Perdida

Gradiente
Nodo Nodo Diametro Velocidad Caudal por
Tramo Material hidraulica
Incial Final (mm) (m/s) (L/s) friccion
(m/km)
(m)
P-1 R2 J-1 300.00 Asbestos Cement 1.84 130.11 9.14 0.05
P-2 J-1 J-2 321.10 PVC 1.61 130.11 5.77 0.79
P-3 J-2 J-3 285.00 PVC 2.04 130.11 10.30 0.73
P-4 J-3 J-4 285.00 PVC 2.03 129.36 10.19 0.21
P-5 J-4 J-5 285.00 PVC 2.03 129.36 10.24 0.05
P-6 J-5 J-6 285.00 PVC 2.03 129.36 10.20 0.95
P-7 J-6 J-7 285.00 PVC 2.03 129.36 10.20 0.18
P-8 J-7 J-8 285.00 PVC 2.03 129.36 10.20 0.48
P-9 J-8 J-9 285.00 PVC 2.03 129.36 10.20 0.57
P-10 J-9 J-10 285.00 PVC 2.03 129.36 10.20 0.59
P-11 J-10 J-11 285.00 PVC 2.03 129.36 10.20 0.16
P-12 J-12 J-14 350.00 Asbestos Cement 1.34 129.36 4.26 0.31
P-13 J-14 J-15 350.00 Asbestos Cement 1.34 129.36 4.26 0.56
P-14 J-15 J-16 350.00 Asbestos Cement 1.34 129.36 4.26 0.29
P-15 J-17 J-18 150.00 Asbestos Cement 0.90 15.88 5.43 1.13
P-16 J-18 J-19 150.00 Asbestos Cement 0.43 7.53 1.36 0.11
P-17 J-19 J-20 150.00 Asbestos Cement 0.38 6.77 1.12 0.19
P-18 J-20 J-21 150.00 Asbestos Cement 0.34 6.01 0.90 0.20
P-19 J-22 J-23 150.00 Asbestos Cement 0.39 -6.84 1.14 0.22
P-20 J-23 J-18 150.00 Asbestos Cement 0.43 -7.59 1.38 0.10
P-21 J-16 J-74 350.00 Asbestos Cement 1.34 129.36 4.26 0.21
P-22 J-74 J-17 150.00 Asbestos Cement 3.12 55.22 54.59 11.51
P-23 J-17 J-24 200.00 Asbestos Cement 1.23 38.59 6.92 0.45
P-24 J-24 J-25 200.00 Asbestos Cement 1.20 37.83 6.67 0.32
P-25 J-25 J-26 200.00 Asbestos Cement 1.18 37.08 6.43 0.62
P-26 J-26 J-27 200.00 Asbestos Cement 1.16 36.32 6.19 0.95
P-27 J-27 J-28 300.00 Asbestos Cement 0.50 35.56 0.83 0.12
P-28 J-28 J-29 160.00 Asbestos Cement 1.73 34.81 16.96 3.66
P-29 J-29 J-30 150.00 Asbestos Cement 1.93 34.05 22.29 2.97
P-30 J-30 J-31 150.00 Asbestos Cement 1.88 33.30 21.39 2.51
P-31 J-31 J-32 100.00 Asbestos Cement 0.58 4.59 3.93 0.59
P-32 J-32 J-33 100.00 Asbestos Cement 0.49 3.84 2.82 0.23
P-33 J-33 J-34 100.00 Asbestos Cement 0.39 3.08 1.88 0.11
P-34 J-34 J-35 100.00 Asbestos Cement 0.30 2.32 1.12 0.06
P-35 J-35 J-36 99.40 PVC 0.20 1.57 0.49 0.05
P-36 J-36 J-37 99.40 PVC 0.10 0.81 0.14 0.01
P-37 J-37 J-38 99.40 PVC 0.01 0.05 0.00 0.00
P-38 J-38 J-39 99.40 PVC 0.09 -0.70 0.11 0.02
P-39 J-31 J-40 100.00 Asbestos Cement 0.96 7.57 9.92 2.14
P-40 J-40 J-41 150.00 Asbestos Cement 0.39 6.81 1.13 0.14
P-41 J-41 J-42 100.00 Asbestos Cement 0.77 6.06 6.56 0.27
P-42 J-42 J-43 100.00 Asbestos Cement 0.67 5.30 5.13 0.76
P-43 J-43 J-44 100.00 Asbestos Cement 0.27 2.11 0.93 0.08
P-44 J-44 J-45 150.00 Asbestos Cement 0.00 -0.02 0.00 0.00
P-45 J-45 J-46 100.00 Asbestos Cement 0.10 -0.78 0.15 0.04
P-46 J-46 J-47 100.00 Asbestos Cement 0.20 -1.53 0.52 0.10
P-47 J-47 J-48 100.00 Asbestos Cement 0.29 -2.29 1.08 0.16
P-48 J-48 J-49 144.60 PVC 0.09 1.51 0.07 0.01
P-49 J-49 J-50 150.00 Asbestos Cement 0.04 0.76 0.02 0.00
P-50 J-48 J-51 100.00 Asbestos Cement 0.58 -4.56 3.88 0.42
P-51 J-52 J-53 100.00 Asbestos Cement 0.50 3.91 2.91 0.24
P-52 J-53 J-54 100.00 Asbestos Cement 0.16 1.29 0.37 0.02
P-53 J-54 J-55 100.00 Asbestos Cement 0.07 0.53 0.07 0.00
P-54 J-55 J-56 100.00 Asbestos Cement 0.03 -0.23 0.02 0.00
P-55 J-56 J-57 99.40 PVC 0.13 -0.98 0.20 0.01
P-56 J-57 J-58 99.40 PVC 0.22 -1.74 0.59 0.03
P-57 J-58 J-59 99.40 PVC 0.32 -2.49 1.15 0.04
P-58 J-59 J-13 99.40 PVC 0.96 -7.42 8.65 1.95
P-59 J-39 J-13 144.60 PVC 0.50 8.17 1.67 0.07
P-60 J-53 J-60 100.00 Asbestos Cement 0.24 1.86 0.74 0.20
P-61 J-60 J-61 99.40 PVC 0.14 1.11 0.26 0.02
P-62 J-61 J-62 99.40 PVC 0.05 0.35 0.04 0.00
P-63 J-62 J-63 99.40 PVC 0.05 -0.41 0.04 0.00
P-64 J-63 J-64 99.40 PVC 0.44 -3.41 2.05 0.13
P-65 J-64 J-59 99.40 PVC 0.54 -4.16 2.97 0.15
P-66 J-43 J-65 100.00 Asbestos Cement 0.31 2.44 1.21 0.08
P-67 J-65 J-66 100.00 Asbestos Cement 0.21 1.68 0.61 0.04
P-68 J-67 J-68 100.00 Asbestos Cement 0.02 0.14 0.01 0.00
P-69 J-68 J-69 100.00 Asbestos Cement 0.08 -0.61 0.10 0.01
P-70 J-69 J-44 100.00 PVC 0.17 -1.37 0.37 0.08
P-71 J-63 J-70 99.40 PVC 0.29 2.24 0.95 0.08
P-72 J-70 J-71 99.40 Asbestos Cement 0.19 1.49 0.50 0.03
P-73 J-71 J-72 100.00 Asbestos Cement 0.09 0.73 0.13 0.03
P-74 J-66 J-72 100.00 Asbestos Cement 0.12 0.92 0.20 0.03
P-75 J-72 J-67 100.00 Asbestos Cement 0.11 0.90 0.19 0.01
P-76 J-51 J-73 150.00 Asbestos Cement 0.30 -5.32 0.72 0.08
P-77 J-73 J-52 100.00 Asbestos Cement 0.59 4.66 4.05 0.27
P-78 J-31 J-73 100.00 Asbestos Cement 1.37 10.74 18.95 2.60
P-79 J-75 J-86 300.00 Asbestos Cement 0.75 53.30 1.75 0.09
P-80 J-86 J-76 300.00 Asbestos Cement 0.73 51.80 1.66 0.10
P-81 J-76 J-77 300.00 Asbestos Cement 0.71 50.37 1.57 0.10
P-82 J-77 J-78 300.00 Asbestos Cement 0.69 48.68 1.48 0.09
P-83 J-78 J-79 300.00 Asbestos Cement 0.59 41.80 1.11 0.14
P-84 J-79 J-80 300.00 Asbestos Cement 0.56 39.78 1.02 0.12
P-85 J-80 J-81 250.00 Asbestos Cement 0.58 28.26 1.31 0.20
P-86 J-81 J-82 250.00 Asbestos Cement 0.50 24.60 1.02 0.08
P-87 J-82 J-83 250.00 Asbestos Cement 0.46 22.52 0.86 0.12
P-88 J-83 J-84 250.00 Asbestos Cement 0.26 12.77 0.30 0.04
P-89 J-84 J-85 250.00 Asbestos Cement 0.16 7.98 0.13 0.05
P-90 J-86 J-87 99.40 PVC 0.10 0.75 0.08 0.00
P-91 J-88 J-89 285.00 PVC 0.24 15.51 0.20 0.01
P-92 J-89 J-90 99.40 PVC 0.52 4.07 2.85 0.18
P-93 J-90 J-91 99.40 PVC 0.43 3.31 1.94 0.11
P-94 J-91 J-92 99.40 PVC 0.33 2.55 1.20 0.07
P-95 J-92 J-78 99.40 PVC 0.07 -0.55 0.07 0.01
P-96 J-78 J-93 99.40 PVC 0.72 5.58 5.14 0.02
P-97 J-93 J-94 99.40 PVC 0.73 5.66 5.25 0.64
P-98 J-94 J-95 99.40 PVC 0.63 4.91 4.03 0.25
P-99 J-95 J-96 99.40 PVC 0.53 4.15 2.95 0.18
P-100 J-96 J-97 99.40 PVC 0.44 3.39 2.04 0.11
P-101 J-97 J-98 99.40 PVC 0.34 2.64 1.27 0.08
P-102 J-98 J-99 99.40 PVC 0.92 -7.17 8.13 0.98
P-103 J-87 J-100 99.40 PVC 0.39 3.04 1.66 0.10
P-104 J-100 J-101 99.40 PVC 0.38 2.95 1.57 0.10
P-105 J-101 J-93 99.40 PVC 0.40 3.13 1.75 0.11
P-106 J-93 J-102 99.40 PVC 0.30 2.29 0.98 0.12
P-107 J-102 J-99 99.40 PVC 0.35 2.71 1.34 0.16
P-108 J-99 J-103 99.40 PVC 0.31 2.37 1.05 0.16
P-109 J-103 J-104 99.40 PVC 0.30 2.35 1.03 0.08
