TB-18UDV1-C-TOA-2001 - Working Plan-Temporary Sheet Pile - Shoring Works-Limestone Storage Shed - Part1
TB-18UDV1-C-TOA-2001 - Working Plan-Temporary Sheet Pile - Shoring Works-Limestone Storage Shed - Part1
PROJECT
THAI BINH THERMAL POWER PLANT
AND TRANSMISSION LINES
CONSTRUCTIONS PROJECT
(CONTRACT NO.261213/TB-EVN-MC)
OWNER
VIETNAM ELECTRICITY
CONSULTANT
FICHTNER GmbH & Co. KG
In association with TEPSCO and PECC1
CONTRACTOR
MARUBENI CORPORATION
PROJECT REV. NO.
CONTROL NO.
TB-18UDV1-C-TOA-2001 0
Title:
Working Plan
- Temporary Sheet Pile & Shoring Work
Limestone Storage Shed
Doc No.: TOA-LSS-8-1-2001 Rev.:0
0 First Issue B. Bates H. Takino 16 Apr 15 Scale: None Date: 16 Apr 2015
1
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
CONTENTS
1. Introduction .......................................................................................................... 3
2. Reference Documents ............................................................................................. 3
3. Organization ....................................................................................................... 4
4. Construction Flow Chart ........................................................................................ 5
5. Materials and Equipment ....................................................................................... 6
6. Sheet Pile and Shoring Works Schedule .................................................................... 8
7. Construction Work Procedure ................................................................................. 8
7.1 Sheet Pile Delivery and Storage ...................................................................................... 8
7.2 Survey Work ............................................................................................................... 9
7.3 Method of Sheet Pile Driving by Vibro Hammer ............................................................... 12
7.3.1 Steel Sheet Pile Installation Procedure ...................................................................... 12
7.3.2 Shoring Installation Procedure................................................................................. 18
8. Quality Control Plan ............................................................................................ 26
9. Safety Control and Risk Assessment ....................................................................... 26
10. Attachments ........................................................................................................ 26
Attachment No - 01................................................................................................... 27
Attachment No - 02................................................................................................... 44
Attachment No - 03................................................................................................... 46
Attachment No - 04................................................................................................... 57
Attachment No - 05..................................................................................................104
Attachment No - 06..................................................................................................146
Attachment No - 07..................................................................................................157
2
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
1. Introduction
This working plan describes temporary sheet pile and shoring works at Limestone Storage Shed in
Thai Binh Thermal Power Plant and Transmission Lines Construction Project located at Thai
Thuy, Thai Binh province, Viet Nam.
The statement consists of Site Preparation, Material Supply, Temporary Sheet Pile and Shoring
Procedure, Quality Plan and Safety Plan, related to Contractor’s responsibility for implementation
of the Sheet Piling Work in Specification and Designs as well as the relevant standard of the
Project.
2. Reference Documents
Specifications for pile installation works shall be conform to the following standards:
3
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
3. Organization
EPC CONTRACTOR: MC
Workers
4
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
B. PREPARATION WORK
1. Survey
2. Preparation of Sheet Pile Driving Guide.
5
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
List of Equipment:
No Name of Brand/Code Serial No. Capacity/ Unit Q.ty Operator Names Lisence
Hammer KW-Spec
2 Hitachi KH
Crawler Crane 242-1584 50 ton nr 1 Nguyen Van Linh 000022185
180-3
3 Hitachi KH
Crawler Crane 222-1009 35 ton nr 1 Lam Quang Oanh 001000471
125-3
Welding power
Machine
Deawoo SL290-LCV-
8 Excavator 1 1.1 m3 nr 1 Duong Van Tu 000267579
Solar V64
Deawoo SL225C-V
9 Excavator 2 0.93 m3 nr 1 Trinh Van Bac 000357192
Solar 1078
kia
6
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
List of Manpower:
STAFFING PLAN
Project: Thai Binh thermal power plan (2x300)
Item: Limestone storage shed-sheet piling work
Customer:
2015, Apr 2015, May
Decription Remark
22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Engineer 3 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Supervisor 5 1 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Surveyor 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Safety Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Operator 7 7 5 5 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Signal man 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder 5 1 0 0 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Driver 7 1 4 4 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Electrician 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Worker 10 3 4 4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Total 42 18 24 24 31 31 0 0 0 0 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 0
45 42
40
35
31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
30
MANPOWER
24 24
25
20 18
15
10
5
0 0 0 0
0
22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
TIME --->
TB-18UDV1-C-TOA-2001_Working Plan-Temporary Sheet Pile & Shoring Works-Limestone Storage Shed
7
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Sheet piles will be transported to site by trailers. The sheet pile will be inspected at site before
storage.
