Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No. Document No. Rev.


AOI NO 01/2018 TGP-JE-GTPT-250-EQ-DAT-0008 C02
Date 30/09/2019 Page 1 of 4
Data Sheet

Data Sheet for Absorber Reflux Drum(GTPT-V-250-003)

Document No.TGP-JE-GTPT-250-EQ-DAT-0008

C02 03/09/2020 Issued for Review XD Wang YY Wang DW Zhan


C01 22/05/2020 Issued for Review XD Wang WQ Liu DW Zhan
Rev Date Description Prepared by Reviewed by Approved by
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018

Document No.: TGP-JE-GTPT-250-EQ-DAT-0008 Rev.: C02 Page: 2 of 4

1 Equipment Name: Absorber Reflux Drum

2 Tag Number: GTPT-V-250-003 PO Number:


3 Quantity: 1 Manufacturer:
4 Operating and Design Conditions

C02 5 Design Code: ASME BPVC.VIII Div.1 2019 Edition Design Life: Years 25
6 Medium: Gas and Condensate Ambient Temperature: °C Min. -1.4 Max. 47.6
7 Operating Temperature: °C -79 Min. Design Metal Temperature: °C -85

C02 8 Operating Pressure: barg 25/32.5(max) Medium: 6ZHHW 6RXU +LJK& :HW+6

9 Design Temperature: °C -85 Location: ,QGRRU 2XWGRRU 0RXQGHG

10 Design Pressure: barg 35.8 Under Shed: <HV 1R

11 Density(Gas/Oil)@Operating Temp: kg/m3 35.23/474.6 Skid Mounded: <HV 1R


3
C02 12 Nominal Capacity: m 0.3 Vessel Type: +RUL]RQWDO 9HUWLFDO

13 Shell Diameter(ID): mm 500 Head Type: 6HPL(OOLSVH 2WKHU7\SH

14 Shell Length(T/T): mm 1500 Liquid Level: mm As Per P&ID

C02 15 Corrosion Allowance: mm Shell:0, Head:0, Nozzles:0 Thickness (Shell/Head): mm 12/12(VTC)


16 Wind Design Code: Eurocode 1 Insulation: mm 190
17 Basic Wind Speed: km/h 118 Net Weight: kg by VENDOR
18 Seismic Design Code: EN 1998-1 Full of Water Weight: kg by VENDOR
19 Ground Type: -- A Operationg Weight: kg by VENDOR
20 Design Ground Acceleration: -- 0.1g

C02 21 Joint Efficiency: -- 1


22 Max. Allowable Working Pressure: barg by VENDOR
23 Applicable Specifications
24 TGP-JE-GTPT-000-EQ-SPE-0001 Specification for Welded Pressure Vessels
25 TGP-JE-GTPT-000-EQ-SPE-0004 Specification for Equipment Welding
26 TGP-JE-GTPT-980-MC-SPE-0002 Specification for Coating and Painting
27 TGP-JE-GTPT-000-PI-SPE-0006 Specification for Allowable Nozzle Loads on Mechanical Equipment
28 TGP-JE-GTPT-000-PI-SPE-0008 Specification for Insulation
29 Materials

C02 30 Code ASME BPVC.II 2019 Edition, ASTM Jacket Shell/Head: N/A
31 Shell: SA-240 316L Body Flange: N/A
32 Head: SA-240 316L Body Flange Gasket: N/A
33 Nozzle(Pipe): SA-312 TP316L Demister N/A
34 Nozzle(Plate): SA-240 316L Insulation Supports/Clips: SS 316L
35 Nozzle(Forged): SA-182 F316L Support: SA-36/SA-240 316L

36 Nozzle Flange: SA-182 F316L Internals Attachments: SA-240 316L

C02 37 Reinforcing Pads: SA-240 316L Earthing Lug: SS 304


38 Bolts/Nuts(Internal): SA-320 Cr.B8 CL2/SA-194 Gr.8 Name Plate: SS 304
39 Bolts/Nuts(External): SA-320 Cr.B8 CL2/SA-194 Gr.8
40 Gasket: Spiral Wound Gaskets, 316L+Flexible graphite, IR-316L, OR-316L, 4.5mm
41
42
43
44
45
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018