P-110 J-104 J-105 99.40 PVC 0.38 2.92 1.54 0.09
P-111 J-105 J-106 99.40 PVC 0.28 2.16 0.88 0.08
P-112 J-106 J-107 99.40 PVC 0.02 0.19 0.01 0.00
P-113 J-107 J-108 99.40 PVC 0.45 3.46 2.11 0.15
P-114 J-106 J-109 99.40 PVC 1.32 10.21 15.65 0.12
P-115 J-109 J-110 99.40 PVC 0.52 4.01 2.77 0.41
P-116 J-110 J-111 99.40 PVC 0.42 3.26 1.89 0.06
P-117 J-111 J-112 99.40 PVC 0.32 2.50 1.16 0.07
P-118 J-112 J-113 99.40 PVC 0.18 1.38 0.38 0.03
P-119 J-113 J-114 99.40 PVC 0.08 0.62 0.08 0.00
P-120 J-114 J-115 99.40 PVC 0.02 -0.13 0.00 0.00
P-121 J-115 J-116 99.40 PVC 0.11 -0.89 0.17 0.02
P-122 J-116 J-117 99.40 PVC 0.21 -1.65 0.53 0.03
P-123 J-117 J-98 99.40 PVC 0.31 -2.40 1.07 0.07
P-124 J-81 J-118 99.40 PVC 0.28 2.17 0.89 0.12
P-125 J-118 J-119 99.40 PVC 0.45 3.50 2.15 0.18
P-126 J-119 J-120 99.40 PVC 0.35 2.74 1.37 0.19
P-127 J-120 J-121 99.40 PVC 0.25 1.97 0.74 0.09
P-128 J-121 J-122 99.40 PVC 0.16 1.22 0.31 0.02
P-129 J-122 J-108 99.40 PVC 0.35 -2.71 1.34 0.20
P-130 J-108 J-123 99.40 PVC 0.00 -0.01 0.00 0.00
P-131 J-123 J-124 99.40 PVC 0.10 -0.76 0.13 0.00
P-132 J-125 J-126 99.40 Asbestos Cement 0.64 4.95 4.65 0.35
P-133 J-126 J-127 99.40 Asbestos Cement 0.54 4.19 3.42 0.45
P-134 J-127 J-128 99.40 Asbestos Cement 0.44 3.44 2.37 0.11
P-135 J-128 J-129 99.40 Asbestos Cement 0.35 2.68 1.49 0.15
P-136 J-129 J-130 99.40 Asbestos Cement 0.25 1.92 0.81 0.10
P-137 J-130 J-131 99.40 Asbestos Cement 0.15 1.17 0.32 0.03
P-138 J-131 J-132 99.40 Asbestos Cement 0.24 1.89 0.79 0.06
P-139 J-132 J-133 99.40 Asbestos Cement 0.15 1.13 0.31 0.03
P-140 J-133 J-134 99.40 Asbestos Cement 0.05 0.38 0.04 0.00
P-141 J-134 J-135 99.40 Asbestos Cement 0.05 -0.38 0.04 0.00
P-142 J-135 J-136 99.40 Asbestos Cement 0.15 -1.13 0.30 0.02
P-143 J-136 J-137 99.40 Asbestos Cement 0.24 -1.89 0.78 0.01
P-144 J-137 J-138 99.40 PVC 0.34 -2.65 1.29 0.22
P-145 J-138 J-139 99.40 PVC 0.66 -5.13 4.37 0.05
P-146 J-139 J-140 99.40 PVC 0.76 -5.89 5.64 0.59
P-147 J-140 J-98 99.40 PVC 0.86 -6.64 7.07 0.07
P-148 J-138 J-141 99.40 PVC 0.22 1.73 0.58 0.04
P-149 J-141 J-142 99.40 PVC 0.13 0.97 0.20 0.01
P-150 J-142 J-143 99.40 PVC 0.03 0.21 0.01 0.00
P-151 J-143 J-144 99.40 PVC 0.07 -0.54 0.07 0.01
P-152 J-144 J-145 99.40 PVC 0.17 -1.30 0.34 0.02
P-153 J-145 J-146 99.40 PVC 0.26 -2.05 0.83 0.01
P-154 J-146 J-112 99.40 PVC 0.75 -5.81 5.50 0.64
P-155 J-112 J-109 99.40 PVC 0.70 -5.44 4.88 0.54
P-156 J-146 J-147 99.40 PVC 0.39 2.99 1.62 0.01
P-157 J-147 J-148 99.40 PVC 0.29 2.24 0.94 0.11
P-158 J-148 J-131 99.40 PVC 0.19 1.48 0.44 0.02
P-159 J-100 J-76 99.40 PVC 0.09 -0.67 0.14 0.00
P-160 J-101 J-77 99.40 PVC 0.12 -0.93 0.22 0.00
P-161 J-102 J-79 99.40 PVC 0.15 -1.17 0.26 0.00
P-162 J-99 J-80 99.40 PVC 0.98 -7.59 8.98 0.04
P-163 J-103 J-81 99.40 PVC 0.09 -0.73 0.15 0.00
P-164 J-104 J-82 99.40 PVC 0.17 -1.32 0.35 0.00
P-165 J-106 J-83 99.40 PVC 1.16 -9.00 12.36 0.04
P-166 J-107 J-84 99.40 PVC 0.52 -4.03 2.76 0.01
P-167 J-149 J-150 150.00 Asbestos Cement 0.51 9.07 1.92 0.09
P-168 J-150 J-151 150.00 Asbestos Cement 0.47 8.31 1.64 0.08
P-169 J-151 J-152 100.00 Asbestos Cement 0.96 7.55 9.88 1.21
P-170 J-153 J-154 99.40 PVC 0.49 3.77 2.48 0.28
P-171 J-154 J-155 100.00 Asbestos Cement 0.38 3.02 1.80 0.09
P-172 J-155 J-156 100.00 Asbestos Cement 0.29 2.26 1.06 0.05
P-173 J-156 J-157 100.00 Asbestos Cement 0.19 1.50 0.50 0.03
P-174 J-152 J-158 100.00 Asbestos Cement 0.87 6.80 8.13 0.10
P-175 J-158 J-159 67.80 PVC 1.67 6.04 38.17 3.88
P-176 J-153 J-160 67.80 PVC 1.25 -4.53 22.36 0.17
P-177 J-159 J-160 67.80 PVC 1.46 5.29 29.79 2.88
P-178 J-161 J-149 150.00 Asbestos Cement 0.56 9.82 2.23 0.21
P-179 J-21 J-162 150.00 Asbestos Cement 0.30 5.26 0.70 0.07
P-180 J-162 J-22 150.00 Asbestos Cement 0.34 -6.08 0.92 0.24
P-181 J-161 J-162 100.00 Asbestos Cement 1.35 -10.58 18.44 1.60
P-182 J-39 J-163 144.60 PVC 0.59 -9.63 2.26 0.28
P-183 J-163 J-31 144.60 PVC 0.59 -9.64 2.27 0.75
P-184 J-157 J-163 100.00 Asbestos Cement 0.09 0.75 0.13 0.00
P-185 J-165 J-166 100.00 Asbestos Cement 0.36 2.81 1.58 0.51
P-186 J-166 J-167 100.00 Asbestos Cement 0.20 1.53 0.52 0.16
P-187 J-168 J-169 100.00 Asbestos Cement 0.08 0.61 0.10 0.01
P-188 J-169 J-170 100.00 Asbestos Cement 0.02 -0.15 0.08 0.00
P-189 J-170 J-171 100.00 Asbestos Cement 0.12 -0.91 0.19 0.01
P-190 J-171 J-172 100.00 Asbestos Cement 0.21 -1.66 0.60 0.04
P-191 J-172 J-173 100.00 Asbestos Cement 0.31 -2.42 1.20 0.01
P-192 J-173 J-122 100.00 Asbestos Cement 0.40 -3.17 1.99 0.03
P-193 J-176 J-80 100.00 Asbestos Cement 0.40 -3.17 1.98 0.12
P-194 J-177 J-176 100.00 Asbestos Cement 0.31 -2.41 1.19 0.08
P-195 J-89 J-179 285.00 Asbestos Cement 0.17 10.69 0.12 0.03
P-196 J-179 J-164 285.00 PVC 0.11 6.88 0.05 0.01
P-197 J-92 J-174 99.40 PVC 0.30 2.35 1.03 0.12
P-198 J-174 J-175 99.40 PVC 0.09 0.67 0.10 0.01
P-199 J-175 J-79 99.40 PVC 0.01 -0.09 0.00 0.00
P-200 J-174 J-178 99.40 PVC 0.12 0.93 0.18 0.04
P-201 J-166 J-180 99.40 PVC 0.07 0.52 0.06 0.01
P-202 J-180 J-120 99.40 PVC 0.00 -0.01 0.00 0.00
P-203 J-180 J-181 99.40 PVC 0.27 2.10 0.84 0.10
P-204 J-167 J-182 100.00 Asbestos Cement 0.10 0.78 0.15 0.02
P-205 J-182 J-168 100.00 Asbestos Cement 0.17 1.36 0.41 0.02
P-206 J-181 J-182 99.40 PVC 0.17 1.35 0.37 0.07
P-207 J-165 J-184 100.00 Asbestos Cement 0.13 1.05 0.26 0.03
P-208 J-184 J-177 100.00 Asbestos Cement 0.05 0.43 0.05 0.01
P-209 J-184 J-183 99.40 PVC 0.40 3.08 1.70 0.36
P-210 J-183 J-180 99.40 PVC 0.30 2.33 1.01 0.13
P-211 J-178 J-179 99.40 PVC 0.39 -3.06 1.68 0.49
P-212 J-178 J-184 99.4 PVC 0.42 3.23 1.853 0.29
P-213 J-118 J-177 99.4 PVC 0.27 -2.09 0.829 0.11
P-214 J-164 J-185 226.2 PVC 0.15 6.12 0.11 0.03
P-215 J-185 J-186 99.4 PVC 0.69 5.37 4.753 0.4
P-216 J-186 J-165 99.4 PVC 0.59 4.61 3.584 0.31
P-217 J-11 PVR-1 400 Asbestos Cement 1.03 129.36 2.222 0.52
P-218 PVR-1 J-12 400 Asbestos Cement 1.03 129.36 2.222 0.52
P-219 J-87 J-187 99.4 PVC 0.39 -3.05 1.649 0.08
P-220 J-188 J-75 300 Asbestos Cement 0.81 57.11 1.987 0.02
P-221 J-88 J-188 285 PVC 0.26 -16.27 0.22 0.02