The storage area of the sheet pile at the site must be flat and on firm ground. Sheet piles on
trailers will be unloaded by crane. During unloading of sheet piles, the following items shall be
observed.
- Sheet pile shall be kept in horizontal position during lifting using guide ropes
- Signal man shall give a clear signal from the position that can be seen by crane operator.
Sheet pile shall be stocked on bedding materials. The sheet pile segment shall be stocked not
greater than 5 layers. Sheet pile storage area will be set up near pile installation area.
8
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Prior to driving sheet piles, surveyors shall check the location and start point of the sheet piles.
9
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
10
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
X=525.088
X=544.619
Y=557.512 secondary axis Y=557.512
a* b*
2512
Y=555.350 Y=555.350
c primary axis d
X=534.950
X=542.950
7000
X=527.650
X=534.950
secondary axis
secondary axis
Y=548.350
b Y=548.350
a primary axis
coordinates of point
primary axis
primary axis
point
a b c d e f
7000
location
X=542.950
f e coordinates of point
Y=540.450 primary axis
Y=540.450 2219 point
a* b* c* d*
d* secondary axis c* location
Y=538.781
Y=538.781 x 525.088 544.619 544.619 525.088
working section 3
2512
working section 5
7000
working section 2
working section 4
7000
2219
working section 1
11
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
benchmark 23931
by bamboo piles
4712
3350
23131
3351
26131
disposal area
7000
6515
4419
pump pit
1,5x1,5m
7300 7302
26924
12
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
3166
4712
1600
13531
7000
EXCAVATOR MACHINE
THE WAY OF
12731
14593
19931
disposal area
26131
7000
THE WAY OF
EXCAVATOR MACHINE
140016001000 1200
4419
6773
6620 2597 10319 7393
pump pit
5112 7300 7300 7212
1,5x1,5m
26924
m
=1 centerline of
1000
:1
:1
=1
sheet pile
m
m
=1
:1
:1
=1
m
SECTION A-A
benchmark by bamboo piles
m
centerline of =1
:1
:1
=1
sheet pile
m
m
=1
:1
:1
=1
m
SECTION B-B
13
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
CRAWLER CRANE
generator
14
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
If adjacent Sheet Piles are moving together with the driven sheet pile, the sheet
pile head portion shall be welded together.
15
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
benchmark 23931
by bamboo piles
4712
a b
excavator
7000
generator 125kva
ne
cra
ice
s e rv
7000
CRAWLER CRANE
d c
4419
pump pit
1,5x1,5m
26924
Steel H350
corner sheet pile
355 Steel plate design by toa
49
2000
46 48
Steel H350
2 4
225
16
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
step - 3.1.2:
- after DRIVING finish the first sheet pile
- DRIVING the sheet pile No.2 (L= 14.0m) step - 3.1.3:
STEP-3.1.3
- after DRIVING finish the first sheet pile
- DRIVING the sheet pile No.3; No.4 ... No.17 (L= 14.0m) step - 3.1.4:
STEP- 3.1.4
- DRIVING the sheet pile No.18; No.19 ... No.47 (L= 14.0m)
a. After Sheet Pile driving is completed, install piano wire and total station machine for
measurement of sheet pile movement. Measurement monitoring work will be carried out
everyday from excavation, foundation construct till backfilling completed.
17
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
18
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
19
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
20
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
21
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
22
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Fixing of Intersection
Struts
King post
Connection pieces
King post
Check connections to ensure bolts have been tightened. After setting waler and struts, ensure to install
packing material (mortar, timber wedges). Waler and strut deflection and warping shall be confirmed by
visual daily inspection.
23
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
24
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Removal of Waler
Removal of Bracket
25
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
This plan shall conform to the document “TB–18U–C–TOA–1010-Rev. 03” HSE (Health, Safety
& Environment) Plan submitted to EVN.
Prior to commencement of the works, TOA will ensure that both PTW and STARRT Procedure
are instigated, together with safe system work, practices and requirements.
