheliftheightsandmaximumheightsstatedin
Section4willhaveamaximumloadcapabilityoftheStandardof24.9kN
Onlytrained,competentoperativesshoulderect,dismantleoradaptKwikstagescaffoldsatall
times.Safesystemsofworkfortheerection,dismantlingoradaptationofKwikstagescaffolds
shouldreflectcurrentlegislativeandindustrybestpracticemethodology.
Werecommendthatasaminimumtheprinciplesforworkingpracticesforscaffoldersworkingat
heightscontainedindocumentSG4,producedbytheNationalAccessandScaffoldingConfederation
(NASC)areappliedtoallscaffoldingactivities.Advanced guardrails should be installed in the
approved methods chosen by the erector.

Part1-Straightrun 4Withonepersonholdingtwo
Standardsvertically,anotherfits
scaffolds aTransomoftherequired
lengthintothebottomsetof
Scaffolds around square or
‘V’pressings.Thewedgesshould
rectangular buildings
notbedrivenhomeatthisstage.

1 Establishthesettingoutofthescaffold,the NB The Standards must be


foundationlevels,andthelevelsatwhich orientated so that the Transom
workingplatformsarerequired.Planto fits into a lower ‘V’ pressing of
erectthescaffoldinacontinuoussequence, the bottom cluster.
startingfromaconvenientpointsuchasthe
highestgroundlevelcornerofthebuilding
tobescaffolded.

2 Ensurethatthereisanadequatefoundation
forthescaffold,andprovidesoleplatesof
suitablesizeandstrengthtospreadtheload (ForoldtypeStandardswithwedge
fromtheStandardsontothefoundation. fittingsatthehead,theouterStandards
musthavethewedgesfacingtheoutside
sothattheydonotobstructthetoeboard.)
3 FitbaseJacksintothebottomoftwo
Standards.AdjusttheJackstosuitthe
approximatelevelofthefirstworking
platformrequired.

FirstIssue2010

11 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

5WiththeStandardsheldupright, 8 Ensurethatthistowerisatthe
thesecondpersonfitstwoLedgers requireddistancefromthebuilding
oftheappropriatelengthinto faceandissquareinplan.(Squarenesscan
thelowestsetof‘V’ becheckedbyplacingaSteelstage
pressings.TheStandards onthebottomTransoms.)AdjusttheJacks
cannowleanover,sothat sothatthebottomTransomsandLedgers
theyaresupportedby arealllevel.Drivehomeallwedgeswitha
thefreeendsofthe singlesharpblowfrom
Ledgers. theKwikstageUniversalToolorsimilar.

NB Once this operation is completed for all


base lifts, no further levelling of the
scaffold is required.

9 Ifstartingfromanexternalcornerofa
6 StandardsequippedwithbaseJacksarethen building,positionaStandard,equippedwith
fittedtothefreeendsoftheLedgersanda itsJack,alongsidetheinnerpairofLedgers
Transomisfixedbetween inthealreadyerectedtower.Thiswillform
theStandards. theinsideStandardonthescaffoldreturn.

10 Makesurethatthis
Standardisatthe
correctdistancefrom
thebuildingface,
thenadjusttheJack
sothatthehigher‘V’
pressingsonthe
Standardjusttouch
theundersideofthe
Ledgersinthetower.

11WithonepersonholdingthisStandardin
position,thesecondoperatorhooksaReturn
Transomoftherequiredlengthoverthe
7 FixtwofurtherTransomsattherequiredlift bottomLedgerinthetower,andconnectsit
height(amaximumoffour‘V’pressing tothebottom‘V’pressingintheStandard.
clustersabovethebottomTransoms).Two
Ledgersarethenfixedatthesamelevelto
formatower.

FirstIssue2010

G E N U I N E K W I K S T A G E 12
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

2erection&dismantling
12 AsecondStandard(withJack)isthen 16 Usingaladdertogainaccesstothis
connectedtothisReturnTransomto platform,addStandards,Ledgers,Transoms
formtheoutsideStandardonthe andReturnTransomsinthesamemanneras
scaffoldreturn.AnotherReturn previouslydescribed,butwithouttheneed
Transomisthenfixedatthelevelof forlevelling.
theupperLedgerinthetower.

17 FixaDiagonalBraceontheoutsideof
13 FurtherLedgers,StandardsandTransoms theouterStandardsinthebottomlift
canthenbefixedinthesamemannerasfor ofeachofthebaysspecifiedinSection5.
thefirsttowerandallthewedgesdriven This is a two person operation requiring
home. thewedgefixingdevicesateachendofthe
Bracetobepositionedsimultaneouslyover
the‘V’pressingatthebottomofone
Standard,andontheappropriate‘V’
pressingontheadjacentStandard.Oncein
position,thewedgesontheBracecanbe
drivenhome.

14Successivebaysoftheappropriatesizecan
thenbeerectedinthesame
manner,remembering,wherepossible,
toworkcontinuouslyinonedirection.

18Continueerectingthescaffold,fixing
Note: Methodsofforminginfillor
componentsinthesequenceandmanner
non-standardbayscanbefoundin
describedabove.Alwaysworkfromasafe
Section2Part2.
platformandprogressivelyfixtiestothe
building,asdetailedinSection4.
15 Toerectasecondlift,firstplacean
appropriatenumberofbattensorSteelstage
19 Whentheleveloftheworking
inposition,sittingonthehorizontalpartof
platformisreached,deckoutabay
eachpairofupperTransoms.Thiswillform
withSteelstageoftheappropriate
partofthesafeplatformfromwhichto
lengthtosuitthebaysize.(800mm
work.
widescaffoldsneedthreeSteelstage
perbayand1.2mwidescaffoldsneed
fiveSteelstage.)

FirstIssue2010

13 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

20FixKwikguardtoprovideedgeprotection
fromfallsofmenandmaterials.This
componenthaswedgedeviceswhich
connecttothesecond‘V’pressingabove
theplatform,andpinswhichengageinto
thefirst‘V’pressings.This is normally a
two person operation.

21IfKwikguardisnotavailable,edge
protectioncanbeprovidedasfollows:

a) FixLedgerstoformguardrailsinthefirst
andsecond‘V’pressingsaboveplatform
level,ontheoutsideStandards.

b) FixaSteelstagetotheinsideoftheouter
Standardstoformatoeboard.TheToeboard
isfixedbymeansofToeboardBrackets
whichhavewedgeconnectingdevices
thatfitaroundtheStandards.

c) AttheendsofscaffoldrunsuseTransomsto
formtheguardrails.Fix1.2mSteelstage
toeboardstotheoutsideoftheStandardsby
meansofEndToeboardBrackets.