P-222 J-74 J-189 321.2 PVC 0.91 73.38 1.993 0.53
P-223 J-189 J-188 321.2 Asbestos Cement 0.91 73.38 2.247 0.02
P-224 J-75 J-187 99.4 PVC 0.39 3.05 1.666 0.01
P-225 J-124 J-190 99.4 Asbestos Cement 0.2 -1.52 0.521 0.05
P-226 J-190 J-125 99.4 Asbestos Cement 0.74 5.71 6.052 0.15
P-227 J-85 J-190 99.4 PVC 0.93 7.23 8.244 0.05
Elevación Presión
Nudo
(m) (m H2O)

J-1 2,776.03 16.89


J-2 2,751.69 40.4
J-3 2,752.25 39.11
J-4 2,749.36 41.78
J-5 2,748.89 42.2
J-6 2,743.09 47.04
J-7 2,742.33 47.62
J-8 2,738.03 51.43
J-9 2,737.41 51.48
J-10 2,735.49 52.81
J-11 2,735.14 53
J-12 2,722.06 30.97
J-13 2,693.42 34.01
J-14 2,721.88 30.84
J-15 2,720.65 31.51
J-16 2,719.85 32.01
J-17 2,714.85 25.31
J-18 2,710.84 28.19
J-19 2,711.06 27.86
J-20 2,709.18 29.55
J-21 2,706.80 31.73
J-22 2,706.64 32.05
J-23 2,710.02 28.9
J-24 2,713.84 25.87
J-25 2,713.01 26.38
J-26 2,711.46 27.31
J-27 2,709.37 28.44
J-28 2,705.97 31.71
J-29 2,704.43 29.59
J-30 2,702.58 28.48
J-31 2,700.50 28.05
J-32 2,698.07 29.89
J-33 2,696.50 31.23
J-34 2,696.11 31.5
J-35 2,695.82 31.73
J-36 2,693.90 33.59
J-37 2,693.55 33.94
J-38 2,693.66 33.83
J-39 2,694.00 33.5
J-40 2,698.88 27.53
J-41 2,698.41 27.86
J-42 2,698.38 27.61
J-43 2,697.54 27.69
J-44 2,696.00 29.15
J-45 2,696.00 29.15
J-46 2,699.99 25.2
J-47 2,700.02 25.27
J-48 2,696.45 28.99
J-49 2,700.35 25.09
J-50 2,700.69 24.75
J-51 2,701.28 24.59
J-52 2,697.36 28.32
J-53 2,697.37 28.07
J-54 2,696.47 28.95
J-55 2,695.67 29.74
J-56 2,693.92 31.49
J-57 2,693.13 32.29
J-58 2,692.60 32.84
J-59 2,692.24 33.24
J-60 2,694.09 31.14
J-61 2,693.44 31.77
J-62 2,693.39 31.82
J-63 2,692.41 32.8
J-64 2,692.00 33.33
J-65 2,695.43 29.72
J-66 2,693.67 31.43
J-67 2,691.22 33.83
J-68 2,691.39 33.66
J-69 2,692.05 33.02
J-70 2,692.45 32.68
J-71 2,692.02 33.07
J-72 2,691.03 34.04
J-73 2,698.47 27.48
J-74 2,718.88 32.77
J-75 2,721.94 29.15
J-76 2,720.30 30.6
J-77 2,719.51 31.29
J-78 2,718.66 32.05
J-79 2,716.74 33.83
J-80 2,714.41 36.04
J-81 2,712.68 37.56
J-82 2,711.99 38.17
J-83 2,710.00 40.03
J-84 2,709.02 40.97
J-85 2,698.76 51.16
J-86 2,721.50 29.5
J-87 2,721.39 29.61
J-88 2,725.16 25.93
J-89 2,723.98 27.1
J-90 2,722.78 28.12
J-91 2,722.32 28.46
J-92 2,721.79 28.92
J-93 2,718.57 32.12
J-94 2,715.94 34.11
J-95 2,714.97 34.83
J-96 2,713.86 35.76
J-97 2,712.93 36.58
J-98 2,711.95 37.47
J-99 2,714.15 36.26
J-100 2,720.17 30.73
J-101 2,719.43 31.37
J-102 2,716.63 33.94
J-103 2,712.48 37.76
J-104 2,711.83 38.33
J-105 2,710.87 39.2
J-106 2,709.83 40.16
J-107 2,708.90 41.09
J-108 2,710.36 39.49
J-109 2,709.46 40.41
J-110 2,704.04 45.4
J-111 2,704.47 44.91
J-112 2,705.27 44.05
J-113 2,706.42 42.87
J-114 2,706.48 42.81
J-115 2,708.00 41.29
J-116 2,709.98 39.33
J-117 2,710.30 39.05
J-118 2,720.43 29.71
J-119 2,720.72 29.24
J-120 2,719.06 30.71
J-121 2,717.56 32.12
J-122 2,717.75 31.91
J-123 2,702.40 47.43
J-124 2,701.26 48.57
J-125 2,698.52 51.2
J-126 2,697.68 51.69
J-127 2,697.80 51.12
J-128 2,697.85 50.96
J-129 2,698.36 50.3
J-130 2,700.92 47.64
J-131 2,701.51 47.02
J-132 2,702.62 45.86
J-133 2,703.94 44.51
J-134 2,704.45 44
J-135 2,706.75 41.71
J-136 2,708.12 40.36
J-137 2,708.22 40.27
J-138 2,709.70 39.01
J-139 2,709.86 38.9
J-140 2,711.92 37.44
J-141 2,708.69 39.98
J-142 2,707.45 41.2
J-143 2,705.53 43.12
J-144 2,704.00 44.65
J-145 2,703.08 45.59
J-146 2,702.95 45.73
J-147 2,702.89 45.78
J-148 2,701.97 46.58
J-149 2,704.44 32.2
J-150 2,703.72 32.84
J-151 2,702.65 33.83
J-152 2,700.71 34.55
J-153 2,697.41 30.83
J-154 2,696.65 31.31
J-155 2,696.37 31.5
J-156 2,695.99 31.83
J-157 2,695.96 31.83
J-158 2,700.45 34.71
J-159 2,698.85 32.43
J-160 2,697.41 31
J-161 2,704.86 31.99
J-162 2,706.75 31.7
J-163 2,695.76 32.02
J-164 2,735.14 15.93
J-165 2,734.66 15.66
J-166 2,734.63 15.18
J-167 2,728.32 21.32
J-168 2,721.55 28.03
J-169 2,719.34 30.23
J-170 2,719.20 30.37
J-171 2,719.65 29.93
J-172 2,717.09 32.52
J-173 2,716.84 32.78
J-174 2,721.18 29.41
J-175 2,718.02 32.56
J-176 2,717.47 32.86
J-177 2,719.58 30.67
J-178 2,731.55 19.02
J-179 2,735.63 15.44
J-180 2,727.06 22.73
J-181 2,725.32 24.36
J-182 2,720.00 29.6
J-183 2,729.53 20.39
J-184 2,730.03 20.25
J-185 2,735.88 15.16
J-186 2,735.26 15.37
J-187 2,722.59 28.5
J-188 2,721.84 29.26
J-189 2,721.73 29.4
J-190 2,699.12 50.76
Gradiente
Nodo Nodo Diametro Velocidad Caudal Perdida por
Tramo Material hidraulica
Incial Final (mm) (m/s) (L/s) friccion (m)
(m/km)
P-1 R2 J-1 300 Asbestos Cement 2.33 164.82 14.115 0.07
P-2 J-1 J-2 321.1 PVC 2.04 164.82 8.934 1.22
P-3 J-2 J-3 285 PVC 2.57 163.87 15.799 1.12
P-4 J-3 J-4 285 PVC 2.57 163.87 15.796 0.33
P-5 J-4 J-5 285 PVC 2.57 163.87 15.76 0.08
P-6 J-5 J-6 285 PVC 2.57 163.87 15.8 1.47
P-7 J-6 J-7 285 PVC 2.57 163.87 15.8 0.28
P-8 J-7 J-8 285 PVC 2.57 163.87 15.795 0.75
P-9 J-8 J-9 285 PVC 2.57 163.87 15.8 0.88
P-10 J-9 J-10 285 PVC 2.57 163.87 15.797 0.91
P-11 J-10 J-11 285 PVC 2.57 163.87 15.811 0.24
P-12 J-12 J-14 350 Asbestos Cement 1.69 162.92 6.529 0.48
P-13 J-14 J-15 350 Asbestos Cement 1.69 162.92 6.528 0.87
P-14 J-15 J-16 350 Asbestos Cement 1.69 162.92 6.527 0.44
P-15 J-17 J-18 150 Asbestos Cement 1.1 19.51 7.946 1.65
P-16 J-18 J-19 150 Asbestos Cement 0.52 9.24 1.994 0.16
P-17 J-19 J-20 150 Asbestos Cement 0.47 8.29 1.627 0.27
P-18 J-20 J-21 150 Asbestos Cement 0.41 7.33 1.298 0.28
P-19 J-22 J-23 150 Asbestos Cement 0.47 -8.36 1.655 0.32
P-20 J-23 J-18 150 Asbestos Cement 0.53 -9.31 2.021 0.15
P-21 J-16 J-74 350 Asbestos Cement 1.68 161.96 6.46 0.32
P-22 J-74 J-17 150 Asbestos Cement 3.89 68.68 81.745 17.24
P-23 J-17 J-24 226.2 PVC 1.2 48.22 5.05 0.33
P-24 J-24 J-25 226.2 PVC 1.18 47.26 4.87 0.23
P-25 J-25 J-26 226.2 PVC 1.15 46.31 4.69 0.45
P-26 J-26 J-27 226.2 PVC 1.13 45.35 4.51 0.7
P-27 J-27 J-28 226.2 PVC 1.1 44.4 4.335 0.65
P-28 J-28 J-29 160 Asbestos Cement 2.16 43.45 25.564 5.52
P-29 J-29 J-30 150 Asbestos Cement 2.4 42.49 33.596 4.47
P-30 J-30 J-31 150 Asbestos Cement 2.35 41.54 32.215 3.78
P-31 J-31 J-32 100 Asbestos Cement 0.64 5.02 4.631 0.69
