PROJECT
THAI BINH THERMAL POWER PLANT
AND TRANSMISSION LINES
CONSTRUCTIONS PROJECT
(CONTRACT NO.261213/TB-EVM-MC)
OWNER
VIETNAM ELECTRICITY
CONSULTANT
FICHTNER GmbH & Co. KG
In association with TEPSCO and PECC1
CONTRACTOR
MARUBENI CORPORATION
PROJECT REV. NO.
CONTROL NO.
TB-18U-C-TOA-2040 1
Title:
Working Plan
- Temporary Sheet Pile & Shoring
Work (Onshore)
2 Reply to CaRs 0725 R2 B. Bates H. Takino 22 Dec 14 Turbine House
1 Reply to CaRs 0725 R1 B. Bates H. Takino 27 Nov 14 Doc No.: TOA -GEN-8-0-2040 Rev.:1
0 First Issue B. Bates H. Takino 07 Nov 14 Scale: None Date: 26 Nov 2014
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
CONTENTS
1. INTRODUCTION ................................................................................................. 3
2. Reference Documents ....................................................................................... 3
3. Organization ...................................................................................................... 4
4. Construction Flow Chart.................................................................................... 5
5. Materials and Equipment .................................................................................. 6
6. Sheet Pile and Shoring Works Schedule ........................................................... 7
7. Construction Work Procedure ........................................................................... 7
7.1 Sheet Pile Delivery and Storage................................................................................... 7
7.2 Survey Work..............................................................................................................9
7.3 Method of Sheet Pile Driving by Pressing Machine .......................................................10
7.3.1 Steel Sheet Pile Installation Procedure ..................................................................10
7.3.2 Shoring Installation Procedure ............................................................................ 14
7.3.3 Shoring Dismantling Procedure ........................................................................... 18
8. Quality Control Plan ........................................................................................ 20
9. Safety Control and Risk Assessment .............................................................. 20
10. Attachments .................................................................................................... 20
Attachment No - 01 ................................................................................................ 21
Attachment No - 02 ................................................................................................ 38
Attachment No - 03 ................................................................................................ 40
Attachment No - 04 ................................................................................................ 44
Attachment No - 05 ................................................................................................ 89
Attachment No - 06 ...............................................................................................101
Attachment No - 07 ...............................................................................................130
Attachment No - 08 ...............................................................................................135
2
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
1. INTRODUCTION
This working plan describes temporary sheet pile and shoring works at Turbine House in
Thai Binh Thermal Power Plant and Transmission Lines Construction Project located at Thai
Thuy, Thai Binh province, Viet Nam.
The statement consists of Site Preparation, Material Supply, Temporary Sheet Pile and
Shoring Procedure, Quality Plan and Safety Plan, related to Contractor’s responsibility for
implementation of the Sheet Piling Work in Specification and Designs as well as the
relevant standard of the Project.
2. Reference Documents
Specifications for pile installation works shall be conform to the following standards:
3
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
3. Organization
EPC CONTRACTOR: MC
TOA-Construction Leader
T. GIANG
HP: 0979.785.100
Local Sub-contractor:
Bach Dang Construction Company
BUI THANH TUNG (Project Manager)
Tel: 0989.379.097
4
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
B. PREPARATION WORK
1. Survey
2. Preparation of Sheet Pile Driving Guide.
5
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
List of Equipment:
Specification
List of Manpower:
Description Unit Quantity Remarks
Engineer Person 3
Supervisor Person 5
Surveyor Person 2
Operator Person 4
Driver Person 3
Electrician Person 1
Welder Person 5
Worker Person 10
6
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Sheet piles will be transported to site by trailers. The sheet pile will be inspected at site
before storage.
The storage area of the sheet pile at the site must be flat and on firm ground. Sheet piles
on trailers will be unloaded by crane. During unloading of sheet piles, the following items
shall be observed.
- Sheet pile shall be kept in horizontal position during lifting using guide ropes
- Signal man shall give a clear signal from the position that can be seen by crane
operator. (Refer Figure 2)
Sheet pile shall be stocked on bedding materials. The sheet pile segment shall be stocked
not greater than 5 layers. Sheet pile storage area will be set up near pile installation area.
