PROJECT
THAI BINH THERMAL POWER PLANT
AND TRANSMISSION LINES
CONSTRUCTIONS PROJECT
(CONTRACT NO.261213/TB-EVM-MC)
OWNER

VIETNAM ELECTRICITY
CONSULTANT
FICHTNER GmbH & Co. KG
In association with TEPSCO and PECC1
CONTRACTOR

MARUBENI CORPORATION
PROJECT REV. NO.
CONTROL NO.
TB-18U-C-TOA-2040 1

Title:
Working Plan
- Temporary Sheet Pile & Shoring
Work (Onshore)
2 Reply to CaRs 0725 R2 B. Bates H. Takino 22 Dec 14 Turbine House
1 Reply to CaRs 0725 R1 B. Bates H. Takino 27 Nov 14 Doc No.: TOA -GEN-8-0-2040 Rev.:1
0 First Issue B. Bates H. Takino 07 Nov 14 Scale: None Date: 26 Nov 2014

Rev. Description By App. Date


1
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

CONTENTS

1. INTRODUCTION ................................................................................................. 3
2. Reference Documents ....................................................................................... 3
3. Organization ...................................................................................................... 4
4. Construction Flow Chart.................................................................................... 5
5. Materials and Equipment .................................................................................. 6
6. Sheet Pile and Shoring Works Schedule ........................................................... 7
7. Construction Work Procedure ........................................................................... 7
7.1 Sheet Pile Delivery and Storage................................................................................... 7
7.2 Survey Work..............................................................................................................9
7.3 Method of Sheet Pile Driving by Pressing Machine .......................................................10
7.3.1 Steel Sheet Pile Installation Procedure ..................................................................10
7.3.2 Shoring Installation Procedure ............................................................................ 14
7.3.3 Shoring Dismantling Procedure ........................................................................... 18
8. Quality Control Plan ........................................................................................ 20
9. Safety Control and Risk Assessment .............................................................. 20
10. Attachments .................................................................................................... 20
Attachment No - 01 ................................................................................................ 21
Attachment No - 02 ................................................................................................ 38
Attachment No - 03 ................................................................................................ 40
Attachment No - 04 ................................................................................................ 44
Attachment No - 05 ................................................................................................ 89
Attachment No - 06 ...............................................................................................101
Attachment No - 07 ...............................................................................................130
Attachment No - 08 ...............................................................................................135

TB-18U-C-TOA-2040_Working Plan - Temporary


Sheet Pile Driving Works (Onshore) Turbine House

2
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

1. INTRODUCTION

This working plan describes temporary sheet pile and shoring works at Turbine House in
Thai Binh Thermal Power Plant and Transmission Lines Construction Project located at Thai
Thuy, Thai Binh province, Viet Nam.

The statement consists of Site Preparation, Material Supply, Temporary Sheet Pile and
Shoring Procedure, Quality Plan and Safety Plan, related to Contractor’s responsibility for
implementation of the Sheet Piling Work in Specification and Designs as well as the
relevant standard of the Project.

2. Reference Documents

Specifications for pile installation works shall be conform to the following standards:

Code / Specification Description

JIS A 5528:2006 Steel Sheet Piles

ITB 8.5.1.4.7 Temporary Supports

ITB 8.5.7 Sheet Piling.


TCVN 5575: 2012 Design standard for steel structure

TOA-GEN-8-0-1010 Rev.2 HSE Plan

TOA-GEN-8-0-1002 Rev.1 Project Quality Plan

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

3
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

3. Organization

OWNER: EVN / PECC1

EPC CONTRACTOR: MC

EPC - MC Site Manager


K WADA

CIVIL SUBCON TOA-Project Manager EPC HSE Coordinator


H. TAKINO TBA

TOA-Senior Civil Manager TOA- HSE Manager


M. MIYAKITA J. LITO
HP: 0946.030.089 HP: 0914.821.388

TOA-Construction Leader
T. GIANG
HP: 0979.785.100

Local Sub-contractor:
Bach Dang Construction Company
BUI THANH TUNG (Project Manager)
Tel: 0989.379.097

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

4
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

4. Construction Flow Chart

A. MATERIAL RECEIVING / TEMPORARY STORAGE


1. Arrival of material by trailer.
2. Unloading of material at Thai Binh site (Turbine Area).

B. PREPARATION WORK
1. Survey
2. Preparation of Sheet Pile Driving Guide.

C. SHEET PILE / SHORING INSTALLATION WORK


1. Install sheet piles
2. (Piling Work)
3. Excavation to 1m below the bottom of shoring elevation
4. Install shoring (walers, struts, jacks)
5. Excavation to final elevation

D. SHEET PILE / SHORING REMOVAL WORK


1. (Complete concrete work and partial backfill).
2. Removal of shoring (walers, struts, jacks)
3. (Complete concrete works and backfill)
4. Removal of sheet piles