P-32 J-32 J-33 100 Asbestos Cement 0.52 4.06 3.136 0.25
P-33 J-33 J-34 100 Asbestos Cement 0.4 3.11 1.907 0.11
P-34 J-34 J-35 100 Asbestos Cement 0.27 2.16 0.97 0.06
P-35 J-35 J-36 99.4 PVC 0.15 1.2 0.298 0.03
P-36 J-36 J-37 99.4 PVC 0.03 0.25 0.018 0
P-37 J-37 J-38 99.4 PVC 0.09 -0.71 0.112 0
P-38 J-38 J-39 99.4 PVC 0.21 -1.66 0.542 0.09
P-39 J-31 J-40 100 Asbestos Cement 0.95 7.49 9.725 2.1
P-40 J-40 J-41 150 Asbestos Cement 0.37 6.54 1.047 0.13
P-41 J-41 J-42 100 Asbestos Cement 0.71 5.58 5.638 0.24
P-42 J-42 J-43 100 Asbestos Cement 0.59 4.63 3.987 0.59
P-43 J-43 J-44 100 Asbestos Cement 0.1 0.78 0.15 0.01
P-44 J-44 J-45 150 Asbestos Cement 0.13 -2.24 0.146 0
P-45 J-45 J-46 100 Asbestos Cement 0.41 -3.2 2.008 0.49
P-46 J-46 J-47 100 Asbestos Cement 0.53 -4.15 3.257 0.62
P-47 J-47 J-48 100 Asbestos Cement 0.65 -5.1 4.779 0.7
P-48 J-48 J-49 144.6 PVC 0.12 1.91 0.112 0.01
P-49 J-49 J-50 150 Asbestos Cement 0.05 0.95 0.032 0
P-50 J-48 J-51 226.2 PVC 0.2 -7.96 0.18 0.02
P-51 J-52 J-53 100 Asbestos Cement 0.93 7.34 9.367 0.78
P-52 J-53 J-54 100 Asbestos Cement 0.44 3.49 2.365 0.11
P-53 J-54 J-55 100 Asbestos Cement 0.32 2.54 1.305 0.06
P-54 J-55 J-56 100 Asbestos Cement 0.2 1.58 0.551 0.03
P-55 J-56 J-57 99.4 PVC 0.08 0.63 0.089 0
P-56 J-57 J-58 99.4 PVC 0.04 -0.33 0.027 0
P-57 J-58 J-59 99.4 PVC 0.16 -1.28 0.335 0.01
P-58 J-59 J-13 99.4 PVC 0.87 -6.78 7.323 1.65
P-59 J-39 J-13 144.6 PVC 0.41 6.78 1.186 0.05
P-60 J-53 J-60 100 Asbestos Cement 0.37 2.9 1.674 0.46
P-61 J-60 J-61 99.4 PVC 0.25 1.94 0.724 0.05
P-62 J-61 J-62 99.4 PVC 0.13 0.99 0.174 0
P-63 J-62 J-63 99.4 PVC 0 0.03 0.005 0
P-64 J-63 J-64 99.4 PVC 0.46 -3.59 2.258 0.14
P-65 J-64 J-59 99.4 PVC 0.59 -4.54 3.493 0.18
P-66 J-43 J-65 100 Asbestos Cement 0.37 2.89 1.669 0.11
P-67 J-65 J-66 100 Asbestos Cement 0.25 1.94 0.798 0.05
P-68 J-67 J-68 100 Asbestos Cement 0.02 -0.16 0.006 0
P-69 J-68 J-69 100 Asbestos Cement 0.14 -1.12 0.288 0.03
P-70 J-69 J-44 100 PVC 0.26 -2.07 0.79 0.17
P-71 J-63 J-70 99.4 PVC 0.34 2.67 1.303 0.11
P-72 J-70 J-71 99.4 Asbestos Cement 0.22 1.72 0.655 0.04
P-73 J-71 J-72 100 Asbestos Cement 0.1 0.76 0.141 0.03
P-74 J-66 J-72 100 Asbestos Cement 0.13 0.98 0.226 0.04
P-75 J-72 J-67 100 Asbestos Cement 0.1 0.79 0.153 0.01
P-76 J-51 J-73 144.6 PVC 0.54 -8.92 1.961 0.23
P-77 J-73 J-52 100 Asbestos Cement 1.06 8.29 11.747 0.77
P-78 J-31 J-73 144.6 PVC 1.11 18.17 7.326 1.01
P-79 J-75 J-86 300 Asbestos Cement 0.95 66.9 2.666 0.13
P-80 J-86 J-76 300 Asbestos Cement 0.92 64.99 2.522 0.15
P-81 J-76 J-77 300 Asbestos Cement 0.89 63.19 2.393 0.15
P-82 J-77 J-78 300 Asbestos Cement 0.86 61.06 2.244 0.13
P-83 J-78 J-79 300 Asbestos Cement 0.74 52.46 1.696 0.21
P-84 J-79 J-80 300 Asbestos Cement 0.71 49.99 1.551 0.19
P-85 J-80 J-81 250 Asbestos Cement 0.72 35.55 2.005 0.3
P-86 J-81 J-82 250 Asbestos Cement 0.63 30.99 1.555 0.12
P-87 J-82 J-83 250 Asbestos Cement 0.58 28.37 1.32 0.19
P-88 J-83 J-84 250 Asbestos Cement 0.33 16.07 0.462 0.06
P-89 J-84 J-85 250 Asbestos Cement 0.2 10.05 0.193 0.08
P-90 J-86 J-87 99.4 PVC 0.12 0.96 0.16 0
P-91 J-88 J-89 321.2 PVC 0.24 19.71 0.174 0.01
P-92 J-89 J-90 99.4 PVC 0.67 5.19 4.46 0.28
P-93 J-90 J-91 99.4 PVC 0.55 4.23 3.062 0.18
P-94 J-91 J-92 99.4 PVC 0.42 3.28 1.909 0.11
P-95 J-92 J-78 99.4 PVC 0.08 -0.62 0.088 0.01
P-96 J-78 J-93 99.4 PVC 0.91 7.03 7.92 0.03
P-97 J-93 J-94 99.4 PVC 0.92 7.14 8.055 0.98
P-98 J-94 J-95 99.4 PVC 0.8 6.18 6.178 0.38
P-99 J-95 J-96 99.4 PVC 0.67 5.23 4.528 0.27
P-100 J-96 J-97 99.4 PVC 0.55 4.27 3.115 0.17
P-101 J-97 J-98 99.4 PVC 0.43 3.32 1.954 0.13
P-102 J-98 J-99 99.4 PVC 1.16 -9.04 12.481 1.51
P-103 J-87 J-100 99.4 PVC 0.49 3.82 2.528 0.15
P-104 J-100 J-101 99.4 PVC 0.48 3.7 2.394 0.15
P-105 J-101 J-93 99.4 PVC 0.51 3.93 2.667 0.16
P-106 J-93 J-102 99.4 PVC 0.37 2.87 1.493 0.18
P-107 J-102 J-99 99.4 PVC 0.44 3.4 2.046 0.25
P-108 J-99 J-103 99.4 PVC 0.38 2.98 1.604 0.24
P-109 J-103 J-104 99.4 PVC 0.38 2.96 1.581 0.13
P-110 J-104 J-105 99.4 PVC 0.47 3.67 2.358 0.14
P-111 J-105 J-106 99.4 PVC 0.35 2.72 1.351 0.12
P-112 J-106 J-107 99.4 PVC 0.03 0.23 0.014 0
P-113 J-107 J-108 99.4 PVC 0.56 4.35 3.216 0.22
P-114 J-106 J-109 99.4 PVC 1.66 12.88 24.04 0.19
P-115 J-109 J-110 99.4 PVC 0.65 5.06 4.265 0.63
P-116 J-110 J-111 99.4 PVC 0.53 4.11 2.893 0.09
P-117 J-111 J-112 99.4 PVC 0.41 3.15 1.777 0.1
P-118 J-112 J-113 99.4 PVC 0.22 1.74 0.591 0.05
P-119 J-113 J-114 99.4 PVC 0.1 0.79 0.162 0
P-120 J-114 J-115 99.4 PVC 0.02 -0.16 0.009 0
P-121 J-115 J-116 99.4 PVC 0.14 -1.12 0.26 0.03
P-122 J-116 J-117 99.4 PVC 0.27 -2.07 0.815 0.05
P-123 J-117 J-98 99.4 PVC 0.39 -3.03 1.647 0.11
P-124 J-81 J-118 99.4 PVC 0.34 2.67 1.309 0.17
P-125 J-118 J-119 99.4 PVC 0.57 4.39 3.284 0.28
P-126 J-119 J-120 99.4 PVC 0.44 3.44 2.085 0.29
P-127 J-120 J-121 99.4 PVC 0.32 2.51 1.165 0.14
P-128 J-121 J-122 99.4 PVC 0.2 1.56 0.486 0.03
P-129 J-122 J-108 99.4 PVC 0.44 -3.38 2.025 0.31
P-130 J-108 J-123 99.4 PVC 0 0.01 0 0
P-131 J-123 J-124 99.4 PVC 0.12 -0.95 0.193 0.01
P-132 J-125 J-126 99.4 Asbestos Cement 0.8 6.24 7.145 0.54
P-133 J-126 J-127 99.4 Asbestos Cement 0.68 5.29 5.257 0.69
P-134 J-127 J-128 99.4 Asbestos Cement 0.56 4.33 3.633 0.17
P-135 J-128 J-129 99.4 Asbestos Cement 0.44 3.38 2.296 0.24
P-136 J-129 J-130 99.4 Asbestos Cement 0.31 2.43 1.243 0.16
P-137 J-130 J-131 99.4 Asbestos Cement 0.19 1.47 0.492 0.05
P-138 J-131 J-132 99.4 Asbestos Cement 0.31 2.39 1.204 0.09
P-139 J-132 J-133 99.4 Asbestos Cement 0.18 1.43 0.469 0.04
P-140 J-133 J-134 99.4 Asbestos Cement 0.06 0.48 0.056 0
P-141 J-134 J-135 99.4 Asbestos Cement 0.06 -0.48 0.059 0.01
P-142 J-135 J-136 99.4 Asbestos Cement 0.18 -1.43 0.468 0.03
P-143 J-136 J-137 99.4 Asbestos Cement 0.31 -2.38 1.187 0.01
P-144 J-137 J-138 99.4 PVC 0.43 -3.34 1.973 0.33
P-145 J-138 J-139 99.4 PVC 0.83 -6.47 6.72 0.08
P-146 J-139 J-140 99.4 PVC 0.96 -7.42 8.671 0.91
P-147 J-140 J-98 99.4 PVC 1.08 -8.38 10.838 0.1
P-148 J-138 J-141 99.4 PVC 0.28 2.18 0.891 0.06
P-149 J-141 J-142 99.4 PVC 0.16 1.22 0.312 0.02
