Project: Thai Binh Thermal Power Plant Project Last Review Date: <Risk Assessment Team>
Company: TOA Corporation Review Date: 13 April 2015 MC : MR KHOI
Process/ Location: LimeStone Storage Shed Conducted by: TOA: Mr. FUNAHASHI
Mr. TUAN
(Names,
Approved by: Mr. DA
designations)
Mr. THUAN
Work Item: Temporary sheet pile & shoring (Name, designation) Mr. Bates
BDCC: Mr T.GIANG
' Mr V.Nam
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
SHORING
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
Activity/
Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
TOA CORPORATION
MS-2001 Ver.
Initial Risk Re-
Existing Risk Evaluation evaluation
INVIRONMENT Activity/
General Hazard and Risk/ Type of Control/Applicable
Evaluation
Evaluation
Work Step Environment Risk Reduction Measure Status
Risk Level
Risk Level
Likelihood
Likelihood
Severity
Severity
Environmental Inpact Law and Regulation
Aspect
(If any)
Operator
Sediment controls to remain in place and
Pollute waterways 4 3 12 H 2 2 4 L Job
if damaged they are to be repaired
supervisor
Risk Assessment: Severity (Severity of Result, Seriousness of Accident):1=Insignificant, 2=Minor Injury, 3=Serious Injury, 4=Major Injury, 5=Fatality
Likelihood (Capability of Frequency and Avoidance):1=Rare, 2=Possible, 3=Probable, 4=Almost Certain
Risk Level:(Severity)× (Likelihood) = 1~20, Judgment: L=1~4: Risks could be accepted without risk abatement measures. Conduct risk abatement measures if needed.
M=5~10: Conduct and confirm risk abatement measures. There is a possibility that the risk can be accepted by timely conducting risk abatement.
H=10~20: Disapproved Activity. Immediately conduct and check risk abatement measures (The activity will be approved if the risk has become accepted).
Fill in "Done" at the work item if a Risk Abatement Measure was conducted, and indicate the measure that was conducted.
Current Status:
Fill in the current status at blank space if a risk abatement measure was conducted after approving the risk evaluation table.
2 Possible 2 4 6 8 10
3 Probable 3 6 9 12 15
Almost
4 4 8 12 16 20
Certain
TOA CORPORATION