For safety analysis (work description and the hazard) and how to minimize the risk, refer to
Attachment 06 - Risk Assessment
For communication and action plan in case of any incident/accident on site, refer to Attachment
07 - Emergency Communication Network
10. Attachments
26
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 01
Sheet Pile and H-Beams Certificate
27
SSP's Certificate
Page 26 of 186
28
22
23
29 Page 27 of 186
SSP's Certificate
Page 28 of 186
30
24
25
31 Page 29 of 186
SSP's Certificate
Page 30 of 186
32
26
SSP's Certificate
Page 31 of 186
33
27
SSP's Certificate
Page 32 of 186
34
28
SSP's Certificate
Page 33 of 186
35
29
SSP's Certificate
Page 34 of 186
36
30
H-beams's Certificate
37
31 Page 35 of 186
H-beams's Certificate
38
32 Page 36 of 186
H-beams's Certificate
39
33 Page 37 of 186
H-beams's Certificate
40
34 Page 38 of 186
H-beams's Certificate
41
35 Page 39 of 186
H-beams's Certificate
42
36 Page 40 of 186
H-beams's Certificate
43
37 Page 41 of 186
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 02
Sheet Pile and Shoring Works Schedule
44
LIMESTONE STORAGE SHED-SHEET PILE SCHEDULE
Apr-15 May-15
Item Description
22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Preparation
2 Excavation work
7 King-post delivery
8 King-post driving
9 Back fill
45
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 03
Sheet Pile / Shoring Installation Sketches
46
DRIVING SHEET PILE
47
48
49
50
STEP 03: DRIVING SHEET PILE
CRAWLER CRANE
51
STEP 03: DRIVING SHEET PILE
52
STEP 03: DRIVING SHEET PILE
- DRIVING SHEET PILE CORNER (48) BY VIBRO HAMMER AND CRAWLER CRANE
CRAWLER CRANE
- DRIVING SHEET PILE (49) BY VIBRO HAMMER AND CRAWLER CRANE - AND
THEN DRIVING SHEET PILE FROM 50,51,52, ..., TO POINT (B)
53
STEP 03: DRIVING SHEET PILE
FINISH DRIVING SHEET PILE, DRIVING KING POST AND REMOVE MACHINE OUTSIDE
54
55
56
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 04
Sheet Pile / Shoring Calculation Sheets
57
=Reference material=
This calculation is made
based on the size and length
that your company specified)
To 東亜建設工業 株式会社
THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT
Calculation of earth
retaining structure
CASE-2-1 上載荷重20KN/m2 Bor.BO37 地盤高 EL+2.9m 掘削底面 EL-3.9m 1段切梁 地下水位EL+2.4m
2015.3.25/3.27
Hirose(VietNam)HaNoi
awda
TEL 0444500202
FAX 0444500203
Design No.
58
Contents PAGE
1. Outline of design-------------------------------- 1
1. Design standard
2. Soil boring log and planned section
3. Soil parameters
4. Allowable stress
59
P-1
1.Outline of design
1-1 Design standard As per「Recommendation for Design and Construction Practice of
Earth Retaining for Excavation」by Architectural Institute of Japan.
H q1
-2.240 m
1 180.53 1.400
H400 H350 H400
1.000
5 5.800
6.800
5.800 1b 5.800
5.400
2
7.800 2 7.800
10 3
11.900 3a 11.900
7.200
4
15
17.000 3b 17.000
5
19.600 4a 19.600
20
Surcharge King post
q1= 20.00 kN/m 2 H300X300X10X15
L= 9.000 m
(Protrusion 0.000 m)
Earth retaining wall
25 SP-4
L= 14.000 m
(Protrusion 0.000 m)
Stress
σmax=
222 N/mm 2 ≦ fb = 225 N/mm 2 -OK-
30
Active side
Unit weight Internal Cohesion Modulus of Average Water
Soil friction subgrade unconfined pressure
Soil layer property N-value Wet Underwater angle reaction compressive coefficient
name strength
NO. (kN/m3) (kN/m3) ( ゚) (kN/m2) (kN/m3) (kN/m2)
1 Sandy soil 15.0 17.0 7.0 30 0.0 15000 ---- 1.00
2 Cohesive soil 4.0 19.0 9.0 0 44.0 4400 50.0 1.00
3 Sandy soil 7.0 18.0 8.0 25 0.0 7000 ---- 1.00
4 Cohesive soil 6.0 17.0 7.0 0 56.0 5600 75.0 1.00
5 Cohesive soil 3.0 17.0 7.0 0 38.0 3800 37.5 1.00
60
P-2
Use the average of the stress for short term loading and stress for long term loading as the
allowable stress, since this calculation is for steel materials for temporary structures.