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

5
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

5. Materials and Equipment


List of Materials:
No Material Type Spec / Details

1 Steel Sheet Pile JIS 5528:2006, Type IV, Grade SY295

2 H-Beams JIS G3101 GRADE SS400

List of Equipment:

No Name of Equipment Brand/Code Serial No. Capacity/ Unit Quantity

Specification

1 Silent Pier Giken KGK 130 1300642A 130 ton set 1

2 Vibro Hammer LSV 60 KW-Spec 45 KW set 1

3 Cargo Crane Truck DongYang SS2515 C2802069939409 12,5 ton nr 1

4 Crane Wheel Kato NK503-865321 40 ton nr 1

5 Generator Denyo 3617276 125 KVA nr 1

6 Dump Truck 20 ton nr 7

7 Excavator Komatsu PC 200 0,8 m3 nr 2

8 Electric Welding Machine Tien Dat 3-phase power set 1

9 Total Station Topcon-Sokkia KY 0793 KS 102 P set 1

10 Water Pump 60 m3/h nr 4

Note: Certificates of equipment are provided in Attachment No - 06

List of Manpower:
Description Unit Quantity Remarks

Engineer Person 3

Supervisor Person 5

Surveyor Person 2

Operator Person 4

Driver Person 3

Electrician Person 1

Welder Person 5

Worker Person 10

Note: Certificates of operators are provided in Attachment No - 06

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

6
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

6. Sheet Pile and Shoring Works Schedule


Refer to Attachment 02

7. Construction Work Procedure


7.1 Sheet Pile Delivery and Storage

Sheet piles will be transported to site by trailers. The sheet pile will be inspected at site
before storage.

The storage area of the sheet pile at the site must be flat and on firm ground. Sheet piles
on trailers will be unloaded by crane. During unloading of sheet piles, the following items
shall be observed.

- Sheet pile shall be kept in horizontal position during lifting using guide ropes
- Signal man shall give a clear signal from the position that can be seen by crane
operator. (Refer Figure 2)

Sheet pile shall be stocked on bedding materials. The sheet pile segment shall be stocked
not greater than 5 layers. Sheet pile storage area will be set up near pile installation area.
(Refer Figure 1)

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

7
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

Figure 1: Layout of Sheet Pile Storage Yard near STG 1&2 Area

Figure 2: Lifting Method for Unloading and Shifting of Sheet Piles

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

8
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

7.2 Survey Work


Prior to driving sheet piles, surveyors shall check the location and start point of the sheet
piles.

Figure 3: Survey Work of Sheet Piles


location plan

sheet pile layout

ditch

47183 7341 17000 2000

11643 35540
X=542.643

X=578.183

Y=847.980 a Y=847.980
b
8580

A
5000

B
note:
- coordinates refer to dwg no."TB-18U-G-MCP-1001"
8000

- elevation +3.900
- unit: millimeter

C
26960

working sequences:
8000

- step 1: setting and checking layout, centerline

- step 2: guiding trench

D - step 3: pressing sheet pile


4000

X=542.643

X=578.183

- step 4: backfill
E d
Y=812.440 Y=812.440
c
temp road

9000 9000 9000 9000 9000

1 2 3 4 5 6

Figure 4: Survey Work of Sheet Piles

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

9
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

7.3 Method of Sheet Pile Driving by Pressing Machine

7.3.1 Steel Sheet Pile Installation Procedure

a. Sheet Pile Lay out

sheet pile plan

9 10 11 12 13 14 15

1 2 3 4 5 6 7
5 6
4a 5a
9000 9000 9000 9000 9000 9000

87@400=34800
1400

5138
1 1
9312

A
5000

2 2
B
2000
87@400=34800
8000

C
3 3
33000
8000

2000

D
4 4
4000

4537
3740

E
3530

200
8000
4470

5 6

Refer to Attachment No. 03 for Shoring Installation Sketches

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

10
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

b. Install Reaction Platform

Reaction
Platform

Confirm centerline of pile and sheet pile centerline

c. Install Silent Piler on top of the Reaction Platform

Silent Piler

Reaction Platform

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

11
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

d. Insert Steel Sheet Pile to the Silent Piler Machine

e. Drive 2~3 Piles Using Reaction Platform

If adjacent Sheet Piles are moving together with the driven sheet pile, the sheet pile head
portion shall be welded together.

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

12
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

f. After the Silent Piler Can Support Itself Over the Already Driven Pile, Remove the
Reaction Platform.
After this, continue cycle: move - drive - move – drive

Confirm Verticality and Horizontal Position (Repair Movement from Inclination)

g. After Sheet Pile Driving is Complete, install piano wire and so that measurement of
sheet pile movement during excavation can be taken readily.