P-150 J-142 J-143 99.4 PVC 0.03 0.27 0.018 0
P-151 J-143 J-144 99.4 PVC 0.09 -0.68 0.104 0.01
P-152 J-144 J-145 99.4 PVC 0.21 -1.64 0.529 0.04
P-153 J-145 J-146 99.4 PVC 0.33 -2.59 1.237 0.01
P-154 J-146 J-112 99.4 PVC 0.94 -7.32 8.448 0.98
P-155 J-112 J-109 99.4 PVC 0.88 -6.86 7.5 0.83
P-156 J-146 J-147 99.4 PVC 0.49 3.77 2.486 0.02
P-157 J-147 J-148 99.4 PVC 0.36 2.82 1.444 0.17
P-158 J-148 J-131 99.4 PVC 0.24 1.87 0.672 0.03
P-159 J-100 J-76 99.4 PVC 0.11 -0.84 0.14 0
P-160 J-101 J-77 99.4 PVC 0.15 -1.18 0.299 0
P-161 J-102 J-79 99.4 PVC 0.19 -1.49 0.454 0
P-162 J-99 J-80 99.4 PVC 1.23 -9.57 13.874 0.06
P-163 J-103 J-81 99.4 PVC 0.12 -0.93 0.22 0
P-164 J-104 J-82 99.4 PVC 0.21 -1.67 0.559 0
P-165 J-106 J-83 99.4 PVC 1.46 -11.34 19.037 0.07
P-166 J-107 J-84 99.4 PVC 0.65 -5.07 4.316 0.01
P-167 J-149 J-150 150 Asbestos Cement 0.62 10.92 2.713 0.12
P-168 J-150 J-151 150 Asbestos Cement 0.56 9.97 2.293 0.11
P-169 J-151 J-152 100 Asbestos Cement 1.15 9.02 13.714 1.69
P-170 J-153 J-154 99.4 PVC 0.55 4.25 3.083 0.35
P-171 J-154 J-155 100 Asbestos Cement 0.42 3.29 2.123 0.1
P-172 J-155 J-156 100 Asbestos Cement 0.3 2.34 1.128 0.06
P-173 J-156 J-157 100 Asbestos Cement 0.18 1.39 0.428 0.02
P-174 J-152 J-158 100 Asbestos Cement 1.03 8.06 11.161 0.14
P-175 J-158 J-159 67.8 PVC 1.97 7.11 51.585 5.25
P-176 J-153 J-160 67.8 PVC 1.44 -5.2 28.901 0.22
P-177 J-159 J-160 67.8 PVC 1.7 6.16 39.505 3.81
P-178 J-161 J-149 150 Asbestos Cement 0.67 11.88 3.169 0.29
P-179 J-21 J-162 150 Asbestos Cement 0.36 6.38 1.004 0.11
P-180 J-162 J-22 150 Asbestos Cement 0.42 -7.41 1.322 0.35
P-181 J-161 J-162 100 Asbestos Cement 1.63 -12.83 26.363 2.29
P-182 J-39 J-163 144.6 PVC 0.57 -9.39 2.157 0.27
P-183 J-163 J-31 144.6 PVC 0.6 -9.91 2.386 0.79
P-184 J-157 J-163 100 Asbestos Cement 0.05 0.43 0.054 0
P-185 J-165 J-166 100 Asbestos Cement 0.46 3.58 2.479 0.81
P-186 J-166 J-167 100 Asbestos Cement 0.25 1.94 0.797 0.25
P-187 J-168 J-169 100 Asbestos Cement 0.1 0.78 0.147 0.01
P-188 J-169 J-170 100 Asbestos Cement 0.02 -0.17 0 0
P-189 J-170 J-171 100 Asbestos Cement 0.14 -1.13 0.295 0.02
P-190 J-171 J-172 100 Asbestos Cement 0.27 -2.08 0.904 0.05
P-191 J-172 J-173 100 Asbestos Cement 0.39 -3.04 1.875 0.01
P-192 J-173 J-122 100 Asbestos Cement 0.51 -3.99 3.014 0.05
P-193 J-176 J-80 100 Asbestos Cement 0.5 -3.92 2.925 0.18
P-194 J-177 J-176 100 Asbestos Cement 0.38 -2.96 1.748 0.12
P-195 J-89 J-179 321.2 Asbestos Cement 0.17 13.57 0.099 0.03
P-196 J-179 J-164 321.2 PVC 0.11 8.7 0.04 0.01
P-197 J-92 J-174 99.4 PVC 0.38 2.94 1.563 0.18
P-198 J-174 J-175 99.4 PVC 0.12 0.93 0.184 0.01
P-199 J-175 J-79 99.4 PVC 0 -0.03 0 0
P-200 J-174 J-178 99.4 PVC 0.14 1.06 0.237 0.05
P-201 J-166 J-180 99.4 PVC 0.09 0.69 0.107 0.01
P-202 J-180 J-120 99.4 PVC 0 0.03 0 0
P-203 J-180 J-181 99.4 PVC 0.34 2.66 1.291 0.16
P-204 J-167 J-182 100 Asbestos Cement 0.13 0.99 0.228 0.03
P-205 J-182 J-168 100 Asbestos Cement 0.22 1.73 0.647 0.03
P-206 J-181 J-182 99.4 PVC 0.22 1.7 0.567 0.11
P-207 J-165 J-184 100 Asbestos Cement 0.19 1.5 0.497 0.06
P-208 J-184 J-177 100 Asbestos Cement 0.08 0.67 0.11 0.02
P-209 J-184 J-183 99.4 PVC 0.5 3.9 2.636 0.56
P-210 J-183 J-180 99.4 PVC 0.38 2.95 1.568 0.2
P-211 J-178 J-179 99.4 PVC 0.5 -3.91 2.649 0.78
P-212 J-178 J-184 99.4 PVC 0.52 4.02 2.786 0.43
P-213 J-118 J-177 99.4 PVC 0.34 -2.67 1.308 0.18
P-214 J-164 J-185 285 PVC 0.12 7.75 0.055 0.02
P-215 J-185 J-186 99.4 PVC 0.88 6.79 7.356 0.62
P-216 J-186 J-165 99.4 PVC 0.78 6.04 5.907 0.51
P-217 J-11 PVR-1 400 Asbestos Cement 1.3 163.87 3.443 0.81
P-218 PVR-1 J-12 400 Asbestos Cement 1.3 163.87 3.444 0.8
P-219 J-87 J-187 99.4 PVC 0.49 -3.81 2.516 0.13
P-220 J-188 J-75 300 Asbestos Cement 1.01 71.67 3.014 0.03
P-221 J-88 J-188 321.2 PVC 0.25 -20.66 0.191 0.02
P-222 J-74 J-189 321.2 PVC 1.14 92.33 3.049 0.81
P-223 J-189 J-188 321.2 Asbestos Cement 1.14 92.33 3.469 0.03
P-224 J-75 J-187 99.4 PVC 0.49 3.81 2.592 0.01
P-225 J-124 J-190 99.4 Asbestos Cement 0.24 -1.9 0.79 0.07
P-226 J-190 J-125 99.4 Asbestos Cement 0.93 7.2 9.299 0.24
P-227 J-85 J-190 99.4 PVC 1.17 9.1 12.627 0.07
Elevación Presión
Nudo
(m) (m H2O)

J-1 2,776.03 16.86


J-2 2,751.69 39.94
J-3 2,752.25 38.26
J-4 2,749.36 40.82
J-5 2,748.89 41.21
J-6 2,743.09 45.53
J-7 2,742.33 46.01
J-8 2,738.03 49.55
J-9 2,737.41 49.3
J-10 2,735.49 50.3
J-11 2,735.14 50.4
J-12 2,722.06 30.69
J-13 2,693.42 22.76
J-14 2,721.88 30.39
J-15 2,720.65 30.76
J-16 2,719.85 31.11
J-17 2,714.85 18.58
J-18 2,710.84 20.94
J-19 2,711.06 20.56
J-20 2,709.18 22.16
J-21 2,706.80 24.25
J-22 2,706.64 24.65
J-23 2,710.02 21.6
J-24 2,713.84 19.26
J-25 2,713.01 19.86
J-26 2,711.46 20.95
J-27 2,709.37 22.34
J-28 2,705.97 25.09
J-29 2,704.43 21.12
J-30 2,702.58 18.51
J-31 2,700.50 16.81
J-32 2,698.07 18.54
J-33 2,696.50 19.85
J-34 2,696.11 20.13
J-35 2,695.82 20.36
J-36 2,693.90 22.25
J-37 2,693.55 22.6
J-38 2,693.66 22.49
J-39 2,694.00 22.24
J-40 2,698.88 16.33
J-41 2,698.41 16.67
J-42 2,698.38 16.46
J-43 2,697.54 16.71
J-44 2,696.00 18.23
J-45 2,696.00 18.24
J-46 2,699.99 14.74
J-47 2,700.02 15.33
J-48 2,696.45 19.6
J-49 2,700.35 15.69
J-50 2,700.69 15.35
J-51 2,701.28 14.8
J-52 2,697.36 18.17
J-53 2,697.37 17.38
J-54 2,696.47 18.16
J-55 2,695.67 18.9
J-56 2,693.92 20.61
J-57 2,693.13 21.39
J-58 2,692.60 21.92
J-59 2,692.24 22.3
J-60 2,694.09 20.19
J-61 2,693.44 20.78
J-62 2,693.39 20.83
J-63 2,692.41 21.81
J-64 2,692.00 22.36
J-65 2,695.43 18.71
J-66 2,693.67 20.41
J-67 2,691.22 22.81
J-68 2,691.39 22.64
J-69 2,692.05 22.01
J-70 2,692.45 21.66
J-71 2,692.02 22.05
J-72 2,691.03 23.01
J-73 2,698.47 17.83
J-74 2,718.88 31.76
J-75 2,721.94 27.84
J-76 2,720.30 29.19
J-77 2,719.51 29.83
J-78 2,718.66 30.55
J-79 2,716.74 32.26
J-80 2,714.41 34.39
J-81 2,712.68 35.82
J-82 2,711.99 36.38
J-83 2,710.00 38.18
J-84 2,709.02 39.1
J-85 2,698.76 49.26
J-86 2,721.50 28.14
J-87 2,721.39 28.25
J-88 2,725.16 24.63
J-89 2,723.98 25.8
J-90 2,722.78 26.72
J-91 2,722.32 27
J-92 2,721.79 27.41