1.11×10 5
fb2=
(Lb・h)/Af
Use the larger one of the values obtained from the above formula.
However,it must be less than the allowable tensile stress.
81.3
fc =
(λ/120) 2 (λ>120)
61
P-3
1)Penetration depth
2)Cross section
Occurrence
Working Mmax position σb δmax
condition (kN・m) (GL-m) (N/mm2 ) (mm)
1st excavation 53.80 3.287 29.6 12.81
2nd excavation 402.57 5.629 221.7 55.51
1st replacement -397.60 5.800 218.9 59.95
Max. value 402.57 5.629 221.7 59.95
(fb= 225.0 N/mm2 )
2-2 Waler
1)
Each Lm Ln W M N S
stage (m) (m) (kN/m) (kN・m) (kN) (kN)
1st stage 4.000 4.000 180.53 361.07 722.14 361.07
2-3 Strut
1)
Each Lm Ln W Wd Na Nt M N
stage (m) (m) (kN/m) (kN/m) (kN) (kN) (kN・m) (kN)
1st stage 7.000 7.000 180.53 5.00 1263.74 150.00 30.63 1413.74
62
P-4
1)
Each Lm Ln W θ Na Nt Wd M N
stage (m) (m) (kN/m) (゚) (kN) (kN) (kN/m) (kN・m) (kN)
1st stage 5.000 4.000 180.53 45 722.14 0.00 5.00 15.63 1021.26
Mounting bolt
Size H300X300X10X15
Penetration depth d = 2.000 m
Overall length Ld = 9.000 m (Protrusion 0.000 m)
Wd Nt
(kN/m) (kN)
1st 5.00 150.00
M N σb σc fb fc K
(kN・m) (kN) (N/mm 2 ) (N/mm2 ) (N/mm2 ) (N/mm2 )
63.27 127.83 46.9 10.8 195.0 105.7 0.34
63
P-5
Decide the wet unit weight by the soil parameters explained in the outline of design.
The lateral pressure distribution diagram shows the lateral pressure per meter.
2.660
43.46 ( 53.41)
5.400 43.46 ( 35.60)
2.000
62.96 ( 55.60)
62.96 ( 84.59)
GL- 6.800 m 0.740
Final excavation level 70.18 ( 94.39) 0.50 17.700
64
P-6
At 1st excavation
= 0.5162 m -1
Ld=2/β= 3.874 m
Dp=1/β+H= 4.337 m
65
P-7
Active earth pressure : Set by using the triangular distribution formula shown in
(Recommendation for Design and Construction Practice of Earth Retaining for
Excavation) presented by Architectural Institute of Japan.
Pa=K(q+γ・h)
The lateral pressure distribution diagram shows the lateral pressure per meter.
q1= 20.00 kN/m 2
GL
8.00
1400
17.52
6800
5400 1
2627
1 2
4471
149.02 70.18
172.48
2 3
191.36 70.18
66
P-8
67
P-9
Ld
68
P-10
Use the triangular distribution formula shown in (Recommendation for Design and
Construction Practice of Earth Retaining for Excavation)presented by Architectural
Institute of Japan.
Decide the wet unit weight by the soil parameters explained in the outline of design.
The lateral pressure distribution diagram shows the lateral pressure per meter.
2.660
43.46 ( 53.41)
5.400 43.46 ( 35.60)
2.000
62.96 ( 55.60)
62.96 ( 84.59)
GL- 6.800 m 0.740
Final excavation level 70.18 ( 94.39) 0.50 17.700
69
P-11
4-2 At excavation
※Kh is the average of the
1) At 1st excavation range form the excavation
level to 1/β
・Excavation depth H = 2.400 m ・Modulus of subgrade reaction Kh= 13484 kN/m 3
・Lateral pressure ・Passive lateral pressure bearing width
coefficient K = 0.40 of earth retaining wall B = 1.000 m
・Surcharge q = 20.00 kN/m 2 ・Elastic modulus of steel material E = 205000000 kN/m 2
・Unit weight of soil γ = 17.000 kN/m 3 ・Moment of inertia of earth retaining wall Ix= 38600.0×10 -8 m 4/m
2
・Lateral pressure Pn=K(γ・H+q) kN/m ・Efficiency of moment of inertia of area αI = 0.60
δmax= 12.81 mm GL
8.00
GL- 0.500 m
2.400
P= 38.78 kN
h= 0.998 m
70
P-12
When calculating the bending moment and displacement,assume each span (between
struts,between a strut and a virtual support point) as a simple beam.