FirstIssue2010

G E N U I N E K W I K S T A G E 14
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

2erection&dismantling
Part2-Infillor Part3-Internalcorners
non-standardbays 1 WhenprovidingaKwikstagescaffoldfor
buildingswhichhaveinternalcorners,itis
1 Whatevertheplandimensionsofabuilding, preferabletostarterectionfromthose
itisnormallypossible,withcareful internalcorners.Thelayoutofthescaffold
planning,toerectaKwikstagescaffold shouldbeplannedaccordingly.
aroundtheperimeterofabuildingwithout
non-standardbays.Iftheyarerequired,any
infillgapsshouldoccurawayfromthe 2 Thetwomostcommonwaysof
corner(i.e.inastraightrun)andbekept accommodatinginternalcornersare:
within600mm.

a) Byusingamirroredversionofthemethodof
2 Leaveanyinfillareasuntilallthestandard formingexternalcornersasdescribedin
Kwikstagebayshave Section2Part1.
beenerected.

b) Byformingasquaretowerinthecornerand
3 ConnecttheKwikstageStandardsoneach thenconnectingbaystothattower.
sideoftheinfillareatogether,ateach
Ledgerposition,bymeansofshortlengths
ofscaffoldtubeandrightanglecouplers. 3 Thelattermethodhastheadvantageof
facilitatingtheuseofPlatformBrackets(see
Section6).However,itshouldbenotedthat
Note: Infillguardrailsmaybeformedof theplatformwillhaveaslightslopeinone
tubeconnectedtotheStandardsbymeans ofthebaysconnectedtothetower.
ofsuitablecouplersofadequateload
bearingcapacity.
4 Toerectthetowerfollowtheproceduresin
Section2Part1,butuseTransomsofthe
4 Deckingandtoeboardstofillthegapcanbe appropriatelengthinplaceofLedgers.
formedfromtimberofadequatequalityfor
theplatformloadingandofadepththat
doesnotcreateatriphazard. 5 Continueerectingthescaffoldintwo
directionsfromthecorner,inaccordance
withSection2Part1.NB:theStandards
mustbeorientatedsothattheTransomsfit
intoalower‘V’pressingofthebottom
cluster.(ForoldtypeStandardswithwedge
fittingsattheheads,theouterStandards
musthavethewedgesfacingtheoutsideso
thattheydonotobstructthetoeboard.)

FirstIssue2010

15 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Part4-Dismantling andtransferredtoasafeworkingplatform
forloweringtotheground.
procedure
1 Checkthescaffoldisstillinthecorrectly
erectedconditione.g.componentsorties 8 RemoveStandardsconnectedaboveplatform
havenotbeenremovedorincorrectlyfixed level,havingfirstcheckedthatall
andthatguardrailsarestillinthereoriginal componentspreviouslyfixedtothemhave
position.Ifthescaffoldiscompromisedin beenremoved.TheStandardsshouldbe
anyway—seekadvice. transferredtoasafeworkingplatformfor
loweringtotheground.

2 Ensuretheplatformisclearofallloose
materialpriortocommencementof 9 Fromtheadjacentsafeworkingplatform
dismantling. thescaffolderunclipstheharnesslanyard
andrepeatsitems5to8untilallbaysare
dismantledworkingtowardsthefully
boardedtower.
3 Ensurethatthereisaminimumofonefully
boardedtower(i.eboardedandguardrailed
everylift)withinthescaffoldstructureto
allowaccessforremovalofmaterialsand 10 Workingfromthefullyboardedplatform
componentswithinasafeworkingplatform. belowthetopplatformremovethe
Steelstage/Scaffoldboardsfromaboveand
boardouttheplaformbelow(ifitisnota
fullyboardedscaffold).Thesafeworking
4 Alldismantlingoperationsmustbe
platformmustbeaminimumofthree
undertakenwithaminimumoftwo
boardswide.
competantpersons.

11 Repeatitems5to8forthenewtop
5 RemoveDiagonalBracesandanyLedgers
platformlevel.Removethelowerendofthe
andTransomsconnectedtoStandardsabove
DiagonalBracefirstandtransferitandall
thelevelofthetopplatformTheseshould
othercomponentstoasafeworking
thenbetransferredtoasafeworking
platformforloweringtotheground.
platformandloweredtotheground.Refer
toLoweringTechniqueinitem13below.
12 Progressivelydismantlethescaffoldinthe
sequencedescribedabove,onlyremoving
6 Removetoeboardbracketsandtoeboards
tieswhentheywouldpreventfurther
fromthetopplatformandtransfertoasafe
dismantling.
workingplatformandlowertotheground.

Note: Removal of guardrails should be in accordance 13 Componentsshouldbeloweredtothe


with the approved methods chosen for advanced groundbypassingfromhandtohanddown
guardrails, refer to Part 1. Erections. thefullyboardedsectionofscaffoldorby
meansofanappropriatesafelowering
method,suchasbyhandline,crane,hoist
7 Before removal of any Guardrail or etc.
Kwikguard, a suitable temporary or
advanced guardrail system must be put in
place in accordance with the requirements 14 If any element of this dismantling
of NASC guidance document SG4.If procedure cannot be fully complied with,
necessary,withthechosensystem,the seek advice.
scaffoldershouldcliponhisharnessin
accordancewithSection9.TheGuardrailor
Kwikguardshouldberemovedoneatatime FirstIssue2010

G E N U I N E K W I K S T A G E 16
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section3
safeuseandmaintenance
1 Beforeallowingpeopleormaterialsonthe 8 Becauseoftheincreaseduseofmechanical
scaffoldstructure,ensurethatithasbeen liftingplantonsitethereisanincreased
erectedcorrectlyandcomplieswiththe possibilityforscaffoldingcomponentsto
user’srequirements. becomefouled/caught.Whenusingcranes
orothermechanicalliftingdevicesnearany
scaffoldstructurecareshouldbetakento
2 Ensurethatallpeopleusingthescaffoldare ensurethatnothingcatchesunderanypart
awareofthepurposeforwhichitis ofthescaffold.Otherwiseupliftcouldoccur
intendedtobeusedandthemaximum withpotentiallydangerousconsequences.
loadingtowhichitcanbesubjected.

Particularcareisrequiredifanypartofthe
3 Ensureusersunderstandthatany itembeingliftedisoutofdriver’ssight.
unauthorisedmodificationtothescaffoldor Connectingpinsareavailabletopositively
removalofcomponentscouldcauseasafety fixKwikstageStandardstogetherifthe
hazard.Alterationsorextensionsshouldbe scaffolduser’smethodstatement/risk
carriedoutonlybyacompetentperson. assessmentindicatesthatupliftcannotbe
eliminated.

4 Carryoutregularinspectionstocheckthat
componentshavenotbeenremovedor
damaged,andthatcomponentshavenot
beenremovedandreplacedincorrectly.

5 Providebarriersandwarningnoticesto
preventaccesstoincompletesectionsof
scaffolding.

6 Ensurethatsafeaccessandegressroutes
areprovidedtoallworkingplatforms,and
thatsuchroutes,includingladdersand
stairways,arekeptclear.

7 Donotoverloadplatforms-useproperly
designedloadingtowersandensurethat
craneandforkliftdriversunderstandloading
restrictionsoneachpartofthescaffold
structure.