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

13
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

7.3.2 Shoring Installation Procedure

a. Shoring Layout Plan

SHORING PLAN
35540

87@400=34800

32
21

28

5965
43

6815
1 1

21520
37

32
57

28
28
57

22
37

6240
87@400=34800

2000
35540

4375
6775
36

23
48

14020

28

32
5370
28

19
43

28
29
65
25

19

43
65
29

6357 5750 6000 7838 4869 4726

19857 15683

Refer to Attachment No. 03 for Shoring Installation Sketches


Refer to Attachment No. 04 for sheet pile / shoring Calculation sheets

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

14
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

b. After excavation to elevation of 1m below the waler, install waler brackets.

Excavation shall never exceed 1m from 1st waler elevation.

c. After installation of waler bracket, waler will be installed

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

15
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

d. After installation of walers, struts and bracing shall be installed.

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

16
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

e. 5.Fixing of Intersection

Struts

King post Connection pieces

Check connections to ensure bolts have been tightened. After setting waler and struts, ensure
to install packing material (mortar, timber wedges). Waler and strut deflection and warping
shall be confirmed by visual daily inspection.

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

17
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

7.3.3 Shoring Dismantling Procedure


a. After removing packing material, remove intersection connection joints.

If oxygen torch is used, surrounding concrete shall be protected from damaged.

b. Removal of Struts, Bracing

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

18
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

c. Removal of Waler

d. Removal of Bracket

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

19
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

8. Quality Control Plan

The driving of sheet pile will be controlled by following allowances:


i. Inclination not more than 1/75
ii. Elevation of top of sheet pile +/-100mm.
Any piles exceeding above limits will be removed and re-driven.

9. Safety Control and Risk Assessment

This plan shall conform to the document “TB–18U–C–TOA–1010” HSE (Health, Safety &
Environment) Plan submitted to EVN.
Prior to commencement of the works, TOA will ensure that both PTW and STARRT
Procedure are instigated, together with safe system work, practices and requirements.
For safety analysis (work description and the hazard) and how to minimize the risk, refer
to Attachment 07 - Risk Assessment
For communication and action plan in case of any incident/accident on site, refer to
Attachment 08 - Emergency Communication Network

10. Attachments
Attachment No - 01: Sheet Pile & H-Beams Certificate
Attachment No - 02: Sheet Pile and Shoring Works Schedule
Attachment No - 03: Sheet Pile / Shoring Installation Sketches
Attachment No - 04: Sheet Pile / Shoring Calculation Sheets
Attachment No - 05: Sheet Pile Pressing
Attachment No - 06: Equipment & Operator and Welders’s Certificate
Attachment No - 07: Risk Assessment
Attachment No - 08: Emergency Communication Network

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

20
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

Attachment No - 01
Sheet Pile & H Beams’s Certificate

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

21
SSP's Certificate

22
23
SSP's Certificate

24
25
SSP's Certificate

26
SSP's Certificate

27
SSP's Certificate

28
SSP's Certificate

29
SSP's Certificate

30
H-beams's Certificate

31
H-beams's Certificate

32
H-beams's Certificate

33
H-beams's Certificate

34
H-beams's Certificate

35
H-beams's Certificate

36
H-beams's Certificate

37
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

Attachment No - 02
Sheet Pile and Shoring Works Schedule

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

38
ID Task Name Duration Start Finish Predecessors v '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15
9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 1
1 SHEET PILE DRIVING  & SHORING  134 days Wed  Thu 4/16/15
SCHEDULE 11/12/14
2 I) STG ‐01 98 days Wed  Thu 3/5/15 3/5
11/12/14
3 1. Pressing  steel sheet piles 35 days Wed 11/12/14 Mon 12/22/14 12/22

4 2. 1st Excavation 10 days Tue 12/30/14 Fri 1/9/15 3FS+6 days 1/9

5 3. 1st Shoring 5 days Wed 1/14/15 Mon 1/19/15 4FS+3 days 1/19

6 4. Excavation  & 2nd shoring 30 days Fri 1/30/15 Thu 3/5/15 5FS+9 days 3/5

7 II) STG ‐02 98 days Wed  Thu 4/16/15


12/24/14
8 1. Pressing steel sheet piles 35 days Wed 12/24/14 Mon 2/2/15 3FS+1 day 2/2

9 2. 1st Excavation 10 days Tue 2/10/15 Fri 2/20/15 8FS+6 days 2/20

10 3. 1st Shoring 5 days Wed 2/25/15 Mon 3/2/15 9FS+3 days 3/2

11 4. Excavation & 2nd shoring 30 days Fri 3/13/15 Thu 4/16/15 10FS+9 days 4

Note : PHC Piling work is not show on this schedule

39
TOA CORPORATION

PROJECT: THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTIONS PROJECT

Working Plan – Temporary Sheet Pile & Doc No. :TOA-GEN-8-0-2040


Title :
Shoring Works (Onshore) Turbine House Date :26/Nov/2014 Rev. 1

Attachment No - 03
Sheet Pile / Shoring Installation Sketches

TB-18U-C-TOA-2040_Working Plan - Temporary Sheet


Pile Driving Works (Onshore) Turbine House

40
41
42
43