5.400 2
8.027
2.627
71
P-13
4-3 At replacement
17.52
5.800 1
72
P-14
4-4 Maximum stress and maximum displacement under each working condition
73
P-15
M
Bending stress σb = = 222 N/mm 2 ≦ 225 N/mm 2
-OK-
Z・α Z
74
P-16
75
P-17
5.Examination of waler
b
1) Span examined Lm m
Axial compression tributary width Ln m t2
Reaction force of waler W kN/m
Bending moment M =W・Lm 2 / 8 kN・m t1
Axial compression N =W・Ln kN h Af
Shearing force S =W・Lm/2 kN
Each Lm Ln W M N S
stage (m) (m) (kN/m) (kN・m) (kN) (kN)
1st stage 4.000 4.000 180.53 361.07 722.14 361.07
76
P-18
6.Examination of strut
1) Span examined Lm m
Axial compression tributary width Ln m
Reaction force of waler W kN/m
Axial compression(Lateral pressure) Na=W・Ln kN
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Bending moment M =Wd・Lm 2 /8 kN・m
Axial compression(Lateral pressure and temperature) N =Na+Nt kN
77
P-19
7.Examination of splay
1) Span examined Lm m
Axial compression tributary width Ln m θ
Reaction force of waler W kN/m
Axial compression(Lateral pressure) Na=W・Ln kN
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Bending moment M =Wd・Lm 2 /8 kN・m
Axial compression(Lateral pressure and temperature)
N =Na/sinθ+Nt kN
Mounting bolt
78
P-20
Size H300X300X10X15
Sectional area A = 11840 mm2 Sectional area of compressive flange
Section modulus Zx = 1350000 mm3 Af = 45.00 cm2
Radius of gyration of area Radius of gyration of area(Cross section
iy = 7.55 cm i' = 8.28 cm
Unit weight wd0= 0.912 kN/m Moment of inertia of area Iy = 6750×10-8 m4
Pile width b = 30.0 cm
Young's modulus E = 2.05×108 kN/m2
Lx1
Ly2
( X-axis direction ) Lx2= 7.000 m
( Y-axis direction ) Ly2= 7.000 m
Lx2
Eccentric distance of strut e = 0.500 m
Reaction force of waler W kN/m
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Compressive stress
σc=N/A = 10.8 N/mm2 Buckling length by bottom strut and virtual support point
Bending stress β = 4 Kh・b/(4E・I)
σb=M/Zx= 46.9 N/mm2 = 0.441 m-1
Allowable compressive stress Kh= 7000 kN/m3 h1
2
(1-0.4{(Lk/iy)/120} )×293 1/β = 2.266 m
fc=
1.5+2/3{(Lk/iy)/120}2 Lk=h1+h2 Pit bottom
= 105.7 N/mm2 = 7.666 m
Allowable bending stress h1= 5.400 m h2= 2.266 m h2
fb= 195.0 N/mm2
Check of stress ※Kh is the average of
K =σb/fb+σc/fc= 0.34 ≦ 1.0 -OK- the range from the
excavation level to 1/β
79
P-21
1) Vertical force
No. 1 Total
qn ---- ----
Lcn ---- 0.000
Nsn 7.0 ----
Lsn 2.000 2.000
80
=Reference material=
This calculation is made
based on the size and length
that your company specified)
To 東亜建設工業 株式会社
THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT
Calculation of earth
retaining structure
CASE-2-2 上載荷重20KN/m2 Bor.BO37 地盤高 EL+4.5m 掘削底面 EL-1.5m 1段切梁 地下水位EL+4.0m
2015.3.25/3.27
TEL
FAX
Design No.
81
Contents PAGE
1. Outline of design-------------------------------- 1
1. Design standard
2. Soil boring log and planned section
3. Soil parameters
4. Allowable stress
82
P-1
1.Outline of design
1-1 Design standard As per「Recommendation for Design and Construction Practice of
Earth Retaining for Excavation」by Architectural Institute of Japan.