(Refer Figure 1)
7
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Figure 1: Layout of Sheet Pile Storage Yard near STG 1&2 Area
8
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
ditch
11643 35540
X=542.643
X=578.183
Y=847.980 a Y=847.980
b
8580
A
5000
B
note:
- coordinates refer to dwg no."TB-18U-G-MCP-1001"
8000
- elevation +3.900
- unit: millimeter
C
26960
working sequences:
8000
X=542.643
X=578.183
- step 4: backfill
E d
Y=812.440 Y=812.440
c
temp road
1 2 3 4 5 6
9
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
9 10 11 12 13 14 15
1 2 3 4 5 6 7
5 6
4a 5a
9000 9000 9000 9000 9000 9000
87@400=34800
1400
5138
1 1
9312
A
5000
2 2
B
2000
87@400=34800
8000
C
3 3
33000
8000
2000
D
4 4
4000
4537
3740
E
3530
200
8000
4470
5 6
10
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Reaction
Platform
Silent Piler
Reaction Platform
11
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
If adjacent Sheet Piles are moving together with the driven sheet pile, the sheet pile head
portion shall be welded together.
12
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
f. After the Silent Piler Can Support Itself Over the Already Driven Pile, Remove the
Reaction Platform.
After this, continue cycle: move - drive - move – drive
g. After Sheet Pile Driving is Complete, install piano wire and so that measurement of
sheet pile movement during excavation can be taken readily.
13
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
SHORING PLAN
35540
87@400=34800
32
21
28
5965
43
6815
1 1
21520
37
32
57
28
28
57
22
37
6240
87@400=34800
2000
35540
4375
6775
36
23
48
14020
28
32
5370
28
19
43
28
29
65
25
19
43
65
29
19857 15683
14
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
15
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
16
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
e. 5.Fixing of Intersection
Struts
Check connections to ensure bolts have been tightened. After setting waler and struts, ensure
to install packing material (mortar, timber wedges). Waler and strut deflection and warping
shall be confirmed by visual daily inspection.
17
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
18
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
c. Removal of Waler
d. Removal of Bracket
19
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
This plan shall conform to the document “TB–18U–C–TOA–1010” HSE (Health, Safety &
Environment) Plan submitted to EVN.
Prior to commencement of the works, TOA will ensure that both PTW and STARRT
Procedure are instigated, together with safe system work, practices and requirements.
For safety analysis (work description and the hazard) and how to minimize the risk, refer
to Attachment 07 - Risk Assessment
For communication and action plan in case of any incident/accident on site, refer to
Attachment 08 - Emergency Communication Network
10. Attachments
Attachment No - 01: Sheet Pile & H-Beams Certificate
Attachment No - 02: Sheet Pile and Shoring Works Schedule
Attachment No - 03: Sheet Pile / Shoring Installation Sketches
Attachment No - 04: Sheet Pile / Shoring Calculation Sheets
Attachment No - 05: Sheet Pile Pressing
Attachment No - 06: Equipment & Operator and Welders’s Certificate
Attachment No - 07: Risk Assessment
Attachment No - 08: Emergency Communication Network
20
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 01
Sheet Pile & H Beams’s Certificate
21
SSP's Certificate
22
23
SSP's Certificate
24
25
SSP's Certificate
26
SSP's Certificate
27
SSP's Certificate
28
SSP's Certificate
29
SSP's Certificate
30
H-beams's Certificate
31
H-beams's Certificate
32
H-beams's Certificate
33
H-beams's Certificate
34
H-beams's Certificate
35
H-beams's Certificate
36
H-beams's Certificate
37
TOA CORPORATION
PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT
Attachment No - 02
Sheet Pile and Shoring Works Schedule
38
ID Task Name Duration Start Finish Predecessors v '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15
9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 1
1 SHEET PILE DRIVING & SHORING 134 days Wed Thu 4/16/15
SCHEDULE 11/12/14
2 I) STG ‐01 98 days Wed Thu 3/5/15 3/5
11/12/14
3 1. Pressing steel sheet piles 35 days Wed 11/12/14 Mon 12/22/14 12/22