Document No.: TGP-JE-GTPT-250-EQ-DAT-0008 Rev.: C02 Page: 3 of 4

1 Internal & External Attachments

2 Type of Support: 6DGGOH /XJ 6NLUW /HJ Mist Eliminator: <HV 1R

C02 3 Manway with Davit/Hinge: <HV 1R Separation Internals: <HV 1R

4 Vortex Breaker: <HV 1R Packing Supports: <HV 1R

5 Insulation Supports/Clips: <HV 1R Ladders & Platforms: <HV 1R

6 Heating Coil: <HV 1R Inner Ladder: <HV 1R

7 Lifting Lugs: <HV 1R

8 Fabrication and Testing Requirements

C02 9 Non-destructive Testing Fabrication Code: ASME BPVC.VIII Div.1 2019 Edition

10 Joint Category Test Means Test Ratio Grade NDE Code: ASME BPVC.V 2019 Edition

11 RT FULL UW-51 Welding Code: ASEM BPVC.IX 2019 Edition


SHELL
12 UT N/A Appendix 12 Impact Test: As per Code
A
C02 13 RT FULL UW-51 Stress Relief (PWHT): <HV 1R
HEAD
14 UT N/A Appendix 12 Hardness Test : N/A

C02 15 RT FULL UW-51 Internal Coating: <HV 1R


B
16 UT N/A Appendix 12 External Painting & Coating: <HV 1R
NOZZLE
17 NPS˚10 or THK.˚29mm RT FULL UW-51 Hydraulic Test Pressure: barg NOTE 7
C
18 OTHER MT/PT FULL Appendix 6/8 Third Party Inspection: <HV 1R

19 D MT/PT FULL Appendix 6/8 Code Stamp Required: <HV 1R

20 Nozzle Schedule

21 Flange
Nozzle Mark Qty. Size Service
22 Rating Type Face

C02 23 N1 1 6" CL300 WN RF Inlet

24 N2 1 3" CL300 WN RF Gas Outlet

C02 25 N3 1 3" CL300 WN RF Liquid Outlet

26 N4a/b 2 2" CL300 WN RF LG

27 N5 1 2" CL300 WN RF Vent


C02
28 N6 1 2" CL300 WN RF UC

29 HW 1 8" CL300 WN RF Handhole with blind flange and bolts, nuts, gasket

30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018

Document No.: TGP-JE-GTPT-250-EQ-DAT-0008 Rev.: C02 Page: 4 of 4


Sketch

NOTE:
All dimensions are in mm except as noted.

Notes
1. Reference P&ID: TGP-JE-GTPT-250-PR-PID-0002.
2. The main approximate content in medium: CO2 in gas is 3.49%(mol).
3. Table with max. allowable nozzle loads shall be shown on the general arrangement drawing.
4. Flange bolts holes shall straddle vessel's north-south line and true vertical line.
)ODQJHJDVNHWVVHDWLQJIDFHILQLVKVKDOOEH ȝP WR ȝP $$5+
6. The hydrostatic test can only take place once the authorization certificate is obtained. CONTRACTOR pointed Tunisian Third Party Inspector
shall witness the hydrostatic test.

C02 7. Hydrostatic test pressure is at least equal to 1.5 times design pressure.
8. Proper position shall be reserved on the nameplate for third party inspector to stamp after hydrotest witness.
9. Picking and passivation shall be performed on the surface of the stainless steel.
10. VTC: Vendor to confirm.
C02 11. Anchor bolts material used for calculation shall conform to EN 10025 S355JR or ASTM A572 Grade 50.
12. Material certificate of EN10204 3.1 for pressure containing parts, and 2.2 for non-pressure parts are required.