3.000
1 5.000 163.02 H400 H350 H400
6.000
1.000
5 3.000
5.800 1b 5.800
2
7.800 2 7.800
10 3
8.000
11.900 3a 11.900
4
15
17.000 3b 17.000
5
19.600 4a 19.600
20
Surcharge King post
q1= 20.00 kN/m 2 H300X300X10X15
L= 9.000 m
(Protrusion 0.000 m)
Earth retaining wall
25 SP-4
L= 14.000 m
(Protrusion 0.000 m)
Stress
σmax=
151 N/mm 2 ≦ fb = 225 N/mm 2 -OK-
30
Active side
Unit weight Internal Cohesion Modulus of Average Water
Soil friction subgrade unconfined pressure
Soil layer property N-value Wet Underwater angle reaction compressive coefficient
name strength
NO. (kN/m3) (kN/m3) ( ゚) (kN/m2) (kN/m3) (kN/m2)
1 Sandy soil 15.0 17.0 7.0 30 0.0 15000 ---- 1.00
2 Cohesive soil 4.0 19.0 9.0 0 44.0 4400 50.0 1.00
3 Sandy soil 7.0 18.0 8.0 25 0.0 7000 ---- 1.00
4 Cohesive soil 6.0 17.0 7.0 0 56.0 5600 75.0 1.00
5 Cohesive soil 3.0 17.0 7.0 0 38.0 3800 37.5 1.00
83
P-2
Use the average of the stress for short term loading and stress for long term loading as the
allowable stress, since this calculation is for steel materials for temporary structures.
1.11×10 5
fb2=
(Lb・h)/Af
Use the larger one of the values obtained from the above formula.
However,it must be less than the allowable tensile stress.
81.3
fc =
(λ/120) 2 (λ>120)
84
P-3
1)Penetration depth
2)Cross section
Occurrence
Working Mmax position σb δmax
condition (kN・m) (GL-m) (N/mm2 ) (mm)
1st excavation 184.33 4.704 101.5 62.83
2nd excavation 86.59 4.967 47.7 3.22
1st replacement -274.72 5.000 151.3 31.73
Max. value -274.72 5.000 151.3 62.83
(fb= 225.0 N/mm2 )
2-2 Waler
1)
Each Lm Ln W M N S
stage (m) (m) (kN/m) (kN・m) (kN) (kN)
1st stage 4.000 4.000 163.02 326.04 652.08 326.04
2-3 Strut
1)
Each Lm Ln W Wd Na Nt M N
stage (m) (m) (kN/m) (kN/m) (kN) (kN) (kN・m) (kN)
1st stage 7.000 7.000 163.02 5.00 1141.13 150.00 30.63 1291.13
85
P-4
1)
Each Lm Ln W θ Na Nt Wd M N
stage (m) (m) (kN/m) (゚) (kN) (kN) (kN/m) (kN・m) (kN)
1st stage 5.000 4.000 163.02 45 652.08 0.00 5.00 15.63 922.17
Mounting bolt
Size H300X300X10X15
Penetration depth d = 3.000 m
Overall length Ld = 9.000 m (Protrusion 0.000 m)
Wd Nt
(kN/m) (kN)
1st 5.00 150.00
M N σb σc fb fc K
(kN・m) (kN) (N/mm 2 ) (N/mm2 ) (N/mm2 ) (N/mm2 )
60.82 124.38 45.1 10.5 195.0 144.1 0.30
86
P-5
Decide the wet unit weight by the soil parameters explained in the outline of design.
The lateral pressure distribution diagram shows the lateral pressure per meter.
3.000
2.500
2.660
3.000
87
P-6
At 1st excavation
= 0.5162 m -1
Ld=2/β= 3.874 m
Dp=1/β+H= 5.937 m
88
P-7
Active earth pressure : Set by using the triangular distribution formula shown in
(Recommendation for Design and Construction Practice of Earth Retaining for
Excavation) presented by Architectural Institute of Japan.
Pa=K(q+γ・h)
The lateral pressure distribution diagram shows the lateral pressure per meter.
q1= 20.00 kN/m 2
GL
9.00
3000
31.95
6000
3000 1
1 2
2405
119.54 61.30
77.71
2 3
110.74 61.30
89
P-8
90
P-9
Ld
91
P-10
Use the triangular distribution formula shown in (Recommendation for Design and
Construction Practice of Earth Retaining for Excavation)presented by Architectural
Institute of Japan.
Decide the wet unit weight by the soil parameters explained in the outline of design.
The lateral pressure distribution diagram shows the lateral pressure per meter.