FirstIssue2010

17 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section4
loadingdataandtiepatterns
LoadingData Thescaffoldhasbeendesignedtoresist
combinedserviceandwindloadingasspecified
TheinformationgiveninthisSectionisfor inBS1139:Part5:1990“Specificationfor
permissibleloadingonbasicKwikstageAccess materials,dimensions,designloadsandsafety
Scaffoldsconstructedstrictlyinaccordance requirementsforserviceandworkingscaffolds
withthisscaffoldingguide. madeofprefabricatedelements”.

All loading data is for 1.2m wide scaffolds and Thefollowingpagesgivedetailsofthe


0.8m wide scaffolds not exceeding 10m in allowablenumbersofboardedlifts,cantilever
height. platformsandworkinglevelsforvarious
configurationsofKwikstage
accessplatforms.
Wherevariationsfromthebasicstructureare
required,theymustbereferredtoaperson
competentinthedesign
ofKwikstage.
TiePatterns
AllKwikstageAccessscaffoldsmustbetiedtoa
Someexamplesofthemorecommonly
permanentstructureofsufficientstrengthto
encounteredvariationsare:
stabilisethescaffold.Foradviceondeviations
fromthefollowingtiepatternsconsultyour
localbranchofRMDKwikformofInterserve
• Non-compliancewiththetiepatterns
Industrial.
specifiedinthisSection

Fordetailsofmaximumheightsofscaffold
• Scaffoldshigherthanthemaximumspecified
refertotheindividualloadingstatedoneachof
thefollowingpages.
• Pavementgantries

• Bridgingoveropeningsinthescaffold

• Arequirementforliftheightsinexcessof
the2mmaximum

• Exposuretoseverewindloading

FirstIssue2010

G E N U I N E K W I K S T A G E 18
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3000
Basicscaffold1.2mwide,withcantileverplatformsformedfrom1or
2BoardPlatformBrackets

Scaffold Type: Fully/Partially Boarded Kwikstage

General Details: Explanatory Notes

ThesegeneralnotesrefertoKwikstagescaffoldswhichareeitherfullyorpartiallyboarded.
ForunboardedscaffoldwithamaximumoftwoworkingplatformsrefertoDetailNo.KS3010.

Tie patterns Alltiepatternsforfullyorpartiallyboarded


Kwikstage,withtherespectiveserviceloadsare
shownonDetailNos.KS3001toKS3008.
MaximumSafeWorkingLoadfortiestobe
6.3kNeach.
Tiepatternsarebasedontheassumptionthatties
arewithin300mmofthenodesindicated.

Scaffold to be tied at top lift (Note 3) Completedscaffoldsmustalwaysbetiedatthe


toplift.

Platforms cantilevered above last Whereprogressivescaffoldsarerequiredtobe


tie location usedwiththerequiredserviceloadonanyliftabove
thetopmosttieposition,ledgerbracingisrequired
asshowndetailedoverleaf.BothStandardsrequireto
bepinnedwithCodeNo.KAX10011 orCode No.9534
oneachliftthatisbraced.CouplerBraceCodeNo.
KAX10013orCodeNo.9402maybeusedasledger
bracing.

Attachment of Debris Netting (Note 5) DebrisNettingmaybedescribedasanyopengrid


netsheet.DebrisNettingmaybeextendedbeyond
thetopplatformlevelofthecompletedscaffoldand
betiedtothetophandrailsorstandards.However
underextremewindconditionsthestructural
integrityofthescaffoldmaybeaffected.Following
anyhighwinds,afullinspectionofthescaffoldas
requiredbycurrentlegislation,mustbecarriedout
priortothescaffoldbeingplacedbackintouse.Any
defectsfoundbysuchaninspectionMUST
immediatelybecorrectedbeforethescaffoldis
deemedfitforpurpose.

FirstIssue2010

19 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Attachment of Sheeting (Note 5) Sheetingisdescribedasclosewovenmaterial


similartoMonarflex,tarpaulinmaterialsor
polythenesheeting.Sheetingmustnotextend
beyondtheplatformlevelofthecompleted
scaffold,i.e.mustnotbetiedtohandrailsor
Standardsabovethetopplatform.

Transoms & Ledgers in lowest TransomsandLedgersmustbeplacedinlowest


‘V’ pressing possible‘V’pressingirrespectiveofthelowest
(Note 2) platformposition.

Cantilever Platform Brackets (Note 4) Uptotwolevelsofcantileverplatformsmaybe


movedtointermediatelevelstoprovide
appropriateaccess.Theallowableloadonsuch
cantileverplatformsis0.75kN/m2.

Platform TieLocationIndicators
Levels

12 SeeNote5
SeeNote3

11

10

Base SeeNote2

FirstIssue2010

G E N U I N E K W I K S T A G E 20
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3001
Basicscaffold1.2mwide,unsheeted,withcantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Fully Boarded Kwikstage

Duty: Masonry or Special Duty

UseofPlatform: Masonrywork,concreteblockwork
andheavycladding
LoadClassificationinaccordancewith Class4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 12liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 12
Maximumnumberofcantileverplatforms 12
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

21 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels
SeeNote3
12

11

10

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 22
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3002
Basicscaffold1.2mwide,unsheeted,withcantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Fully Boarded Kwikstage

Duty: Masonry or Special Duty


UseofPlatform: Masonrywork,concreteblockwork
andheavycladding
LoadClassificationinaccordancewith Class4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 10liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 10
Maximumnumberofcantileverplatforms 10
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

23 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Note: Alternative tying pattern for Masonry Scaffold with a restricted height of ten lifts and
ties starting at level 2.

Platform TieLocations
Levels
SeeNote3
10

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 24
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3003
Basicscaffold1.2mwide,unsheeted,withcantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Partially Boarded Kwikstage

Duty: Heavy Duty


UseofPlatform: Blockwork,brickwork
andheavycladding
LoadClassificationinaccordancewith Notapplicable
BSEN12811-1:2003
Maximumplatformserviceload 2.50kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.25kN/m2
-onelevel:
Maximumheightofscaffold: 12liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 9
Maximumnumberofcantileverplatforms 9
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

25 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels
SeeNote3
12

11

10

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 26
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3004
Basicscaffold1.2mwide,unsheeted,withcantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Fully Boarded Kwikstage

Duty: Heavy Duty


UseofPlatform: Blockwork,brickwork
andheavycladding
LoadClassificationinaccordancewith Notapplicable
BSEN12811-1:2003
Maximumplatformserviceload 2.50kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.25kN/m2
-onelevel:
Maximumheightofscaffold: 8liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 8
Maximumnumberofcantileverplatforms 8
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

27 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Note: Alternative three lift tying pattern for Heavy Duty scaffold with a restricted height of
eight lifts.