J-93 2,718.57 30.61
J-94 2,715.94 32.25
J-95 2,714.97 32.84
J-96 2,713.86 33.68
J-97 2,712.93 34.43
J-98 2,711.95 35.28
J-99 2,714.15 34.59
J-100 2,720.17 29.32
J-101 2,719.43 29.91
J-102 2,716.63 32.36
J-103 2,712.48 36.02
J-104 2,711.83 36.54
J-105 2,710.87 37.36
J-106 2,709.83 38.28
J-107 2,708.90 39.21
J-108 2,710.36 37.53
J-109 2,709.46 38.46
J-110 2,704.04 43.24
J-111 2,704.47 42.71
J-112 2,705.27 41.81
J-113 2,706.42 40.62
J-114 2,706.48 40.56
J-115 2,708.00 39.04
J-116 2,709.98 37.09
J-117 2,710.30 36.82
J-118 2,720.43 27.91
J-119 2,720.72 27.34
J-120 2,719.06 28.71
J-121 2,717.56 30.07
J-122 2,717.75 29.85
J-123 2,702.40 45.47
J-124 2,701.26 46.62
J-125 2,698.52 49.19
J-126 2,697.68 49.49
J-127 2,697.80 48.68
J-128 2,697.85 48.46
J-129 2,698.36 47.72
J-130 2,700.92 45.01
J-131 2,701.51 44.37
J-132 2,702.62 43.17
J-133 2,703.94 41.81
J-134 2,704.45 41.3
J-135 2,706.75 39.01
J-136 2,708.12 37.68
J-137 2,708.22 37.59
J-138 2,709.70 36.44
J-139 2,709.86 36.36
J-140 2,711.92 35.21
J-141 2,708.69 37.39
J-142 2,707.45 38.6
J-143 2,705.53 40.52
J-144 2,704.00 42.05
J-145 2,703.08 43.01
J-146 2,702.95 43.15
J-147 2,702.89 43.19
J-148 2,701.97 43.94
J-149 2,704.44 23.93
J-150 2,703.72 24.52
J-151 2,702.65 25.48
J-152 2,700.71 25.74
J-153 2,697.41 19.63
J-154 2,696.65 20.04
J-155 2,696.37 20.22
J-156 2,695.99 20.54
J-157 2,695.96 20.55
J-158 2,700.45 25.86
J-159 2,698.85 22.22
J-160 2,697.41 19.85
J-161 2,704.86 23.8
J-162 2,706.75 24.19
J-163 2,695.76 20.74
J-164 2,735.14 14.63
J-165 2,734.66 13.96
J-166 2,734.63 13.19
J-167 2,728.32 19.24
J-168 2,721.55 25.93
J-169 2,719.34 28.13
J-170 2,719.20 28.27
J-171 2,719.65 27.84
J-172 2,717.09 30.44
J-173 2,716.84 30.7
J-174 2,721.18 27.84
J-175 2,718.02 30.98
J-176 2,717.47 31.16
J-177 2,719.58 28.94
J-178 2,731.55 17.44
J-179 2,735.63 14.15
J-180 2,727.06 20.73
J-181 2,725.32 22.31
J-182 2,720.00 27.51
J-183 2,729.53 18.47
J-184 2,730.03 18.53
J-185 2,735.88 13.88
J-186 2,735.26 13.88
J-187 2,722.59 27.18
J-188 2,721.84 27.96
J-189 2,721.73 28.11
J-190 2,699.12 48.83
Perdida
Gradiente
Nodo Nodo Diametro Velocidad Caudal por
Tramo Material hidraulica
Incial Final (mm) (m/s) (L/s) friccion
(m/km)
(m)
P-1 R2 J-1 300 Asbestos Cement 3.46 244.86 29.401 0.15
P-2 J-1 J-2 321.1 PVC 3.02 244.86 18.592 2.54
P-3 J-2 J-3 321.2 PVC 3.02 244.86 18.564 1.32
P-4 J-3 J-4 321.2 PVC 3 243.43 18.369 0.38
P-5 J-4 J-5 285 PVC 3.82 243.43 32.853 0.16
P-6 J-5 J-6 321.2 PVC 3 243.43 18.366 1.71
P-7 J-6 J-7 321.2 PVC 3 243.43 18.369 0.33
P-8 J-7 J-8 321.2 PVC 3 243.43 18.363 0.87
P-9 J-8 J-9 321.2 PVC 3 243.43 18.362 1.02
P-10 J-9 J-10 321.2 PVC 3 243.43 18.366 1.06
P-11 J-10 J-11 321.2 PVC 3 243.43 18.37 0.28
P-12 J-12 J-14 350 Asbestos Cement 2.53 243.43 13.735 1.01
P-13 J-14 J-15 350 Asbestos Cement 2.53 243.43 13.734 1.82
P-14 J-15 J-16 350 Asbestos Cement 2.53 243.43 13.735 0.94
P-15 J-17 J-18 321.2 PVC 0.34 27.63 0.327 0.07
P-16 J-18 J-19 150 Asbestos Cement 0.74 13.06 3.778 0.3
P-17 J-19 J-20 150 Asbestos Cement 0.66 11.64 3.053 0.51
P-18 J-20 J-21 150 Asbestos Cement 0.58 10.22 2.398 0.52
P-19 J-22 J-23 150 Asbestos Cement 0.66 -11.72 3.093 0.6
P-20 J-23 J-18 150 Asbestos Cement 0.74 -13.14 3.823 0.29
P-21 J-16 J-74 350 Asbestos Cement 2.53 243.43 13.737 0.68
P-22 J-74 J-17 321.2 PVC 1.28 103.92 3.796 0.8
P-23 J-17 J-24 285 PVC 1.17 74.87 3.704 0.24
P-24 J-24 J-25 285 PVC 1.15 73.44 3.574 0.17
P-25 J-25 J-26 285 PVC 1.13 72.02 3.446 0.33
P-26 J-26 J-27 285 PVC 1.11 70.6 3.321 0.51
P-27 J-27 J-28 300 Asbestos Cement 0.98 69.17 2.831 0.42
P-28 J-28 J-29 226.2 Asbestos Cement 1.69 67.75 10.777 2.33
P-29 J-29 J-30 150 Asbestos Cement 3.75 66.33 76.636 10.2
P-30 J-30 J-31 150 Asbestos Cement 3.67 64.9 73.616 8.65
P-31 J-31 J-32 100 Asbestos Cement 0.98 7.71 10.274 1.54
P-32 J-32 J-33 100 Asbestos Cement 0.8 6.29 7.042 0.57
P-33 J-33 J-34 100 Asbestos Cement 0.62 4.87 4.379 0.26
P-34 J-34 J-35 100 Asbestos Cement 0.44 3.44 2.307 0.13
P-35 J-35 J-36 99.4 PVC 0.26 2.02 0.777 0.08
P-36 J-36 J-37 99.4 PVC 0.08 0.6 0.082 0
P-37 J-37 J-38 99.4 PVC 0.11 -0.83 0.14 0
P-38 J-38 J-39 99.4 PVC 0.29 -2.25 0.951 0.15
P-39 J-31 J-40 144.6 Asbestos Cement 0.83 13.57 4.849 1.05
P-40 J-40 J-41 150 Asbestos Cement 0.69 12.14 3.301 0.4
P-41 J-41 J-42 100 Asbestos Cement 1.37 10.72 18.899 0.79
P-42 J-42 J-43 100 Asbestos Cement 1.18 9.3 14.515 2.16
P-43 J-43 J-44 100 Asbestos Cement 0.26 2.08 0.903 0.08
P-44 J-44 J-45 150 Asbestos Cement 0.21 -3.65 0.356 0.01
P-45 J-45 J-46 100 Asbestos Cement 0.65 -5.08 4.732 1.15
P-46 J-46 J-47 144.6 PVC 0.4 -6.5 1.092 0.21
P-47 J-47 J-48 144.6 PVC 0.48 -7.92 1.576 0.23
P-48 J-48 J-49 144.6 PVC 0.17 2.85 0.237 0.03
P-49 J-49 J-50 150 Asbestos Cement 0.08 1.42 0.065 0
P-50 J-48 J-51 144.6 PVC 0.74 -12.19 3.501 0.38
P-51 J-52 J-53 100 Asbestos Cement 1.25 9.84 16.133 1.35
P-52 J-53 J-54 100 Asbestos Cement 0.63 4.95 4.515 0.21
P-53 J-54 J-55 100 Asbestos Cement 0.45 3.53 2.405 0.12
P-54 J-55 J-56 100 Asbestos Cement 0.27 2.1 0.929 0.06
P-55 J-56 J-57 99.4 PVC 0.09 0.68 0.102 0
P-56 J-57 J-58 99.4 PVC 0.1 -0.74 0.124 0.01
P-57 J-58 J-59 99.4 PVC 0.28 -2.17 0.891 0.03
P-58 J-59 J-13 99.4 PVC 1.1 -8.53 11.205 2.52
P-59 J-39 J-13 144.6 PVC 0.61 9.95 2.405 0.11
P-60 J-53 J-60 100 Asbestos Cement 0.44 3.47 2.339 0.64
P-61 J-60 J-61 99.4 PVC 0.26 2.05 0.796 0.06
P-62 J-61 J-62 99.4 PVC 0.08 0.62 0.087 0
P-63 J-62 J-63 99.4 PVC 0.1 -0.8 0.138 0.01
P-64 J-63 J-64 99.4 PVC 0.45 -3.51 2.166 0.13
P-65 J-64 J-59 99.4 PVC 0.64 -4.93 4.074 0.21
P-66 J-43 J-65 100 Asbestos Cement 0.74 5.8 6.05 0.4
P-67 J-65 J-66 100 Asbestos Cement 0.56 4.37 3.594 0.24
P-68 J-67 J-68 100 Asbestos Cement 0.19 -1.46 0.466 0.02
P-69 J-68 J-69 100 Asbestos Cement 0.37 -2.88 1.658 0.18
P-70 J-69 J-44 100 PVC 0.55 -4.3 3.068 0.65
P-71 J-63 J-70 99.4 PVC 0.17 1.29 0.335 0.03
P-72 J-70 J-71 99.4 Asbestos Cement 0.02 -0.14 0.004 0
P-73 J-71 J-72 100 Asbestos Cement 0.2 -1.56 0.533 0.11
P-74 J-66 J-72 100 Asbestos Cement 0.38 2.95 1.733 0.28