3.000
2.500
2.660
3.000
92
P-11
4-2 At excavation
※Kh is the average of the
1) At 1st excavation range form the excavation
level to 1/β
・Excavation depth H = 4.000 m ・Modulus of subgrade reaction Kh= 13484 kN/m 3
・Lateral pressure ・Passive lateral pressure bearing width
coefficient K = 0.45 of earth retaining wall B = 1.000 m
・Surcharge q = 20.00 kN/m 2 ・Elastic modulus of steel material E = 205000000 kN/m 2
・Unit weight of soil γ = 17.000 kN/m 3 ・Moment of inertia of earth retaining wall Ix= 38600.0×10 -8 m 4/m
2
・Lateral pressure Pn=K(γ・H+q) kN/m ・Efficiency of moment of inertia of area αI = 0.60
δmax= 62.83 mm GL
9.00
GL- 0.500 m
4.000
P= 97.20 kN
h= 1.580 m
93
P-12
When calculating the bending moment and displacement,assume each span (between
struts,between a strut and a virtual support point) as a simple beam.
3.000 1
R=163.02 kN/m
31.95
3.000 2
3.777
0.777
94
P-13
4-3 At replacement
GL- 0.500 m
5.000 1
31.95
95
P-14
4-4 Maximum stress and maximum displacement under each working condition
96
P-15
M
Bending stress σb = = 151 N/mm 2 ≦ 225 N/mm 2
-OK-
Z・α Z
97
P-16
98
P-17
5.Examination of waler
b
1) Span examined Lm m
Axial compression tributary width Ln m t2
Reaction force of waler W kN/m
Bending moment M =W・Lm 2 / 8 kN・m t1
Axial compression N =W・Ln kN h Af
Shearing force S =W・Lm/2 kN
Each Lm Ln W M N S
stage (m) (m) (kN/m) (kN・m) (kN) (kN)
1st stage 4.000 4.000 163.02 326.04 652.08 326.04
99
P-18
6.Examination of strut
1) Span examined Lm m
Axial compression tributary width Ln m
Reaction force of waler W kN/m
Axial compression(Lateral pressure) Na=W・Ln kN
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Bending moment M =Wd・Lm 2 /8 kN・m
Axial compression(Lateral pressure and temperature) N =Na+Nt kN
100
P-19
7.Examination of splay
1) Span examined Lm m
Axial compression tributary width Ln m θ
Reaction force of waler W kN/m
Axial compression(Lateral pressure) Na=W・Ln kN
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Bending moment M =Wd・Lm 2 /8 kN・m
Axial compression(Lateral pressure and temperature)
N =Na/sinθ+Nt kN
Mounting bolt
101
P-20
Size H300X300X10X15
Sectional area A = 11840 mm2 Sectional area of compressive flange
Section modulus Zx = 1350000 mm3 Af = 45.00 cm2
Radius of gyration of area Radius of gyration of area(Cross section
iy = 7.55 cm i' = 8.28 cm
Unit weight wd0= 0.912 kN/m Moment of inertia of area Iy = 6750×10-8 m4
Pile width b = 30.0 cm
Young's modulus E = 2.05×108 kN/m2
Lx1
Ly2
( X-axis direction ) Lx2= 7.000 m
( Y-axis direction ) Ly2= 7.000 m
Lx2
Eccentric distance of strut e = 0.500 m
Reaction force of waler W kN/m
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Compressive stress
σc=N/A = 10.5 N/mm2 Buckling length by bottom strut and virtual support point
Bending stress β = 4 Kh・b/(4E・I)
σb=M/Zx= 45.1 N/mm2 = 0.410 m-1
Allowable compressive stress Kh= 5228 kN/m3 h1
2
(1-0.4{(Lk/iy)/120} )×293 1/β = 2.437 m
fc=
1.5+2/3{(Lk/iy)/120}2 Lk=h1+h2 Pit bottom
= 144.1 N/mm2 = 5.437 m
Allowable bending stress h1= 3.000 m h2= 2.437 m h2
fb= 195.0 N/mm2
Check of stress ※Kh is the average of
K =σb/fb+σc/fc= 0.30 ≦ 1.0 -OK- the range from the
excavation level to 1/β
102
P-21
1) Vertical force
No. 1 2 Total
qn 50.00 ---- ----
Lcn 1.660 ---- 1.660
Nsn ---- 7.0 ----
Lsn ---- 1.340 1.340
103
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 05
Equipment & Operator Certificate
104