Platform TieLocations
Levels

8 SeeNote3

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 28
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3005
Basicscaffold1.2mwide,unsheeted,withcantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Partially Boarded Kwikstage

Duty: General Purpose


UseofPlatform: Generalbuildingworkincluding
brickwork,window&mullionfixing,
rendering,plastering
LoadClassificationinaccordancewith Class3
BSEN12811-1:2003
Maximumplatformserviceload 2.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.00kN/m2
-onelevel:
Maximumheightofscaffold: 11liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 9
Maximumnumberofcantileverplatforms 9
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

29 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels

11 SeeNote3

10

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 30
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3006
Basicscaffold1.2mwide,unsheeted,withcantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Partially Boarded Kwikstage

Duty: Light Duty


UseofPlatform: Plastering,painting,stonecleaning,
glazingandpointing
LoadClassificationinaccordancewith Class2
BSEN12811-1:2003
Maximumplatformserviceload 1.50kN/m2
-onelevel:
Maximumadditionalworkingplatform 0.75kN/m2
-onelevel:
Maximumheightofscaffold: 11liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 11
Maximumnumberofcantileverplatforms 11
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)
Note1 Façadebracingomittedforclarity.

FirstIssue2010

31 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels

11 SeeNote3

10

Base SeeNote2

Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 32
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3007
Basicscaffold1.2mwide,sheeted,withdebrisnetting,withcantilever
platformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Fully Boarded Kwikstage

Duty: Debris Netting


UseofPlatform: Alltypesincludingmasonrywork,heavy
duty,generalpurposeandlightaccess.
LoadClassificationinaccordancewith UptoClass4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 12liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 12
Maximumnumberofcantileverplatforms 12
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)
Note1 Façadebracingomittedforclarity.

FirstIssue2010

33 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels
SeeNote5
12 SeeNote3

11

10

SeeNote2
Base

Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.
Note5 DebrisNettingmaybeextendedbeyondthetopplatformlevelofthecompleted
scaffoldandbetiedtothetophandrailsorstandards.However,underextreme
windconditionsthestructuralintegrityofthescaffoldmaybeaffected.Following
anyhighwinds,afullinspectionofthescaffoldasrequiredbycurrentlegislation,
mustbecarriedoutpriortoscaffoldbeingplacedbackintouse.Anydefectsfound
bysuchaninspectionMUSTimmediatelybecorrectedbeforethescaffoldis
deemedfitforpurpose.

FirstIssue2010

G E N U I N E K W I K S T A G E 34
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3008
Basicscaffold1.2mwide,sheeted,withcantileverplatformsformedfrom1
or2BoardPlatformBrackets

Scaffold Type: Fully Boarded Kwikstage

Duty: Sheeted Scaffold


UseofPlatform: Alltypesincludingmasonrywork,heavy
duty,generalpurposeandlightaccess.
LoadClassificationinaccordancewith UptoClass4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 12liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 12
Maximumnumberofcantileverplatforms 12
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

35 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels
SeeNote5
12 SeeNote3

11

10

1
Base SeeNote2

Note 1 Façade bracing omitted for clarity.


Note 2 Transoms and Ledgers must be placed in lowest possible ‘V’ pressing irrespective of
lowest platform position.
Note 3 Completed scaffolds must always be tied at the top lift.
Note 4 Up to two levels of cantilever platforms may be moved to intermediate levels to
provide appropriate access.
The allowable load on such cantilever platforms is 0.75kN/m2.
Note 5 Sheeting must not extend beyond the platform level of the completed scaffold, i.e.
must not be tied to handrails or Standards above the top platform.

FirstIssue2010

G E N U I N E K W I K S T A G E 36
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3010
Basicunboardedscaffold1.2mwide,withtwocantileverplatforms
formedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

General Details: Explanatory Notes


These general notes refer to Kwikstage scaffolds with a maximum number of two boarded
lifts.
For fully boarded scaffold refer to Detail No. KS 3000.

Tie patterns AlltiepatternsforunboardedKwikstage,withthe


respectiveserviceloadsareshownonDetail Nos.
KS 3011 to KS 3016.MaximumSafeWorkingLoad
fortiestobe6.3kNeach.Tiepatternsarebasedon
theassumptionthattiesarewithin300mmofthe
nodesindicated.

Maximum number of boarded lifts Inallcasesthemaximumnumberofliftstobe


boardedistwowithtwocantileverplatforms.No
additionalSteelstageorboardingoutofthescaffold
maytakeplace.

Scaffold to be tied at top lift (Note 3) Completedscaffoldsmustalwaysbetiedatthetop


lift.

Platforms cantilevered above last Whereprogressivescaffoldsarerequiredtobe


tie location usedwiththerequiredserviceloadonanylift
abovethetopmosttieposition,ledgerbracingis
requiredasshowndetailedbelow.BothStandards
requiretobepinnedwithCodeNo.KAX10011or
CodeNo.9534oneachliftthatisbraced.Coupler
BraceitemNo.KAX10013oritemNo.9402maybe
usedasledgerbracing.

FirstIssue2010

37 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Attachment of Debris Netting (Note 5) Debrisnettingisdescribedasanyopengridnet


sheet.DebrisNettingmaybeextendedbeyondthe
topplatformlevelofthecompletedscaffoldand
betiedtothetophandrailsorstandards.However,
underextremewindconditionsthestructural
integrityofthescaffoldmaybeaffected.
Followinganyhighwinds,afullinspectionofthe
scaffoldasrequiredbycurrentlegislation,mustbe
carriedoutpriortoscaffoldbeingplacedbackinto
use.AnydefectsfoundbysuchaninspectionMUST
immediatelybecorrectedbeforethescaffoldis
deemedfitforpurpose.

Sheeting Forthetyingpatternforallsheetedscaffoldsrefer
toKS3008.

Transoms & Ledgers in lowest TransomsandLedgersmustbeplacedinlowest


‘V’ pressing possible‘V’pressingirrespectiveofthelowest
(Note 2) platformposition.

Cantilever Platform Brackets (Note 4) Twolevelsofcantileverplatformsmaybemoved


tointermediatelevelstoprovideappropriate
access.Theallowableloadonsuchcantilever
platformsis0.75kN/m2.

Platform TieLocationIndicators
Levels
SeeNote5
12 SeeNote3

11

10

Base SeeNote2

FirstIssue2010

G E N U I N E K W I K S T A G E 38
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3011
Basicunboardedandunsheetedscaffold1.2mwide,withcantilever
platformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

Duty: Masonry or Special Duty


UseofPlatform: Masonrywork,concreteblockwork
andheavycladding
LoadClassificationinaccordancewith Class4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 30liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 2
Maximumnumberofcantileverplatforms 2
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

39 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels

30 SeeNote3

29

28

27

26

Tieseverysecondliftbetweenlifts5and27

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 40
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3012
Basicunboardedandunsheetedscaffold1.2mwide,withcantilever
platformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

Duty: Masonry or Special Duty


UseofPlatform: Masonrywork,concreteblockwork
andheavycladding
LoadClassificationinaccordancewith Class4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 26liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 2
Maximumnumberofcantileverplatforms 2
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

41 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Note: Alternative tying pattern for Masonry Scaffold with a restricted height of 26 lifts
and ties starting at Level 2.