P-75 J-72 J-67 100 Asbestos Cement 0 -0.03 0 0
P-76 J-51 J-73 144.6 PVC 0.83 -13.62 4.296 0.5
P-77 J-73 J-52 100 Asbestos Cement 1.43 11.27 20.715 1.36
P-78 J-31 J-73 144.6 PVC 1.6 26.31 14.544 2
P-79 J-75 J-86 300 Asbestos Cement 1.18 83.71 4.032 0.2
P-80 J-86 J-76 300 Asbestos Cement 1.14 80.89 3.783 0.23
P-81 J-76 J-77 300 Asbestos Cement 1.11 78.2 3.551 0.22
P-82 J-77 J-78 300 Asbestos Cement 1.06 74.93 3.287 0.2
P-83 J-78 J-79 300 Asbestos Cement 0.98 68.95 2.812 0.34
P-84 J-79 J-80 300 Asbestos Cement 0.99 69.63 2.867 0.35
P-85 J-80 J-81 250 Asbestos Cement 1.03 50.59 3.853 0.58
P-86 J-81 J-82 250 Asbestos Cement 0.92 45.29 3.143 0.25
P-87 J-82 J-83 250 Asbestos Cement 0.84 41.39 2.657 0.38
P-88 J-83 J-84 250 Asbestos Cement 0.47 23.29 0.915 0.12
P-89 J-84 J-85 250 Asbestos Cement 0.3 14.51 0.382 0.16
P-90 J-86 J-87 99.4 PVC 0.18 1.4 0.401 0
P-91 J-88 J-89 321.2 PVC 0.58 46.76 0.865 0.05
P-92 J-89 J-90 226.2 PVC 0.37 14.83 0.569 0.04
P-93 J-90 J-91 226.2 PVC 0.33 13.41 0.472 0.03
P-94 J-91 J-92 226.2 PVC 0.3 11.98 0.382 0.02
P-95 J-92 J-78 99.4 PVC 0.78 6.03 5.907 0.66
P-96 J-78 J-93 99.4 PVC 1.37 10.59 16.711 0.06
P-97 J-93 J-94 99.4 PVC 1.35 10.47 16.401 2
P-98 J-94 J-95 99.4 PVC 1.17 9.05 12.514 0.78
P-99 J-95 J-96 99.4 PVC 0.98 7.63 9.11 0.55
P-100 J-96 J-97 99.4 PVC 0.8 6.2 6.219 0.34
P-101 J-97 J-98 99.4 PVC 0.62 4.78 3.836 0.25
P-102 J-98 J-99 99.4 PVC 1.74 -13.47 26.117 3.15
P-103 J-87 J-100 99.4 PVC 0.61 4.75 3.792 0.23
P-104 J-100 J-101 99.4 PVC 0.59 4.59 3.557 0.22
P-105 J-101 J-93 99.4 PVC 0.65 5.01 4.181 0.25
P-106 J-93 J-102 99.4 PVC 0.48 3.7 2.393 0.29
P-107 J-102 J-99 99.4 PVC 0.62 4.82 3.893 0.47
P-108 J-99 J-103 99.4 PVC 0.54 4.2 3.014 0.46
P-109 J-103 J-104 99.4 PVC 0.56 4.33 3.191 0.25
P-110 J-104 J-105 99.4 PVC 0.69 5.39 4.787 0.28
P-111 J-105 J-106 99.4 PVC 0.51 3.96 2.713 0.23
P-112 J-106 J-107 99.4 PVC 0.02 -0.15 0.005 0
P-113 J-107 J-108 99.4 PVC 0.74 5.77 5.44 0.38
P-114 J-106 J-109 99.4 PVC 2.5 19.37 51.217 0.4
P-115 J-109 J-110 99.4 PVC 0.98 7.61 9.083 1.35
P-116 J-110 J-111 99.4 PVC 0.8 6.19 6.182 0.2
P-117 J-111 J-112 99.4 PVC 0.61 4.77 3.82 0.22
P-118 J-112 J-113 99.4 PVC 0.35 2.73 1.362 0.11
P-119 J-113 J-114 99.4 PVC 0.17 1.31 0.323 0
P-120 J-114 J-115 99.4 PVC 0.01 -0.11 0.004 0
P-121 J-115 J-116 99.4 PVC 0.2 -1.54 0.467 0.05
P-122 J-116 J-117 99.4 PVC 0.38 -2.96 1.58 0.1
P-123 J-117 J-98 99.4 PVC 0.56 -4.38 3.268 0.22
P-124 J-81 J-118 99.4 PVC 0.3 2.32 1.005 0.13
P-125 J-118 J-119 99.4 PVC 0.73 5.7 5.313 0.45
P-126 J-119 J-120 99.4 PVC 0.55 4.27 3.12 0.43
P-127 J-120 J-121 99.4 PVC 0.57 4.42 3.317 0.4
P-128 J-121 J-122 99.4 PVC 0.39 2.99 1.612 0.11
P-129 J-122 J-108 99.4 PVC 0.49 -3.8 2.512 0.38
P-130 J-108 J-123 99.4 PVC 0.07 0.55 0.069 0.01
P-131 J-123 J-124 99.4 PVC 0.11 -0.88 0.161 0.01
P-132 J-125 J-126 99.4 Asbestos Cement 1.21 9.36 15.147 1.14
P-133 J-126 J-127 99.4 Asbestos Cement 1.02 7.94 11.159 1.46
P-134 J-127 J-128 99.4 Asbestos Cement 0.84 6.52 7.738 0.36
P-135 J-128 J-129 99.4 Asbestos Cement 0.66 5.09 4.903 0.5
P-136 J-129 J-130 99.4 Asbestos Cement 0.47 3.67 2.674 0.34
P-137 J-130 J-131 99.4 Asbestos Cement 0.29 2.25 1.076 0.11
P-138 J-131 J-132 99.4 Asbestos Cement 0.46 3.59 2.559 0.19
P-139 J-132 J-133 99.4 Asbestos Cement 0.28 2.16 1.001 0.09
P-140 J-133 J-134 99.4 Asbestos Cement 0.1 0.74 0.137 0.01
P-141 J-134 J-135 99.4 Asbestos Cement 0.09 -0.68 0.118 0.01
P-142 J-135 J-136 99.4 Asbestos Cement 0.27 -2.11 0.959 0.06
P-143 J-136 J-137 99.4 Asbestos Cement 0.46 -3.53 2.468 0.02
P-144 J-137 J-138 99.4 PVC 0.64 -4.96 4.102 0.69
P-145 J-138 J-139 99.4 PVC 1.24 -9.59 13.947 0.16
P-146 J-139 J-140 99.4 PVC 1.42 -11.01 17.998 1.89
P-147 J-140 J-98 99.4 PVC 1.6 -12.44 22.547 0.22
P-148 J-138 J-141 99.4 PVC 0.41 3.21 1.833 0.13
P-149 J-141 J-142 99.4 PVC 0.23 1.79 0.624 0.04
P-150 J-142 J-143 99.4 PVC 0.05 0.36 0.03 0
P-151 J-143 J-144 99.40 PVC 0.14 -1.06 0.24 0.02
P-152 J-144 J-145 99.40 PVC 0.32 -2.48 1.14 0.08
P-153 J-145 J-146 99.40 PVC 0.50 -3.91 2.64 0.02
P-154 J-146 J-112 99.40 PVC 1.41 -10.94 17.78 2.06
P-155 J-112 J-109 99.40 PVC 1.33 -10.33 16.00 1.78
P-156 J-146 J-147 99.40 PVC 0.72 5.61 5.18 0.04
P-157 J-147 J-148 99.40 PVC 0.54 4.19 3.00 0.35
P-158 J-148 J-131 99.40 PVC 0.36 2.76 1.40 0.06
P-159 J-100 J-76 99.40 PVC 0.16 -1.27 0.35 0.00
P-160 J-101 J-77 99.40 PVC 0.24 -1.84 0.67 0.00
P-161 J-102 J-79 99.40 PVC 0.33 -2.54 1.23 0.01
P-162 J-99 J-80 99.40 PVC 1.84 -14.27 29.09 0.13
P-163 J-103 J-81 99.40 PVC 0.20 -1.55 0.51 0.00
P-164 J-104 J-82 99.40 PVC 0.32 -2.48 1.12 0.00
P-165 J-106 J-83 99.40 PVC 2.15 -16.68 38.83 0.14
P-166 J-107 J-84 99.40 PVC 0.95 -7.35 8.51 0.02
P-167 J-149 J-150 150.00 Asbestos Cement 0.84 14.82 4.78 0.21
P-168 J-150 J-151 150.00 Asbestos Cement 0.76 13.39 3.96 0.18
P-169 J-151 J-152 100.00 Asbestos Cement 1.52 11.97 23.18 2.85
P-170 J-153 J-154 99.40 PVC 0.63 4.85 3.95 0.44
P-171 J-154 J-155 100.00 Asbestos Cement 0.44 3.43 2.29 0.11
P-172 J-155 J-156 100.00 Asbestos Cement 0.26 2.01 0.85 0.04
P-173 J-156 J-157 100.00 Asbestos Cement 0.07 0.58 0.09 0.01
P-174 J-152 J-158 100.00 Asbestos Cement 1.34 10.55 18.36 0.23
P-175 J-158 J-159 67.80 PVC 2.53 9.12 81.89 8.33
P-176 J-153 J-160 67.80 PVC 1.74 -6.28 40.96 0.31
P-177 J-159 J-160 67.80 PVC 2.13 7.70 59.81 5.77
P-178 J-161 J-149 150.00 Asbestos Cement 0.92 16.24 5.66 0.52
P-179 J-21 J-162 150.00 Asbestos Cement 0.50 8.79 1.82 0.19
P-180 J-162 J-22 150.00 Asbestos Cement 0.58 -10.30 2.43 0.64
P-181 J-161 J-162 100.00 Asbestos Cement 2.25 -17.67 47.65 4.14
P-182 J-39 J-163 144.60 PVC 0.83 -13.62 4.30 0.53
P-183 J-163 J-31 144.60 PVC 0.97 -15.89 5.72 1.90
P-184 J-157 J-163 100.00 Asbestos Cement 0.11 -0.84 0.18 0.00
P-185 J-165 J-166 100.00 Asbestos Cement 0.87 6.85 8.24 2.68
P-186 J-166 J-167 100.00 Asbestos Cement 0.41 3.25 2.07 0.65
P-187 J-168 J-169 100.00 Asbestos Cement 0.22 1.74 0.65 0.04
P-188 J-169 J-170 100.00 Asbestos Cement 0.04 0.32 0.08 0.00
P-189 J-170 J-171 100.00 Asbestos Cement 0.14 -1.10 0.28 0.02