Platform TieLocations
Levels
SeeNote3
26

25

24

Tieseverysecondliftbetweenlifts4and24

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 42
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3013
Basicunboardedandunsheetedscaffold1.2mwide,withcantilever
platformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

Duty: Masonry or Special Duty


UseofPlatform: Masonrywork,concreteblockwork
andheavycladding
LoadClassificationinaccordancewith Class4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 10liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 2
Maximumnumberofcantileverplatforms 2
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

43 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Note: Alternative three lift tying pattern for Masonry Scaffold with a restricted height of ten lifts and
ties starting at Level 1.

Platform TieLocations
Levels

10 SeeNote3

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 44
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3014
Basicunboardedandunsheetedscaffold1.2mwide,withcantilever
platformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

Duty: General Purpose


UseofPlatform: Generalbuildingworkincluding
brickwork,window&mullionfixing,
renderingandplastering
LoadClassificationinaccordancewith Class3
BSEN12811-1:2003
Maximumplatformserviceload 2.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.00kN/m2
-onelevel:
Maximumheightofscaffold: 20liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 2
Maximumnumberofcantileverplatforms 2
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

45 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels
SeeNote3
20

19

18

17

16

Tieseverythirdliftbetweenlifts4and16

Base SeeNote2

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 46
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3015
Basicunboardedandunsheetedscaffold1.2mwide,withcantilever
platformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

Duty: Light Duty


UseofPlatform: Plastering,painting,stonecleaning,
glazingandpointing
LoadClassificationinaccordancewith Class2
BSEN12811-1:2003
Maximumplatformserviceload 1.50kN/m2
-onelevel:
Maximumadditionalworkingplatform 0.75kN/m2
-onelevel:
Maximumheightofscaffold: 20liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 2
Maximumnumberofcantileverplatforms 2
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

47 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels

20 SeeNote3

19

18

17

16

Tieseverythirdliftbetweenlifts5and17

SeeNote2
Base

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.

FirstIssue2010

G E N U I N E K W I K S T A G E 48
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tyingpatternforkwikstage
scaffolds-detailno.KS3016
Basicunboardedscaffold1.2mwide,sheetedwithDebrisNettingwith
cantileverplatformsformedfrom1or2BoardPlatformBrackets

Scaffold Type: Unboarded Kwikstage

Duty: Debris Netting


UseofPlatform: Alltypesincludingmasonrywork,
heavyduty,generalpurposeand
lightaccess.
LoadClassificationinaccordancewith Class4
BSEN12811-1:2003
Maximumplatformserviceload 3.00kN/m2
-onelevel:
Maximumadditionalworkingplatform 1.50kN/m2
-onelevel:
Maximumheightofscaffold: 30liftsof2.0mmaximumliftheight
Maximumnumberofboardedlifts: 2
Maximumnumberofcantileverplatforms 2
(atplatformlevel):
Maximumnumberofworkingcantileverplatforms: 2(SeeNote4)

FirstIssue2010

49 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

Platform TieLocations
Levels

30 SeeNote5
SeeNote3

29

28

27

Tieseverysecondliftbetweenlifts5and27

1
SeeNote2
Base

Note1 Façadebracingomittedforclarity.
Note2 TransomsandLedgersmustbeplacedinlowestpossible‘V’pressingirrespectiveof
lowestplatformposition.
Note3 Completedscaffoldsmustalwaysbetiedatthetoplift.
Note4 Uptotwolevelsofcantileverplatformsmaybemovedtointermediatelevelsto
provideappropriateaccess.
Theallowableloadonsuchcantileverplatformsis0.75kN/m2.
Note5 DebrisNettingmaybeextendedbeyondthetopplatformlevelofthecompleted
scaffoldandbetiedtothetophandrailsorstandards.However,underextreme
windconditionsthestructuralintegrityofthescaffoldmaybeaffected.Following
anyhighwinds,afullinspectionofthescaffoldasrequiredbycurrentlegislation,
mustbecarriedoutpriortoscaffoldbeingplacedbackintouse.Anydefectsfound
bysuchaninspection MUST immediatelybecorrectedbeforethescaffoldis
deemedfitforpurpose.

FirstIssue2010

G E N U I N E K W I K S T A G E 50
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

tiepatternsfor0.8m
widescaffold
Drawing detail A - Tie pattern A) Tiepatternfor0.8mwide
AllKwikstageAccessscaffoldsmustbetied un-sheetedscaffold.
toapermanentstructureofsufficient
strengthtostabilisethescaffold.

ForKwikstagescaffoldswithaplatform
widthofnogreaterthan0.8m(i.e3boards)
thestabilityofthescaffoldduringerection
isimportant.Thescaffoldshallbetiedin
accordancewithTiePatternsstatedinthis
UserGuide.Thescaffoldcanalternatively
betiedinaccordancewithA(opposite)and
themaximumheightofsuchscaffoldsshould
benotgreaterthanstatedinKS300toKS
3006andKS3010toKS3014.Fordebris
nettedscaffoldsthetiepatternshouldbeas
showninKS3007andforsheetedscaffolds
thetiepatternshouldbeasKS3008
Notes:
1) MinimumSafeWorkingLoadoftiestobe
6.1kNeach.

2) Thetiepatternsshownarebasedonthe
assumptionthatthetiesarewithin
300mmofthenodesindicated.

2) 3 Board Platform Brackets must not be


used on 0.8m wide scaffolds.

FirstIssue2010

51 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section5
bracingrequirements
Bracing requirements Forlongfaçades,bracingshouldreturnto
thebottomofthescaffoldasshown,with
Façadebracingshouldgenerallybe
themaximumnumberofunbracedbays
providedintheformofacontinuouslong
notexceedingfour.
diagonalrunningfromthebottomtothetop
ofthescaffoldasillustratedbelow.

Iftheproportions(length:height)ofthe
scaffoldaresuchthatasinglerunof
diagonalbracingdoesnotreachthetopof
thescaffold,thenfurthersequencesof
bracingmustbeprovided,asshownopposite
untilthetopofthescaffoldisreached.

Note:
Thebottomendofeachbracemustbe
connectedtothe‘V’pressingBELOWthe
topendofthepreviousbrace.

Scaffolds for housing


ForKwikstagescaffoldsusedinhouse
buildingtypeworks,wherethemaximum
numberofliftsislessthanfourthe
followingbracingpatternmaybeused.
Bracingshouldberepeatedevery
fourbays.

FirstIssue2010

G E N U I N E K W I K S T A G E 52
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section6
platformbrackets
PlatformBracketsareavailableinthree 5. If2or3BoardPlatformBracketsare
widthstoformcantileverextensionsto beingused,aTieBaroftheappropriate
platformsontheinsideofaKwikstage lengthmustbefittedbeforeany
scaffold.Theyconnectinto‘V’pressingson SteelstageareplacedontheBrackets.
theStandardsinthesamemanneras
theTransoms. 6. ThecurvedlugsontheendsoftheTie
BarengageinholesinthePlatform
1,2or3BoardPlatformBracketsmaybe Bracketswiththehorizontallegofthe
usedon1.2m(fiveboard)wideKwikstage anglesectionpointingoutwards(i.e.
scaffolds.Only1or2BoardPlatform awayfromthescaffold).
Bracketsarepermittedon0.8m(3board)
widescaffolds. NB Asafesystemofworkisrequired
duringinstallationorremovalof
Thesecomponentscanonlybeusedin TieBars.
locationswherethereisnotariskofpeople
falling(e.g.whentheedgeofthe
cantileveredplatformisclosetothefaceof
abuilding).

Steelstageshouldbeusedasthedeckingon 7. OncetheTieBarhasbeenfixed,
PlatformBrackets. Steelstagecanbeplacedinthatbayto
formacompletelydeckedbayof
PlatformBracketsshouldbefittedinthe cantileveredplatform,andthewedges
followingmanner: drivenhome.(TwoorthreeSteelstage
willberequireddependingonthe
1. ConnectaPlatformBracketofthe PlatformBracketbeingused.)
requiredwidthtoa‘V’pressing,atthe
appropriatelevel,onthesideofa Note: TheTieBarisnowlockedin
Standardfacingthebuilding. positionandcannotberemovedwithout
firstremovingoneof
2. Repeattheoperationonan theSteelstage.
adjacentStandard.
8. Continueerectingcantileveredplatforms
3. Ifa1BoardPlatformBracketisbeing intheabovemannerforasmanybaysas
used,placeaSteelstageofthe arerequired,withparticularemphasison
appropriatelengthontheBracketsand theneedtofixTieBarsinthesequence
taphomethewedges. and
methodspecified.
4. Thecantileverplatformforonebayis
nowcompleteanditcanbecontinued 9. AnInternalCornerFiller(CodeNo.9053
alongthescaffoldfortherequired orCodeNo.KAX10017)isavailableshould
numberofbaysinthesamemanner. cantileverplatformsberequiredon
internalcorners.
FirstIssue2010

53 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section7
ladderandstairaccess
Part 1 - Ladder towers b) FitaLadderAccessTransomcentrally
acrosstheLedgers2mabovethe
1 Whereladderaccesstowersarerequired boardedlift,withthehalfcoupler
carefulconsiderationshouldbegivento attachedtotheoutsideLedgerofthe
theirlocationinthescaffold.The laddertower.Leavethehalfcoupler
followingisrecommended:- looseenoughtoadjusttheposition
oftheTransom.
a) Wheneverpossibleaseparateladder
towershouldbeconstructedleaving c) Placea1.2mSteelstagebetweenthe
theworkingplatformonthescaffold outsideTransomandtheLadder
intact. AccessTransomandensureitisfully
locatedbypushingtheLadderAccess
b) When(a)isnotpossibletheladder Transomupagainstit.Checkitis
towershouldbepositionedonthe squareandtightenthe
endofarunofscaffold,keepingthe halfcoupler.
disruptionoftheworkingplatformto
aminimum.

c) Onlywhen(a)and(b)arenot
practicableshouldconsiderationbe
giventopositioningtheladderaccess
towerinthegeneralrunof
thescaffold.

2 Constructionoftheladdertower
frameworkshouldbeinaccordancewith
theproceduresetoutinSection2ofthis d) Workingfrombelow,fitthesecond
UserGuidetakingcognisanceofthe 1.2mandthree2.4mSteelstageinto
chosenmethodofadvancedguardrail thebay.
requirements.

3 Theerectionsequencethatfollowsis
basedontheladdertowerbeingerected
ina2.4mx1.2mbaybuiltin2mlifts
andusinga3mladdertogiveaccessto
eachlift.

a) Erectthebasicframeworkofthe
laddertowerandfullydeckoutat
thelowesttransomlevel. FirstIssue2010

G E N U I N E K W I K S T A G E 54
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

e) Usinga3mladderasaccess,tieitto
theLadderAccessTransomand
completethe2mliftbyerecting
doubleguardrails,toeboardsandend
toeboardsasapplicabletoall
exposedfacesoftheladdertower.

Part 2 - Stair towers


Note: Kwikguardscouldbeusedasan
alternativetoguardrailsandtoeboards. 1 Wherestairtowersarerequired,careful
considerationshouldbegiventothe
4 Wheretheladderaccessiserected layoutofthemainaccessscaffold.The
withinthemainrunofscaffold(referto Stairscanonlybefittedintoa2.4mbay
1c),fitaguardrailatmainguardrail andthelandingplatformseitherside
heightonly,ontheapproachestothe mustmatchthebaysizesofthemain
ladderaccess. scaffoldruntowhichthestairtoweris
attached.
Note:Thisguardrailshouldbefittedwith
anoticewarningthatthereisanopening 2 Theminimumlengthofthestairtoweris
intheplatform. a2.4mbaywith1.2mlandingplatforms
ateachend.
5 Repeattheerectionsequence3(and4)
aboveasrequiredbytheprogressofthe 3 Constructionofthestairtower
mainscaffold. frameworkshouldbeinaccordancewith
theproceduresetoutinSection2ofthe
6 TodismantletheLadderTowerreverse thisUserGuide.
theabovesequencehavingfirstchecked
thatthescaffoldisstillinthecorrectly 4 Erection Sequence
erectedcondition. TheStairwayUnitiserectedina2.4mx
0.8mbaybuiltin2mlifts,withlanding
baystomatchthemainscaffold
eitherside.

FirstIssue2010

55 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

7 ladderandstairaccess
4.1 Theerectionsequenceisbasedonthe
stairtowerbeingbuiltwithaccesstothe
workingliftsthatisindependentofthe
a & b
mainaccessscaffold.

a) Erectthebasicframeworkofthestair
toweri.e.threebayslongxtwo0.8m
bayswidex2mlift.Atthelowest
transomlevelfullydeckoutthe
landingbays.

b) FitaStairwayUnitintothecentral
2.4mbay.Thisshouldbelocatedin Note: AlternativelyanindependentStair
theinsidebaynexttothemain Towercanbeerected,Thisshouldbetiedto
scaffold.(A two person operation.) theadjoiningscaffoldoneveryStandardat
alternativelifts.
FixtheStairwayUnittothe0.8m
Transoms,topandbottom,usingtwo
BeamClips.FittwoHandrailUnitsto
theStairwayUnits.(A two person
operation.) c
c) Frombelow,fullydeckoutthelanding
bays2maboveandproceedtothe
nextlift.Fitdoubleguardrailsaround
thesidesofthelandingbays,and
acrossthecentral2.4mbaynextto
themainscaffold.

d) FitaStairwayUnitintheoutsidebay
intheoppositedirectiontotheone
below.Repeattheabovesequence,
d
addingtotheheightofthestairway
andprovidingaccessontotheworking
platformsasnecessary.