P-190 J-171 J-172 100.00 Asbestos Cement 0.32 -2.53 1.30 0.08
P-191 J-172 J-173 100.00 Asbestos Cement 0.50 -3.95 2.97 0.02
P-192 J-173 J-122 100.00 Asbestos Cement 0.68 -5.37 5.26 0.09
P-193 J-176 J-80 100.00 Asbestos Cement 0.43 -3.35 2.19 0.13
P-194 J-177 J-176 100.00 Asbestos Cement 0.25 -1.93 0.79 0.06
P-195 J-89 J-179 321.20 PVC 0.38 30.50 0.39 0.10
P-196 J-179 J-164 321.20 PVC 0.23 18.93 0.16 0.02
P-197 J-92 J-174 99.40 PVC 0.58 4.53 3.46 0.41
P-198 J-174 J-175 99.40 PVC 0.78 6.07 5.95 0.41
P-199 J-175 J-79 99.40 PVC 0.60 4.64 3.62 0.18
P-200 J-174 J-178 99.40 PVC 0.38 -2.96 1.54 0.31
P-201 J-166 J-180 99.40 PVC 0.28 2.18 0.89 0.11
P-202 J-180 J-120 99.40 PVC 0.20 1.57 0.49 0.06
P-203 J-180 J-181 99.40 PVC 0.54 4.19 3.01 0.37
P-204 J-167 J-182 100.00 Asbestos Cement 0.23 1.83 0.71 0.09
P-205 J-182 J-168 100.00 Asbestos Cement 0.40 3.17 1.98 0.10
P-206 J-181 J-182 99.40 PVC 0.36 2.77 1.39 0.27
P-207 J-165 J-184 100.00 Asbestos Cement 0.81 6.39 7.25 0.84
P-208 J-184 J-177 100.00 Asbestos Cement 0.55 4.30 3.48 0.60
P-209 J-184 J-183 99.40 PVC 0.83 6.43 6.64 1.41
P-210 J-183 J-180 99.40 PVC 0.65 5.01 4.18 0.54
P-211 J-178 J-179 226.20 PVC 0.25 -10.15 0.28 0.08
P-212 J-178 J-184 99.4 PVC 0.74 5.76 5.417 0.84
P-213 J-118 J-177 99.4 PVC 0.62 -4.8 3.87 0.53
P-214 J-164 J-185 321.2 PVC 0.22 17.51 0.14 0.04
P-215 J-185 J-186 321.2 PVC 0.2 16.09 0.12 0.01
P-216 J-186 J-165 321.2 PVC 0.18 14.66 0.099 0.01
P-217 J-11 PVR-1 400 Asbestos Cement 1.94 243.43 7.166 1.69
P-218 PVR-1 J-12 400 Asbestos Cement 1.94 243.43 7.167 1.66
P-219 J-87 J-187 99.4 PVC 0.61 -4.77 3.818 0.19
P-220 J-188 J-75 300 Asbestos Cement 1.27 89.91 4.571 0.04
P-221 J-88 J-188 321.2 PVC 0.59 -48.18 0.913 0.09
P-222 J-74 J-189 321.2 PVC 1.7 138.09 6.427 1.71
P-223 J-189 J-188 321.2 Asbestos Cement 1.7 138.09 7.302 0.07
P-224 J-75 J-187 99.4 PVC 0.61 4.77 3.887 0.01
P-225 J-124 J-190 99.4 Asbestos Cement 0.3 -2.3 1.126 0.1
P-226 J-190 J-125 99.4 Asbestos Cement 1.39 10.79 19.68 0.5
P-227 J-85 J-190 99.4 PVC 1.69 13.09 24.784 0.14
Elevación Presión
Nudo
(m) (m H2O)

J-1 2,776.03 16.79


J-2 2,751.69 38.55
J-3 2,752.25 36.68
J-4 2,749.36 39.18
J-5 2,748.89 39.48
J-6 2,743.09 43.57
J-7 2,742.33 44
J-8 2,738.03 47.42
J-9 2,737.41 47.02
J-10 2,735.49 47.88
J-11 2,735.14 47.94
J-12 2,722.06 29.83
J-13 2,693.42 27.83
J-14 2,721.88 29
J-15 2,720.65 28.41
J-16 2,719.85 28.28
J-17 2,714.85 31.79
J-18 2,710.84 35.72
J-19 2,711.06 35.2
J-20 2,709.18 36.56
J-21 2,706.80 38.42
J-22 2,706.64 39.02
J-23 2,710.02 36.25
J-24 2,713.84 32.56
J-25 2,713.01 33.21
J-26 2,711.46 34.43
J-27 2,709.37 36
J-28 2,705.97 38.97
J-29 2,704.43 38.19
J-30 2,702.58 29.86
J-31 2,700.50 23.3
J-32 2,698.07 24.19
J-33 2,696.50 25.19
J-34 2,696.11 25.32
J-35 2,695.82 25.48
J-36 2,693.90 27.31
J-37 2,693.55 27.66
J-38 2,693.66 27.55
J-39 2,694.00 27.36
J-40 2,698.88 23.87
J-41 2,698.41 23.95
J-42 2,698.38 23.19
J-43 2,697.54 21.87
J-44 2,696.00 23.33
J-45 2,696.00 23.34
J-46 2,699.99 20.5
J-47 2,700.02 20.68
J-48 2,696.45 24.47
J-49 2,700.35 20.56
J-50 2,700.69 20.21
J-51 2,701.28 20.03
J-52 2,697.36 23.09
J-53 2,697.37 21.73
J-54 2,696.47 22.41
J-55 2,695.67 23.09
J-56 2,693.92 24.79
J-57 2,693.13 25.57
J-58 2,692.60 26.1
J-59 2,692.24 26.49
J-60 2,694.09 24.36
J-61 2,693.44 24.95
J-62 2,693.39 25
J-63 2,692.41 25.99
J-64 2,692.00 26.53
J-65 2,695.43 23.58
J-66 2,693.67 25.09
J-67 2,691.22 27.26
J-68 2,691.39 27.11
J-69 2,692.05 26.63
J-70 2,692.45 25.92
J-71 2,692.02 26.35
J-72 2,691.03 27.45
J-73 2,698.47 23.34
J-74 2,718.88 28.56
J-75 2,721.94 23.7
J-76 2,720.30 24.9
J-77 2,719.51 25.48
J-78 2,718.66 26.13
J-79 2,716.74 27.7
J-80 2,714.41 29.68
J-81 2,712.68 30.82
J-82 2,711.99 31.26
J-83 2,710.00 32.87
J-84 2,709.02 33.73
J-85 2,698.76 43.81
J-86 2,721.50 23.93
J-87 2,721.39 24.04
J-88 2,725.16 20.44
J-89 2,723.98 21.56
J-90 2,722.78 22.73
J-91 2,722.32 23.16
J-92 2,721.79 23.66
J-93 2,718.57 26.16
J-94 2,715.94 26.79
J-95 2,714.97 26.98
J-96 2,713.86 27.55
J-97 2,712.93 28.14
J-98 2,711.95 28.86
J-99 2,714.15 29.81
J-100 2,720.17 25.03
J-101 2,719.43 25.55
J-102 2,716.63 27.81
J-103 2,712.48 31.02
J-104 2,711.83 31.42
J-105 2,710.87 32.09
J-106 2,709.83 32.9
J-107 2,708.90 33.83
J-108 2,710.36 32
J-109 2,709.46 32.87
J-110 2,704.04 36.93
J-111 2,704.47 36.3
J-112 2,705.27 35.28
J-113 2,706.42 34.02
J-114 2,706.48 33.96
J-115 2,708.00 32.44
J-116 2,709.98 30.51
J-117 2,710.30 30.29
J-118 2,720.43 22.96
J-119 2,720.72 22.22
J-120 2,719.06 23.45
J-121 2,717.56 24.55
J-122 2,717.75 24.24
J-123 2,702.40 39.93
J-124 2,701.26 41.07
J-125 2,698.52 43.41
J-126 2,697.68 43.1
J-127 2,697.80 41.53
J-128 2,697.85 41.12
J-129 2,698.36 40.11
J-130 2,700.92 37.22
J-131 2,701.51 36.51
J-132 2,702.62 35.22
J-133 2,703.94 33.82
J-134 2,704.45 33.3
J-135 2,706.75 31.02
J-136 2,708.12 29.72
J-137 2,708.22 29.64
J-138 2,709.70 28.85
J-139 2,709.86 28.84
J-140 2,711.92 28.68
J-141 2,708.69 29.73
J-142 2,707.45 30.93
J-143 2,705.53 32.84
J-144 2,704.00 34.38
J-145 2,703.08 35.38
J-146 2,702.95 35.53
J-147 2,702.89 35.56
J-148 2,701.97 36.12
J-149 2,704.44 35.93
J-150 2,703.72 36.43
J-151 2,702.65 37.32
J-152 2,700.71 36.41
J-153 2,697.41 25.09
J-154 2,696.65 25.4
J-155 2,696.37 25.57
J-156 2,695.99 25.91
J-157 2,695.96 25.93
J-158 2,700.45 36.44
J-159 2,698.85 29.72
J-160 2,697.41 25.4
J-161 2,704.86 36.03
J-162 2,706.75 38.27
J-163 2,695.76 26.13
J-164 2,735.14 10.3
J-165 2,734.66 10.72
J-166 2,734.63 8.08
J-167 2,728.32 13.73
J-168 2,721.55 20.29
J-169 2,719.34 22.45
J-170 2,719.20 22.59
J-171 2,719.65 22.16
J-172 2,717.09 24.79
J-173 2,716.84 25.06
J-174 2,721.18 23.87
J-175 2,718.02 26.61
J-176 2,717.47 26.5
J-177 2,719.58 24.33
J-178 2,731.55 13.83
J-179 2,735.63 9.84
J-180 2,727.06 15.53
J-181 2,725.32 16.9
J-182 2,720.00 21.94
J-183 2,729.53 13.6
J-184 2,730.03 14.51
J-185 2,735.88 9.52
J-186 2,735.26 10.13
J-187 2,722.59 23.03
J-188 2,721.84 23.83
J-189 2,721.73 24.01
J-190 2,699.12 43.31