Note: Toeboardsarenotnecessaryonthe
landingplatformsifthereareno
materialsthatcouldbedislodged.

5 To dismantle the stair tower, reverse


the above sequence having first
checked that the scaffold is still in the
correctly erected condition. FirstIssue2010

G E N U I N E K W I K S T A G E 56
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

1
section8
loadingtower
1 Determinerequiredlocationof
thetower.

UsingtheproceduresinSection2,erect
anintermediateStandardandUniversal
Jackusingfour1.2mInfillTransomsand
twoLoadingTowerIntermediate 2
StandardRestraints.Donotdrivehome
theTransomwedgesatthisstage.

2 ErectfrontStandardsoftowerusing
UniversalJacksand2.4mLedgersinthe
bottom‘V’pressings.Leveltowerby
3 & 4
adjustingthefrontlegUniversalJacks.

Note: AdjustableBaseandHeadJack
(CodeNo.KAX20003orCodeNo.9600)
mustnotbeusedinaloadingtower.

3 Place2.4mLoadingTowerTransomand
sidefaceLedgersatrequired
platformlevel.

4 PlacehookofInfillTiearound
intermediateStandardandmoveforward
untilendbracketpassesoverLoading
TowerTransom‘T’section. 5
Drive home all wedges.

5 PlacetenSteelstageontotowerto
createworkingplatform. 6
6 Takingcognisanceofthechosenmethod
ofadvancedguardrailrequirements,fix
Kwikguardstosidesofworkingplatform.
EnsurethesideoftheKwikguardwith
thetoeboardreturnfacesoutwards.(A
twopersonoperation.)

7 PlaceGuardrail/GateRestraintontopof
verticalanglesofKwikguards.Adjust
positionofhalfcouplersontoprailsof
Kwikguardsuntiltheypassthroughmesh.
Tightencouplers.(Atwo
personoperation.)
7& 8
Note: AnalternativeLoadingTowergateis
available,refertoSection1;Components

FirstIssue2010

57 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

8 loading tower 12
8 WithGuardrail/GateRestraintin closedposition,and
loweredposition,placeapairof refixlock.
LoadingTowerGatesontothefront
Standardsofthetowerbyfittingthe
hingepinsintothefront‘V’pressingson
theStandards.CloseGatesandensure
thatthelockingmechanismlocatesover
theGuardrail/GateRestraint.
9 Attachtubeandcouplerplandiagonal
bracesfromoutsidelegsoftowerto
Notes:
mainscaffoldatplatformlevel.Fix
(i) Maximumloadperplatformis20kN.
3.54mDiagonalBracestoeachsideof
Thisloadistypicallyonepalletof
thetower,usingthelowestavailable
brickswithonetubofmortar
‘V’pressing.
alongside.

8 & 9 Maximumcombinedloadpertoweris
60kN.
(ii) Nopersonsmustbeontheloading
towerplatformwhilstthe
Guardrail/GateRestraintispositioned
attherearoftheplatform.
(iii) A Loading Tower Intermediate
Standard Restraint must be fitted
and left in position at every level of
10 Repeatprocedureforallothertower the main scaffold.
workingplatforms.Connecting pins
should be inserted in all joints between (iv)Tubeandcouplerdiagonalplanbraces
Standards supporting the 2.4m Loading mustbefittedateveryloadingtower
Tower Transom. workingplatformlevelandatno
greaterthanalternateliftsinall
11 To dismantle the loading tower, reverse othercircumstances.
the above sequence having first
checked that the scaffold is still in the (v) Ifaplatformisnotrequiredatany
correctly erected condition. level,theInfillTiemayberemoved
andtheLoadingTowerTransom
Special attention should be given to replacedwitha2.4mLedger.
the Loading Tower Intermediate
Standard Restraints to ensure they
remain in place at all times. Thisshould
especially be checked prior to
dismantling.
12 Toopengates,undolockingmechanism.
WithGuardrail/GateRestraintstillin
position,swinggatesopenuntiltheyare
at180o totheclosedposition.Insert
lockingpinsintothe‘V’pressings
formingtheupperhinges.The
Guardrail/GateRestraintcanthenbe
swungoveruntilitrestsattherearof
theloadingplatform.Toclosegates,
repositionGuardrail/GateRestraint,
removelockingpins,swinggatestothe
FirstIssue2010

G E N U I N E K W I K S T A G E 58
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

section9
kwikstagesafeanchoragepoints
Anchorage points shown are to support full arrest
equipment which includes but is not limited to Safety
Harness, Lanyard and 55mm opening scaffold hook.

WorkingLevel

RecommendedlocationsforattachmentofSafetyHarness

NotsuitableforattachmentofSafetyHarness

FirstIssue2010

59 V A L I D O N L Y F O R
RMDKWIKFORMANDINTERSERVEINDUSTRIAL

appendixA
identificationanduseof
alternativecomponents
InformationinthisAppendixisforcomponents
Loading Tower Gates
whichhavebeenmodifiedorsupersededbut
whichcanstillbeusedfortheapplications Thesegalvanisedgateshavepinstoholdthe
gatesinthe‘open’position.Agravitylatch
specified.
mechanismconnectstotheGuardrail/Gate
Restraintstosecurethegatesinthe‘closed’
Adjustable Base and Head Jack position.
CodeNo. KAX20003
CodeNo. 9600
Weight 4.4kg
Maximumadjustment 515mm
Thiscomponentservesthesamepurposeasthe
UniversalJackexceptthattheappliedaxial
loadmustnotexceed25kN.Coarseadjustment Loading Tower Gates
isbymeansofacaptivepinandholesinthe CodeNo.(pair) KAX10014
Jackstem.Fineadjustmentisbymeansofthe
CodeNo.(pair) 9006
collaronthethreadedsectionofthe
Weight(pair) 38.0kg
stem.

Heavy Duty Adjustable Return Kwikguard


BaseJack CodeNo. N/A
CodeNo. 9070
CodeNo. KAX20002
Weight 11.0kg
CodeNo. 9062
Weight 11.0kg
Maximumadjustment 595mm
Thiscomponentservesthesamepurpose Three Step Access Bracket
astheUniversalJackwhichhasreplaced CodeNo. N/A
it.Itishoweverheavierandslowerto CodeNo. 9088&9089
adjust. Weight 11.0kg
Maximumadjustment 595mm

Steelstage
Locking
Plate
CodeNo. N/A
CodeNo. 952000
Weight 11.0kg

FirstIssue2010

G E N U I N E K W I K S T A G E 60
middle east asia pacific
offices offices
UAE Australia
RMDKwikformMiddleEastLLC RMD(Australia)Pty.Ltd.
P.O.Box5801,Sharjah,UAE POBox169,MelrosePark,
Tel:+97165534173Fax:+97165534327 SouthAustralia,5039.
Email:rmd.me@rmdkwikform.com Tel:+61881798200Fax:+61881798201
Email:rmd.australia@rmdformwork.com
Abu Dhabi
RMDKwikform, Hong Kong
POBox259,AbuDhabi,UAE. RMDKwikform,
Tel:+97125502383Fax:+97125502384 22nd FloorEasyTower,
Email:rmd.abudhabi@rmdkwikform.com 609TaiNanWestStreet,CheungShaWan,
Kowloon,HongKong.
Dubai Tel:+85224154882Fax:+85224134797
RMDKwikformMiddleEastLLC Email:rmd.hongkong@rmdkwikform.com
european P.O.Box115480,Dubai,UAE
Tel:+97148856144Fax:+97148856141 Korea
offices Email:rmd.dubai@rmdkwikform.com RMDKwikformCo.Ltd,RMDHouse,
2nd floor,HOBuilding,38-16JamWon-Dong,
United Kingdom Bahrain Seocho-Gu,Seoul,Korea,135-080.
RMDKwikform, RMDKwikform(Almoayed)BahrainLLC Tel:+8225452484Fax:+8225451878
BrickyardRoad,Aldridge, POBox21475,Flat12,Building829, Email:rmd.seoul@rmdkwikform.com
WalsallWS98BW,UK. Road833,Block408,Sanabis,
Tel:+441922743743Fax:+441922743400 KingdomofBahrain New Zealand
Email:info@rmdkwikform.com Tel:+97317382724Fax:+97317382624 RMD(NewZealand)Ltd.
Email:rmd.bahrain@rmdkwikform.com POBox22-316,101-105StationRoad,
Ireland Otahuhu,Auckland6,NewZealand.
RMDKwikform, Lebanon Tel:+6492765955Fax:+6492766732
BallybogganRoad,Finglas,Dublin11,Ireland RMDKwikform. Email:rmd.auckland@rmdformwork.com
Tel:+35318302500Fax:+35318302522 AtcoSari,Hazmieh,Lebanon.
Email:rmd.dublin@rmdkwikform.com HobeikaCentre,3rdFloor. Philippines
Tel:+9615450214Fax:+9615955387 RMDKwikform,
Portugal Email:rmd.lebanon@rmdkwikform.com Unit1102,AnnapolisWilshirePlaza,
RMDKwikform, #11AnnapolisStreet,Greenhill’s,
Av25deAbril,32-1ºEsquerdo, Oman SanJuan,MetroManila,Philippines.
2870-150Montijo,Portugal RMDKwikformOmanLLC Tel:+6327244213Fax:+6327244214
Tel:+351212328688Fax:+351212315715 P.O.Box889,PostCode100 Email:rmd.manila@rmdkwikform.com
Email:rmd.lisboa@rmdkwikform.com Muscat,SultanateofOman
Tel:+96824613571Fax:+96824613573
Spain
RMDKwikformIbéricaSA,
Email:rmd.oman@rmdkwikform.com
south american
PaseodelClubDeportivo,1 Kuwait office
UrbanizaciónLaFinca,Edif.3,1Izda. RMDKwikform,
28223PozuelodeAlarcón,Madrid POBox42094,Shuwaik70651,Kuwait
Tel:+34915556104Fax:+34915554745 Tel:+96524845161Fax:+96524846414 Chile
Email:rmd.madrid@rmdkwikform.com Email:rmd.kuwait@rmdkwikform.com RMDKwikform,
LaEstera811,ParqueIndustrialValle
Saudi Arabia Grande,Lampa,SantiagodeChile
south american RMDKwikformSaudiArabiaLLC Tel:+5627149800Fax:+5627149800
Al-BandariyahCenterOfficeNo611(Unit5) Email:rmd.chile@rmdkwikform.com
office BuildingNo3194,PrinceFaisalBinFahadRoad
AlKhobar34424–8555,KingdomofSaudiArabia
Tel:+96638825444Fax:+96638826604
South Africa
Email:rmd.ksa@rmdkwikform.com
RMDKwikformSouthAfrica(PTY)Ltd,
52JakarandaSt,Hennopspark,
Qatar
Centurion,Pretoria.
RMDKwikform(AlMaha)QatarLLC
Tel:+27126810360Fax:+27126810361
P.O.Box405,Doha,Qatar
Email:rmd.sa@rmdkwikform.com
Tel:+9744653034Fax:+9744653282
Email:rmd.qatar@rmdkwikform.com

FirstIssue2010

R M D K W I K F O R M O F F I C E S
Interserve Industrial
offices
Belvedere Teesside
CrabtreeManorwaySouth, 6EgglestonCourt,StartforthRoad
Belvedere,KentDA176BH RiversidePark,Middlesbrough,TS21RU
Tel:+442083269560Fax:+442083102016 Tel:+441642258500Fax:+441642258501

Cardiff West Bromwich


UnitG9,TheBusinessCentre,CardiffHouse, IntersectionHouse,
CardiffRoad,ValeofGlamorgan,CF632AW 110BirminghamRoad,WestBromwich,
Tel:+441446731240Fax:+441446731245 WestMidlands,B706RP
info.industrial@interserve.com
Derby Tel:+441215005000Fax:+441215248820
134Bdg,c/oCelaneseAcetate,POBox5
Spondon,Derby,DE217BP
Tel:+441332663001Fax:+441332281414

Dundee
70/72PerrieStreet,Lochee
Dundee,DD22RD
Tel:+441382610511Fax:+441382623923

Edinburgh
600GilmertonRoad
Edinburgh,EH178RY
Tel:+441316722698Fax:+441316722560

Ellesmere Port
Unit2,OlympicPark,PooleHallRoad
EllesmerePort,CH661ST
Tel:+441513737660Fax:+441513564034

Glasgow
35NorthCanalBankStreet
Glasgow,G49XQ
Tel:+441415520003Fax:+441413323614

Grangemouth
22CastleRoad,BanksideIndustrialEstate,
Falkirk,FK27XY
Tel:+441324627430Fax:+441324625834

Leeds
WestlandSquare,WestlandRoad
Leeds,LS115SS
Tel:+441132713841Fax:+441132700048

Newcastle
ChainBridgeRoad,Blaydon-on-Tyne,
TyneandWear,NE215SZ
Tel:+441914142481Fax:+441914990087

Preston
Rough-HeyRoad,Grimsargh
PrestonPR25AR
Tel:+441772796665Fax:+441772703122

FirstIssue2010

I N T E R S E R V E I N D U S T R I A L O F F I C E S
RMDKWIKFORMANDINTERSERVEINDUSTRIAL
The arrangements of photographs may have been assembled by others and therefore not reflect current best working practices or legislation requirements

Our policy is one of continuous improvement and we reserve the right to change, alter or modify
any detail, design, weight, dimension or code without prior notice being given.

www.rm dkwi kform .com


FirstIssue2010
www.i nterserve.com
V A L I D O N L Y F O R
Kwikstage User Guide - Issued April 2010